12-09-2020 Special Agenda with Backup
MEETING AGENDA
City Council
SPECIAL WORKSHOP SESSION CITY COUNCIL
December 9, 2020
HAL BALDWIN MUNICIPAL COMPLEX
CIVIC CENTER - BLUEBONNET HALL
1400 SCHERTZ PARKWAY - BUILDING #5
SCHERTZ, TEXAS 78154
CITY OF SCHERTZ CORE VALUES
Do the right thing
Do the best you can
Treat others the way you want to be treated
Work cooperatively as a team
SPECIAL AGENDA
WEDNESDAY, DECEMBER 9, 2020 at 6:00 p.m.
Call to Order
Hearing of Residents
This time is set aside for any person who wishes to address the City Council. Each person should fill out
the speaker’s register prior to the meeting. Presentations should be limited to no more than 3 minutes.
All remarks shall be addressed to the Council as a body, and not to any individual member thereof.
Any person making personal, impertinent, or slanderous remarks while addressing the Council may
be requested to leave the meeting.
Discussion by the Council of any item not on the agenda shall be limited to statements of specific factual
information given in response to any inquiry, a recitation of existing policy in response to an inquiry,
and/or a proposal to place the item on a future agenda. The presiding officer, during the Hearing of
Residents portion of the agenda, will call on those persons who
have signed up to speak in the order they have registered.
Workshop
Discussion and direction on chip seal projects as part of the SPAM program. (M. Browne/B.
James/K. Woodlee)
December 9, 2020 City Council Agenda Page 1
Adjournment
CERTIFICATION
I, BRENDA DENNIS, CITY SECRETARY OF THE CITY OF SCHERTZ, TEXAS, DO HEREBY
CERTIFY THAT THE ABOVE AGENDA WAS PREPARED AND POSTED ON THE OFFICIAL
BULLETIN BOARDS ON THIS THE 4th DAY OF DECEMBER 2020 AT 1:45 P.M., WHICH IS A
PLACE READILY ACCESSIBLE TO THE PUBLIC AT ALL TIMES AND THAT SAID NOTICE
WAS POSTED IN ACCORDANCE WITH CHAPTER 551, TEXAS GOVERNMENT CODE.
BRENDA DENNIS
I CERTIFY THAT THE ATTACHED NOTICE AND AGENDA OF ITEMS TO BE
CONSIDERED BY THE CITY COUNCIL WAS REMOVED BY ME FROM THE OFFICIAL
BULLETIN BOARD ON _____DAY OF _______________, 2020. TITLE: ______________
This facility is accessible in accordance with the Americans with Disabilities Act. Handicapped parking
spaces are available. If you require special assistance or have a request for sign interpretative services
or other services, please call 210-619-1030.
The City Council for the City of Schertz reserves the right to adjourn into closed session at any
time during the course of this meeting to discuss any of the matters listed above, as authorized by
the Texas Open Meetings Act.
Closed Sessions Authorized: This agenda has been reviewed and approved by the City’s legal
counsel and the presence of any subject in any Closed Session portion of the agenda constitutes a
written interpretation of Texas Government Code Chapter 551 by legal counsel for the
governmental body and constitutes an opinion by the attorney that the items discussed therein may
be legally discussed in the closed portion of the meeting considering available opinions of a court of
record and opinions of the Texas Attorney General known to the attorney. This provision has been
added to this agenda with the intent to meet all elements necessary to satisfy Texas Government
Code Chapter 551.144(c) and the meeting is conducted by all participants in reliance on this
opinion.
