Loading...
04-07-2026 Agenda Packet       MEETING AGENDA City Council REGULAR SESSION CITY COUNCIL April 7, 2026                                 HAL BALDWIN MUNICIPAL COMPLEX COUNCIL CHAMBERS 1400 SCHERTZ PARKWAY BUILDING #4 SCHERTZ, TEXAS 78154 CITY OF SCHERTZ CORE VALUES Do the right thing Do the best you can Treat others the way you want to be treated Work cooperatively as a team  AGENDA TUESDAY, APRIL 7, 2026 at 6:00 p.m.        Call to Order   Opening Prayer and Pledges of Allegiance to the Flags of the United States and State of Texas. (Councilmember Sheridan)   Special Announcement  Hal Baldwin Scholarship - Students attending for the Hal Baldwin Scholarship need to sign in on the sheet located on the back podium. If you are watching remotely, please email Sarah Gonzalez at sgonzalez@schertz.com to virtually sign in.  Please direct any questions to Ms. Gonzalez.   Proclamations   National Crime Victims' Rights Week-April 19-25, 2026 (Councilmember Watson)    Child Abuse Prevention and Awareness Month-April 2026 (Councilmember Macaluso)    Sexual Assault Awareness Month-April 2026 (Councilmember Guerrero)    Animal Care and Control Appreciation Week - April 12-18, 2026 (Councilmember Heyward)    National Public Safety Telecommunicators Week-April 12-18, 2026 (Councilmember Westbrook)    Military Child Month-April 2026 (Councilmember Sheridan)    Employee Introduction  April 7, 2026  City Council Agenda                                Page 1  Employee Introduction  Neighborhood Services: Steven Miller-Code Enforcement Officer Police: Ashley Aldaba-Police Officer Public Works-Drainage: Drainage Worker Trainees, Victor Guerrero, David Mosqueda, and Kevin Joler Utilities Billing: Emilia Zapata   Presentations   25 Year Tenure Milestone Service Pin: Presentation for Fire Lieutenant Mack Melancon    The 2026 Bond for Schertz-Cibolo-Universal City ISD  (Superintendent Paige Meloni)   Presentation of Schertz Police Department 2025 Annual Report Presentation (J.Lowery/P.Waller)    City Events and Announcements  Announcements of upcoming City Events (B.James/S.Gonzalez) Announcements and recognitions by the City Manager (S.Williams) Announcements and recognitions by the Mayor (R.Rodriguez)   Hearing of Residents This time is set aside for any person who wishes to address the City Council. Each person should fill out the speaker’s register prior to the meeting. Presentations should be limited to no more than 3 minutes.  All remarks shall be addressed to the Council as a body, and not to any individual member thereof. Any person making personal, impertinent, or slanderous remarks while addressing the Council may be requested to leave the meeting. All handouts and/or USB devices must be submitted to the City Secretary no later than noon on the Monday preceding the meeting.  Handouts will be provided to each Councilmember prior to the start of the meeting by the City Secretary.  All USB devices will be vetted by City IT staff to ensure City property is protected from malware. Discussion by the Council of any item not on the agenda shall be limited to statements of specific factual information given in response to any inquiry, a recitation of existing policy in response to an inquiry, and/or a proposal to place the item on a future agenda. The presiding officer, during the Hearing of Residents portion of the agenda, will call on those persons who have signed up to speak in the order they have registered.   Consent Agenda Items The Consent Agenda is considered self-explanatory and will be enacted by the Council with one motion. There will be no separate discussion of these items unless they are removed from the Consent Agenda upon the request of the Mayor or a Councilmember.   1.Minutes - Approval of the minutes from the regular Council Meeting on March 17, 2026 (S.Edmondson/S.Courney/I.Chavez)    2.Appointments, Re-appointments, and Resignations - City of Schertz Boards, Commissions, and Committees  April 7, 2026  City Council Agenda                                Page 2  2.Appointments, Re-appointments, and Resignations - City of Schertz Boards, Commissions, and Committees  Appointments   n/a Re-appointments  Schertz Historical Preservation Committee for the term ending 03/31/2028: Becki Babcock, Lauren Dalton, Sophie Rodriguez, Kathleen Samsey, Rosalyn Wise Capital Improvement Advisory Committee for the term ending 06/30/2028: Dr. Mark Penshorn and Mr. Bryan Jones Resignations, Removals, and Expiring Terms  CIAC: Tamara Brown, Judy, Goldick, Roderick Hector, David Hughes, Patrick McMaster, Glen Outlaw, and Clayton Wallace   3.Councilmember Absence - Approve Councilmember Allison Heyward's absence on March 3, 2026, in accordance with City Council Rules of Conduct and Procedure, Article 2.2.2.B (R.Rodriguez/S.Edmondson)    4.Resolution 26-R-032 - Authorizing an amendment to the professional services agreement with Halff Associates for the FM 1518 Utility Relocation Project (B.James/K.Woodlee/E.Schulze)    5.Resolution 26-R-034 - Authorizing the purchase of software licenses with SHI (B.James/D.Hardin/J.Bluebird)    6.Resolution 26-R-046 - Adopting the State-mandated Texas Women’s Privacy Act Policy (B.James/D.Hardin/C.Lonsberry)    7.Resolution 26-R-047 - Authorize the City Manager to apply for and accept funds from the Urban Areas Security Initiative (UASI) to purchase a tethered unmanned aircraft system (UAS) in order to improve and enhance department and city UAS capabilities (S.Williams/G.Rodgers)    8.Resolution 26-R-049 - Authorizing a Task Order Amendment with Kimley-Horn and Associates, Inc. for the Schertz Forest Roadway and Waterline Improvements Project (B.James/K.Woodlee/J.Nowak)    9.Resolution 26-R-021 - Authorizing expenditures with Versalift for the acquisition of an Aerial Bucket Truck as part of the FY2025-26 Supplemental Vehicle/Equipment Replacement/Acquisition program (B.James/D.Hardin/M.Chappell)    Discussion and Action Items   10.Resolution 26-R-037 - Authorizing the purchase and installation of twenty-six (26) HVAC systems from Way Mechanical (B.James/D.Hardin/C.Lonsberry)     Closed Session   11.The City Council will meet in closed session pursuant to Section 551.071 of the Texas Government Code. The City of Schertz will consult in closed session with its attorney to receive legal advice regarding pending or contemplated litigation, a settlement offer, or matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter, to include the unauthorized use of City property.    12.The City Council will meet in closed session in accordance with Section 551.072, Texas Government Code April 7, 2026  City Council Agenda                                Page 3  12.The City Council will meet in closed session in accordance with Section 551.072, Texas Government Code deliberation regarding the purchase, sale, exchange, lease, or value of water lease rights.      Reconvene into Regular Session   13.Take any action based on discussion held in Closed Session under Agenda Item # 11.    14.Take any action based on discussion held in Closed Session under Agenda Item # 12.    Information available in City Council Packets - NO DISCUSSION TO OCCUR   15.Quarterly Update-City Council Approved Zoning and Specific Use Permit Ordinances in relation to current development status (B.James/L.Wood/E.Delgado)    16.Tim Brown Memorial Plaque for Council Chamber Conference Room (B.James/D.Hardin)    17.Check Report - February 2026 (S.Gonzalez/J.Walters)    18.Monthly Update - Major Projects in Progress/CIP (B.James/K.Woodlee)    Requests and Announcements  Requests by Mayor and Councilmembers for updates or information from Staff  Requests by Mayor and Councilmembers that items or presentations be placed on a future City Council agenda City and Community Events attended and to be attended (Council)     Adjournment   CERTIFICATION I, SHEILA EDMONDSON, CITY SECRETARY OF THE CITY OF SCHERTZ, TEXAS, DO HEREBY CERTIFY THAT THE ABOVE AGENDA WAS PREPARED AND POSTED ON THE OFFICIAL BULLETIN BOARDS ON THIS THE 1ST DAY OF APRIL 2026 AT 5:15 P.M., WHICH IS A PLACE READILY ACCESSIBLE TO THE PUBLIC AT ALL TIMES AND THAT SAID NOTICE WAS POSTED IN ACCORDANCE WITH CHAPTER 551, TEXAS GOVERNMENT CODE.    SHEILA EDMONDSON    I CERTIFY THAT THE ATTACHED NOTICE AND AGENDA OF ITEMS TO BE CONSIDERED BY THE CITY COUNCIL WAS REMOVED BY ME FROM THE OFFICIAL BULLETIN BOARD ON ________DAY OF ___________________, 2026. TITLE: _______________________________ This facility is accessible in accordance with the Americans with Disabilities Act. Handicapped parking spaces are available. If you require special assistance or have a request for sign interpretative services or other services, please call 210-619-1030. The City Council for the City of Schertz reserves the right to adjourn into closed session at any time during the course of this meeting to discuss any of the matters listed above, as authorized by the Texas Open Meetings Act. Closed Sessions Authorized: This agenda has been reviewed and approved by the City’s legal counsel and the presence of any subject in any Closed Session portion of the agenda constitutes a written interpretation of Texas Government Code Chapter 551 by legal counsel for the governmental body and constitutes an opinion by the attorney that the items discussed therein may be legally discussed in the closed portion of the meeting considering available opinions of a court of record and opinions of the Texas Attorney General known to the attorney. This provision has been added to this agenda with the intent to meet all elements necessary to satisfy Texas Government Code Chapter 551.144(c) and the meeting is April 7, 2026  City Council Agenda                                Page 4  added to this agenda with the intent to meet all elements necessary to satisfy Texas Government Code Chapter 551.144(c) and the meeting is conducted by all participants in reliance on this opinion.    COUNCIL COMMITTEE AND LIAISON ASSIGNMENTS     Mayor Rodriguez Member Audit Committee Investment Advisory Committee Main Street Committee TIRZ II Board Liaison Board of Adjustments Senior Center Advisory Board-Alternate Councilmember Davis– Place 1 Member Interview Committee  Main Street Committee - Chair TIRZ II Board Liaison Parks & Recreation Advisory Board Schertz Housing Authority Board Transportation Safety Advisory Board Councilmember Watson – Place 2 Member Audit Committee Liaison Library Advisory Board Senior Center Advisory Board Schertz-Seguin Local Government Corporation (SSLGC) -Ex-Officio  Councilmember Macaluso – Place 3 Member Interview Committee  Hal Baldwin Scholarship Committee TIRZ II Board   Councilmember Guerrero – Place 4 Member Hal Baldwin Scholarship Committee Investment Advisory Committee Liaison Schertz Historical Preservation Committee Councilmember Westbrook – Place 5 Liaison Schertz-Seguin Local Government Corporation (SSLGC)     Planning and Zoning Commission Schertz Historical Preservation Committee Cibolo Valley Local Government Corporation (CVLGC)-Alternate Councilmember Heyward – Place 6 Member Animal Services Advisory Committee Audit Committee Interview Committee-Chair Investment Advisory Committee Main Street Committee Liaison Building and Standards Commission Economic Development Corporation - Alternate Senior Center Advisory Board Councilmember Sheridan – Place 7      April 7, 2026  City Council Agenda                                Page 5  Agenda No.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:National Crime Victims' Rights Week-April 19-25, 2026 (Councilmember Watson) Attachments National Crime Victim's Rights Week April 19-25, 2026 National Crime Victims’ Rights Week April 19-25, 2026 Whereas, millions of Americans are victims of crime each year, and these crimes also affect family members, friends, neighbors, and co-workers; and Whereas, crime can leave a lasting physical, emotional, or financial impact on people of all ages and abilities, and of all economic, racial, and social backgrounds; and Whereas, in 1984, the Crime Victims Fund was established by the Victims of Crime Act (VOCA) to provide a permanent source of support for crime victim services and compensation through fines and penalties paid by convicted federal offenders; and Whereas, the Crime Victims Fund today supports thousands of victim assistance programs who provide help and support to child victims of violence and sexual abuse; stalking victims; survivors of homicide victims; victims of drunk-driving crashes; and victims of domestic, dating, and sexual violence and other crimes; and Whereas, by ensuring that federal offender criminal fines and penalties are deposited into the Crime Victims Fund, Congress affirmed that those who commit crimes should be held accountable for the impact of their actions; and Whereas, the Crime Victims Fund provides victim assistance to millions of crime victims annually and also provides compensation funds to thousands of crime victims each year for reimbursement of expenses related to their victimization; and Whereas, the victim assistance community faces new challenges to reach and serve all victims, including victims of newly recognized crimes; and Whereas, now is the time to embrace a new emphasis on learning what works in reaching underserved victims and meeting victims’ needs; and Whereas, National Crime Victims’ Rights Week, provides an opportunity to celebrate the energy, creativity, and commitment that launched the victims’ rights movement, inspired its progress, and continues to advance the cause of justice for crime victims; and Whereas, Advocates are joining forces with victim service providers, criminal justice agencies, and concerned citizens throughout The City of Schertz and America to raise awareness of victims’ rights and observe National Crime Victims’ Rights Week. Now Therefore, Be It Resolved, that I, Ralph Rodriguez, Mayor of the City of hereby proclaims the week of April 19-25, 2026 as National Crime Victims’ Rights Week in Schertz, Texas, and reaffirms the City’s commitment to respect and enforce victims’ rights and address victims’ needs during National Crime Victims’ Rights Week and throughout the year; and express our appreciation for those victims and crime survivors who have turned personal tragedy into a motivating force to improve our response to victims of crime and build a more just community. IN WITNESS WHEREOF, I have hereunto set my hand and caused the SEAL of the City of Schertz to be affixed this the 7th day of April 2026. _______________________________ Ralph Rodriguez, Mayor Agenda No.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:Child Abuse Prevention and Awareness Month -April 2026 (Councilmember Macaluso) Attachments Child Abuse Prevention & Awareness Month April 2026 Child Abuse Prevention & Awareness Month In Schertz, Texas - April 2026 Whereas, more than 33,249 cases of child abuse and neglect were confirmed in Texas during fiscal year 2025; and Whereas, there were 163 confirmed victims of child abuse and neglect in Guadalupe County in fiscal year 2025; and Whereas, child abuse prevention is a community responsibility and finding solutions depends on involvement among all people; and Whereas, communities must make every effort to promote and support programs that benefit children and their families; and Whereas, effective child abuse prevention programs succeed because of partnerships among a variety of entities including but not limited to schools, religious organizations, law enforcement agencies, child protective services, prosecution agencies, medical professionals, mental health professionals, SJRC Texas-Belong, the Guadalupe County Child Welfare Board, Children’s Advocacy Centers, Court Appointed Special Advocates, Bikers Against Child Abuse, and other community-based non-profit organizations; and Whereas, everyone in the community should become more aware of child abuse prevention and consider helping parents raise their children in safe, nurturing environments as well as supporting local professionals dedicated to meeting the needs of child abuse victims; and Now Therefore, Be It Resolved, in official recognition, I Ralph Rodriguez, Mayor of the City of Schertz hereby proclaims April 2026 as Child Abuse Prevention & Awareness Month in Schertz, Texas, and urge all citizens to work together to reduce child abuse and neglect and to significantly improve the response of our community when child abuse occurs in the months and years ahead. IN WITNESS WHEREOF, I have hereunto set my hand and caused the SEAL of the City of Schertz to be affixed this the 7th day of April 2026. _______________________________ Ralph Rodriguez, Mayor Agenda No.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:Sexual Assault Awareness Month -April 2026 (Councilmember Guerrero) Attachments Sexual Assault Awareness Month April 2026 National Sexual Assault Awareness and Prevention Month April 2026 WHEREAS, every 68 seconds another person in the United States is sexually assaulted, and in Texas 2 in 5 women and 1 in 5 men are victims of sexual assault; AND in fiscal year 2025, Thriving Hearts Crisis Center rendered 552 services to 93 survivors of sexual violence and provided 94 hospital accompaniments for sexual assault exams; WHEREAS, according to a study conducted by the Texas Association Against Sexual Assault and The University of Texas at Austin Institute on Domestic Violence and Sexual Assault approximately 6.3 million Texans have been sexually victimized; WHEREAS, most victims are sexually assaulted by someone they know and 91 percent of victims did not report to police; WHEREAS, it is appropriate to salute the more than 20 Million victims who have survived sexual assault in the United States and the efforts of victims, volunteers, and professionals who combat sexual assault; WHEREAS, national and community organizations and private sector supporters should be recognized and applauded for their work in promoting awareness about sexual assault; WHEREAS, police, forensic workers, and prosecutors should be recognized and commended for their hard work and innovative strategies to increase the percentage of sexual assault cases that resolve in the prosecution and incarceration of the offenders; WHEREAS, sexual violence is a persistent and pervasive problem in our society, one that requires attention year- round and in order to foster healthy communities, all citizens must support the effort to end sexual violence every month of the year; and, WHEREAS, national and community organizations, businesses in the private sector, and the media are urged, through National Sexual Assault Awareness of sexual violence and strategies to decrease the incidence of sexual assault. NOW, THEREFORE, I, Ralph Rodriguez, Mayor of the City of Schertz do hereby proclaim the month of April 2026 as “National Sexual Assault Awareness and Prevention Month” in Schertz and urge all citizens to observe this month by supporting the goals and ideas of victims and those working toward awareness and prevention, and by participating in community efforts. IN TESTIMONY WHEREOF, I have signed my name officially and caused the Seal of the City of Schertz to be affixed on the 7th of April 2026. ______________________________ Ralph Rodriguez, Mayor Agenda No.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:Animal Care and Control Appreciation Week - April 12-18, 2026 (Councilmember Heyward) Attachments National Animal Care and Control Week April 12-18, 2026 NATIONAL ANIMAL CARE AND CONTROL APPRECIATION WEEK April 12-18, 2026 WHEREAS, the National Animal Care and Control Association has designated the second full week in April as Animal Care and Control Appreciation Week; and WHEREAS various federal, state, and local government officials throughout the country take this time to recognize, thank and commend all Animal Control Officers and Animal Services Staff for the dedicated service they provide to the citizens, public safety, and domestic animals and livestock across the nation; and WHEREAS the City of Schertz recognizes and commends the Schertz Animal Services personnel who answer calls for assistance, capture roaming and potentially dangerous animals, rescue animals, investigate reports of animal abuse, educate pet owners about responsible care, and mediate disputes between neighbors regarding pets; and WHEREAS, in 2025, the City of Schertz Animal Services responded to 2,067 calls for service and handled 1,238 animals for intake; and WHEREAS, the City of Schertz has a staff that includes: 1-Animal Services Manager, 4-Animal Services Officers and 4-Kennel Technicians; and WHEREAS, in 2025, the Schertz Animal Services has developed partnerships with San Antonio Humane Society and other animal rescue organizations for the placement of scared or ill animals. WHEREAS, in 2025, the Schertz Animal Services department continues their vision to have a special unit where they can care for neonatal animals, both domestic and wild. They have an entire room in full service dedicated to the care of infant animals; and, WHEREAS Animal Control Officers provide essential community functions including the enforcement of animal control laws, protecting the public from diseases such as rabies, and educating the public on the proper care of the community's pets; and NOW, THEREFORE be it resolved that I, Ralph Rodriguez, Mayor of the City of Schertz proclaim National Animal Care and Control Appreciation Week - April 12-18, 2026 I encourage all citizens to join me in thanking our City of Schertz Animal Services for the dedication and exceptional service they provide to all citizens and animals in our great community . IN TESTIMONY WHEREOF, I hereunto set my hand and caused the Seal of City of Schertz to be affixed on this the 7th day of April 2026. ________________________________ Ralph Rodriguez, Mayor Agenda No.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:National Public Safety Telecommunicators Week-April 12-18, 2026 (Councilmember Westbrook) Attachments National Public Safety Telecommunicators Week 2026 National Public Safety Telecommunicators Week April 12-18, 2026 Whereas, emergencies can occur at any time that require police, fire, or emergency medical services; and, Whereas, when an emergency occurs the prompt response of police officers, firefighters and paramedics is critical to the protection of life and preservation of property; and, Whereas, the safety of our police officers and firefighters is dependent upon the quality and accuracy of information obtained from citizens who telephone the City of Schertz emergency communications center; and, Whereas, Public Safety Telecommunicators are the first and most critical contact our citizens have with emergency services; and, Whereas, the Public Safety Telecommunicators Department has 16 employees: 1-Commications Manager with 21.5 years of experience, 4-Shift Supervisors with a combined 57 years of experience and, 11-Communication Officers with a combined total of 29 years of experience; and Whereas, the Public Safety Telecommunicators for the City of Schertz answered approximately 29,000-911 Calls answered, 64,000 Non-emergency lines answered, 1,400 Text to 911 answered. In 2025, there were 43,000 Calls for Service for Schertz PD, 25,000 Calls for Service for Cibolo PD, 5,000 Calls for Service for Schertz Fire, 4,000 Calls for Service for Cibolo Fire and 16,5000 Calls for Service for Schertz EMS; Whereas, Public Safety Telecommunicators are the single vital link for our police officers and firefighters by monitoring their activities by radio, providing them information, and ensuring their safety; and, Whereas, Public Safety Telecommunicators of the City of Schertz have contributed substantially to the apprehension of criminals, suppression of fires and treatment of patients; and, Whereas, each dispatcher has exhibited compassion, understanding and professionalism during the performance of their job in the past year. Now Therefore, Be It Resolved that I, Ralph Rodriguez, Mayor of the City of Schertz proclaims. National Public Safety Telecommunicators Week, April 12-18, 2026 I encourage all citizens to join us in honoring the men and women whose diligence and professionalism keep our city and citizens safe. IN TESTIMONY WHEREOF, I have hereunto set my hand and caused the SEAL of the City of Schertz to be affixed to this on the 7th day of April 2026. _________________________________ Ralph Rodriguez, Mayor Agenda No.