Loading...
ccspec 01-24-06 e MINUTES STRATEGIC PLANNING SESSION JANUARY 24, 2006 The Schertz City Council convened in Strategic Planning Session on Tuesday, January 24, 2006 at 7:00 p.m. in the Council Chambers Conference Room, 1400 Schertz Parkway Building #4, Schertz, Texas. The following members were present: Mayor Hal Baldwin presiding, Council Members Carl Douglas, John Trayhan, Reginna Agee, Tony Wilenchik and Michael Carpenter. Also present were City Manager, Don Taylor, Assistant City Manager John Bierschwale, and Deputy City Secretary Mary Ybarra. #1 CALL TO ORDER Mayor Baldwin called the meeting to order at 7:00 p.m. At this time, City Manager Taylor explained that Planning and Zoning was holding their regular scheduled meeting and would not be present this evening, thus Council will hear from Public Works. #2 STRATEGIC PLANNING SESSION e A) Planning and Zoning Department 1) Non-Compliant Subdivision Issues B) Public Works and Engineering 1) Infrastructure 2) Streets 3) Drainage 4) Water/Sewer 5) Funding Sources 6) Water/Sewer Impact Fees 7) Drainage PID Program 8) Bonds At this time, Sam Willoughby, Public Works Director introduced Larry Dublin from Ford Engineering, who would make a presentation on behalf of Public Works. Mr. Dublin went on to explain that the following presentation is a wish list, complied after looking at all public work departments, which include major, future, infrastructure and capital projects. Mr. Dublin covered the following and provided on overall view that included maintenance, repair, recommendations, requirements, construction and costs: e Strategic Planning Session 78 D Street Division- 105.62 miles of roadways and public streets e 0 Street Projects: Doerr Lane Improvements Widen and Reconstruct Schertz Parkway from Bridge to RR at FM78 Wiederstein Road/Chelsea Road Alignment at FM 1103. Dimrock Repair Woodland Oaks Drive Improvements Improve sub-standard roads south ofFM78 and North ofIH-35 rest stop Live Oak/Maske Road Realignment-FM 1518 to FM 3009 Deer Haven Improvements Lone Oak Subdivision Improvements Reconstruction of Wieder stein Road from FM 1103 to FM 3009 Main Street Improvements Lone Oak Emergency Exit Upgrade Green Valley Road to City standards Northcliffe Subdivision Improvements Street Project Total $41,076,696.39 D Annual Road Maintenance 0 Establish schedule to allow for ten-year cycle on approx. 10 miles of streets per year e Approximate cost per year $ 400,000.00 D Drainage Division-23 miles of ROW and 154 acres of Drainage areas 0 Cibolo Creek Railroad Crossing at FM 78 Improvements 0 Improve low water structure Cibolo Creek crossing on Aviation 0 Drainage system in Village Unit 1 & II Subdivision improvements 0 Drainage on Elbel Road from Samuel Clemens High School to FEMA channel improvements 0 Greenshire Drainage improvements 0 Clyde Ford & Gettysburg area (Village Unit III & IV) improvements 0 Northcliffe Drainage channel improvements 0 Woodland Oaks Drainage improvements 0 Clean floodplain from Maske Road to IH-35 0 Mid-Cities area drainage project 0 Dietz Creek-Railroad Crossing at FM 78 to Cibolo Creek improvements Drainage Projects Total $10,461,256.04 D Water Division-l 0, 800 water connections 0 Operational Improvements 0 Aviation Heights service line and Fire Hydrant replacement e 0 Southeast Quadrant Water plant Strategic Planning Session 79 e 0 Southeast Quadrant Distribution Main 0 Additional Live Oak Ground Storage Tank 0 New installation of C-900 12" distribution pipe at IH-35-Country Club Blvd. to rest area 0 New installation of C-900 8" distribution pipe at Chelsea Park and Castle Hills 0 New Installation of C-900 8" distribution pipe at Lower Seguin to Ware Seguin Road. 0 Northcliffe Water Plant upgrade/ Plant and storage modifications to serve new and existing development in the northeast quadrant 0 Upgrade of Ware Seguin Pump Station 0 Northcliffe Loop feed, providing transmission main to loop feed to the ground storage at northeast quadrant (Northcliffe) plant 0 Northeast Quadrant-provide looped distribution backbone for northeast quadrant development north and east of North cliffe area. Water Projects Total $17,095,852.38 D Wastewater Division 0 Town Creek Sewer project 0 New Sewer Treatment Plant (South) 0 Annual Maintenance-over 500,000 feet of sewer line, many installed over e 50 years age, 12-lift stations-a must to establish schedule to keep sewer system in working condition Sewer Projects Total $16,461,144.13 D 5 Year Equipment/Personnel Projection DeDartments Water-Equipment Street-Equipment Service Truck 1 Triple Tipper 1 Radio Read Nine Wheel Roller 1 Meter System 1 13 Yard Dump Check Reader 1 Truck 1 Street Categorization 1 Personnel Personnel Serviceman III 1 PW Supervisor 1 Serviceman I 3 Worker III 1 Meter Tech III 1 Worker II 1 Meter Tech I 2 Worker I 2 e Sweeper Operator 1 Strategic Planning Session 80 I e Drainage-Equipment Fleet-Equipment 3yd Front end Loader Fluid Distribution Grade-All System 1 Parallel Lift 1 Service Truck 1 Personnel Personnel GIS 1 Fleet Manager 1 Work II 1 Mechanic 1 Work I 1 Total $85,105,351.29 Items A, C & D will be placed on the next strategic session. . C) Public Park System D) Municipal Complex Expansion Program #3 ADJOURNMENT Mayor Baldwin adjourned the meeting at 9:26 p.m. e , ATTEST: e Strategic Planning Session 81