COUNCIL COMMITTEE AND LIAISON ASSIGNMENTS
Mayor Gutierrez
Audit Committee
Investment Advisory Committee
Main Street Committee
Councilmember Scagliola – Place 5
Cibolo Valley Local Government Corporation -
Alternate
Hal Baldwin Scholarship Committee
Interview Committee for Boards and Commissions -
Alternate
Schertz-Seguin Local Government Corporation
Councilmember Davis– Place 1
Interview Committee for Boards and
Commissions
Main Street Committee - Chair
Schertz Housing Authority Board
TIRZ II Board
Councilmember Scott – Place 2
Interview Committee for Boards and Commissions
Schertz Animal Services Advisory Committee
December 9, 2020 City Council Agenda Page 2
Councilmember Whittaker – Place 3
Audit Committee
Councilmember Dahle – Place 4
Cibolo Valley Local Government Corporation
Interview Committee for Boards and Commissions
TIRZ II Board
Councilmember Heyward – Place 6
Audit Committee
Investment Advisory Committee
Main Steet Committee
Councilmember Brown – Place 7
Main Street Committee
Schertz-Seguin Local Government Corporation -
Alternate
December 9, 2020 City Council Agenda Page 3
City Council Meeting
December 9, 2020
2018 SPAM Resurfacing Workshop
1
2
• SPAM – Street Preservation and Maintenance Program:
• Our program to maintain and extend the life of our streets
• PCI – Pavement Condition Index
• Study done about ever 5 years to:
• assess the condition of approximately 171 miles of the City's roadways and
will provide digital images documenting the pavement surface condition of
the roadway; an evaluation of the the level of damage in the roadway; depth
of any ruts; severity of cracking; and GPS coordinates and sizes of
distresses.
• All this data will allow the City to update the City's PAVER database and begin to
develop a plan for the next five-year SPAM cycle.
Introduction
.
3
Pavement Condition Index
.
4
Pavement Preservation
5
Areas Chip Sealed
Deer Haven
The Estates at
Wilson’s
Preserve
Greenfield
Village
Lone Oak
Randolph, Exchange to Rooster Run
Curtiss, Lindbergh to Beacon
E. Live Oak (not completed)
6
• Pros:
• Seals and protects the street
• Fast operation; can re-open to traffic quickly
• Lower cost with about 8 years service life
• Cons:
• Loose excess chips (rocks)
• Rougher surface than new asphalt
Pros and Cons of Chip Seal
7
• Fog Seal – sprays a thin layer of oil onto the surface
• Scrub Seal – essentially a chip seal, but is able to seal cracks as part of the
process. Extra oil is applied and brooms are used to push the oil into the cracks.
• Slurry seal – applies a thin layer of oil and fine sand onto the surface
• Micro Paving/Micro Sealing – applies a thin layer of oil and aggregate onto the
surface
• Cape Seal – chip seal with a fog seal, slurry seal, or micro paving/micro sealing
on top of the chip seal
• In Place Recycling – grinds off a portion of the existing pavement, mixes the
millings with new oils and aggregates, places the material back in a new layer on
the street (“Hot” or “Cold” options)
• Mill and Overlay – grinds off a portion of the existing pavement and replaces the
layer removed with a new layer of new asphalt
Other Resurfacing Options
8
• Chip Seal:
• $2.80/SY; total $340,280
• Slurry Seal:
• $7.30/SY; Total $888,454 (2.61 times more)
• Mill and Overlay:
• $14.00/SY; total $1,703,884 (5 times more) based
on the Schertz Parkway Overlay project
2018 SPAM Bid Costs
9
• Georgetown – “High performance surface seal”; chip seal (two-course chip seal with
“sealant layer” on top); mill and overlay
• San Marcos – slurry seal and mill and overlay
• New Braunfels – blade level up; mill and overlay; chip seal with limited overlay (thin layer of
asphalt on top of chip seal)
• Austin – chip seal; slurry seal; micro sealing in cul-de-sacs; mill and overlay
What Do Other Cities Do?
10
• Some areas have not adhered properly
• Predominantly in hand-applied areas
• Oil thickness less than needed
• Possibly a few areas had something detrimental on existing
surface
• Excess chips – current sweeping efforts have not been
sufficient in removing excess
• Not uncommon with new chip seals
• Surface roughness is typical for a chip seal at this stage
• Using a finer grade of chip would result in a slightly smoother
surface, but still would be significantly rougher than new
asphalt
• Still in “Warranty Period”
Current Chip Seal Status
11
• High level of complaints in some areas – Estates at Wilson’s Preserve
• Lots of loose rock
• Patches where chip seal has not adhered at all
• Rough surface
• Some very few or no complaints and minimal issues. – Randolph Blvd.