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:Military Child Month-April 2026 (Councilmember Sheridan) Attachments Military Child Month 2026 April 2026 is “Month of the Military Child” & April 7, 2026 is “Purple Up! For Military Kids Day” WHEREAS, The City of Schertz will observe “Month of the Military Child” during the month of April 2026, and on April 7, 2026 “Purple Up! For Military Kids Day” to honor military families and their children for the sacrifices they make and their unconditional support of our armed forces; and WHEREAS, Nearly 2 million children in military families face unique challenges, including frequent moves and family separations. These remarkable young people demonstrate incredible strength and courage while adapting to new schools, making new friends and supporting their families; service to our nation; and WHEREAS, The City of Schertz, along with the Texas Education Agency, are committed to ensuring military connected students are supported in our schools and various programs, as our men and women in uniform focus on the challenges and missions they face in the line of duty; and WHEREAS, In the month of April, citizens can show their support for military children and appreciation for their strength and sacrifices by wearing purple – which represents the blending of the colors of the Five Branches of the Armed Forces. NOW, THEREFORE, I, Ralph Rodriguez, Mayor of the City of Schertz, call upon all citizens of the City of Schertz and upon all patriotic, civic and educational organizations to observe the month of April 2026 to be the “Month of the Military Child” & April 7, 2026 as “Purple Up! For Military Kids Day” Military kids are essential members of our community who deserve recognition for their strength and sacrifice. IN WITNESS THEREOF, I have hereunto set my hand this 7th Day of April 2026 and caused the Seal of the City of Schertz to be affixed. ___________________________ Ralph Rodriguez, Mayor Agenda No.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:The 2026 Bond for Schertz-Cibolo-Universal City ISD (Superintendent Paige Meloni) Agenda No.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Police Department Subject:Presentation of Schertz Police Department 2025 Annual Report Presentation (J.Lowery/P.Waller) BACKGROUND The Schertz Police Department is proud to present its first annual report incorporating the 2025 calendar year. Department staff have worked together over the last several months to obtain and verify information, as well as coordinate with each other on the design and contents of the report.  The annual report will be a new project the department will publish each year to further our commitment to transparency for the community.  The annual report includes information on crime statistics, uses of force, participation with the community, and an overall picture of the department and its organization.   Attachments Schertz PD 2025 Annual Report ANNUAL REPORT CITY OF SCHERTZ POLICE DEPARTMENT 2025 MESSAGE FROM THE CHIEF OF POLICE It is with great pride and sincere appreciation that I present this Annual Report for the Schertz Police Department. This report reflects not only the accomplishments of the past year, but more importantly, the dedication, professionalism, and service-oriented mindset of the men and women who serve this department and our community every day. First and foremost, I want to recognize and thank our employees; sworn officers, civilian staff, and volunteers, whose hard work and commitment make the Schertz Police Department what it is. Law enforcement is, at its core, a service-based profession. Our work requires long hours, personal sacrifice, resilience, and an unwavering sense of duty. The employees of this department consistently demonstrate these qualities while maintaining the highest standards of integrity, accountability, and compassion. Their dedication to public service and to one another is the foundation of our success. Equally important to our mission is the strong partnership we share with the community we serve. Public safety cannot be achieved by law enforcement alone. It requires collaboration, trust, and mutual respect between the police department and community members, businesses, elected officials, and partner agencies. I am grateful for the continued support, cooperation, and engagement of the Schertz community, City Manager’s Office, and our elected officials. Your willingness to work alongside us, provide feedback, and participate in problem-solving efforts strengthens our ability to serve effectively and responsibly. CONTENTS Message from the Chief of Police .......................3 Message from the Mayor ......................................4 Message from the City Manager .........................5 Department Organization .....................................6 Field Operations Bureau ......................................10 Operations Support Bureau ................................12 Department Training ............................................20 Community Engagement ......................................21 Employee Recognition .........................................23 This past year has been one of meaningful progress and success. Together, we have accomplished a great deal, enhancing training, improving operational efficiency, strengthening community outreach, and continuing to adapt to the evolving challenges of modern policing. These accomplishments are a direct result of the dedication of our personnel and the support of our community partners. While we take pride in what we have achieved, we also recognize that there are always opportunities to grow, improve, and do even more. Looking ahead, the Schertz Police Department remains committed to continuous improvement and innovation. We will continue to invest in our people, foster collaboration, and pursue best practices that enhance public trust and safety. Our goal is not only to meet expectations, but to exceed them as we work toward becoming a premier law enforcement agency, one that is respected, trusted, and reflective of the community we serve. In closing, I extend my sincere gratitude to our employees, our community members, our city leadership, and our partner agencies for their continued support and dedication. It is an honor to serve as Chief of Police for the City of Schertz, and I am proud of the collective efforts that move us forward. Together, we will continue our mission and vision by adhering to our core values of professionalism, respect, accountability, integrity, service, and excellence. Loyalty Above All Else Except Honor… JAMES LOWERY Schertz Chief of Police COMMAND STAFF Daniel Roman Assistant Chief Phillip E. Waller Assistant Chief Kelly Kallies Lieutenant Virgil Jones Lieutenant Darin Scott La Cour Lieutenant Martin Trevino Lieutenant City of Schertz Police Department ANNUAL REPORT 2025 3 MESSAGE FROM THE MAYOR It is my privilege to present the 2025 Annual Report of the Schertz Police Department to our residents, businesses, and community partners. Schertz is a city defined by growth, opportunity, service, and community pride. With that growth comes responsibility, the responsibility to protect our neighborhoods, support our families, and ensure that everyone who lives, works, and visits here feels safe. Each day, the dedicated men and women of the Schertz Police Department answer that call with courage, professionalism, and an unwavering commitment to excellence. Because of their tireless efforts, Schertz continues to be recognized as one of the safest cities in the nation, including being named the 9th safest city in Texas for 2025. While we are proud of this achievement, what truly sets our department apart is our constant drive to improve, adapt, and serve our community even better. Our officers, dispatchers, and civilian staff do more than enforce the law; they build trust, strengthen relationships, and help shape a safer future for everyone. Their service reflects the very character of our city. Schertz is also proud to be home to a large population of active-duty military members, veterans, and their families, and that deep tradition of service and sacrifice is reflected in the commitment and values we see throughout our police department. This report highlights the dedication and progress of these professionals, and I encourage you to read it. On behalf of the Schertz City Council, I ask you to join us in supporting our officers and partnering with them to make this community the very best it can be. Together, we will continue building a safer, stronger Schertz today and for generations to come. Dr. Robert L. Sheridan III Place 7 Dr. Mark E. Davis Place 1 Michelle Watson Place 2 Allison Heyward Place 6 Paul Macaluso Place 3 Benjamin Guerrero Place 4 Robert Westbrook Place 5 CITY COUNCIL MEMBERS RALPH RODRIGUEZ Mayor, City of Schertz 4 City of Schertz Police Department ANNUAL REPORT 2025 MESSAGE FROM THE CITY MANAGER This year, the Schertz Police Department has continued to set the standard for excellence in public safety and community engagement. Their recognition as the 2025 Outstanding Crime Prevention Agency – Small Agency, along with Chief James W. Lowery, Jr.’s honor as 2025 Outstanding Crime Prevention Manager, reflects the dedication and leadership that guide their daily work. Beyond these awards, what stands out most is the department’s commitment to building strong connections with our community. Through programs like the Citizens Police Academy, Jr. Police Academy, and Teen Police Academy, the department invests in educating and engaging residents of all ages. Services such as car seat checks and security assessments also provide valuable support to residents and businesses. Community events like National Night Out, Blue Santa, Coffee with a Cop, and Breakfast with the Blue show that our police officers are not only protecting Schertz but are also deeply invested in the people who call it home. I am grateful for Chief Lowery and every member of the Schertz Police Department. Their dedication makes Schertz a safer, stronger, and more connected community. STEVE WILLIAMS City Manager, City of Schertz Brian James Deputy City Manager Sarah Gonzalez Assistant City Manager CITY MANAGER’S OFFICE City of Schertz Police Department ANNUAL REPORT 2025 5 ORGANIZATIONAL CHART SE C T I O N S / U N I T S / T E A M S BU R E A U S DI V I S I O N S Patrol/Reserves K - 9 Special Events Planning FTO Program JBSA Incid. Command SWAT CIS Crime Victim Liaison Sex Offender Registrations City Council Security Warrants/Court Security Task Force Jail/Interview Room UAS/Drone Property Room Crime Scene Communications Polygraph/Recruiting I.T. Records SRO EOC Traffic AI Community Projects/ Crime Prevention Crime Analysis Training Animal Services Quartermaster Internal Affairs Rangemaster Capital Assets Inventory Best Practices Applicant Processing/Background Chief of PoliceAdmin Assistant Strategic Comms Advisor Asst. Chief (OSB) Operations SupportAsst. Chief (FOB) Field Operations Lt. Uniform Services (USD) Lt. Support Services (SSD) Lt. Professional Standards (PSD) Peer Support Budget/UCR Lt. Central Investigations (CID) 6 City of Schertz Police Department ANNUAL REPORT 2025 } } * Authorized Sworn: 73 * Authorized Sworn: 74 DEPARTMENT DEMOGRAPHICS DEPARTMENT BUDGET FY 2024 FY 2025 Personnel Services $10,809,313 $12,420,787 Operating $3,095,313 $2,621,470 TOTAL $13,904,626 $15,042,257 BY THE NUMBERS WHITE 34 HISPANIC 30 BLACK 4 ASIAN 0 ALASKA/INDIAN 0 WHITE 31 HISPANIC 31 BLACK 4 ASIAN 0 ALASKA/INDIAN 0 2024 SWORN OFFICERS: 2025 SWORN OFFICERS: 68* 66* 61 59 7 7 MALE MALE FEMALE FEMALE 46 * PROFESSIONAL STAFF as of December 31, 2025 * Authorized Professional Staff: 48 66SWORN OFFICERS as of December 31, 2025 City of Schertz Police Department ANNUAL REPORT 2025 7 CRIMES AGAINST PERSONS 2024 2025 PERCENT CHANGE Assault Offenses 322 451 38% Homicide Offenses 0 0 0 Human Trafficking 0 0 –100% Kidnapping/ Abductions 3 18 83% Sex Offenses 5 35 600% Sex Offenses (Non-Forcible)0 2 100% CRIMES AGAINST SOCIETY 2024 2025 PERCENT CHANGE Animal Cruelty 2 2 0% Drug Offenses 176 262 49% Gambling Offenses 0 0 0% Pornography 7 12 71% Prostitution 0 1 100% Weapon Violations 15 24 60% CRIMES AGAINST PROPERTY 2024 2025 PERCENT CHANGE Arson 1 2 100% Bribery 0 3 100% Burglary 54 47 –13% Counterfeiting/ Forgery 16 23 44% Criminal Mischief 77 187 143% Embezzlement 6 0 –100% Extortion 3 5 67% Fraud 71 96 35% Larceny 278 270 –3% Motor Vehicle Theft 56 69 23% Robbery 6 12 100% Stolen Property Offenses 0 24 100% SCHERTZ OVERALL ACTIVITY 2024 2025 PERCENT CHANGE Arrests (Adult & Juv)485 401 –17% Traffic Stops 5,204 8,052 55% Citations 2,522 3,574 42% Warnings 3,336 5,605 68% Accidents (Major/Minor)1,001 1,096 9% NIBRS/TIBRS 451 CASES OF ASSAULT HANDLED in 2025 8 City of Schertz Police Department ANNUAL REPORT 2025 Department Internal Affairs This section compares Internal Affairs (IA) investigations completed in calendar years 2024 and 2025, organized by standard disposition categories: Sustained, Not Sustained, and Exonerated/Unfounded. These categories reflect the evidentiary outcome of each investigation and help ensure consistent reporting and accountability measures across cases. A “Sustained” finding indicates the allegation was supported by sufficient evidence and that a policy violation occurred. A “Not Sustained” finding indicates the available evidence was insufficient to prove or disprove the allegation. “Exonerated/ Unfounded” indicates either the allegation was not supported by the facts as reported (Unfounded) or the employee’s actions were lawful, proper, and within policy (Exonerated). These outcomes are evidence-based determinations and do not reflect pre-judgment; they reflect what can be established through documentation, interviews, and objective review. INVESTIGATIONS 2024 2025 Total Investigations 23 18 Sustained 21 16 Not Sustained 0 1 Exonerated/Unfounded 2 1 Department Use of Force Stats Use of Force is an occasional and unfortunate outcome of police work. Statistics from around the nation show a very small percentage of police contacts result in use of force, and applied force does not equal excessive force. An annual review by Professional Standards helps guide training, supervision, policy refinement, and the handling of force-related allegations. In 2025, the Schertz Police Department had 251 Use of Force applications. It should also be noted that more than one type of use of force may be used during a single event. USE OF FORCE DEMOGRAPHICS RACE/ETHNICITY MALE FEMALE Caucasian/ Hispanic 51 10 African American 50 23 Asian 0 0 TYPES OF USE OF FORCE FORCE TYPE COUNT Handcuffing While Struggling 30 Hands/ Feet/ Fists 153 Leg Restraints 8 OC Spray 14 Taser Deployed (Contact)18 Taser Deployed (No Contact)4 Taser Displayed 1 Threat of Lethal Force 54 City of Schertz Police Department ANNUAL REPORT 2025 9 FIELD OPERATIONS BUREAU The Field Operations Bureau is the backbone of the department and the face the public is familiar with. Field Operations consists of the Uniform Services Division which oversees vital aspects of the department. From Uniform Patrol, Special Events Planning and Coordination, K-9, and the Field Training Program. The Field Operations Bureau is the largest and one of the most visible aspects of the department. Uniform Patrol Patrol officers serve as the most visible representatives of the police department by playing a crucial role in fostering community safety. Their presence not only deters criminal activity but also instills a sense of security among residents. These dedicated professionals respond swiftly to both emergency and non-emergency calls, addressing situations ranging from traffic accidents to domestic disputes with skill and empathy. Moreover, by actively engaging with community members, patrol officers build strong relationships and foster trust, enhancing public cooperation in crime reporting and prevention efforts. This collaborative approach is essential for creating safer neighborhoods and ensuring a more resilient community. 10 City of Schertz Police Department ANNUAL REPORT 2025 Canine Unit The Schertz Police K9 Unit plays an indispensable role in law enforcement, significantly enhancing public safety and strengthening police operations. These highly trained dogs are adept at detecting drugs, explosives, and human scents, making them invaluable assets in criminal investigations and threat prevention. K9s are not only skilled at pursuing and apprehending dangerous suspects, but they also do so while maintaining the safety of both officers and civilians. Through rigorous training that emphasizes obedience, agility, and specialized operational tasks, these K9s become exceptional partners in a wide range of environments, ensuring a safer community for everyone. Alamo Area Special Weapons and Tactics Team The Schertz Police Department is proud to be part of the Alamo Area Special Weapons and Tactics Team. Partnered with several municipal agencies, the Schertz Police Department currently contributes four SWAT operators and two Crisis Negotiators. All team members receive specialized training for their specialty to assist our law enforcement partners to ensure continued safety in Schertz and surrounding communities. In 2025, the AASWAT Team responded to seven operations, which included emergency callouts and warrant deployments, and trained for over 152 hours. Field Training Program All commissioned peace officers employed by the Schertz Police Department are required to undergo an intensive, on-the-job training known as the Field Training Program. This training and evaluation program helps new officers transition from the classroom environment to a practical application of what they have learned in the Police Academy so that they can be certified for solo patrol. There is also an accelerated program to acquaint officers with prior experience to the Schertz Police Department. The Field Training Officers (FTOs) provide one-on-one training for the recruits that lasts approximately 21 weeks. During that time, recruit officers progress through five phases and rotate FTOs and shifts each phase. Once the 21- week training program is completed, the recruit officers are assigned to the Uniformed Patrol Division as Patrol Officers. In 2025, the department had approximately 10 available FTOs who have trained 12 recruit officers. These highly trained dogs are adept at detecting drugs, explosives, and human scents, making them invaluable assets. City of Schertz Police Department ANNUAL REPORT 2025 11 OPERATIONS SUPPORT BUREAU The Operations Support Bureau (OSB) strengthens our law enforcement operations through three key divisions: Support Services, Central Investigations, and Professional Standards. Each division is essential to maintaining our department’s efficiency, accountability, and professionalism. OSB supports our police department by fostering excellence and a commitment to serving the community with honor and professionalism. We invite you to learn more about our work as we continue to enhance public safety and build trust within the community. OSB supports our police department by fostering excellence and a commitment to serving the community with honor and professionalism. 12 City of Schertz Police Department ANNUAL REPORT 2025 Property Room and Crime Scene Section are responsible for responding to crime scenes where they document evidence through photography, detailed notes and specialized equipment. Members of the section process the scene for evidence like fingerprints, DNA, hairs, fibers or anything that could be related to the offense. In 2025, our technicians responded to seventy-two (72) callouts throughout the year, a 10% decrease from 2024 with eighty (80) callouts. Warrant Section Warrant Section is composed of a peace officer assigned to assist the Schertz Municipal Court. The section is responsible for receiving, logging, and serving warrants, capiases, and other processes. The Warrant Section maintains a close liaison with the Court Clerk to ensure accurate accounting on payments received and proper disposition of warrants and capiases. Members also provide bailiff duties to include courtroom security; escorting prisoners and defendants and works closely with the Municipal Judge and Prosecutor. 2024 2025 Warrants Issued 602 1,195 Warrants Cleared 861 802 Central Investigation Division The Criminal Investigation Division (CID) is overseen by a Lieutenant and is comprised of four sections. The Central Investigations Division manages complex cases requiring specialized expertise. Our investigators gather evidence, solve crimes, and bring offenders to justice to help keep our community safe. Criminal Investigation Section Criminal Investigation Section (CIS) consists of one Detective Sergeant and five Detectives. Detectives are responsible for investigating crimes against persons and property, including homicide, burglary, robbery, assault, sex crimes, missing person, and fraud. CIS is responsible for performing all criminal investigations and works closely with Comal, Guadalupe, and Bexar County District Attorney’s Offices to aid in successful prosecution of criminal cases. 2024 2025 Cases Assigned 766 1006 Cases Filed for Prosecution 154 269 Property Room and Crime Scene Section Property Room and Crime Scene Section are responsible for the intake and security of all evidence collected by members of the department pending the outcome of a criminal investigation, while maintaining a secure chain of custody. Members of the unit work diligently to maintain a well-organized Property Room to support efficiency. Members of the section handle evidence requests for various reasons to include forensic analysis and trial. During 2025, they took custody of more than 1,300 items of various categories to care for to ensure successful prosecution of criminal cases. 269 CASES FILED FOR PROSECUTION in 2025 City of Schertz Police Department ANNUAL REPORT 2025 13 Crime Victim Liaison Section The Crime Victim Liaison Section is to alleviate the psychological and emotional trauma incurred as a result of a crime and provides crime victims with written notices about their rights and financial needs, and refer victims to community resources that can help them deal with the aftermath of the crime. The ultimate goal is to empower victims by meeting their individual needs with compassion, respect, and support. Members of the section work closely with Children’s Advocacy Centers and the Texas Department of Family and Protective Services (commonly referred to as Child Protective Services). The Crime Victim Liaison Section offers a range of support services to crime victims and their families. These services include, but are not limited to: ■Crisis intervention ■Assistance with filing Crime Victims Compensation applications ■Court accompaniment ■Notification of victims’ rights ■Referrals for emergency shelter, financial assistance, and counseling ■Referrals and assistance with medical services ADVOCACY AND SUPPORT PROVIDED FOR VICTIMS 2024 2025 Survivors of Sexual Assault 80 25 Crimes Against Children 96 47 Family Violence 256 143 Stalking/ Harassment 38 14 Homicide Families 1 1 354 VICTIMS OF CRIME SERVED in 2024 1,773 ADVOCACY SERVICES PROVIDED in 2024 5 CRIME VICTIM COMPENSATION APPLICATIONS in 2024 311 VICTIMS OF CRIME SERVED in 2025 2,119 ADVOCACY SERVICES PROVIDED in 2025 7 CRIME VICTIM COMPENSATION APPLICATIONS in 2025 14 City of Schertz Police Department ANNUAL REPORT 2025 Support Services Division The Support Service Division is commanded by one Lieutenant and consists of Communications (Dispatch), Records, Community Projects, Traffic Unit, and School Resource Officers. The Support Services division delivers essential resources and logistical support, enabling officers to focus on protecting and serving the community. This division provides technological solutions and training to ensure our personnel are well-equipped for success. The Support Services division delivers essential resources and logistical support, enabling officers to focus on protecting and serving the community. City of Schertz Police Department ANNUAL REPORT 2025 15 Communications Unit Our Communications Unit consists of one (1) communications manager, sixteen (16) full-time and three (3) part-time telecommunicators, ensuring 24/7 staffing with a minimum of two Communications Officers at all times. They are the first people notified in an emergency. The dispatchers handle all emergency calls for service for Police Fire and EMS. The City of Schertz maintains its own Public Safety Dispatch Center onsite. Our PSAP (Public Safety Answering Point) receives all non-emergency calls, 9-1-1 calls and text messages for the City of Schertz and the City of Cibolo, and serves as the primary link between the public and emergency services. Utilizing multiple computer systems, radio equipment and databases they dispatch responders for all Police, Fire, EMS and Animal Control calls. The Communications Center is also responsible for notification to other city departments for any after-hours calls that may affect resident and visitor quality of life, such as contacting Public Works for street issues. All of our Communications Officers are TCOLE certified through the state and receive four months of combined on-the- job and classroom training to meet all the state requirements with continuing education every year. We currently have two TAC’s (Terminal Agency Coordinator) that ensure compliance to policies and procedures set by TCIC/NCIC (Texas & National crime information centers) and CJIS policies set by the FBI. COMMUNICATIONS CENTER INCOMING CALLS 2024 2025 911 Calls 27,679 28,992 Non-Emergency Calls 54,116 63,893 Texts to 911 122 1,413 TCIC/NCIC Transactions 111,315 132,673 CALLS FOR SERVICE 2024 2025 Schertz Police Department 35,633 43,361 Cibolo Police Department 26,022 24,768 Schertz Fire Department 4,529 4,996 Cibolo Fire Department 3,008 3,692 Schertz EMS 15,253 16,545 28,992 911 CALLS ATTENDED in 2025 16 City of Schertz Police Department ANNUAL REPORT 2025 Records Unit Our Records Unit consists of one (1) records manager and three (3) professional records personnel. They are the first people you meet when coming to the Department and handle all aspects of record management to include records safekeeping, crime statistics, and crash and criminal case filings. The unit performs specialized duties in the preparation and maintenance of a wide variety of police records. Our Police Records Specialists review and process all alarm permits, solicitor’s permits, incident reports, arrest reports, crime reports, and traffic reports. The Police Records Unit ensures all records releases are handled in accordance with all applicable laws. Additionally, our friendly and professional Police Reports Specialists greet all who come into the Schertz Police Department. 2024 2025 Public Information Requests 1,394 1,520 Total Reports Processed 3,615 3,933 Total Cases Filed to DA 828 1,572 Community Projects Unit Community Projects Unit consists of one (1) highly trained officer who is committed to serving our community members with community outreach, child car seat training, crime prevention and more. Partnering with the community, various programs are offered to the public, including Neighborhood Crime Watch, National Night Out, Citizens Police Academy (CPA), Home and Business Security Assessments, and youth summer programs for young adults ages 11 – 17 who have an interest in law enforcement. In 2025, the department won the Outstanding Crime Prevention Small Agency award and Chief Lowery was the recipient of the Outstanding Crime Prevention Manager award. Traffic Unit The Traffic Unit is comprised of one (1) sergeant and four (4) officers who investigate traffic complaints, accidents, and vehicle related fatalities as well as enforce traffic laws. They are responsive to community complaints, assist with traffic studies that affect traffic flow and traffic engineering, and conduct enforcement in areas with the ultimate goal to reduce traffic accidents to make the community safer. School Resource Officer Unit Our School Resource Officers (SROs) are authorized up to two (2) sergeants and ten (10) officers who are in our community schools every day schools are in session, ensuring our children’s safety. An SRO’s responsibilities blend law enforcement duties with education and community policing. Our SROs help enforce laws, ensure campus security, mentor students, and collaborate with school staff/administration to create a safe and supportive learning environment. Their role is not just about discipline; it’s about building trust, teaching prevention, and responding effectively to emergencies. The School Resource Officer (SRO) program continually evolves to keep pace with state and federal mandates, as well as changes in educational policies, societal expectations, and community needs. Officers in the SRO program maintain a high level of ALERRT (Advanced Law Enforcement Rapid Response Training) training. This is a central aspect of their role, as they are the first line of defense when emergencies occur at school, and they must be prepared to handle a wide range of high-pressure situations. Their expertise in incident management helps maintain order, mitigate risks, and ensure the safety of everyone involved. City of Schertz Police Department ANNUAL REPORT 2025 17 Professional Standards Division The Professional Standards Division exists to ensure the Schertz Police Department consistently delivers ethical, lawful, and professional service, both in what we do and how we do it. Our work is largely behind the scenes, but it directly impacts officer readiness, accountability, safety, and public confidence. Professional Standards supports the department by strengthening performance, identifying risk early, ensuring compliance with state requirements, and maintaining transparent, fair processes that protect employees and the public alike. In 2025, the Professional Standards Division encompassed Internal Affairs, Training, Quartermaster, and Animal Services, along with ongoing responsibilities tied to policy review and oversight, as well as support functions related to recruiting and hiring. Each area plays a distinct role, but together they support a single mission: service grounded in integrity, professionalism, and public trust. Quartermaster Quartermaster operations support officer and public safety through the procurement, issuance, tracking, and accountability of Department equipment and uniforms. In 2025, the Department continued to grow in this area by acquiring updated, modern equipment and leveraging technology that improves readiness, response, and effectiveness in the field. This includes maintaining high standards for the condition and function of critical gear, strengthening inventory controls for accountability, and ensuring personnel are equipped with tools that support safer outcomes and better service to the community. Quartermaster plays a key role in professionalism and public stewardship, ensuring we responsibly manage resources while providing officers the equipment they need to perform at a high level. Each area plays a distinct role, but together they support a single mission: service grounded in integrity, professionalism, and public trust. 18 City of Schertz Police Department ANNUAL REPORT 2025 284 ANIMAL TRANSFERS TO ANIMAL RESCUE in 2024 228 ANIMAL TRANSFERS TO ANIMAL RESCUE in 2025 2,720 CALLS FOR SERVICE in 2024 2,067 CALLS FOR SERVICE in 2025 1,381 ANIMAL INTAKES in 2024 1,238 ANIMAL INTAKES in 2025 404 ANIMAL ADOPTIONS in 2024 486 ANIMAL ADOPTIONS in 2025 Animal Services Section Animal Services consists of one Animal Services Manager, four Animal Services Officers and four Kennel Technicians. Animal Services Officers are responsible for the enforcement of City of Schertz animal ordinances and codes. Responsibilities also include the capture and restraint of stray, diseased, vicious, and dangerous animals, investigating animal cruelty, dog bites and attacks on humans and the capture of injured wildlife. Kennel Technicians are responsible for the general care and maintenance of all animals housed at the Schertz Animal Adoption Center, along with the cleaning and care of the facility. Kennel Technicians provide both preventative care for the animals as well as first aid and treatment prior to vet care. Members work together as a team to assess animal behavior to ensure a smooth transition while at the animal shelter. Members are also trained to care for and rehabilitate orphaned, neonatal kittens. City of Schertz Police Department ANNUAL REPORT 2025 19 DEPARTMENT TRAINING The Schertz Police Department encourages continued education and training among the sworn and professional staff. With constant changes and challenges in the law enforcement profession, training is put at the forefront to ensure continued professionalism. In 2025, department employees not only attended state-mandated training but furthered their knowledge by attending advanced training and professional conferences. In 2025, the Training Unit reported 4,641 hours of training pushed out to department officers. This is an increase to the 4,206 hours in the same reporting period of the previous year. This increase in training has seen benefits on the career development front with nine members (three telecommunicators and six peace officers) of the department advancing their licenses. In 2025, all department employees received approximately 13,603 combined hours of training from external, internal, and online sources. 13,603 COMBINED HOURS OF TRAINING in 2025 624 HRS ALERRT LEVEL 1 in 2025 251 HRS ALERRT UPDATE in 2025 732 HRS FIREARM RELATED TRAINING in 2025 20 City of Schertz Police Department ANNUAL REPORT 2025 COMMUNITY ENGAGEMENT Throughout 2025, the Schertz Police Department initiated and participated in a variety of programs that promoted community engagement and safety, education, such as neighborhood watch, child safety seat inspections, Blue Santa, and the Youth and Citizens Police Academies. Schertz Citizens Police Academy Alumni Association In 1991, the Schertz Police Department established a citizen volunteer program called Schertz Citizens Police Academy Alumni Association (SCPAAA). These citizens volunteers are not commissioned as sworn officers and have no enforcement authority beyond that of any citizen, but assist officers with designated, non- confrontational activities. The Department draws on time, talents, and experience of its volunteers to allow Officers to better perform their frontline duties. We attempt to match volunteers to jobs according to their strengths and abilities. Volunteers must be a graduate of the Schertz Citizens Police Academy (SCPA) but need no prior experience. After completing the SCPA Program, citizens volunteers complete at least four hours of volunteer work per month. Citizens volunteers perform the following services: ■Assist at animal services ■Assist in a variety of administration situations ■Assist in vacation house watch ■Assist in crime prevention by participating in citizen on patrol ■Festivals/parade patrols ■Assist in vehicle maintenance ■Assist with community engagement/event Citizen volunteers drive a specially marked vehicle bearing the Citizens on Patrol logo. To drive the C.O.P. vehicle, volunteers must be CPR certified, take the Defensive Driving Course, and take the Traffic Incident Management course. Our SCPAAA is a non-profit organization that has also participated in a variety of fundraisers to help purchase various equipment for the Department. In 2024, the SCPAAA purchased a DJI Drone and in 2025, they purchased a TruNarc. 3,242 SCPAAA VOLUNTEER HOURS in 2025 City of Schertz Police Department ANNUAL REPORT 2025 21 Annual Review of Community Events In 2025, the Schertz Police Department participated in many community engagement opportunities, including: ■Blue Santa ■Child Passenger Safety ■Youth Police Academy ■National Night Out ■Neighborhood Watch ■Citizens Police Academy ■CarFit 22 City of Schertz Police Department ANNUAL REPORT 2025 Non-Annual Awards and Recognitions ■Life Saving - Daniel Hall, Joaquin Montes, Matthew De Leon, Adam Rodriguez, Shawn O’Leary, Andrew England, Marte Nesham ■Distinguished Service Medals - Elizabeth Rhinehart, Steven Solitto, Frank Schmidt ■Schertz Police Department - 2025 Outstanding Crime Prevention Agency - Small Agency ■Schertz Police Department- 2025 Outstanding Crime Prevention Manager - Chief James Lowery ■Schertz Police Department - Recognized 7th place in the state and 20th in the nation for 2025 National Night Out efforts for cities with a population of 15,000-50,000 ■City of Schertz safest city in the San Antonio Metroplex and the 9th Safest City in the State of Texas Department Annual Awards ■Volunteer of the Year - Cyndi Broshat ■Animal Services Employee of the Year - Luis Gonzales ■Civilian of the Year - Lasonya Madison ■Rookie of the Year - Adam Rodriguez ■Officer of the Year - Frank Chavarria ■Detective of the Year - Samuel Ramirez ■Civilian Supervisor of the Year - Monica Kuehn ■Commissioned Supervisor of the Year - Sgt. Daniel Trevino Service Awards One Year Service: ■Sheila Truszkowski, Astrid Jamie, Patrick Beuligmann, Kelsey Ragland, Griffin Roberts, Phillip E. Waller, Rodney Robinson, Robert Surre, Benjamin Ekomo, Christopher Brusich, Joshua Dorantes, JayVeon Cardwell, Carla Cardona, Luis Gonzales, Adam Rodriguez Five – Twenty Years ■Five Year Service - Annemarie Sibdhannie, Zue Tellez, Ian McMath, LaSonya Madison, Sally Alfaro, Alberto De La Torre, Rolando Pena, Catherine Crenshaw, Ayleen Almanza ■Ten Year Service - Danielle Apgar, Sean McKenna Twenty-Five Years and Beyond ■Twenty Year Service - Shawn Ceeko ■Twenty-five Year Service - Alicia Sepeda ■Thirty Year Service -Darin S. La Cour EMPLOYEE/DEPARTMENT RECOGNITION Elizabeth Rhinehart Steven Solitto Frank Schmidt Michael McGuire EMPLOYEE PROMOTIONS EMPLOYEE RETIREMENTS Gregg Flowers Sergeant Richard Kunz Sergeant Hector Castro Sergeant Rolando Pena Sergeant Renee Sifuentez Civilian Supervisor (Communications Shift Supervisor) City of Schertz Police Department ANNUAL REPORT 2025 23 We thank our valued supporters THE SCHERTZ POLICE DEPARTMENT 1400 Schertz Parkway, Building 6 Schertz, TX 78154 Agenda No. 1.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:Minutes - Approval of the minutes from the regular Council Meeting on March 17, 2026 (S.Edmondson/S.Courney/I.Chavez) Attachments 03-17-2026 Minutes Draft Agenda No. 2.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:City Secretary Subject:Appointments, Re-appointments, and Resignations - City of Schertz Boards, Commissions, and Committees Appointments n/a Re-appointments Schertz Historical Preservation Committee for the term ending 03/31/2028: Becki Babcock, Lauren Dalton, Sophie Rodriguez, Kathleen Samsey, Rosalyn Wise Capital Improvement Advisory Committee for the term ending 06/30/2028: Dr. Mark Penshorn and Mr. Bryan Jones Resignations, Removals, and Expiring Terms CIAC: Tamara Brown, Judy, Goldick, Roderick Hector, David Hughes, Patrick McMaster, Glen Outlaw, and Clayton Wallace BACKGROUND In accordance with City policy and Council rules and procedures, periodic appointments and re-appointments to City Boards, Commissions, and Committees are brought forward for City Council consideration. The following individuals are recommended for re-appointment to continue serving on their respective boards and committees: Schertz Historical Preservation Committee Term Ending: March 31, 2028 Becki Babcock Lauren Dalton Sophie Rodriguez Kathleen Samsey Rosalyn Wise Capital Improvement Advisory Committee (CIAC) Term Ending: June 30, 2028 Dr. Mark Penshorn Mr. Bryan Jones Recent legislative changes to state law no longer allow members of the Planning and Zoning Commission to serve concurrently as members of the Capital Improvement Advisory Committee (CIAC). As a result, current CIAC members who serve by virtue of their Planning and Zoning Commission positions must be removed to ensure compliance with state law. Those members are as follows: Tamara Brown Judy Goldick Roderick Hector David Hughes Patrick McMaster Glen Outlaw Clayton Wallace Agenda No. 4.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Engineering Subject:Resolution 26-R-032 - Authorizing an amendment to the professional services agreement with Halff Associates for the FM 1518 Utility Relocation Project (B.James/K.Woodlee/E.Schulze) BACKGROUND City staff has determined that the City requires additional engineering-related services for the completion of the FM 1518 Water and Wastewater Relocation Project.  Halff Associates, Inc. (Halff) has exceeded the project scope with respect to construction administration services and is requesting an additional fee to complete the project. The original agreement with Halff for the design, bid, and construction phase services was for $548,370 with a not to exceed amount of $600,000 as approved by council on May 5, 2021, with Resolution 21-R-37.  Due to additional design revisions requested by the City and TxDOT as well as increased coordination efforts throughout the construction phase of this project, Halff had previously been approved to reallocate their fees between “Data Collection” and “Utility Design” as well as to increase the construction phase services an additional $43,500.  This increased the total contract amount to $591,870, which remained within the not to exceed amount originally approved.  Recently, Halff has been tasked with resolving conflicts with abandoned asbestos cement (AC) water lines that were not known to exist prior to design or construction beginning.  These abandoned utilities required testing of their structural integrity to satisfy TxDOT in order remain abandoned-in-place without removal.  Halff is requesting an additional fee of $25,000 since this effort was not included in their original scope of work.  With this amendment, the total professional services agreement amount will be $616,870 and the new not to exceed amount will be $625,000.  GOAL The goal of Resolution 26-R-032 is to obtain authorization from City Council to have Halff provide additional services toward completion of the FM 1518 Water and Wastewater Relocation Project.  COMMUNITY BENEFIT The relocation of these lines will ensure the City utilities are provided in an alignment that allows adequate space for future maintenance, and prevents conflicts with TxDOT’s proposed roadway.  SUMMARY OF RECOMMENDED ACTION Staff recommends that the City Council approve Resolution 26-R-032, authorizing an amendment to Halff’s agreement for the FM 1518 Relocation Project, for an additional amount of $25,000.  FISCAL IMPACT Funding for the project was allocated from the City’s Water and Sewer Construction Reserves, bond Funding for the project was allocated from the City’s Water and Sewer Construction Reserves, bond proceeds, and ARP funds.  The amendment to the task order is an additional $25,000 which is within the budget funded by those sources.  RECOMMENDATION Approve Resolution 26-R-032.  Attachments Resolution 26-R-032 with attachement FM 1518 Utility Relocation CIP Project Sheet RESOLUTION 26-R-032 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING AN AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH HALFF ASSOCIATES FOR THE FM 1518 UTILITY RELOCATION PROJECT WHEREAS, the Schertz City Council approved Resolution 21-R-37 on May 5, 2021 authorizing the design, bid, and construction phase engineering services for the FM 1518 Utility Relocation Project; and WHEREAS, The City staff of the City of Schertz has determined that the City requires additional engineering-related services for the completion of the FM 1518 Utility Relocation Project; and WHEREAS, City staff has determined that Halff Associates, Inc. is uniquely qualified to provide such services for the City; and WHEREAS, Halff and Associates, Inc. is an approved On-Call Engineering Firm for the City of Schertz; and WHEREAS, the City Council has determined that it is in the best interest of the City to amend its Agreement with Halff Associates, Inc. for the construction phase services for the FM 1518 Utility Relocation Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes an amendment to the agreement with Halff Associates, Inc., in substantially the form set forth on Exhibit A and in accordance with the original project agreement authorized by Resolution 21-R37, for a total professional service agreement amount of $616,870 and the new Not to Exceed amount of $625,000. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND APPROVED on the _______ day of _______________, 2026. CITY OF SCHERTZ, TEXAS ________________________________ Ralph Rodriguez, Mayor ATTEST: _______________________________ Sheila Edmondson, City Secretary Attachment A Amendment to Task Order AMENDMENT TO TASK ORDER Amendment No. 2 Task Order Number: 03 Project Name: FM 1518 Utility Relocations Owner: City of Schertz Engineer: Halff Associates, Inc. General Purpose of the Amendment: This amendment is intended to support the City's request, and in coordination with TxDOT’s Project Manager, Halff Associates has continued to provide additional assistance in the Construction Phase Services (Phase 500) of the FM 1518 Utility Relocations Project. The additional assistance is related to design assistance/coordination required for Construction Phase Services by TxDOT and the City, which was necessary to keep the accelerated project, associated with the joint bid of the City of Schertz Utilities and the TxDOT FM 1518 reconstruction project, on schedule. Below, in the modification of the description, is a summary of the additional efforts under the amendment. The objective of this amendment is to ensure the city continues to receive the necessary support from Halff related to the Construction Phase Services Phase of this project and to cover any additional items that arise during this phase until construction is completed. Description of Modifications: In accordance with the contracted scope and fee under the Original Task Order, Halff has fully utilized the allocated budget for Construction Phase Services. This effort was necessary due to changes requested by the city and TxDOT and associated coordination efforts, including attending weekly meetings with TxDOT, preparing additional plan sheets for a water line to tie into an existing development, attending onsite meetings with city and TxDOT staff, coordinating the abandonment of an asbestos waterline, and addressing questions from the contractor to address conflicts with other utilities relocated as part of this project. Approximately two to four months of construction coordination remain, and we estimate that the requested additional fee of $25,000 is needed for the Construction Phase Services. Most of this effort is expected to be spent keeping up with the tight TxDOT schedule. Summary of Original Task Order and Amendments Original Task Order Total = $548,370.00 Previous Amendments = $43,500.00 (#1 – 9/13/2024) Current Task Order Total = $591,870.00 This Amendment #2 = $25,000 New Task Order Total = $616,870.00 Owner and Engineer hereby agree to modify the above-referenced Main Agreement as set forth in this Amendment. The Effective Date of the Amendment is . Owner Engineer Halff Associates, Inc. (typed or printed name of organization) (typed or printed name of organization) By: By: (individual’s signature) (individual’s signature) Date: Date: 3/10/2026 (date signed) (date signed) Name: Name: Lamberto “Bobby” Balli (typed or printed) (typed or printed) Title: Title: Director of Public Works/ Vice President (typed or printed) (typed or printed) Project Type:W23 Project Title: Project Manager: Location Description: Project Summary: Start Date:May-21 Completion Date:May-25 Project Forecast Prior Appropriation 2023-24 2024-25 2025-26 2026-27 2027-28 2028-33 Total Cost Funding Source ARP -$ -$ 3,688,076$ -$ -$ -$ -$ 3,688,076$ Water/Sewer Reserves 819,341$ -$ -$ -$ -$ -$ -$ 819,341$ Bonds 10,000,000$ -$ -$ -$ -$ -$ -$ 10,000,000$ -$ -$ -$ -$ -$ -$ -$ -$ Total Funding Source 10,819,341$ -$ 3,688,076$ -$ -$ -$ -$ 14,507,417$ Expenditure Land Purchase -$ 8,810$ -$ -$ -$ -$ -$ 8,810$ Professional Services 724,334$ 80,299$ 95,367$ -$ -$ -$ -$ 900,000$ Construction 9,354,552$ -$ 4,244,056$ -$ -$ -$ -$ 13,598,608$ Total Expenditure 10,078,885$ 89,109$ 4,339,423$ -$ -$ -$ -$ 14,507,417$ FM 1518 between FM 78 and IH 10 Relocation of water and sewer utilities to avoid conflicts as part of the TxDot FM 1518 Improvement Project. Includes water and wastewater relocations along FM 1518, relocation of a water line from FM 78, across Aztec Lane, back to FM 1518, and relocation of a backflow preventer for Randolph AFB. Water/Wastewater Project Code: FM 1518 Utility Relocations Engineering 14 Project Type:Project Code:W23 Project Title: Location: Water/Wastewater FM 1518 Utility Relocations 15 Agenda No. 5.