• A few complaints in Deer Haven, Greenfield Village and Lone Oak
• Mostly loose rock in areas – cul-de-sacs and turns, an few areas bare at turns
• Same contractor on all projects
• Two reports – LAN on projects and Kimley-Horn on pavement preservation methods
Current Chip Seal Complaints
12
Areas Chip Sealed
Deer Haven
The Estates at
Wilson’s
Preserve
Greenfield
Village
Lone Oak
Randolph, Exchange to Rooster Run
Curtiss, Lindbergh to Beacon
E. Live Oak (not completed)
13
• All chip seal areas we do additional, improved sweeping
• Remove excess chips and identify and other improperly bonded areas
• Contractor re-apply chip seal in unbonded areas
• Increase smoothness of surface
• No “one size fits all” solution.
• At a minimum, apply a fog seal to the surface in all areas. Fog Seal Video
• Additional surface product dependent on factors unique to each area (traffic volumes; straight
segments versus cul-de-sacs; turning movements; etc.)
• Will come back to Council with an analysis and recommendation for each area in
January.
• The Estates at Wilson’s Preserve this point recommended to get a micro-seal additional
surface due to the larger number of cul-de-sacs, lower traffic volumes, and higher turning
movements.
“Remedies” For The Chip Seal
14
• Use a “modified” chip seal in very select locations (lower volume “collector” streets
having straight runs and no homes fronting the street, ie: Randolph, E. Live Oak,
Boenig)
• User finer grade aggregate,
• Increase sweeping effort (have additional sweeping be part of the contract)
• Switch to a different resurfacing material in residential areas
• Slurry seal
• Micro paving/micro seal
• Mill and overlay on arterial and high volume collector streets
Future Resurfacing Efforts
15
• Pros:
• Seals and “rejuvenates” the street surface
• Fast application
• Lower cost
• Cons:
• Needs at least one hour cure time before
reopening to traffic
• Short service life – about 2 years
• Most often used in conjunction with other efforts
Pros and Cons of Fog Seal Alone
16
• Pros:
• Seals and protects the street
• Fast operation; can re-open to traffic quickly
• Does not typically require separate crack sealing
effort
• Lower cost with about 8 years service life
• Cons:
• Loose excess chips (rocks)
• Rougher surface than new asphalt
Pros and Cons of Scrub Seal
17
• Pros:
• Seals and protects the street
• Fast application
• Medium cost with 6 to 8 years service life
• Cons:
• Requires at least an hour to cure before re-
opening to traffic
• Slightly rougher surface than new asphalt (some
products)
• Can have a “streaky” appearance
Pros and Cons of Slurry Seal
18
• Pros:
• Seals and protects the street
• Fast application
• Surface is much more smooth (near new asphalt)
• Cons:
• Needs at least a couple hours to cure before
reopening to traffic
• More expensive than other options
• Not as long service life – 5 to 8 years
Pros and Cons of Micro Paving/Micro Sealing
19
• Pros:
• Seals and protects the street
• Fast application of layers
• Cons:
• Takes longer to complete: chip seal done first,
then have to apply another layer on top
• Rougher surface than new asphalt, but not as
rough as a chip seal
• Higher cost but not a comparable increase in
service life
Pros and Cons of Cape Seal
20
• Pros:
• Provides a new pavement surface
• Doesn’t require a lot of new material being brought to the site or removal of
material from the site
• Typically costs less than a mill and overlay
• Similar service life as an overlay
• Cons:
• Requires long equipment “train”; does not handle sharp curves, cul-de-
sacs, etc. well
• More suited for long, straight sections of roadways (highways in particular)
• May be considered “new construction” by Federal rules – ADA upgrades
required
Pros and Cons of In Place Recycling
21
• Pros:
• Smooth surface – new asphalt
• In some cases can add structural capacity to the
street
• Longer service life about 12 years
• Cons:
• High cost – most expensive option
• Considered “new construction” by Federal rules –
ADA upgrades required
Pros and Cons of Mill and Overlay
Questions?
22