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Information Technology Subject:Resolution 26-R-034 - Authorizing the purchase of software licenses with SHI (B.James/D.Hardin/J.Bluebird) BACKGROUND The City is requesting approval of Resolution 26-R-034 authorizing the purchase of Microsoft Office 365 licenses from SHI and for the City Manager to execute the necessary agreements related to the licensing and use of Microsoft Office 365. The total annual cost will vary depending on the number and types of licenses required. Based on the anticipated licensing needs for the upcoming year, the estimated cost is $95,044.08. Funding for this expenditure is included in the FY 2025–2026 Information Technology budget.  Staff is seeking Council approval, since the maximum not to exceed amount for three years is set at $330,000. SHI Government Solutions is an authorized vendor under the Texas Department of Information Resources (DIR) Cooperative Purchasing Program.  GOAL To obtain authorization from Council to approve the purchase of Microsoft Office 365 Licenses from SHI.  COMMUNITY BENEFIT The ability to continue to communicate effectively between our employees, vendors, and our constituents via email and the continued use of Microsoft Office 365 products.    SUMMARY OF RECOMMENDED ACTION Approval of Resolution 26-R-034 authorizing the purchase of Microsoft Office 365 licenses through SHI.  FISCAL IMPACT The first year cost of this three-year contract is $95,044.08 but may vary in future years based on the number and types of licenses for staff. The current cost reflects the license count and type for 2025-26. Funds are available in the Information Technology budget for FY 2025-26. The maximum not to exceed amount for three years is set at $330,000.  RECOMMENDATION Approval of Resolution 26-R-034.  Attachments Resolution 26-R-034 w attachment RESOLUTION 26-R-034 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING THE PURCHASE OF SOFTWARE LICENSES FROM SHI. WHEREAS, the Schertz IT Department has a need to purchase Microsoft Office 365 licenses for the City employees; and WHEREAS, the Schertz IT Department distributes this software for the daily function of the City employees to fit the needs of the City, to obtain the best pricing for this need and to provide the most compatibility with citizens, vendors, and other municipalities; and WHEREAS, the Schertz IT Department has chosen SHI, a DIR Group Purchasing contracted vendor, for the purchase of these licenses; and WHEREAS, DIR gives public entities the advantage of leveraging the cooperative’s ability to obtain bulk discounts, combined with the ease of online, web-based shopping and ordering; and WHEREAS, the City of Schertz will fund the purchase of the Microsoft Office 365 licenses through the approved 2025-2026 annual IT department budget. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes purchases of software licenses with SHI not to exceed the amount of THREE HUNDRED AND THIRTY THOUSAND DOLLARS ($330,000.00) during the three-year agreement, starting in FY 2025-2026. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND APPROVED on the day of , 2025. CITY OF SCHERTZ, TEXAS Ralph Rodriguez, Mayor ATTEST: Sheila Edmondson, TRMC City Secretary EXHIBIT A Quote from SHI Pricing Proposal Quotation #: 27076603 Reference #: EA - 54320988 - Budgetary Renewal Created On: 1/21/2026 Valid Until: 3/31/2026 TX-City of Schertz Microsoft Inside Account Manager Oscar Medina 1400 SCHERTZ PARKWAY SCHERTZ IT DEPT Cibolo, TX 78108 United States Phone: 210-619-1186 Email: omedina@schertz.com Vivien Cruz 290 Davidson Ave. Somerset, NJ 08873 Phone: 732-868-5926 Email: vivien_cruz@shi.com All Prices are in US Dollar (USO) Product Qty Retail Your Price Total 1 Audio Conferencing Pay Per Min GCC Sub Per User 5 $0.00 $0.00 $0.00 Microsoft - Part#: HUS-00001 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CP0-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 2 Entra ID P1 Gov Sub Per User 5 $68.40 $56.28 $281.40 Microsoft - Part#: MQM-00001 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CP0-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 3 lntune P1 Gov Sub AP Per User 170 $85.20 $70.08 $11,913.60 Microsoft - Part#: 3QA-00008 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CP0-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 4 M365 F3 Unified GCC Sub Per User 346 $103.20 $84.96 $29,396.16 Microsoft - Part#: AAD-63092 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CP0-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 5 0365 Extra File Storage GCC Sub Add-on Extra Storage 1 GB 1025 $3.60 $3.00 $3,075.00 Microsoft - Part#: M9T-00002 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 6 0365 G1 FSA GCC Renewal Sub Per User 74 $105.60 $86.88 $6,429.12 Microsoft - Part#: 7R6-00001 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 7 0365 G1 GCC Sub Per User 21 $132.00 $108.72 $2,283.12 Microsoft - Part#: U4S-00002 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 8 0365 G3 FSA Renewal GCC Sub Per User 56 $258.00 $212.52 $11,901.12 Microsoft- Part#: AM-11924 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 9 0365 G3 GCC Sub Per User 83 $303.60 $250.08 $20,756.64 Microsoft- Part#: AM-11894 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 10 0365 GS GCC Sub Per User 5 $501.60 $413.16 $2,065.80 Microsoft - Part#: T2N-00001 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 11 Planner & Project PS GCC Sub Per User 11 $618.00 $509.04 $5,599.44 Microsoft - Part#: 7VX-00001 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 12 Power Automate Premium GCC Sub Per User 1 $198.00 $163.08 $163.08 Microsoft - Part#: 105-00001 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 13 Power Bl Pro GCC Sub Per User 2 $123.60 $101.76 $203.52 Microsoft - Part#: DDJ-00001 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 14 Teams AC with Dial Out US/CA GCC Sub Add-on Microsoft - Part#: NYH-00001 580 $0.00 $0.00 $0.00 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment 15 Visio P2 GCC Sub Per User Microsoft - Part#: P3U-00001 7 $169.20 $139.44 $976.08 Contract Name: Adobe/Microsoft Software & Related Services Contract#: DIR-CPO-5237 Coverage Term: 4/1/2026 - 3/31/2027 Note: Year 1 of 3 Commitment Total $95,044.08 Additional Comments Pricing is subject to change based on OEM and Distribution pricing changes Purchasing Microsoft Azure Services Customer may purchase Microsoft Azure Services from SHI in one or a combination of the following ways: Azure Prepayment: Customer will have access to its entire Azure prepayment throughout the term of its Enrollment if Customer agrees to be invoiced for the full amount upfront (the "Fully Prepaid Option"). Alternatively, if Customer elects to be invoiced for its Azure prepayment on an annual basis, Customer will have access to an Allocated Annual prepayment each year of the Enrollment (the "Annually Prepaid Option"). Under the Fully Prepaid Option, any unused Azure prepayment will be forfeited at the end of the Enrollment, and under the Annually Prepaid Option, any unused Allocated Annual prepayment will be forfeited on the following Enrollment anniversary date. Using Azure prepayment: Each month, Microsoft will deduct from Customer's Azure prepayment (or Allocated Annual prepayment, if applicable) the monetary value of Customer's usage of eligible Microsoft Azure Services. Once Customer's Azure prepayment (or Allocated Annual prepayment, if applicable) balance has been exhausted, any additional usage will be invoiced at Consumption Rates (as described below). Invoicing Azure prepayment: If Customer elects the Fully Prepaid Option, Azure prepayment will be invoiced immediately. If Customer elects the Annually Prepaid Option, the first Allocated Annual prepayment will be invoiced immediately, and future Allocated Annual prepayments will be invoiced on the anniversary of the Enrollment effective date. Invoicing Azure prepayment overage: If Customer's usage is higher than either its Azure prepayment under the Fully Prepaid Option or its Allocated Annual prepayment under the Annually Prepaid Option, such excess will be invoiced at Consumption Rates to Customer at the end of each Enrollment month. Consumption: Customer pays based on the amount of Microsoft Azure Services consumed during a billing period. Consumption invoicing: If Customer provisions Microsoft Azure Services without an Azure prepayment, SHI will invoice customer in the following month of usage at Consumption Rates. All usage of the Microsoft Azure Services after the expiration or termination of Customer's subscription term will be invoiced by SHI to Customer at then-current Consumption Rates monthly. SHI will invoice eligible Microsoft Azure Services at the contracted mark-up. Please refer to the Azure Portal or Pricing Calculator for more information on availability: https://azure.microsoft.comlen-uslpricinglcalculatorl Payment Schedule Year 1 (Apr-01-2026 to Mar-31-2027): $95,044.08 Year 2 (Apr-01-2027 to Mar-31-2028): $95,044.08 Year 3 (Apr-01-2028 to Mar-31-2029): $95,044.08 Due to the potential impact of any current or future tariffs, the price and availability of hardware items on this quote may be subject to change. This quote has been marked as budgetary, as certain pricing may require approval from Microsoft. Please note, SHI is unable to process Purchase Orders against budgetary quotes. Kindly reach out to your SHI sales team for a Final Quote once you have determined your required counts and licenses. The products offered under this proposal are resold in accordance with the terms and conditions of the Contract referenced under that applicable line item. Agenda No. 6.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Facility & Fleet Subject:Resolution 26-R-046 - Adopting the State-mandated Texas Women’s Privacy Act Policy (B.James/D.Hardin/C.Lonsberry) BACKGROUND The 89th Texas legislature passed Senate Bill 8 adopting the Texas Women’s Privacy Act, amending Chapter 3002 of the Texas Government Code, effective December 4, 2025. The bill specifically requires state agencies and political subdivisions, including cities, to designate certain facilities, generally multiple-occupancy private spaces, for use only by individuals of one sex and to take every reasonable step to prevent use by the opposite sex. As part of the "reasonable step(s)" it is recommended the City adopt a policy regarding use and enforcement. In this case, the City must ensure all multiple-occupancy private spaces in City-owned, City-operated, or City-controlled buildings have the appropriate signage on the outside of the facility, according to Senate Bill 8.  GOAL To comply with the requirements of Senate Bill 8.  COMMUNITY BENEFIT The City of Schertz will be in compliance with State Law.  SUMMARY OF RECOMMENDED ACTION Approval of resolution 26-R- adopting the Texas Women’s Privacy Act to comply with Senate Bill 8.  RECOMMENDATION Approval of Resolution 26-R-046.    Attachments Resolution 26-R-046 Chapter 3002 Government Code 1 RESOLUTION 26-R-046 A RESOLUTION OF THE CITY OF SCHERTZ, TEXAS APPROVING A POLICY TITLED “DESIGNATION AND USE OF CERTAIN CITY FACILITIES UNDER CHAPTER 3002, TEXAS GOVERNMENT CODE”; DIRECTING IMPLEMENTATION; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Texas Legislature adopted the Texas Women’s Privacy Act, to be codified in Chapter 3002 of the Texas Government Code, with an effective date of December 4, 2025; and WHEREAS, Chapter 3002 applies to political subdivisions, including municipalities, and requires them to designate certain multiple-occupancy private spaces in buildings they own, operate, or control for use based on sex, and to take reasonable steps to ensure compliance; and WHEREAS, Chapter 3002 further establishes complaint, cure, and enforcement procedures, including potential civil penalties for noncompliance; and WHEREAS, the City Council desires to ensure that City facilities are administered in accordance with state law and that City staff are provided clear direction for implementing the statutory requirements; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS, THAT: Section 1. The City Council hereby approves the policy titled “Designation and Use of Certain City Facilities Under Texas Government Code, Chapter 3002” in the form presented to the City Council on this date and attached hereto as Exhibit “A”. Section 2.The policy is adopted to comply with the requirements imposed on the City by Texas Government Code, Chapter 3002 Section 3. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as part of the judgment and finding of the City Council. Section 4.All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 5. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 6. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of 2 such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 7. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 8. This resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND APPROVED on this ________ day of ____________, 2026. Ralph Rodriguez, Mayor ATTEST: Sheila Edmondson, City Secretary APPROVED AS TO FORM: _____________________________________ Denton Navarro Rodriguez Bernal Santee & Zech, P.C. 3 EXHIBIT A Designation and Use of Certain City Facilities Under Texas Government Code, Chapter 3002 1. Purpose The purpose of this policy is to implement the requirements imposed on municipalities by Texas Government Code, Chapter 3002, relating to the designation and use of certain multiple occupancy private spaces in City-owned, City-operated, or City-controlled buildings according to sex. 2. Applicability 2.1. This policy applies to: (a) every building and facility the City owns, operates, or controls; and (b) every multiple-occupancy private space within those facilities, as that term is used in Chapter 3002 (e.g., restrooms, locker rooms, changing rooms, showers designed for more than one person at a time). 2.2. This policy does not apply to facilities the City neither owns, operates, nor controls, or to private businesses. 3. Terms & Definitions For purposes of this policy, the definitions in Texas Government Code, Chapter 3002, are adopted by reference, including but not limited to “multiple-occupancy private space,” “single occupancy private space,” “political subdivision,” and “sex.” 4. Designation of Facilities 4.1. Facilities Management shall complete an inventory of all City-controlled facilities and identify every multiple-occupancy private space. 4.2. Each identified multiple-occupancy private space shall be designated for use only by individuals of one sex (male or female) and shall have exterior signage indicating the designation. 4.3. Departments shall take “every reasonable step” to ensure that individuals do not enter a multiple-occupancy private space designated for the opposite sex, consistent with Chapter 3002. Reasonable steps may include signage, staff direction, and adjustments to access points. 4 5. Single-Occupancy Options This policy does not prohibit the City from providing or creating: 5.1. single-occupancy restrooms, 5.2. family restrooms, or 5.3. changing rooms, as allowed in Chapter 3002. 6. Statutory Exceptions Access inconsistent with the posted designation is permitted only in the limited circumstances identified in Chapter 3002, such as custodial/maintenance access, emergencies, law enforcement needs, assistance to a person who needs help, or a child of or under the age prescribed by law who is accompanied by a caregiver. Staff shall be trained to recognize these exceptions. 7. Complaints and Cure 7.1. Chapter 3002 allows Texas residents to file a complaint with the Texas Attorney General if a political subdivision has not complied, but only after the political subdivision has been given written notice and three business days to cure. 7.2. Any employee who receives a written complaint or notice alleging noncompliance with Chapter 3002 must immediately forward it to: (a) the City Manager (or designee), and (b) the City Attorney’s Office. 7.3. The receiving department must correct any substantiated noncompliance (e.g., missing sign, mis-designation, staff error) within three business days of receipt so the City can demonstrate cure within the statutory window. 8. Communications 8.1. The City may post on its website or in City facilities a general statement that City facility designations are made pursuant to state law (Chapter 3002, Texas Government Code). 8.2. The City may also provide contact information for the State of Texas or for state legislative offices for members of the public who have questions or concerns about the scope or content of Chapter 3002. 5 9. Enforcement Failure by City personnel to follow this policy may be addressed under normal personnel procedures. External enforcement, including civil penalties and private actions, is governed exclusively by Chapter 3002 and is outside the City’s control. 10. No Waiver of Immunity Nothing in this policy shall be construed as a waiver of the immunities and jurisdictional limitations preserved to the City by Chapter 3002, including Sections 3002.106–.109, or by any other law. CKRANJIAJP ?K@A PEPHA -,*CAJAN=H CKRANJIAJP OQ>PEPHA V*IEO?AHH=JAKQO LNKREOEKJO LNKDE>EPEJC ?ANP=EJ CKRANJIAJP=H =?PEKJO ?D=LPAN /,,.*NACQH=PEKJ KB EJ@ERE@Q=HO EJ ?ANP=EJ OL=?AO =J@ B=?EHEPEAO =??KN@EJC PK OAT OQ>?D=LPAN =*CAJAN=H LNKREOEKJO Oa_*=/,,.*,,-*==@ABEJEPEKJO*==Ej pdeo _d]lpan6 $-%==l?knna_pekj]h b]_ehepul d]o pda ia]jejc ]ooecja‘ ^u Oa_pekj -*,3(Laj]h ?k‘a* $.%==lB]iehu rekhaj_a odahpanl ia]jo ]b]iehu rekhaj_a jkjnaoe‘ajpe]h _ajpan kn ]b]iehu rekhaj_a odahpan _ajpan(]o pdkoa panio ]na ‘abeja‘^u Oa_pekj 1-*,,.(Dqi]j Naokqn_ao ?k‘a(pd]p d]o _kjpn]_pa‘sepd pda Da]hpd ]j‘Dqi]j Oanre_ao ?kiieooekj qj‘an Oa_pekj 1-*,,/(Dqi]j Naokqn_ao ?k‘a* $/%==lBai]hal ia]jo ]j ej‘ere‘q]h sdk j]pqn]hhu d]o kn sehh d]ra(kn d]‘kn skqh‘d]ra ^qp bkn ]_kjcajep]h ]jki]hu kn ]j ejpajpekj]h kn qjejpajpekj]h ‘eonqlpekj(]nalnk‘q_pera ouopai ‘aoecja‘pk lnk‘q_a(pn]jolknp(]j‘lnkre‘a acco bkn banpehev]pekj* $0%==lEjopepqpekj kb decdan a‘q_]pekjl d]o pda ia]jejc ]ooecja‘^u Oa_pekj 2-*,,/(A‘q_]pekj ?k‘a* $1%==lI]hal ia]jo ]j ej‘ere‘q]h sdk j]pqn]hhu d]o kn sehh d]ra(kn d]‘kn skqh‘d]ra ^qp bkn ]_kjcajep]h ]jki]hu kn ]j ejpajpekj]h kn qjejpajpekj]h ‘eonqlpekj(]nalnk‘q_pera ouopai ‘aoecja‘pk lnk‘q_a(pn]jolknp(]j‘qpeheva olani bkn banpehev]pekj* $2%==lIqhpelha)k__ql]j_u lner]pa ol]_al ia]jo ] b]_ehepu ‘aoecja‘kn ‘aoecj]pa‘bkn oeiqhp]jakqo qoa ^u ikna pd]j kja ej‘ere‘q]h ]j‘ej sde_d ]j ej‘ere‘q]h i]u ^a ej ]op]pa kb qj‘naoo ej pda lnaoaj_a kb ]jkpdan ej‘ere‘q]h(nac]n‘haoo kb sdapdan pda b]_ehepu lnkre‘ao _qnp]ejo kn l]npe]h s]hho bkn lner]_u*==Pda pani ej_hq‘ao ]naopnkki(hk_gan nkki(_d]jcejc nkki( kn odksan nkki* $3%==lLkhepe_]h oq^‘ereoekjl ia]jo ]ckranjiajp]h ajpepu kb pdeo op]pa(ej_hq‘ejc ]_kqjpu(iqje_el]hepu(ola_e]h - lqnlkoa ‘eopne_p kn ]qpdknepu(o_dkkh ‘eopne_p(klaj)ajnkhhiajp _d]npan o_dkkh(kn fqjekn _khhaca ‘eopne_p*==Pda pani ‘kao jkp ej_hq‘a ]op]pa ]caj_u* $4%==lOatl ia]jo ]j ej‘ere‘q]h #o ^ekhkce_]h oat(aepdan i]ha kn bai]ha* $5%==lOejcha)k__ql]j_u lner]pa ol]_al ia]jo ]b]_ehepu ‘aoecja‘kn ‘aoecj]pa‘bkn qoa ^u kjhu kja ej‘ere‘q]h ]p ]peia ]j‘ ej sde_d pda ej‘ere‘q]h i]u ^a ej ]op]pa kb qj‘naoo*==Pda pani ej_hq‘ao6 $=%==]oejcha pkehap naopnkki sepd ]hk_gejc ‘kkn pd]p eo ‘aoecja‘kn ‘aoecj]pa‘]o qjeoat kn bkn qoa ^]oa‘kj oat7 ]j‘ $>%==ohaalejc mq]npano ‘aoecja‘kn ‘aoecj]pa‘bkn qoa ^u kja ej‘ere‘q]h* $-,%==lOp]pa ]caj_ul ia]jo ]‘al]npiajp(_kiieooekj( ^k]n‘(kbbe_a(_kqj_eh(]qpdknepu(kn kpdan ]caj_u ej pda ata_qpera(haceoh]pera(kn fq‘e_e]h ^n]j_d kb op]pa ckranjiajp pd]p eo _na]pa‘^u pda _kjopepqpekj kn ]op]pqpa kb pdeo op]pa(ej_hq‘ejc ]j ejopepqpekj kb decdan a‘q_]pekj* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*,,.*==?KJOPNQ?PEKJ KB ?D=LPAN*==Pdeo _d]lpan i]u jkp ^a _kjopnqa‘pk lnarajp ]hepec]jp bnki ]ooanpejc pda ejr]he‘epu kn qj_kjopepqpekj]hepu kb ]lnkreoekj kn ]llhe_]pekj kb pdeo _d]lpan ]o ]‘abajoa pk he]^ehepu ej ]j ]_pekj(_h]ei(kn _kqjpan_h]ei ^nkqcdp qj‘an pdeo _d]lpan* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* OQ>?D=LPAN >*@AOECJ=PEKJ =J@ QOA KB ?ANP=EJ OL=?AO =J@ B=?EHEPEAO =??KN@EJC PK OAT Oa_*=/,,.*,1-*==@AOECJ=PEKJ KB IQHPELHA)K??QL=J?U LNER=PA OL=?AO*$]%===lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u od]hh ‘aoecj]pa a]_d iqhpelha)k__ql]j_u lner]pa ol]_a ej ]^qeh‘ejc pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u ksjo(klan]pao(kn _kjpnkho . bkn qoa kjhu ^u ej‘ere‘q]ho kb kja oat* $^%===lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u od]hh p]ga aranu na]okj]^ha opal pk ajoqna ]j ej‘ere‘q]h sdkoa oat eo kllkoepa pk pda oat ‘aoecj]pa‘bkn ]iqhpelha)k__ql]j_u lner]pa ol]_a qj‘an Oq^oa_pekj $]%‘kao jkp ajpan pda lner]pa ol]_a* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*,1.*===??KIIK@=PEKJO*$]%==Oa_pekj /,,.*,1-‘kao jkp lnkde^ep ]lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u bnki6 $-%==]‘klpejc ]lkhe_u ja_aoo]nu pk ]__kiik‘]pa ]j ej‘ere‘q]h sepd ]‘eo]^ehepu(]ukqjc _deh‘(kn ]j ah‘anhu ej‘ere‘q]h sdk namqenao ]ooeop]j_a sdaj qoejc ]iqhpelha)k__ql]j_u lner]pa ol]_a7 $.%==aop]^heodejc ]oejcha)k__ql]j_u lner]pa ol]_a( b]iehu naopnkki(kn _d]jcejc nkki7 kn $/%==_d]jcejc pda ‘aoecj]pekj kb ]iqhpelha)k__ql]j_u lner]pa ol]_a bnki pda qoa ‘aoecj]pa‘qj‘an Oa_pekj /,,.*,1-pk at_hqoera qoa ^u ej‘ere‘q]ho kb pda oat kllkoepa pk pda lnarekqohu ‘aoecj]pa‘oat* $^%===lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u eo lnkde^epa‘ bnki lnkre‘ejc ]j ]__kiik‘]pekj qj‘an Oq^oa_pekj $]%pd]p ]hhkso ]j ej‘ere‘q]h pk qoa ]iqhpelha)k__ql]j_u lner]pa ol]_a ‘aoecj]pa‘bkn pda at_hqoera qoa kb ej‘ere‘q]ho kb pda oat kllkoepa pk pda ej‘ere‘q]h #o oat* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*,1/*==AT?ALPEKJO*===‘aoecj]pekj kb ] iqhpelha)k__ql]j_u lner]pa ol]_a qj‘an Oa_pekj /,,.*,1-‘kao jkp ]llhu pk6 $-%==]j ej‘ere‘q]h ajpanejc ]iqhpelha)k__ql]j_u lner]pa ol]_a ‘aoecj]pa‘bkn pda at_hqoera qoa kb ej‘ere‘q]ho kb pda oat kllkoepa pk pda ej‘ere‘q]h #o oat6 $=%==bkn ]_qopk‘e]h lqnlkoa7 $>%==bkn ]i]ejpaj]j_a kn ejola_pekj lqnlkoa7 $?%==pk naj‘an ia‘e_]h kn kpdan aiancaj_u / ]ooeop]j_a7 $@%==pk ]__kil]ju ]j‘lnkre‘a ]ooeop]j_a pk ]j ej‘ere‘q]h sdk jaa‘o ]ooeop]j_a ej qoejc pda b]_ehepu7 $A%==bkn ]h]s ajbkn_aiajp lqnlkoa7 kn $B%==pk naj‘an ]ooeop]j_a ja_aoo]nu ej lnarajpejc ]oanekqo pdna]p pk lnklan kn‘an kn o]bapu7 kn $.%==]_deh‘sdk eo6 $=%==jeja ua]no kb ]ca kn ukqjcan ajpanejc ] iqhpelha)k__ql]j_u lner]pa ol]_a ‘aoecj]pa‘bkn pda at_hqoera qoa kb ej‘ere‘q]ho kb pda oat kllkoepa pk pda _deh‘#o oat7 ]j‘ $>%==]__kil]jea‘^u ]j ej‘ere‘q]h _]nejc bkn pda _deh‘* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*,10*==DKQOEJC KB EJI=PAO =??KN@EJC PK OAT* $]%==Pda Pat]o @al]npiajp kb ?neiej]h Fqope_a od]hh ajoqna eji]pao ]na dkqoa‘ej ]_knna_pekj]h b]_ehepu(ej_hq‘ejc ]‘kniepknu kn _ahh^hk_g kb ]_knna_pekj]h b]_ehepu(]__kn‘ejc pk pda eji]pa #o oat* $^%==Pda Pat]o >k]n‘kb ?neiej]h Fqope_a od]hh ]‘klp nqhao pk eilhaiajp pdeo oa_pekj(ej_hq‘ejc nqhao ajoqnejc pdeo oa_pekj eo eilhaiajpa‘ej _kilhe]j_a sepd op]pa ]j‘ba‘an]h h]s* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*,11*==LNKDE>EPA@ OANRE?AO =P ?ANP=EJ B=IEHU REKHAJ?A ODAHPANO*===b]iehu rekhaj_a odahpan ‘aoecja‘ ola_ebe_]hhu pk lnkre‘a oanre_ao pk bai]ha re_peio kb b]iehu rekhaj_a i]u kjhu lnkre‘a oanre_ao pk6 $-%==]j ej‘ere‘q]h sdkoa oat eo bai]ha7 ]j‘ $.%==]j ej‘ere‘q]h sdk eo -3 ua]no kb ]ca kn ukqjcan ]j‘ eo pda _deh‘kb ]j ej‘ere‘q]h ‘ao_ne^a‘^u Oq^‘ereoekj $-%sdk eo na_aerejc oanre_ao ]p pda odahpan* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* 0 OQ>?D=LPAN ?*AJBKN?AIAJP Oa_*=/,,.*-,-*==?EREH LAJ=HPU*$]%===lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u pd]p rekh]pao pdeo _d]lpan eo he]^ha bkn ]_ereh laj]hpu kb6 $-%==i.1(,,,bkn pda benop rekh]pekj7 ]j‘ $.%==i-.1(,,,bkn pda oa_kj‘kn ]oq^oamqajp rekh]pekj* $^%==A]_d ‘]u kb ]_kjpejqejc rekh]pekj kb pdeo _d]lpan _kjopepqpao ]oal]n]pa rekh]pekj* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*-,.*==?KILH=EJP7 JKPE?A*$]%===naoe‘ajp kb pdeo op]pa i]u beha ]_kilh]ejp sepd pda ]ppknjau cajan]h ]c]ejop ] lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u bkn ]rekh]pekj kb pdeo _d]lpan kjhu eb6 $-%==pda naoe‘ajp lnkre‘ao pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u ]sneppaj jkpe_a ‘ao_ne^ejc pda rekh]pekj7 ]j‘ $.%==pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u ‘kao jkp _qna pda rekh]pekj ^abkna pda aj‘kb pda pden‘^qoejaoo ‘]u ]bpan pda ‘]pa pda sneppaj jkpe_a eo na_aera‘* $^%===_kilh]ejp beha‘qj‘an pdeo oa_pekj iqop ej_hq‘a6 $-%==]_klu kb pda sneppaj jkpe_a7 ]j‘ $.%==pda naoe‘ajp #o osknj op]paiajp kn ]bbe‘]rep ‘ao_ne^ejc pda rekh]pekj ]j‘ej‘e_]pejc pda naoe‘ajp lnkre‘a‘pda jkpe_a namqena‘^u pdeo oa_pekj* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*-,/*==@QPEAO KB =PPKNJAU CAJAN=H6 EJRAOPEC=PEKJ =J@ JKPE?A*$]%==>abkna ^nejcejc ]j ]_pekj ]c]ejop ]lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u bkn ]rekh]pekj kb pdeo _d]lpan(pda ]ppknjau cajan]h od]hh ejraopec]pa ]_kilh]ejp beha‘qj‘an Oa_pekj /,,.*-,.pk ‘apanieja sdapdan hac]h ]_pekj eo s]nn]jpa‘* $^%==Pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u oq^fa_p pk pda _kilh]ejp od]hh lnkre‘a pk pda ]ppknjau cajan]h ]ju ejbkni]pekj pda ]ppknjau cajan]h namqaopo ej _kjja_pekj sepd pda _kilh]ejp( 1 ej_hq‘ejc6 $-%==oqllknpejc ‘k_qiajpo nah]pa‘pk pda _kilh]ejp7 ]j‘ $.%==]op]paiajp kj sdapdan pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u d]o _kilhea‘kn ejpaj‘o pk _kilhu sepd pdeo _d]lpan* $_%==Eb pda ]ppknjau cajan]h ‘apaniejao hac]h ]_pekj eo s]nn]jpa‘(pda ]ppknjau cajan]h od]hh lnkre‘a pk pda ]llnklne]pa kbbe_an kb pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u _d]nca‘sepd pda rekh]pekj ]sneppaj jkpe_a6 $-%==‘ao_ne^ejc pda rekh]pekj ]j‘hk_]pekj kb pda iqhpelha)k__ql]j_u lner]pa ol]_a bkqj‘pk ^a ej rekh]pekj7 $.%==op]pejc pda ]ikqjp kb pda lnklkoa‘laj]hpu bkn pda rekh]pekj7 ]j‘ $/%==namqenejc pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u pk _qna pda rekh]pekj kj kn ^abkna pda -1pd ‘]u ]bpan pda ‘]pa pda jkpe_a eo na_aera‘pk ]rke‘pda laj]hpu(qjhaoo ]_kqnp lnarekqohu bkqj‘pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u he]^ha bkn ]rekh]pekj kb pdeo _d]lpan* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*-,0*==?KHHA?PEKJ KB ?EREH LAJ=HPU7 I=J@=IQO* $]%==Eb(]bpan na_aelp kb jkpe_a qj‘an Oa_pekj /,,.*-,/$_%(pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u d]o jkp _qna‘pda rekh]pekj kj kn ^abkna pda -1pd ‘]u ]bpan pda ‘]pa pda jkpe_a eo na_aera‘kn s]o lnarekqohu bkqj‘he]^ha ^u ]_kqnp bkn ]rekh]pekj kb pdeo _d]lpan(pda ]ppknjau cajan]h i]u ^nejc ]j ]_pekj pk _khha_p pda _ereh laj]hpu ]qpdkneva‘qj‘an Oa_pekj /,,.*-,-* $^%==Ej ]‘‘epekj pk ^nejcejc ]j ]_pekj qj‘an Oq^oa_pekj $]%( pda ]ppknjau cajan]h i]u ]hok beha ]lapepekj bkn ]snep kb i]j‘]iqo kn ]llhu bkn kpdan ]llnklne]pa amqep]^ha naheab* $_%===j ]_pekj qj‘an pdeo oa_pekj i]u ^a ^nkqcdp kn beha‘ej ] ‘eopne_p _kqnp ej pda _kqjpu ej sde_d pda lnej_el]h kbbe_a kb pda lkhepe_]h oq^‘ereoekj kn op]pa ]caj_u eo hk_]pa‘* $‘%==Pda ]ppknjau cajan]h i]u na_kran na]okj]^ha atlajoao ej_qnna‘ej k^p]ejejc naheab qj‘an pdeo oa_pekj(ej_hq‘ejc _kqnp _kopo(na]okj]^ha ]ppknjau #o baao(ejraopec]pera _kopo(sepjaoo baao(]j‘‘alkoepekj _kopo* 2 $a%===_ereh laj]hpu _khha_pa‘^u pda ]ppknjau cajan]h qj‘an pdeo oa_pekj od]hh ^a ‘alkoepa‘pk pda _na‘ep kb pda _kilajo]pekj pk re_peio kb _neia bqj‘aop]^heoda‘qj‘an Oq^_d]lpan F(?d]lpan 12>( ?k‘a kb ?neiej]h Lnk_a‘qna* $b%==Jkpsepdop]j‘ejc ]ju kpdan h]s(pda Bebpaajpd ?kqnp kb =lla]ho d]o at_hqoera fqneo‘e_pekj kran ]ju ]lla]h ]neoejc kqp kb ] _ereh ]_pekj ^nkqcdp qj‘an pdeo oa_pekj* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*-,1*==LNER=PA ?EREH ?=QOA KB =?PEKJ*$]%=== lanokj ]bba_pa‘^u ]lkhepe_]h oq^‘ereoekj #o kn op]pa ]caj_u #o rekh]pekj kb pdeo _d]lpan i]u ^nejc ]_ereh ]_pekj ]j‘eo ajpepha‘ pk k^p]ej6 $-%==‘a_h]n]pknu naheab7 $.%==ejfqj_pera naheab7 ]j‘ $/%==_kqnp _kopo(ej_hq‘ejc na]okj]^ha ]ppknjau #o ]j‘ sepjaoo baao* $^%==Jkpsepdop]j‘ejc ]ju kpdan h]s(pda Bebpaajpd ?kqnp kb =lla]ho d]o at_hqoera fqneo‘e_pekj kran ]ju ]lla]h ]neoejc kqp kb ] _ereh ]_pekj ^nkqcdp qj‘an pdeo oa_pekj* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*-,2*==OKRANAECJ(CKRANJIAJP=H(=J@ KBBE?E=H EIIQJEPU*$]%==Jkpsepdop]j‘ejc ]ju kpdan h]s at_alp ]o lnkre‘a‘^u Oq^oa_pekj $^%(pdeo op]pa d]o okranaecj eiiqjepu(]lkhepe_]h oq^‘ereoekj d]o ckranjiajp]h eiiqjepu(]j‘]j kbbe_an(ailhkuaa(kn ]cajp kb pdeo op]pa kn ]lkhepe_]h oq^‘ereoekj d]o kbbe_e]h eiiqjepu ej ]j ]_pekj(_h]ei(_kqjpan_h]ei(kn ]ju pula kb hac]h kn amqep]^ha ]_pekj pd]p6 $-%==_d]hhajcao pda r]he‘epu kb ]ju lnkreoekj kn ]llhe_]pekj kb pdeo _d]lpan(kj _kjopepqpekj]h cnkqj‘o kn kpdanseoa7 kn $.%==oaago pk lnarajp kn ajfkej pdeo op]pa(]lkhepe_]h oq^‘ereoekj(kn ]j kbbe_an(ailhkuaa(kn ]cajp kb pdeo op]pa kn ] lkhepe_]h oq^‘ereoekj bnki6 3 $=%==ajbkn_ejc ]ju lnkreoekj kn ]llhe_]pekj kb pdeo _d]lpan7 kn $>%==da]nejc(]‘fq‘e_]pejc(kn ‘k_gapejc ]j ]_pekj ^nkqcdp qj‘an Oa_pekj /,,.*-,0 kn /,,.*-,1 bkn ]rekh]pekj kb pdeo _d]lpan* $^%==Oq^oa_pekj $]%‘kao jkp ]llhu eb6 $-%==eiiqjepu d]o ^aaj ]^nkc]pa‘kn lnaailpa‘^u ba‘an]h h]s ej ]i]jjan _kjoeopajp sepd pda Qjepa‘Op]pao ?kjopepqpekj7 kn $.%==okranaecj eiiqjepu kb pdeo op]pa ]j‘ckranjiajp]h eiiqjepu kb ]lkhepe_]h oq^‘ereoekj pk oqep ]j‘bnki he]^ehepu d]ra ^aaj s]era‘ej ]__kn‘]j_a sepd pdeo _d]lpan* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*-,3*===LLHE?=>EHEPU KB EIIQJEPU*==Jkpsepdop]j‘ejc ]ju kpdan h]s(pda eiiqjepeao ‘ao_ne^a‘^u Oa_pekj /,,.*-,2 ]llhu ej aranu op]pa ]j‘ba‘an]h _kqnp ]j‘ej aranu pula kb ]‘fq‘e_]pera lnk_aa‘ejc* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* Oa_*=/,,.*-,4*==S=ERAN KB EIIQJEPU*$]%==Jkpsepdop]j‘ejc ]ju kpdan h]s(]lnkreoekj kb op]pa h]s i]u jkp ^a _kjopnqa‘pk s]era kn ]^nkc]pa ]j eiiqjepu ‘ao_ne^a‘^u Oa_pekj /,,.*-,2 qjhaoo pda lnkreoekj atlnaoohu s]erao kn ]^nkc]pao pda eiiqjepu sepd ola_ebe_nabanaj_a pk pdeo oa_pekj* $^%==Jkpsepdop]j‘ejc ]ju kpdan h]s(]j ]ppknjau nalnaoajpejc pdeo op]pa(]lkhepe_]h oq^‘ereoekj(kn ]j kbbe_an(ailhkuaa(kn ]cajp kb pdeo op]pa kn ]lkhepe_]h oq^‘ereoekj i]u jkp s]era ]j eiiqjepu ‘ao_ne^a‘^u Oa_pekj /,,.*-,2 kn p]ga ]j ]_pekj pd]p skqh‘ naoqhp ej ]s]eran kb pd]p eiiqjepu*===lqnlknpa‘s]eran kn ]_pekj lnkde^epa‘qj‘an pdeo oq^oa_pekj eo _kjoe‘ana‘rke‘]j‘]j qhpn] renao ]_p* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* 4 Oa_*=/,,.*-,5*==FQNEO@E?PEKJ*$]%==Jkpsepdop]j‘ejc ]ju kpdan h]s(ej_hq‘ejc ?d]lpan /3(?ereh Ln]_pe_a ]j‘Naia‘eao ?k‘a( ]j‘Oa_pekjo ..*,,.(..*..-(.0*,,3(.0*,,4(.0*,,5(.0*,-,(]j‘ .0*,--kb pdeo _k‘a(]_kqnp kb pdeo op]pa ‘kao jkp d]ra fqneo‘e_pekj pk _kjoe‘an ]j‘i]u jkp ]s]n‘‘a_h]n]pknu kn ejfqj_pera naheab(kn ]ju pula kb snep(ej_hq‘ejc ]snep kb lnkde^epekj(pd]p skqh‘6 $-%==lnkjkqj_a ]ju lnkreoekj kn ]llhe_]pekj kb pdeo _d]lpan ejr]he‘kn qj_kjopepqpekj]h7 kn $.%==naopn]ej pdeo op]pa(]lkhepe_]h oq^‘ereoekj(]j kbbe_an(ailhkuaa(kn ]cajp kb pdeo op]pa kn ]lkhepe_]h oq^‘ereoekj(kn ]ju kpdan lanokj bnki6 $=%==ajbkn_ejc ]ju lnkreoekj kn ]llhe_]pekj kb pdeo _d]lpan7 kn $>%==da]nejc(]‘fq‘e_]pejc(‘k_gapejc(kn behejc ]_ereh ]_pekj ^nkqcdp qj‘an pdeo _d]lpan* $^%==Jkpsepdop]j‘ejc ]ju kpdan h]s(ej_hq‘ejc ?d]lpan .2( ?ereh Ln]_pe_a ]j‘Naia‘eao ?k‘a(]j‘Nqha 0.(Pat]o Nqhao kb ?ereh Lnk_a‘qna(]_kqnp i]u jkp _anpebu ]_h]ei]jp _h]oo kn ]‘abaj‘]jp _h]oo ej ]_ereh ]_pekj pd]p oaago naheab ‘ao_ne^a‘^u pdeo oa_pekj* =‘‘a‘^u =_po .,.1(45pd Hac*(.j‘?*O*(?d*.,$O*>*4%(Oa_*.( abb*@a_ai^an 0(.,.1* 5 Agenda No. 7.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Fire Department Subject:Resolution 26-R-047 - Authorize the City Manager to apply for and accept funds from the Urban Areas Security Initiative (UASI) to purchase a tethered unmanned aircraft system (UAS) in order to improve and enhance department and city UAS capabilities (S.Williams/G.Rodgers) BACKGROUND This project is a strategic initiative by the City of Schertz Office of Emergency Management to secure federal funding through the Urban Area Security Initiative (UASI). The goal is to procure a Tethered Unmanned Aerial System (UAS) that will be operated by the Schertz Fire Department to serve both local and regional safety needs. Core Objectives  Persistent Oversight: Unlike traditional drones that are limited by battery life, this system uses a physical tether for continuous power and data transmission. Enhanced Situational Awareness: The drone provides a high-altitude, uninterrupted "eye in the sky" to help incident commanders maintain a common operating picture during long-duration events. Regional Collaboration: The equipment is intended for regional deployment, benefiting the San Antonio UASI and the GUADACOMA Emergency Response Group, covering Bexar, Comal, and Guadalupe counties. Strategic Necessity  Addressing Capability Gaps: Current assets suffer from signal vulnerabilities and short flight times, which create "blind spots" during complex responses. Terrorism Prevention: The system is designed to monitor "soft targets" (crowded places) and critical infrastructure to prevent and respond to coordinated attacks. THIRA/SPR Alignment: The project directly addresses deficiencies identified in the regional Threat and Hazard Identification and Risk Assessment (THIRA) and the State Preparedness Report (SPR) regarding intelligence sharing and operational coordination. Sustained Operations  Financial Commitment: The City of Schertz plans to transition recurring maintenance and life-cycle costs into the Fire Department’s annual budget once the grant period ends. Professional Standards: The project leverages existing Part 107 certified personnel and ensures compliance with the National Incident Management System (NIMS). GOAL The primary goal of this application is to secure Urban Area Security Initiative (UASI) funding to The primary goal of this application is to secure Urban Area Security Initiative (UASI) funding to procure a Tethered Unmanned Aerial System (UAS) for the City of Schertz. This system is designed to provide persistent, high-altitude situational awareness and secure communications during extended emergency incidents or large-scale special events. The project aims to achieve the following specific objectives:  Close Capability Gaps: It addresses the limitations of standard drones, such as short battery life and signal vulnerabilities, which currently hinder long-term overwatch and real-time intelligence sharing. Enhance Regional Coordination: The system will be a regional asset housed at the Schertz Fire Department, deployed to assist partners in the San Antonio UASI and GUADACOMA Emergency Response Group across Bexar, Comal, and Guadalupe counties. Support Terrorism Prevention: The drone will provide uninterrupted surveillance of soft targets, crowded places, and critical infrastructure to reduce vulnerabilities to coordinated attacks. Establish a Common Operating Picture: By delivering a continuous, live video feed, the system ensures that all responding agencies maintain a unified and stable operational structure during complex responses. Align with Strategic Goals: The project directly fulfills priorities within the Texas Homeland Security Strategic Plan and addresses deficiencies noted in the regional Threat and Hazard Identification and Risk Assessment (THIRA). COMMUNITY BENEFIT The acquisition of a tethered drone system provides several layers of protection and operational enhancement for the Schertz community, focusing on public safety and regional resilience. Enhanced Public Safety for Local Events The system provides persistent, high-altitude situational awareness during large-scale emergency incidents and special events within the city. Unlike standard drones that must land frequently to change batteries, this system remains airborne for the entire duration of an event, ensuring there are no "blind spots" during critical times. This is particularly beneficial for:  Crowded Places: Providing superior overwatch for festivals, parks, and shopping centers to prevent and respond to threats. Search and Rescue: Supporting local search operations with an uninterrupted view of the area. Protection of Critical Infrastructure Schertz sits along vital transportation and utility corridors that are essential to the community's daily life. This project allows for:  Continuous Monitoring: Uninterrupted surveillance of critical infrastructure to reduce vulnerabilities to attacks or accidents. Rapid Threat Detection: Delivering a real-time common operating picture that allows city leadership and emergency responders to detect and mitigate hazards quickly. Regional Leadership and Resource Access By housing this equipment at the Schertz Fire Department, the city establishes itself as a key player in regional emergency management.  Mutual Aid Benefits: Schertz residents benefit from the city's enhanced ability to coordinate with regional partners like the San Antonio UASI and GUADACOMA groups. Improved Coordination: The system ensures all responding agencies—whether local, county, or state—are looking at the same live data, leading to a more efficient and unified response during a crisis. Fiscal Responsibility The project is designed to be a sustainable investment that does not rely indefinitely on outside funding.  Grant Funded Procurement: The initial high cost of the specialized hardware is covered by federal UASI funds rather than local tax dollars. Long-Term Planning: The city has already committed to integrating recurring maintenance into the Fire Department's budget, ensuring the equipment remains operational and ready for the community's needs for years to come. SUMMARY OF RECOMMENDED ACTION Authorize the Grant Application Submission: Formally approve the submission of the Urban Area Security Initiative (UASI) grant application for the project titled "Enhancing Unmanned Aircraft Systems Capabilities". Designate the Schertz Fire Department as the Host Agency: Confirm that the tethered drone system will be housed, maintained, and deployed by the Schertz Fire Department for both local and regional operations. Approve Long-Term Budgetary Integration: Commit to transitioning the recurring maintenance and equipment life-cycle replacement costs into the Fire Department’s annual operating budget once the federal grant funding period ends. Ensure Continued Compliance with State Requirements: Direct the Office of Emergency Management to maintain the city's eligibility by fulfilling annual cybersecurity training, criminal history reporting standards, and the maintenance of an "Intermediate Level" Emergency Management Plan. Adopt the Regional Response Framework: Support the use of this equipment as a regional asset to be shared with partners in the San Antonio UASI and the GUADACOMA Emergency Response Group. FISCAL IMPACT 100% REIMBURSABLE GRANT PROGRAM UASI Cost Share: $43,000.00 Local Cost Share: $0.00  RECOMMENDATION Staff recommends approval of Resolution 26-R-000.   Attachments Resolution 26-R-047 RESOLUTION 26-R-047 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING THE CITY MANAGER TO APPLY FOR, ACCEPT, REJECT, ALTER, OR TERMINATE A SUB-RECIPIENT AGREEMENT FOR THE URBAN AREAS SECURITY INITIATIVE (UASI) GRANT PROGRAM PROVIDING FOR UNMANNED AIRCRAFT SYSTEMS (UAS) ENHANCEMENT IN AN AMOUNT NOT TO EXCEED FOURTY THREE THOUSAND DOLLARS. WHEREAS, the City Council of the City of Schertz finds it to be in the public interest to maintain  and  enhance  the  safety  and  security  of  its  residents  through  specialize  emergency response capabilities; and WHEREAS, the Urban Area Security Initiative (UASI) grant program provides federal funding  through  the  Office  of  the  Governor  (OOG),  Public  Safety  Office  (PSO)  to  support regional preparedness; and WHEREAS, the City of Schertz Office of Emergency Management seeks to enhance regional Unmanned Aircraft Systems (UAS) capabilities to mitigate both natural and man-made hazards providing enhanced situational awareness; and WHEREAS,  the  City  Council  deems  it  necessary  and  proper  to  authorize  the  City Manager to act on behalf of the City of Schertz in all matter related to this grant application as the Authorized Official (AO);  and WHEREAS, the City of Schertz, Texas agrees that in the event of loss or misuse of the Office of the Governor funds, City of Schertz, Texas assures that the funds will be returned to the Office of the Governor in full; and WHEREAS, the City Council designates the Finance Director of the City of Schertz as the Financial Officer to submit financial and programmatic reports or alter the grant on behalf of the City of Schertz, Texas; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1.The City Council hereby authorizes the City Manager, or their designee to apply for, accept, reject and execute a sub-recipient agreement for the Urban Areas Security Initiative (UASI) grant program through the Office of the Governor (OOG), Public Safety Office (PSO) in an amount not to exceed FOURTY THREE THOUSAND DOLLARS for the purpose of enhancing Unmanned Aircraft Systems (UAS) capabilities. Section 2.The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3.All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4.This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5.If any provision of this Resolution or the application thereof to any person or circumstance  shall  be  held  to  be  invalid,  the  remainder  of  this  Resolution  and  the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6.It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution,  was  given,  all  as  required  by  Chapter 551,  Texas  Government  Code,  as amended. Section 7.This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND APPROVED on the _______ day of  _______________, 2025. CITY OF SCHERTZ, TEXAS ________________________________ Ralph Gutierrez, Mayor ATTEST: _______________________________ Sheila Edmondson, City Secretary Agenda No. 8.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Engineering Subject:Resolution 26-R-049 - Authorizing a Task Order Amendment with Kimley-Horn and Associates, Inc. for the Schertz Forest Roadway and Waterline Improvements Project (B.James/K.Woodlee/J.Nowak) BACKGROUND Previously, Council authorized a Task Order Agreement (Professional Services Agreement) with Kimley Horn for the Schertz Forest Roadway and Waterline Improvement Project.  This project combined two project efforts — a water line replacement project and resurfacing, rehabilitation, and reconstruction of the streets in the subdivision (part of an earlier planned SPAM project).  As the Capital Improvement Plan (CIP) was modified, the project was formally called the "Robin Hood Way Water Line Replacement Project" since the majority of the total project costs are associated with the water line replacement.  Both names are actually referring to the same project. As the project design progressed, it was noted that the FM 1518 project was relocating water lines in FM 1518 and extending slightly down Ware Seguin Road.  With the original planned water line replacement addressing the water lines across the width of the Schertz Forest Subdivision only, this would leave a relatively short section of "old" water line along Ware Seguin Road between the subdivision and FM 1518.  The "old" section of line would be more prone to failures in the future and would have a shorter service life than the new lines.  Staff determined it would be prudent to also replace this segment of water line to have a continuous "run" of new water line from FM 1518 to the western boundary of the subdivision.  This would reduce the failure potential and provide a similar service life for the water line segments. The Schertz Forest Subdivision has some known drainage issues that cause ponding at some locations.  The ponding has caused settlement/deterioration of the curb and has caused the pavement section to deteriorate more quickly.  The planned design effort assumed a straightforward, but relatively simple approach would be sufficient to address the ponding issues.  However, as the design progressed, it was discovered that more effort was needed in order to address the ponding issues.  The additional effort needed involves some additional surveying and design work to replace longer sections of curb and regrade some drainage features.  The proposed amendment provides for this additional design effort. Additionally, as the design progressed, it was noted that some earlier observed pavement failure areas and curb settlement areas have increased significantly.  This was causing the street improvement costs to increase significantly beyond the current available budget.  With the proposed amendment, some additional pavement section options will be evaluated and the project design modified to reduce the street construction cost, but still provide a similar expected service life, to get the construction costs closer to the available budget amount. Because the proposed amendment is covering multiple project scope items, the cost of the amendment exceeds the current available contingency in the current not to exceed amount ($720,000) for the exceeds the current available contingency in the current not to exceed amount ($720,000) for the project design.  The current not to exceed amount has approximately $29,000 of contingency available.  Staff's recommendation is to increase the not to exceed amount to $764,000, which will provide funding for the proposed amendment and still preserve approximately $28,000 of contingency for the project design.  GOAL To have Council authorize the City Manager to execute a Professional Services Agreement Amendment with Kimley-Horn and Associates, Inc. to add some additional design services to the project scope for the Robin Hood Way Water Line Replacement Project.  COMMUNITY BENEFIT Replacing an additional segment of existing water main along Ware Seguin Road will result in new water main being installed along FM 1518; along Ware Seguin Road to the Schertz Forest Subdivision; and in the "main road" through the Schertz Forest Subdivision.  This would avoid having a short segment of older water main between the subdivision and FM 1518 which would be more prone to failure as time goes on.  It would result in all the water main segment being new and having the same service life.  Performing additional survey and design work on part of the streets and drainage channels in the Subdivision will reduce the existing ponding, leading to an increased service life for the pavement section.  SUMMARY OF RECOMMENDED ACTION Approval of a Resolution authorizing the City Manager to execute a Professional Services Agreement Amendment with Kimley-Horn and Associates for additional design scope for the Schertz Forest Roadway and Waterline Improvement Project.  FISCAL IMPACT The CIP Project Sheet (Robin Hood Way Waterline Replacement Project) has $930,000 allocated for Professional Services.  The original Not to Exceed amount of the Professional Services Agreement was significantly below this at $720,000.  The proposed increase in the Not to Exceed amount to $764,000 is still well below the CIP allocated funding amount.  No funding transfer or budget amendment is required for this Professional Services Agreement Amendment.  RECOMMENDATION Approve Resolution 26-R-049  Attachments Resolution 26-R-049 with attachment CIP Project Sheet and Map RESOLUTION 26-R-049 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING AN AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING SERVICES ON THE SCHERTZ FOREST ROADWAY AND WATERLINE IMPROVEMENT PROJECT WHEREAS, on February 18, 2025, the City Council of the City of Schertz approved Resolution 25-R-035 approving a Task Order with Kimley-Horn Associates, Inc. with a not to exceed amount of $720,000 for the design of the Schertz Forest Roadway and Waterline Improvement Project, and WHEREAS, during the project design it was noted that a segment of existing water main would remain along Ware Seguin Road between the new proposed water main in the subdivision and the new, relocated water main along FM 1518 and that some additional street and drainage channel grading is needed to address existing drainage issues in the Schertz Forest subdivision; and WHEREAS, the City Council wishes to amend the Task Order Agreement to add additional design and surveying services to replace the additional water main section and address the drainage issues; and WHEREAS, City Staff has determined that Kimley-Horn and Associates, Inc. is uniquely qualified to provide such services for the City; and WHEREAS, Kimley-Horn and Associates is an approved On-Call Engineering Fim for the City of Schertz; and WHEREAS, pursuant to Section 252.022(a)(4), the City is not required to seek bids or proposals with respect to a procurement for professional or planning purposes. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes the City Manager to execute and deliver the Amendment to the Agreement with Kimley-Horn and Associates, Inc., in substantially the same form set forth in Exhibit A for $44,829.29 and to execute further amendments as necessary not to exceed a total amount of $764,000. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND APPROVED on the _______ day of _______________, 2026. CITY OF SCHERTZ, TEXAS ________________________________ Ralph Rodriguez, Mayor ATTEST: _______________________________ Sheila Edmondson, City Secretary 50077397.1 A-1 EXHIBIT A AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT AMENDMENT TO TASK ORDER 01 Amendment No. 1 Task Order Number: 01 Project Name: Schertz Forest Roadway and Waterline Improvements Owner: City of Schertz Engineer: Kimley-Horn and Associates, Inc. General Purpose of the Amendment: Additional Survey and Design services to include the following: • Additional survey on Ware Seguin Road and Robin Hood Way, as shown in attachment included in Amendment No. 1 scope and fee proposal • Additional water line design on Ware Seguin Road • Additional driveway, grading, fence replacement, tcp and sw3P design Description of Modifications: Reference Kimley-Horn’s Amendment No. 1 scope and fee proposal dated December 30, 2025. Owner and Engineer hereby agree to modify the above-referenced Main Agreement as set forth in this Amendment. The Effective Date of the Amendment is , 2026. Owner Engineer City of Schertz Kimley-Horn and Associates, Inc. (typed or printed name of organization) (typed or printed name of organization) By: By: (individual’s signature) (individual’s signature) Date: Date: (date signed) (date signed) Name: Name: (typed or printed) (typed or printed) Title: Title: (typed or printed) (typed or printed) Jeff Farnsworth Senior Vice President 12/30/2025 kimley-horn.com 10101 Reunion Place, Suite 400, San Antonio, TX 78216 210 541 9166 December 30, 2025 John Nowak, PE Assistant City Engineer City of Schertz - Engineering 11 Commercial Place Schertz, Texas 78154 RE: Schertz Forest Roadway and Water Line Improvements Project – TO-01 Amendment No. 1 – Additional Design Services Dear Mr. Nowak: As requested by the City of Schertz (“City”), Kimley-Horn and Associates, Inc. (“Kimley-Horn) is submitting this amendment letter for additional design services to extend the proposed water main relocation to a 45- degree bend installed as part of the FM 1518 widening project. As part of the original scope of work, the proposed water main for the Schertz Forest project would tie-in to the existing water main at the Nottingshire and Ware Seguin Road intersection. During the 50% review meeting, the City determined it would be in the best interest of the project to replace the main fully to a connection point on the new water main installed near FM 1518 and Ware Seguin Road. This extension will allow for a brand-new water main from Nottingshire to FM 1518. In addition to the water line extension on Ware Seguin Road, additional survey is required within an existing drainage easement at 7018 and 7024 Robin Hood Way. The true low point in the Robin Hood Way profile is at the property line of these two parcels, and Robin Hood Way discharges into this drainage easement. Through discussions with City staff it was determined to obtain additional survey of the existing easement and regrade as needed to ensure sufficient gravity slope is maintained from the low point at Robin Hood Way. This will require additional design including grading of the existing easement and replacement of existing wrought iron fences at both parcels. To accommodate these additional design services, additional traffic control (TCP) and SW3P will also be required. Lastly, after review of the original design scope of services, the street reconstruction limits has increased as originally proposed. This resulted in an additional 13 driveway profiles needed to accommodate the change in grading. Kimley-Horn is requesting additional fee to cover these additional driveway designs. SCOPE OF SERVICES The below tasks outline the additional scope of work to be completed by Kimley-Horn for the above referenced additional design services: Task 1: Project Management 1. Project Management - Process amendment - Including invoicing with description of services performed and processing contract amendment Page 2 kimley-horn.com 10101 Reunion Place, Suite 400, San Antonio, TX 78216 210 541 9166 2. Subcontract Management - Prepare subconsultant contract for additional survey - Subconsultant invoicing - Coordination of scope of work with subconsultant 3. Additional Project Coordination Task 2: Data Collection Topographic Survey Services (McGray & McGray) 1. Obtain detailed topographic survey to produce a digital terrain model (DTM) for survey limits identified in survey exhibits (Attachment 2). Data to be collected and deliverables will be consistent with the parameters included in the original scope and fee proposal. The additional areas and limits of survey for each are as follows: - Area 1 – Drainage Easement at 7018 and 7024 Robin Hood Way - Area 2 – ROW along 7030 Robin Hood Way o This area was previously unavailable due to bulky brush being within the existing ROW - Area 3 – Ware Seguin Road (Water Main Extension) 2. Design team survey review - Complete necessary site visits to review additional topographic improvements included in survey and provide comments. - Review DTM and provide comments - Coordinate final resolution of comments - General survey cleanup to meet Kimley-Horn CAD standards - Incorporate additional survey and DTM into current base files The survey subconsultant scope and fee proposal can be referenced in Attachment 3. Task 4: Final Design Phase The following additional scope will be completed with the Final Design Phase: Utility Coordination - Coordinate with Overhead Electric company for pole relocation on Nottingshire - Finalize utility conflict matrix (Ware Seguin Road water line extension) General − Finalize general sheets − Update project layout sheets for additional grading and overall project boundary − Update quantity summary Roadway Plan Sheets − Additional driveway design (13 each) within reconstruction limits − Additional grading design within existing drainage easement − Fence replacement/reconstruction plan sheets (7018/7024 Robin Hood Way) Water Plan Sheets − FM 1518 water plans as-built review − Coordinate tie-in connection to appropriate bend/location − Develop water alignment extension from Nottingshire to Ware Seguin Road connection − Update water plan project layout sheet Page 3 kimley-horn.com 10101 Reunion Place, Suite 400, San Antonio, TX 78216 210 541 9166 − Prepare additional plan and profile sheet (40 scale, 1 sheet) Traffic and SW3P Plan Sheets - Additional TCP for water extension on Ware Seguin Road - Update traffic control narrative and sequence of work - Additional SW3P for water extension on Ware Seguin Road and grading easement Miscellaneous 2. Finalize additional quantities and OPCC 3. QC/QA additional design items 4. Address internal QC/QA comments for additional design services SCHEDULE Upon approval of this additional service request by the City staff and any necessary council action, Kimley-Horn proposes to complete these additional design services and remaining final design services outlined in the original scope of work at the following schedule: • Data Collection – 30 calendar days • Final Design Phase – 45 calendar days • City Final Review and Sign/Seal Plans and Project Manual – 15 days • Bid Phase – per original schedule • Construction phase – as determined during final design FEE AND BILLING In accordance with the below fee summary table and attached project work plan, Kimley-Horn proposes to complete the above referenced additional design services for a lump sum fee of $44,829.29. The total contract amount proposed for this project, including base, supplemental, and Amendment No. 1 design services, increases to $735,845.85. The following fee summary table outlines the proposed fee by task for additional design services associated with Amendment No. 1: Task Description of Service Amount Basis of Compensation BASIC SERVICES 1 Project Management 4,790.00$ [ Lump Sum ] 2 Data Collection 8,359.29$ [ Lump Sum ] 4 Final Design Phase 31,680.00$ [ Lump Sum ] TOTAL COMPENSATION (AMENDMENT NO. 1)44,829.29$ BASE SERVICES (ORIGINAL SCOPE OF WORK)668,426.56$ [ Lump Sum ] SUPPLEMENTAL SERVICES NO. 1 (ORIGINAL SCOPE OF WORK)22,590.00$ TOTAL AMENDMENT CONTRACT AMOUNT 735,845.85$ Page 4 kimley-horn.com 10101 Reunion Place, Suite 400, San Antonio, TX 78216 210 541 9166 Kimley-Horn will submit invoices to the City on a monthly basis for services performed in accordance with contract requirements. Each invoice will include a summary of work completed for the corresponding month. We appreciate the opportunity to be of service to the City and appreciate the City’s consideration for approval of these additional design services. We look forward to successfully completing the design of this project and moving into construction. Please don’t hesitate to contact me at stephen.aniol@kimley- horn.com or (210) 321-3404 should you have any questions on this Amendment No. 1 request. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. TBPE# 928 By: Stephen J. Aniol, P.E. Senior Project Manager Attachments 1 – Project Work Plan 2 – Additional Survey Limits 3 – Subconsultant Scope and Fee Proposal Project Name: Design Firm: Date Proposal Submitted: CoS Project Manager: Kimley-Horn Project Manager: Position/Personnel Title QA/QC Manager Sr. Project Manager Civil Engineer Staff Engineer II Staff Engineer I Accountant Consultant Fee Total Sub-Consultant Fee Total Fee Total Proposed Staff Rates 305.00$ 290.00$ 190.00$ 150.00$ 140.00$ 150.00$ Task to be performed/Phase Description (including Sub-consultant work)Total Hours BASIC SERVICES 1 Project Management 0 7 9 4 0 3 23 4,790.00$ -$ 4,790.00$ 1.1 Project Management, including amendment processing and invoicing 2 2 2 6 1,260.00$ 1.2 Subcontract Management and Coordination 1 3 1 5 $ 1,010.00 1.6 Additional Project Coordination 4 4 4 12 $ 2,520.00 2 Data Collection 0 1 1 4 8 0 14 2,200.00$ 6,159.29$ 8,359.29$ Survey 0 -$ 2.1 Topographic Survey Services (McGray & McGray Land Surveyors) 0 -$ 6,159.29$ 2.2 Survey review (including site visit, and updating and merging base files) 1 1 4 8 14 2,200.00$ 4 Final Design Phase 4 15 34 131 0 0 184 31,680.00$ -$ 31,680.00$ Utility Coodination 4.4 Coordinate with overhead electric company for pole relocation 2 2 4 680.00$ 4.4 Finalize conflict matrix (Ware-Seguin extension)1 1 2 4 780.00$ General 4.5 Finalize general sheets (project layout, quantity summary) 1 4 5 790.00$ Roadway Plan Sheets 4.8 Design Limits - Finalize horizontal geometrics (Additional Driveways - 13 EA) 1 2 12 15 2,470.00$ 4.9 Design Limits - Finalize roadway design (easement grading sheet and fence details) 4 8 32 44 7,480.00$ Water Plan Sheets 4.13A As-Built Review, coordinate tie-in connection 1 3 4 640.00$ 4.13B Develop alignment extension 1 3 4 740.00$ 4.13C Update Water project layout sheet 1 3 4 640.00$ 4.13D Prepare plan and profile sheets (40 scale, 1 sheet)2 4 16 22 3,740.00$ Traffic and SW3P Plan Sheets 4.15 Finalize Traffic plan sheets (additional TCP Ware Seguin, narrative and sequence) 2 4 12 18 3,140.00$ 4.16 Finalize SW3P plan sheets (Ware Seguin water extension and grading easement) 2 4 24 30 4,940.00$ Miscellaneous 4.23 Finalize quantities and OPCC 1 4 8 13 2,250.00$ 4.24A QC/QA Final Submittal 4 4 1,220.00$ 4.24B Address internal QC/QA comments 1 2 10 13 2,170.00$ Total Hours (Basic Services): 4 23 44 139 8 3 221 Total Amendment 1 Fee: 38,670.00$ 6,159.29$ 44,829.29$ CITY OF SCHERTZ Fee/Price Proposal Breakdown for Professional Services Kimley-Horn and Associates, Inc. 12/30/2025 John Nowak, PE Stephen Aniol, PE Schertz Forest Rehabilitation and Water Line Improvements On-Call Engineering Services, Task Order - 01 Amendment No. 1 - Additional Design Services ATTACHMENT 1 Project Name: Design Firm: Date Proposal Submitted: CoS Project Manager: Kimley-Horn Project Manager: Position/Personnel Title QA/QC Manager Sr. Project Manager Civil Engineer Staff Engineer II Staff Engineer I Accountant Consultant Fee Total Sub-Consultant Fee Total Fee Total Proposed Staff Rates 305.00$ 290.00$ 190.00$ 150.00$ 140.00$ 150.00$ Task to be performed/Phase Description (including Sub-consultant work)Total Hours CITY OF SCHERTZ Fee/Price Proposal Breakdown for Professional Services Kimley-Horn and Associates, Inc. 12/30/2025 John Nowak, PE Stephen Aniol, PE Schertz Forest Rehabilitation and Water Line Improvements On-Call Engineering Services, Task Order - 01 Amendment No. 1 - Additional Design Services ATTACHMENT 1 F I L E : D A T E : R O B I N _ H O O D _ W A Y . d g n 1 1 / 1 8 / 2 0 2 5 6 : 1 6 : 5 4 A M D N : C K : D W : C K : 10101 Reunion Pl Suite 400 Texas Registered Firm, No. F-928 San Antonio, TX 78216 Fax No. 210-541-8699 Tel No. 210-541-9166 DATE: DateByRevision No. NO. SHEET11/17/2025 DRAWN: MR CHECKED: SJA DESIGN: SE/HF KHA PROJECT NO. 068702920 AND UTILITY IMPROVEMENTS STREET REHABILITATION SCHERTZ FOREST BETWEEN 7018 AND 7024 DRIVEWAYS. BE SURE TO LOCATE FENCE POSTS WITH EXISTING FEATURES INCLUDED. OBTAIN 4 CROSS SECTIONS AT 25' INTERVALS, W ROBIN HOOD WAY 7012 7018 7009 7021 7024 MAT C H L IN E S TA . 1 3 0 + 0 0 M A T C H LI N E S T A. 1 3 4 + 0 0 1 0'40'20' SCALE LEGEND ADDITIONAL SURVEY LIMITS ATTACHMENT 2 F I L E : D A T E : R O B I N _ H O O D _ W A Y _ 2 . d g n 1 1 / 1 8 / 2 0 2 5 6 : 2 0 : 0 1 A M D N : C K : D W : C K : 10101 Reunion Pl Suite 400 Texas Registered Firm, No. F-928 San Antonio, TX 78216 Fax No. 210-541-8699 Tel No. 210-541-9166 DATE: DateByRevision No. NO. SHEET11/17/2025 DRAWN: MR CHECKED: SJA DESIGN: SE/HF KHA PROJECT NO. 068702920 AND UTILITY IMPROVEMENTS STREET REHABILITATION SCHERTZ FOREST FROM CURB TO ROW. OBTAIN UPDATED TOPO W W W ROBIN HOOD WAY 7024 7030 70337021 7039 7036 M A T C H L I N E S T A . 1 3 8 + 0 0 M ATC H LIN E S TA . 1 3 4 + 0 0 2 0'40'20' SCALE LEGEND ADDITIONAL SURVEY LIMITS POINT FOR OUR PROFILES. BRUSH AND CREATED AN UNREALISTIC TIE-IN HOWEVER IT WAS PREVIOUSLY COVERED IN 1. THIS SECTION WAS PREVIOUSLY SURVEYED. NOTES: ATTACHMENT 2 W W W EST @ 8,202.26 SF ADDITIONAL SURVEY AREA INCLUDED IN ORIGINAL IPO. OF WORK CONSISTENT WITH SERVICES CONMPLETE UTILITY DESIGNATION SCOPE OBTAINED. MERGE NEW SURFACE TO EXISTING. CONNECT TO EDGE OF EXISTING TOPO CENTERLINE OF WARE SEGUIN ROAD). HATCHED AREA (FROM ROW TO FEATURES/IMPROVEMENTS WITHIN CUT 25' CROSS SECTIONS AND OBTAIN ALL NOTTINGSHIRE W A R E S E G U I N R D SEGUIN RD 12713 WARE FM 1518 NOTTINGSHIRE NOTTINGSHIRE 7137 FM 1518 F I L E : D A T E : N O T T I N G S H I R E _ 1 5 1 8 . d g n 1 1 / 1 8 / 2 0 2 5 6 : 0 8 : 3 1 A M D N : C K : D W : C K : 10101 Reunion Pl Suite 400 Texas Registered Firm, No. F-928 San Antonio, TX 78216 Fax No. 210-541-8699 Tel No. 210-541-9166 DATE: DateByRevision No. NO. SHEET11/5/2025 DRAWN: MR CHECKED: SJA DESIGN: SE/HF KHA PROJECT NO. 068702920 AND UTILITY IMPROVEMENTS STREET REHABILITATION SCHERTZ FOREST 11/18/2025 or permit purposes. Not for construction, bidding, DateP.E. No. Engineer FOR REVIEW ONLY 112658 STEPHEN J. ANIOL, P.E. 0'60'30' SCALE LEGEND ADDITIONAL SURVEY LIMITS 3 ATTACHMENT 2 ATTACHMENT 3 Project Type:Project Code:0 Project Title: Location: Water Robin Hood Way Waterline Replacement 41 Project Type: Project Title: Project Manager: Location Description: Project Summary: Start Date:4/1/2025 Completion Date:12/31/2025 Project Forecast Prior Appropriation 2024-25 2025-26 2026-27 2027-28 2028-29 2029-33 Total Cost Funding Source Water Reserves -$ 662,000$ -$ -$ -$ -$ -$ 662,000$ Bonds (utility)-$ 3,988,000$ -$ -$ -$ -$ -$ 3,988,000$ Bonds (street)-$ 700,000$ -$ -$ -$ -$ -$ 700,000$ Total Funding Source -$ 5,350,000$ -$ -$ -$ -$ -$ 5,350,000$ Expenditure Land Purchase -$ -$ -$ -$ -$ -$ -$ -$ Professional Services -$ 930,000$ -$ -$ -$ -$ -$ 930,000$ Construction -$ 4,420,000$ -$ -$ -$ -$ -$ 4,420,000$ Total Expenditure -$ 5,350,000$ -$ -$ -$ -$ -$ 5,350,000$ Robin Hood Way off E FM 1518 N Upsizing approximately 6,670 LF of existing 8" water line to 12" water line along Robin Hood Way. Upgrades are needed for fire flow. This is also include the street resurfacing and reconstruction that was original part of 2024 SPAM. NT-W10 Water Project Code: Robin Hood Way Waterline Replacement Engineering City of Schertz, Texas CIP FY 2023-2024 Agenda No. 9.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Facility & Fleet Subject:Resolution 26-R-021 - Authorizing expenditures with Versalift for the acquisition of an Aerial Bucket Truck as part of the FY2025-26 Supplemental Vehicle/Equipment Replacement/Acquisition program (B.James/D.Hardin/M.Chappell) BACKGROUND Each fiscal year, the Fleet Department submits requests to purchase vehicles and equipment. These purchases help replace aging vehicles and support expansion of the fleet, ensuring the City maintains reliable and efficient operations. This request, for an Aerial Bucket Truck for the Water and Wastewater Department, was approved at the start of the FY2025–26 budget year. The Fleet Department worked with Purchasing to issue a Request for Bids (RFB) because the total cost was anticipated to exceed $100,000. The process focused on selecting the lowest responsive bid and ensuring delivery by the end of FY2025–26. Multiple bids were received. Versalift submitted the lowest bid and meets the specifications agreed upon by the Public Works and Fleet Departments.  GOAL To authorize the City Manager to execute the purchase order for the purchase of the vehicle from Versalift as part of the vehicle and equipment replacement and acquisition program.  COMMUNITY BENEFIT Having a current and operational Fleet will provide all departments with the necessary vehicles and equipment to perform their assigned duties within the City of Schertz and reduce the maintenance cost of an aging fleet.  SUMMARY OF RECOMMENDED ACTION Approval of this resolution will allow the purchase of the vehicles/equipment listed in the vehicle replacement program for FY2025-26.   FISCAL IMPACT The purchase of the vehicle/equipment will be funded through the city’s Water & Sewer budget. The fiscal impact of this project will be approximately $187,000.00.  These funds were approved in the FY 2025-26 supplemental budget.  RECOMMENDATION Approval of Resolution 26-R-021  Attachments Resolution 26-R-021 RESOLUTION 26-R-021 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING AN EXPENDITURE WITH VERSALIFT FOR THE ACQUISITION OF AN AERIAL BUCKET TRUCK. WHEREAS, the Schertz Fleet Department has a need to purchase an aerial bucket truck as a new asset to the City’s fleet as part of the Vehicle/Equipment Replacement/Acquisition Program; and WHEREAS, the Schertz Fleet Department has done due diligence in researching what vehicle best fits the needs of the Public Works department, to obtain the best pricing and availability, and provide the best quality vehicles/equipment; and WHEREAS, the Schertz Fleet Department solicited bids from qualified dealerships for this vehicle purchase; and WHEREAS, after extensive analysis of the bids provided by each of the four dealerships, City staff has selected to purchase this vehicle from Versalift; and WHEREAS, the City of Schertz will fund the purchase of this vehicle through the water and wastewater fund that was approved in the FY 2025-26 budget; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes purchases with Equipment Technology, LLC not to exceed the amount of ONE HUNDRED EIGHTY-SEVEN THOUSAND DOLLARS ($187,000.00) during the FY 2025-2026. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND APPROVED on the day of , 2026. CITY OF SCHERTZ, TEXAS Ralph Rodriguez, Mayor ATTEST: Sheila Edmondson, TRMC City Secretary Agenda No. 10.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Facility & Fleet Subject:Resolution 26-R-037 - Authorizing the purchase and installation of twenty-six (26) HVAC systems from Way Mechanical (B.James/D.Hardin/C.Lonsberry) BACKGROUND The City needs to replace twenty-six (26) pieces of HVAC equipment that are failing or nearing the end of life expectancy.  There will be eleven (11) systems replaced at the Recreation Center (YMCA), nine (9) systems replaced at the Schertz Public Library, one (1) system replaced at the Schertz City Council Building, and five (5) systems replaced at the Schertz City Hall. City Hall will also need some extra work performed, which will bring the area the units sit to the current HVAC codes, Electrical codes, Plumbing codes, building safety codes by installing a safety railing and a roof screen. Staff was initially planning to procure these services using a request for bids, but after reviewing purchasing cooperatives, it was discovered that one had many of the major companies likely to bid on the project. Purchases under the cooperative programs meet the requirements under the Texas Local Government Purchasing Code. The decision was made to get quotes for the work from those vendors through the purchasing cooperatives with the belief this would ensure a number of firms bid on the work and the City received the best pricing. The decision was made to get pricing for the entirety of the work to achieve economies of scale. Way Mechanical, a TIPS purchasing cooperative vendor was selected as their price was more than $150,000 less than the next lowest priced vendor.   GOAL To obtain authorization to approve an agreement with Way Mechanical to purchase and install twenty-six (26) HVAC systems and to make changes to City Hall to bring them up to current codes.   COMMUNITY BENEFIT To improve HVAC efficiency across four (4) buildings – City Hall, Council Chambers, Library, and YMCA to lower electrical consumption, replace aging HVAC equipment before the equipment fails and bring our buildings up to current building and trade codes and city ordinances.   SUMMARY OF RECOMMENDED ACTION Authorize approval of an agreement to purchase twenty-six (26) HVAC systems and installation with Way Mechanical.   FISCAL IMPACT The quote is $829,472.26 for the purchase and installation of the equipment, plus a 10% contingency The quote is $829,472.26 for the purchase and installation of the equipment, plus a 10% contingency for any unknowns, totaling $912,000. These funds were previously approved FY2021-22 through CO22 bond, Energy Efficiency Project.    RECOMMENDATION Recommendation of approval for Resolution 26-R-037.   Attachments Resolution 26-R-037 w attachment RESOLUTION NO. 26-R-037 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING THE PURCHASES AND INSTALLATION OF HVAC SYSTEMS IN FROM WAY MECHANICAL. WHEREAS, the Internal Services Department has a need to purchase twenty-six (26) HVAC systems to replace aging equipment before it fails; and WHEREAS, the Internal Services Department obtained the best pricing for this need to provide the best quality installation of equipment that ensures longevity in its use; and WHEREAS, the Internal Services Department has chosen Way Mechanical who is a member of TIPS-USA National Purchasing Cooperative vendor, for the purchase and installation of this equipment; and WHEREAS, the TIPS-USA National Purchasing Cooperative is a national online purchasing cooperative that complies with state laws which require government entities to make purchases through a competitive procurement process; and WHEREAS, TIPS-USA gives public entities the advantage of leveraging the cooperative’s ability to obtain bulk discounts, combined with the ease of online, web-based shopping and ordering; and WHEREAS, purchases under the cooperative programs meet the requirements under the Texas Local Government Purchasing Code; and WHEREAS, the City of Schertz will fund the purchase of twenty-six (26) HVAC systems through the approved CO22 bond, Energy Efficiency Project, previously approved FY21-22. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes purchases with Way Mechanical not to exceed the amount of NINE HUNDRED TWELVE THOUSAND DOLLARS ($912,000) for the equipment and services in the attached Exhibit "A". Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND ADOPTED, this day of , 2026. CITY OF SCHERTZ, TEXAS Ralph Rodriguez, Mayor ATTEST: Sheila Edmondson, City Secretary Exhibit A 1/30/2026 Company Name: City of Schertz Company Address: 1400 Schertz Pkwy, Schertz, TX 78154 Pipe Drive ID: 62943 Description of Work: Replacement of 5 Heat pump RTU's, install new condensation line system, Install 2 new GFCI's EXECUTIVE SUMMARY Way Mechanical is pleased to submit the following Proposal for the above referenced project. We hope you find the attached Clarifications and Exclusions clear and complete in showing the scope of work intended. This proposal includes labor, material, equipment, and supervision required to provide a professional product. $ 107,347.80 (tax excluded) 50% Progress Billing Option: $53,673.90 Equipment - Make/Model Quantity - Estimated Lead Time RTU 3A, 3B, 4, 5, 6 6-8 Weeks Scope of Work: Arrive and speak with customer about scope of work being performed Lock out/Tag out Remove all condensate pvc piping and electrical Recover remaining refrigerant within the system Remove unit from the curb using crane and set it on trailer to be removed from location Using crane, remove existing curb and raise new curb adaptor Using crane, raise new unit onto new curb Re-attached all electrical piping to unit Install new 3/4" pvc condensate lines at units Tie into new 1" condesnate lines going to new termination at kitchen sink drain and abandoned drain line. Vacuum system down to factory spec microns Perform startup on unit and verify proper operations and pressures Clean work area and dispose of trash Remove all existing condensation lines Install new GFCI convenience outlets to bring roof up to code 1/30/2026 EXCLUSIONS Our quote provides for all items necessary for a complete and operating system except for the following excluded items: *ELECTRICAL SERVICE FROM CIRCUIT BREAKER UP TO AND INCLUDING DISCONNECT SWITCH *CUTTING, PAINTING, PATCHING OR ANY CARPENTRY WORK REQUIRED FOR INSTALLATION *ALL WORK TO BE PERFORMED DURING NORMAL BUSINESS HOURS *TEMPORARY AIR CONDITIONING OR HEATING EQUIPMENT *CRANE OR LIFTING EQUIPMENT *Price does not include cost impacts imposed by unforeseen tariffs. Such costs will be brought to the attention of customers and updating pricing will be provided as needed. *excludes all roof penetrations *excludes all paint and patch *excludes overtime EMERGENCY REPAIR SERVICE Way Mechanical agrees to maintain twenty-four (24) hour back-up service availability, seven days a week, schedulable on an on-call basis, for the handling of emergency service and repair work, insofar as that work extends to the terms defined, and equipment included, in this contract. All services performed in addition to those described in Section II, “SCOPE OF SERVICES – HVAC EQUIPMENT COVERAGE,” will be billed at the Company’s current customer rates for labor plus material. Our normal business hours are from 7:00 A.M. to 3:30 P.M. Overtime work is defined as any services performed outside of normal business hours. Overtime work will be billed at either 150% or 200% the normal hourly rate, dependent upon policy and respective to availability and any other terms negotiated at the time of the Emergency Repair Service request. WAY MECHANICAL SERVICE 24 HOUR PHONE NUMBER IS (877)WAY-MECH CONDITIONS City of Schertz, agrees to the following conditions: To provide access to equipment after normal working hours and that Way Mechanical may be free to start and stop the equipment as necessary to perform services after previous arrangements have been made with management. To operate the equipment in accordance with our recommendations, and to keep the equipment rooms, and space around the equipment free of unnecessary storage, materials, etc., and to move any fixtures, displays or partitions which interfere with reasonable access to the equipment. To require all insurance companies furnishing fire or casualty insurance or boiler and machinery insurance on the systems or properties to waive any right of recovery for any loss by subrogation against the Company; that the Company shall not, under any circumstances, be liable for any accident, injuries to persons, or damage to property, unless such a loss or damage is caused by negligent acts, acts of omission or commission by our agents, employees, or sub - contractors; the Company shall not be liable in any event for consequential damages, obsolescence, nor delays occasioned by conditions beyond our control. It is understood that the Company will not carry fire, casualty, or boiler and machinery insurance on the systems or properties. 1/30/2026 CONTRACT TERMS This proposal will remain in effect for a period of thirty - (30) days. After 30 days, Way Mechanical. reserves the right to amend this proposal prior to its acceptance. THIS CONTRACT PROPOSAL IS EFFECTIVE AS OF: 01/30/2026 Contract # 0 Coop # 24010401 Pipedrive # 62943 Way Mechanical Signature: 8610 Wallisville Rd Houston, TX 77029 By: Alex Patino Title: Date: City of Schertz Signature: 1400 Schertz Pkwy, Schertz, TX 78154 By: Antonio Wilson Title: Date: 2/6/2026 Company Name: City of Schertz Company Address: 1400 Schertz Pkwy, Schertz, TX 78154 Pipe Drive ID: 67378 Description of Work: Installation of roof railings and roof screen EXECUTIVE SUMMARY Way Mechanical is pleased to submit the following Proposal for the above referenced project. We hope you find the attached Clarifications and Exclusions clear and complete in showing the scope of work intended. This proposal includes labor, material, equipment, and supervision required to provide a professional product. TOTAL PRICE (Plus Applicable Tax) : $ 54,811.94 50% Progress Billing Option: $27,405.97 Equipment - Make/Model Quantity - Estimated Lead Time Scope of Work: Arrive on site and discuss scope of work Fabricate and install roof screen to be 4' high to block view of RTU's Install screen support post with base plates and pads Install two line rails with posts at 4' centers Using 5/8" steel base plates on pads Paint and primer Clean up work area of all debris Work to be done during regular business hours Mon-Fri 7am-3:45pm 2/6/2026 EXCLUSIONS Our quote provides for all items necessary for a complete and operating system except for the following excluded items: *ELECTRICAL SERVICE FROM CIRCUIT BREAKER UP TO AND INCLUDING DISCONNECT SWITCH *CUTTING, PAINTING, PATCHING OR ANY CARPENTRY WORK REQUIRED FOR INSTALLATION *ALL WORK TO BE PERFORMED DURING NORMAL BUSINESS HOURS *TEMPORARY AIR CONDITIONING OR HEATING EQUIPMENT *CRANE OR LIFTING EQUIPMENT *Price does not include cost impacts imposed by unforeseen tariffs. Such costs will be brought to the attention of customers and updating pricing will be provided as needed. EMERGENCY REPAIR SERVICE Way Mechanical agrees to maintain twenty-four (24) hour back-up service availability, seven days a week, schedulable on an on-call basis, for the handling of emergency service and repair work, insofar as that work extends to the terms defined, and equipment included, in this contract. All services performed in addition to those described in Section II, “SCOPE OF SERVICES – HVAC EQUIPMENT COVERAGE,” will be billed at the Company’s current customer rates for labor plus material. Our normal business hours are from 7:00 A.M. to 3:30 P.M. Overtime work is defined as any services performed outside of normal business hours. Overtime work will be billed at either 150% or 200% the normal hourly rate, dependent upon policy and respective to availability and any other terms negotiated at the time of the Emergency Repair Service request. WAY MECHANICAL SERVICE 24 HOUR PHONE NUMBER IS (877)WAY-MECH CONDITIONS City of Schertz, agrees to the following conditions: To provide access to equipment after normal working hours and that Way Mechanical may be free to start and stop the equipment as necessary to perform services after previous arrangements have been made with management. To operate the equipment in accordance with our recommendations, and to keep the equipment rooms, and space around the equipment free of unnecessary storage, materials, etc., and to move any fixtures, displays or partitions which interfere with reasonable access to the equipment. To require all insurance companies furnishing fire or casualty insurance or boiler and machinery insurance on the systems or properties to waive any right of recovery for any loss by subrogation against the Company; that the Company shall not, under any circumstances, be liable for any accident, injuries to persons, or damage to property, unless such a loss or damage is caused by negligent acts, acts of omission or commission by our agents, employees, or sub - contractors; the Company shall not be liable in any event for consequential damages, obsolescence, nor delays occasioned by conditions beyond our control. It is understood that the Company will not carry fire, casualty, or boiler and machinery insurance on the systems or properties. 2/6/2026 CONTRACT TERMS This proposal will remain in effect for a period of thirty - (30) days. After 30 days, Way Mechanical. reserves the right to amend this proposal prior to its acceptance. THIS CONTRACT PROPOSAL IS EFFECTIVE AS OF: 02/06/2026 Contract # 0 Coop # 24010401 Pipedrive # 67378 Way Mechanical Signature: 8610 Wallisville Rd Houston, TX 77029 By: Alex Patino Title: Date: City of Schertz Signature: 1400 Schertz Pkwy, Schertz, TX 78154 By: Antonio Wilson Title: Date: 1/30/2026 Company Name: City of Schertz Company Address: 1400 Schertz Pkwy, Schertz, TX 78154 Pipe Drive ID: 67064 Description of Work: 20 Ton Split system changeout, new line set, build fence and pour concrete slab EXECUTIVE SUMMARY Way Mechanical is pleased to submit the following Proposal for the above referenced project. We hope you find the attached Clarifications and Exclusions clear and complete in showing the scope of work intended. This proposal includes labor, material, equipment, and supervision required to provide a professional product. $ 71,796.64 (tax excluded) 50% Progress Billing Option: $35,898.32 Equipment - Make/Model Quantity - Estimated Lead Time Scope of Work: Arrive and speak with customer about scope of work being performed Lock out/Tag out Remove all condensate pvc piping and electrical Recover remaining refrigerant within the system Remove condenser from pad Demolish existing pad Pour new slab per engineering spec Remove air handler from space Lift new air handler into space Run new refrigerant line per engineering spec and connect indoor and outdoor units Install new disconnect on exterior wall Re-attached all electrical and condensate pvc piping to unit Vacuum system down to factory spec microns Perform startup on unit and verify proper operations and pressures Build new fence around units per engineering spec Clean work area and dispose of trash 1/30/2026 EXCLUSIONS Our quote provides for all items necessary for a complete and operating system except for the following excluded items: *ELECTRICAL SERVICE FROM CIRCUIT BREAKER UP TO AND INCLUDING DISCONNECT SWITCH *CUTTING, PAINTING, PATCHING OR ANY CARPENTRY WORK REQUIRED FOR INSTALLATION *ALL WORK TO BE PERFORMED DURING NORMAL BUSINESS HOURS *TEMPORARY AIR CONDITIONING OR HEATING EQUIPMENT *CRANE OR LIFTING EQUIPMENT *Price does not include cost impacts imposed by unforeseen tariffs. Such costs will be brought to the attention of customers and updating pricing will be provided as needed. EMERGENCY REPAIR SERVICE Way Mechanical agrees to maintain twenty-four (24) hour back-up service availability, seven days a week, schedulable on an on-call basis, for the handling of emergency service and repair work, insofar as that work extends to the terms defined, and equipment included, in this contract. All services performed in addition to those described in Section II, “SCOPE OF SERVICES – HVAC EQUIPMENT COVERAGE,” will be billed at the Company’s current customer rates for labor plus material. Our normal business hours are from 7:00 A.M. to 3:30 P.M. Overtime work is defined as any services performed outside of normal business hours. Overtime work will be billed at either 150% or 200% the normal hourly rate, dependent upon policy and respective to availability and any other terms negotiated at the time of the Emergency Repair Service request. WAY MECHANICAL SERVICE 24 HOUR PHONE NUMBER IS (877)WAY-MECH CONDITIONS City of Schertz, agrees to the following conditions: To provide access to equipment after normal working hours and that Way Mechanical may be free to start and stop the equipment as necessary to perform services after previous arrangements have been made with management. To operate the equipment in accordance with our recommendations, and to keep the equipment rooms, and space around the equipment free of unnecessary storage, materials, etc., and to move any fixtures, displays or partitions which interfere with reasonable access to the equipment. To require all insurance companies furnishing fire or casualty insurance or boiler and machinery insurance on the systems or properties to waive any right of recovery for any loss by subrogation against the Company; that the Company shall not, under any circumstances, be liable for any accident, injuries to persons, or damage to property, unless such a loss or damage is caused by negligent acts, acts of omission or commission by our agents, employees, or sub - contractors; the Company shall not be liable in any event for consequential damages, obsolescence, nor delays occasioned by conditions beyond our control. It is understood that the Company will not carry fire, casualty, or boiler and machinery insurance on the systems or properties. 1/30/2026 CONTRACT TERMS This proposal will remain in effect for a period of thirty - (30) days. After 30 days, Way Mechanical. reserves the right to amend this proposal prior to its acceptance. THIS CONTRACT PROPOSAL IS EFFECTIVE AS OF: 01/30/2026 Contract # 0 Coop # 24010401 Pipedrive # 67064 Way Mechanical Signature: 8610 Wallisville Rd Houston, TX 77029 By: Alex Patino Title: Date: City of Schertz Signature: 1400 Schertz Pkwy, Schertz, TX 78154 By: Antonio Wilson Title: Date: 1/30/2026 Company Name: City of Schertz Company Address: 1400 Schertz Pkwy, Schertz, TX 78154 Pipe Drive ID: 62943 Description of Work: Replacement of 9 Units for the Library w/ Hot Gas Reheat EXECUTIVE SUMMARY Way Mechanical is pleased to submit the following Proposal for the above referenced project. We hope you find the attached Clarifications and Exclusions clear and complete in showing the scope of work intended. This proposal includes labor, material, equipment, and supervision required to provide a professional product. $ 308,656.19 (tax excluded) 50% Progress Billing Option: $154,328.09 Equipment - Make/Model Quantity - Estimated Lead Time RTU 1-9 6-8 Weeks Scope of Work: Arrive and speak with customer about scope of work being performed Lock out/Tag out Remove all condensate pvc piping and electrical Disconnect and remove gas line Recover remaining refrigerant within the system Remove unit from the curb using crane and set it on trailer to be removed from location Using crane, raise new unit onto existing curb Re-attached all electrical and condensate pvc piping to unit Re-connect gas line and turn on Vacuum system down to factory spec microns Perform startup on unit and verify proper operations and pressures Clean work area and dispose of trash 1/30/2026 EXCLUSIONS Our quote provides for all items necessary for a complete and operating system except for the following excluded items: *ELECTRICAL SERVICE FROM CIRCUIT BREAKER UP TO AND INCLUDING DISCONNECT SWITCH *CUTTING, PAINTING, PATCHING OR ANY CARPENTRY WORK REQUIRED FOR INSTALLATION *ALL WORK TO BE PERFORMED DURING NORMAL BUSINESS HOURS *TEMPORARY AIR CONDITIONING OR HEATING EQUIPMENT *CRANE OR LIFTING EQUIPMENT *Price does not include cost impacts imposed by unforeseen tariffs. Such costs will be brought to the attention of customers and updating pricing will be provided as needed. *Price includes ability to leave crane in place and only one trip fee. If crane cannot stay in place a change order will be written. EMERGENCY REPAIR SERVICE Way Mechanical agrees to maintain twenty-four (24) hour back-up service availability, seven days a week, schedulable on an on-call basis, for the handling of emergency service and repair work, insofar as that work extends to the terms defined, and equipment included, in this contract. All services performed in addition to those described in Section II, “SCOPE OF SERVICES – HVAC EQUIPMENT COVERAGE,” will be billed at the Company’s current customer rates for labor plus material. Our normal business hours are from 7:00 A.M. to 3:30 P.M. Overtime work is defined as any services performed outside of normal business hours. Overtime work will be billed at either 150% or 200% the normal hourly rate, dependent upon policy and respective to availability and any other terms negotiated at the time of the Emergency Repair Service request. WAY MECHANICAL SERVICE 24 HOUR PHONE NUMBER IS (877)WAY-MECH CONDITIONS City of Schertz, agrees to the following conditions: To provide access to equipment after normal working hours and that Way Mechanical may be free to start and stop the equipment as necessary to perform services after previous arrangements have been made with management. To operate the equipment in accordance with our recommendations, and to keep the equipment rooms, and space around the equipment free of unnecessary storage, materials, etc., and to move any fixtures, displays or partitions which interfere with reasonable access to the equipment. To require all insurance companies furnishing fire or casualty insurance or boiler and machinery insurance on the systems or properties to waive any right of recovery for any loss by subrogation against the Company; that the Company shall not, under any circumstances, be liable for any accident, injuries to persons, or damage to property, unless such a loss or damage is caused by negligent acts, acts of omission or commission by our agents, employees, or sub - contractors; the Company shall not be liable in any event for consequential damages, obsolescence, nor delays occasioned by conditions beyond our control. It is understood that the Company will not carry fire, casualty, or boiler and machinery insurance on the systems or properties. 1/30/2026 CONTRACT TERMS This proposal will remain in effect for a period of thirty - (30) days. After 30 days, Way Mechanical. reserves the right to amend this proposal prior to its acceptance. THIS CONTRACT PROPOSAL IS EFFECTIVE AS OF: 01/30/2026 Contract # 0 Coop # 24010401 Pipedrive # 62943 Way Mechanical Signature: 8610 Wallisville Rd Houston, TX 77029 By: Alex Patino Title: Date: City of Schertz Signature: 1400 Schertz Pkwy, Schertz, TX 78154 By: Antonio Wilson Title: Date: 1/30/2026 Company Name: City of Schertz Company Address: 1400 Schertz Pkwy, Schertz, TX 78154 Pipe Drive ID: 67067 Description of Work: Replacement of 11 units for YMCA Rec Center w/ Hot Gas Reheat EXECUTIVE SUMMARY Way Mechanical is pleased to submit the following Proposal for the above referenced project. We hope you find the attached Clarifications and Exclusions clear and complete in showing the scope of work intended. This proposal includes labor, material, equipment, and supervision required to provide a professional product. $ 286,859.69 (tax excluded) 50% Progress Billing Option: $143,429.85 Equipment Name Quantity - Estimated Lead Time RTU 1, 2, 4, 5, 6, 7, 8, 9, 10, 12, 13 6-8 weeks Scope of Work: Arrive and speak with customer about scope of work being performed Lock out/Tag out Remove all condensate pvc piping and electrical Disconnect and remove all gas piping Recover remaining refrigerant within the system Remove unit from the curb using crane and set it on trailer to be removed from location Using crane, raise new unit onto existing curb Re-attached all electrical and condensate pvc piping to unit Vacuum system down to factory spec microns Re-attached gas piping and turn gas back on Perform startup on unit and verify proper operations and pressures Clean work area and dispose of trash 1/30/2026 EXCLUSIONS Our quote provides for all items necessary for a complete and operating system except for the following excluded items: *ELECTRICAL SERVICE FROM CIRCUIT BREAKER UP TO AND INCLUDING DISCONNECT SWITCH *CUTTING, PAINTING, PATCHING OR ANY CARPENTRY WORK REQUIRED FOR INSTALLATION *ALL WORK TO BE PERFORMED DURING NORMAL BUSINESS HOURS *TEMPORARY AIR CONDITIONING OR HEATING EQUIPMENT *CRANE OR LIFTING EQUIPMENT *Price does not include cost impacts imposed by unforeseen tariffs. Such costs will be brought to the attention of customers and updating pricing will be provided as needed. *Price includes ability to leave crane in place and only one trip fee. If crane cannot stay in place a change order will be written. EMERGENCY REPAIR SERVICE Way Mechanical agrees to maintain twenty-four (24) hour back-up service availability, seven days a week, schedulable on an on-call basis, for the handling of emergency service and repair work, insofar as that work extends to the terms defined, and equipment included, in this contract. All services performed in addition to those described in Section II, “SCOPE OF SERVICES – HVAC EQUIPMENT COVERAGE,” will be billed at the Company’s current customer rates for labor plus material. Our normal business hours are from 7:00 A.M. to 3:30 P.M. Overtime work is defined as any services performed outside of normal business hours. Overtime work will be billed at either 150% or 200% the normal hourly rate, dependent upon policy and respective to availability and any other terms negotiated at the time of the Emergency Repair Service request. WAY MECHANICAL SERVICE 24 HOUR PHONE NUMBER IS (877)WAY-MECH CONDITIONS City of Schertz, agrees to the following conditions: To provide access to equipment after normal working hours and that Way Mechanical may be free to start and stop the equipment as necessary to perform services after previous arrangements have been made with management. To operate the equipment in accordance with our recommendations, and to keep the equipment rooms, and space around the equipment free of unnecessary storage, materials, etc., and to move any fixtures, displays or partitions which interfere with reasonable access to the equipment. To require all insurance companies furnishing fire or casualty insurance or boiler and machinery insurance on the systems or properties to waive any right of recovery for any loss by subrogation against the Company; that the Company shall not, under any circumstances, be liable for any accident, injuries to persons, or damage to property, unless such a loss or damage is caused by negligent acts, acts of omission or commission by our agents, employees, or sub - contractors; the Company shall not be liable in any event for consequential damages, obsolescence, nor delays occasioned by conditions beyond our control. It is understood that the Company will not carry fire, casualty, or boiler and machinery insurance on the systems or properties. 1/30/2026 CONTRACT TERMS This proposal will remain in effect for a period of thirty - (30) days. After 30 days, Way Mechanical. reserves the right to amend this proposal prior to its acceptance. THIS CONTRACT PROPOSAL IS EFFECTIVE AS OF: 01/30/2026 Contract # 0 Coop # 24010401 Pipedrive # 67067 Way Mechanical Signature: 8610 Wallisville Rd Houston, TX 77029 By: Alex Patino Title: Date: City of Schertz Signature: 1400 Schertz Pkwy, Schertz, TX 78154 By: Antonio Wilson Title: Date: Agenda No. 15.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Planning & Community Development Subject:Quarterly Update-City Council Approved Zoning and Specific Use Permit Ordinances in relation to current development status (B.James/L.Wood/E.Delgado) BACKGROUND The quarterly report identifies the zoning ordinances and specific use permit ordinances that have been heard and approved by City Council from 2023 to current. The report provides the ordinance approval date, a description of the request, location of the project, and the current development status. The current development status will provide information on whether the project is moving forward and is in the platting or site plan process or if no applications have been submitted in conjunction with that specific ordinance.   Attachments Quarterly Update on Zone Changes and Specific Use Permits- April 2026 Quarterly Update on Zone Changes and Specific Use Permits- April 2026 1 Ordinance Number City Council Approval Date Ordinance Request Project Name Project Location Current Status 23-S-04 3/28/2023 Rezone 87 Acres to General Business District II (GB-2) No project name provided 12625 E IH 10 Approved Clearing and Grading Permit. Preliminary Plat Certification under review. 23-S-10 5/23/2023 Rezone 1 Acre to Neighborhood Services District (NS) FM 3009 Medical Office 1663 FM 3009 Final Plat Administratively Approved. Site Plan Administratively Approved. Building Permit Under Review. 23-S-12 6/20/2023 Specific Use Permit for a Convenience Store with Gas Pumps Graytown Commercial C-Store 11185 Ih 10 E // Bexar County Property ID 619232 SUP Expired, see 25-S-037 23-S-16 9/19/2023 Specific Use Permit for a Convenience Store with Gas Pumps Tex Stop FM 78 1008 and 1020 FM 78 Site Plan Administratively Approved. Building Permit issued and site under construction. 23-S-24 11/14/2023 Rezone 2.1 Acres to Planned Development District (PDD) Addition of 2.1 Acres to the Heritage Oaks PDD on Schertz Parkway Guadalupe County Parcel ID 31970, 31971, 31972, 31973, 31980, 31981, 31982, 31983 Replat Application Approved for the Live Oak Hills Subdivision Unit 1. Replat Certification Under Review for Live Oak Hills Subdivision Unit 2A. 23-S-32 1/9/2024 Specific Use Permit for a Convenience Store with Gas Pumps Gas Station on IH 35 near the intersection of IH 35 and FM 2252 Guadalupe County Parcel ID 114083, Comal County Parcel ID 119021 SUP Expired, see 26-S-004 23-S-33 1/9/2024 Specific Use Permit for a Truck Terminal Sysco Annex Lot Near Baugh Lane and Schwab Road, Comal County Parcel ID 464879 SUP Expired, see 26-S-005 Quarterly Update on Zone Changes and Specific Use Permits- April 2026 2 23-S-35 1/16/2024 Rezone 65 Acres to Planned Development District (PDD) Schertz Gateway PDD Comal County Parcel ID 75458 and Guadalupe County Parcel ID 64005 near IH 35 and Schwab Road Preliminary Plat Certification Under Review. 24-S-02 2/20/2024 Specific Use Permit for Automobile Repairs & Service Major No project name provided 1205 Borgfeld Road No applications at this time. 24-S-05 3/16/2024 Rezone 26 Acres to General Business District (GB) Del Toro Multi-Sport Bexar County Parcel ID 308363 No applications at this time. 24-S-09 4/16/2024 Rezone 7.7 Acres to Single Family Residential District (R- 1) Hallies Court at Hallies Cove 8215 Trainer Hale Road Final Plat Recorded with Bexar County. 24-S-11 4/16/2024 Rezone 3.6 Acres to Neighborhood Services District (NS) Kellum Phase III 3517 FM 3009 Site Plan Administratively Approved. No active applications at this time. 24-S-18 5/21/2024 Rezone 1.8 Acres to Single-Family Residential / Agricultural (RA) Burnette Plat 12396 Schaefer Road Final Plat recorded with Bexar County. No other applications at this time or anticipated. 24-S-19 5/21/2024 Rezone 3 Acres to Single-Family Residential / Agricultural (RA) No project name provided 11627 Voges Pass, Bexar County Parcel ID 308402 Building Permit issued, construction completed for remodel of home. No other applications at this time or anticipated. 24-S-26 6/18/2024 Specific Use Permit Mixed-Use Self-Storage FM 3009 Storage SUP Portion of Guadalupe County Property ID:70506 (FM 3009 & Forest Ridge) Preliminary Plat Approved. No active applications at this time. Quarterly Update on Zone Changes and Specific Use Permits- April 2026 3 24-S-22 7/2/2024 Rezone 894 Acres to Agricultural District (AD) Comal and Guadalupe County Annexation Properties Zoning Ordinance / No Development to Occur Comal and Guadalupe County Annexation Properties Zoning Ordinance / No Development to Occur No applications at this time. No development to occur. 24-S-24 7/2/2024 Rezone 2,167 Acres to Agricultural District (AD) Bexar County Annexation Properties Zoning Ordinance / No Development to Occur Bexar County Annexation Properties Zoning Ordinance / No Development to Occur No applications at this time. No development to occur. 24-S-140 7/16/2024 Rezone 1 Acre to Single Family Residential / Agricultural (RA) Johnson Property 11639 Voges Pass No applications at this time. 24-S-141 7/16/2024 Rezone 3.6 Acres to Single Family Residential / Agricultural (RA) Saunders Addition 6691 FM 482 (Intersection of Friesenhahn and FM 482) Preliminary Plat Certification Application Under Review. 24-S-142 7/16/2024 Specific Use Permit for a Convenience Store with Gas Pumps Maske Gas Station and Retail Intersection of Maske Road and E FM 1518, Guadalupe County Parcel ID 64548 Final Plat Certification Under Review. Site Plan Certification Under Review. 24-S-145 8/20/2024 Rezone 3.3 Acres to Single Family Residential District (R- 6) No project name provided 7444 FM 482 No applications at this time. Property went through the zone change and specific use permit process in 2025, please see 25- S-008 and 25-S-009. 24-S-148 9/17/2024 Rezone 71 Acres to 41 Acres as Single Family Residential District (R- 2) and 30 Acres as Single Family Residential District (R- 6) Monterey Meadows 12840 Lower Seguin Road Preliminary Plat Approved. No active applications at this time. Quarterly Update on Zone Changes and Specific Use Permits- April 2026 4 24-S-149 9/17/2024 Rezone 79 Acres to Single Family Residential District (R- 1) Poppy Hills Subdivision 8676 Trainer Hale Road Master Development Plan Approved. Preliminary Plat Certification Under Review for Unit 1. 24-S-157 11/19/2024 Rezone 218 Acres to Agricultural District (AD) Annexation Properties Zoning Ordinance / No Development to Occur Annexation Properties Zoning Ordinance / No Development to Occur No applications at this time. No development to occur. 24-S-159 12/3/2024 Rezone 3.014 Acres to Agricultural District (AD) Annexation Property Zoning Ordinance / No Development to Occur Comal County Parcel ID 79004 No applications at this time. No development to occur. 24-S-167 12/3/2024 Rezone 100 Acres to Manufacturing District Light (M-1) and Apartment / Multi- Family Residential (R-4) Hausman Square Comal county Parcel IDs 79017, 75463, 79018, 75468, Intersection of IH 35 and Schwab Road Preliminary Plat Certification Under Review 24-S-168 12/3/2024 Rezone 1.66 Acres to Main Street Mixed Use (MSMU) Contreras Rezone to MSMU 819, 817, 815 Main Street and 810 Exchange Ave No applications at this time. 24-S-169 12/3/2024 Rezone 0.23 Acres to Main Street Mixed Use (MSMU) 702 Main Street Zone Change 702 Main Street No applications at this time. 24-S-170 12/3/2024 Specific Use Permit for a Mixed Use Self- Storage Development I-35 & Cibolo Valley Drive SUP Guadalupe County Parcel ID 185564, Intersection of IH 35 and Cibolo Valley Drive (near existing QT) No applications at this time. 25-S-002 1/7/2025 Rezone 85 Acres to 55 acres of Single Family Residential District (R- 2) and 33 acres of Single Family Residential District (R- 6) Krueger-Martin Tract 2,000 feet north of the intersection of Weir Road and Trainer Hale Road, Bexar County Parcel IDs 310048 and 1190132 No applications at this time. Quarterly Update on Zone Changes and Specific Use Permits- April 2026 5 25-S-003 1/7/2025 Rezone 20 Acres to Middle Density Residential District (R- 5) Eckhardt Estates 5524 Eckhardt Road, Comal County Parcel ID 75449 and 78233 Preliminary Plat Certification Under Review 25-S-007 3/4/2025 Specific Use Permit for Automobile Repairs & Service Major on a 0.4 acre tract Alamo Food Trailers Guadalupe County Parcel ID 121092 No applications at this time. 25-S-008 3/4/2025 Rezone 4.3 acres to General Business District (GB) No project name provided 7444 FM 482 No applications at this time. 25-S-009 3/4/2025 Specific Use Permit for Nursery, Major on approximately 4.3 acres No project name provided 7444 FM 482 No applications at this time. 25-S-011 4/15/2025 Rezone 0.4 acres to Single Family Residential District (R- 6) No project name provided 305 Aviation Avenue No applications at this time. 25-S-020 5/6/2025 Rezone 1.38 acres to Single-Family Residential / Agricultural (R-A) No project name provided 9126 Trainer Hale Road, Bexar County Parcel ID 310235 No applications at this time. 25-S-021 6/3/2025 Rezone 4.15 acres to General Business District II (GB-2) No project name provided 46 and 44 Maske Road. Guadalupe County Parcel IDs 199116 and 199117 Replat Certification Under Review. Site Plan Certification Under Review. 25-S-022 6/3/2025 Rezone 20 acres to Single Family Residential District (R- 2) Trails at Lower Seguin 12816 and 12746 Lower Seguin Road, Bexar County Parcel IDs 310027, 310026, 310028 Preliminary Plat Certification Under Review. Quarterly Update on Zone Changes and Specific Use Permits- April 2026 6 25-S-023 6/3/2025 Rezone 62 acres to Single Family Residential District (R- 2) Sterling Grove 3,800 feet east of the intersection of FM 1518 and Trainer Hale Road, Bexar County Parcel IDs 310054 and a portion of 310053 and 310061 Preliminary Plat Certification Under Review. 25-S-027 7/1/2025 Rezone 19 acres to Middle Density Residential District (R- 5) Cottages at Schertz 19018 Old Wiederstein Road, Guadalupe County Parcel IDs 68302 and 68303 Preliminary Plat Certification Under Review. 25-S-029 7/1/2025 Rezone 173 acres to Single-Family Residential District (R- 1), Single-Family Residential District (R- 2) and Single-Family Residnetial District (R- 6) Judah Ranch Bexar County Parcel ID 310012, 309425, 309427, generally located 1,000 feet to the west of Cibolo Creek on Lower Seguin Road Preliminary Plat Certification Under Review. 25-S-030 8/5/2025 Rezone 4.64 acres to General Business District II (GB-2) No project name provided Guadalupe County Parcel ID 199114 and 199115, also known as 36 and 40 Maske Road No applications at this time. 25-S-035 9/2/2025 Specific Use Permit for Mixed-Use Self Storage on approximately 2.14 acres No project name provided 900 feet west of the intersection of Ih 35 and Cibolo Valley Drive, Guadalupe County Parcel ID 62840 Preliminary Plat Certification Under Review. 25-S-037 9/2/2025 Specific Use Permit for a Convenience Store with Gas Pumps on approximately 4.2 acres Graytown Commercial 11185 Ih 10 E, Bexar County Parcel ID 619232 Final Plat Certification Under Review. Site Plan Certification Under Review. Quarterly Update on Zone Changes and Specific Use Permits- April 2026 7 25-S-040 10/14/2025 Rezone 4.7 acres to Public Use District (PUB) St. Joseph's Catholic Church- Schertz 8890 E FM 1518, Bexar County Parcel IDs 310108 and 1061511 Preliminary Plat Certification Under Review. 25-S-042 10/21/2025 Rezone 96 acres to Planned Development District (PDD), associated with 25-S- 041 a Comprehensive Land Use Plan amendment that was completed. Gleitz I-10 Schertz 10661 IH 10, Bexar County Parcel ID 619206 Preliminary Plat Certification Under Review. 25-S-046 11/18/2025 Rezone 11.03 acres to Agricultural District (AD) No project name provided 7703 Trainer Hale Road, Bexar County Parcel ID 339346 No applications at this time. 26-S-001 1/6/2026 Rezone 44 acres to Single-Family Residential District (R- 2) and Single-Family Residential District (R- 6) Mesquite Ridge Ranch 1,412 feet west of Eckhardt Road and Green Valley Road, Guadalupe County Parcel IDs 67959 and 64006 Preliminary Plat Certification Under Review. 26-S-004 3/3/2026 Specific Use Permit for a Convenience Store with Gas Pumps on approximately 7.8 acres // associated with 23-S-32 that expired Bunny Stop #9 Guadalupe County Parcel ID 114083, Comal County Parcel ID 119021 Final Plat Approved. Site Plan Approved. Building Permit under review. 26-S-005 3/3/2026 Specific Use Permit for a Truck Terminal on approximately 4.1 acres // associated with 23-S-33 that expired. Sysco Annex Lot Near Baugh Lane and Schwab Road, Comal County Parcel ID 464879 Final Plat Approved. Site Plan Certified. Building Permit under review. Agenda No. 16.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Facility & Fleet Subject:Tim Brown Memorial Plaque for Council Chamber Conference Room (B.James/D.Hardin) BACKGROUND In honor of the late Tim Brown, Council wishes to recognize his service as City of Schertz Councilmember, Place 7, and his commitment to public service through civic leadership, economic development, and community involvement. To commemorate his contributions, Council is dedicating the Council Chambers Conference Room in his honor. The attachment shows the proposed design of one wood plaque and one cast metal plaque with a bronze finish and notes the proposed locations of both Unless Council provides feedback to the City Manager for changes, staff will proceed with acquiring the plaques as proposed.   Attachments Proposed Plaques It is proposed to place the bronze plaque on the wall to the left of the doors into the Council Workroom where the large wooden plaque with the city’s core values is currently located. The plaque with the City’s core values will be moved to the opposite. The mockup of the proposed plaque is below. It will look similar to the plaque in the lobby of Building #1 honoring Steve Simonson. It is proposed to place a wooden plaque with the wording as shown in image below on the door into the Council Workroom from the break area. Agenda No. 17.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Finance Subject:Check Report - February 2026 (S.Gonzalez/J.Walters) BACKGROUND Attached is a vendor expenditure report from February 2026, detailing all vendors with whom the City spent $25,000 - $100,000. These reports will be provided to Council monthly for awareness.  Attachments February 2026 Check Report 3/30/2026 9:07:49 AM Page 1 of 2 Monthly Council Check Report City of Schertz, TX By Check Number Date Range: 02/01/2026 - 02/28/2026 Vendor Number Vendor DBA Name Payment Amount NumberPayment TypePayment Date Discount Amount Bank Code: NAP-Schertz Bank Pooled Cash 012400 SHI GOVERNMENT SOLUTIONS 02/06/2026 10152326,738.98EFT0.00 019082 Citibank, N.A.02/11/2026 10152688,847.85EFT0.00 016859 YMCA of Greater San Antonio 02/13/2026 10155634,618.58EFT0.00 0112126 Unintech Consulting Engineers, Inc 02/19/2026 10156836,585.15EFT0.00 0110617 KIMLEY-HORN AND ASSOCIATES INC 02/24/2026 10157966,345.25EFT0.00 13949 Martinez Architects LP 02/24/2026 10158056,661.00EFT0.00 010345 EDWARDS AQUIFER AUTHORITY 02/05/2026 72226361,882.66Regular0.00 14243 SER Construction Partners LLC 02/10/2026 72232888,706.26Regular0.00 0111995 GVEC 02/11/2026 72235850,547.50Regular0.00 0111632 WEX BANK 02/11/2026 72236049,669.62Regular0.00 013736 Esri 02/12/2026 72237442,200.00Regular0.00 012574 CITY OF SEGUIN 02/19/2026 72241851,229.00Regular0.00 0111713 HALFF ASSOCIATES INC 02/27/2026 72254227,342.67Regular0.00 13045 Global Payments Direct, Inc 02/06/2026 DFT000041435,012.82Bank Draft 0.00 Regular Checks Manual Checks Voided Checks Discount Payment CountPayment Type Bank Code NAP Summary Bank Drafts EFT's 7 0 0 1 6 0.00 0.00 0.00 0.00 0.00 14 0.00 Payment 371,577.71 0.00 0.00 35,012.82 309,796.81 716,387.34 Payable Count 12 0 0 1 93 106 Monthly Council Check Report Date Range: 02/01/2026 - 02/28/2026 Page 2 of 23/30/2026 9:07:49 AM All Bank Codes Check Summary Payment Type Discount Payment Count Payment Payable Count Regular Checks Manual Checks Voided Checks Bank Drafts EFT's 7 0 0 1 6 0.00 0.00 0.00 0.00 0.00 14 0.00 371,577.71 0.00 0.00 35,012.82 309,796.81 716,387.34 12 0 0 1 93 106 Fund Name AmountPeriod Fund Summary 999 OPERATING POOLED CASH 716,387.342/2026 716,387.34 Agenda No. 18.   CITY COUNCIL MEMORANDUM    City Council Meeting:April 07, 2026 Department:Engineering Subject:Monthly Update - Major Projects in Progress/CIP (B.James/K.Woodlee) Attachments April 2026 Major Projects in Progress/CIP Informational Only CITY COUNCIL MEMORANDUM City Council Meeting: April 7, 2026 Department: City Manager Subject: Update on Major Projects in Progress Background This is the monthly update on large projects that are in progress or in the planning process. This update is being provided so Council will be up to date on the progress of these large projects. If Council desires more information on any project or on projects not on this list, please reach out to staff and that information will be provided. Facilities Projects: 1. Fleet Building Parking Lot Project Description – Pave the open grassy area located at 27 Commercial Place o Project Status: Site Plan Development and Construction Design o Projected Completion: To be determined o Consultant: Unintech Consulting Engineers, Inc. o Contractor: To be determined Project Update: This project is being pushed back to FY26-27 due to the need to reallocate funding from this project to help fund the repairs of the retention wall and pavers at the Schertz Library. In the interim, Public Works has started grading a small area of the lot to provide additional improved surface for parking and storage of vehicles and equipment in order to comply with the City’s regulations regarding the use of unimproved surfaces. 2. Library Retention Wall (Pavers) Project Description – Replacing the failing plastic panels around the library foundation with concrete panels. This includes removal and replacement of some of the concrete pavers in the rear courtyard. o Project Status: Design o Projected Completion: Spring 2026 o Project Cost: $350,000 o Consultant: Unintech Consulting Engineering o Contractor: To be determined Project Update: The consultant provided the plans draft for the library retention wall repair. City staff are in the process of reviewing the plans before drafting documents for bid of the bid package. Once the review is complete, the project will be ready for bid. 3. Fire Station 4 Project Description – Fire Station 4 Build o Project Status: Full building and development phase. Footing and building beams have been poured. Working through power, technology, water, and sewer to building o Projected Completion: March 2027 o Total Project Cost: Estimated $13.25 million o Building Cost: Estimated $10 million o Consultant: AGCM – Owner Rep o Architect: Martinez Architecture o Contractor: Marksman – CMAR Project Update: Look ahead shows underground utility rough in, fire line from hydrant to riser. vapor layer and termite protection being laid for concrete slab protection. When completed, rebar laid for bay and living area. In conjunction with this, we are working on electrical rough in, power connection, plumbing rough in, wastewater tap, and prepare generator rough in and concrete slab. Expectation is slab to be poured on 3/27 or if setbacks, no later than 4/3. 4. FM 78 Build Out PD CID Property Room Project Description – Remodel a portion of the County Building that PD will utilize for CID and Property o Project Status: Approved by the County o Projected Completion: TBD o Consultant: TBD o Contractor: TBD Project Update: The initial quote we received was significantly overpriced, likely due to a miscommunication about the scope of work. The initial quote was $3.6 million. On March 24, 2026, we met with them for a facility walkthrough, which clarified several misconceptions about the project. They will provide a revised cost proposal within a few days based on this new information. They emphasized that the total cost would exceed $400,000, but we will have more details once we receive the proposal. On March 26, 2026, Parkhill provided an updated quote of $1.6M. 5. Police Department Building Remodel Project Description – Remodel office areas within building #6 where the Police Department operates. Areas to remodel may include the current CIS division, P&E holding area, and possibly other offices along that hallway. o Project Status: Once the FM 78 project is nearing completion, we can move forward. o Projected Completion: TBD o Consultant: TBD o Contractor: TBD Project Update: In a holding status until administrative tasks with the FM 78 build out for the property room and CID are completed. Drainage Projects: 1. FM 78 South Channel Silt Removal Project Description – Silt removal for the existing FM 78 South Drainage channel to include permitting, easement acquisition and construction. o Project Status: Easement Acquisition o Projected Completion: Spring 2027 o Project Cost: Design $32,100, Drainage Report $4,600 o Consultant: Unintech Consulting Engineers, Inc. o Contractor: TBD Project Update: After a lengthy pause, the City’s professional services consultant is actively working to survey the properties, create easement documents and negotiate access and temporary construction easements for the project. After easements are acquired, the project will be rebid, and construction will proceed. 2. Pickrell Park & FM 1518 Drainage Project Description – Installation of underground drainage, upgraded creek outfalls and provide localized surface drainage swales. Sanitary sewer relocation within areas of conflict with proposed drainage improvements o Project Status: Preliminary Engineering Study o Projected Completion: TBD o Project Cost: $41,987 - $47,500 NTE (study only) o Consultant: Unintech Consulting Engineers, Inc. o Contractor: TBD Project Update: Staff has reviewed the preliminary study and has provided comments back to Unintech. Unintech is working to include these comments and will meet with staff when complete to finalize the report. Recommendations from the study will be used to develop a project to improve the drainage in this area of the City. 3. Wendy Swan Drainage Project Description – Removal of an existing concrete retaining wall, install underground drainage and fill to grade with localized surface drainage. o Project Status: Design o Projected Completion: Summer 2026 o Project Cost: Design $108,500 ($125,000 NTE), Construction Estimate $1,100,000 o Consultant: Unintech Consulting Engineers, Inc. o Contractor: TBD Project Update: Staff is providing final comments to Unintech to incorporate into the plan set. Once complete, a bid package will be developed. 4. Friesenhahn Lift Station Drainage Improvements Project Description – Drainage study of Friesenhahn Lift Station site will be performed and used to develop plans for construction of recommended improvements to remedy poor drainage conditions around the site. o Project Status: Study and Design o Projected Completion: TBD o Project Cost: Design $74,815 Construction Estimate TBD o Consultant: Utility Engineering Group o Contractor: TBD Project Update: UEG has completed the initial analysis of the drainage concerns near the lift station. Staff will meet with UEG to discuss options to improve the drainage situation and begin developing a separate project for improvements. Water and Wastewater Projects: 1. Woman Hollering Creek Wastewater Interceptor Main and Lift Station Project Description – Design and construction of a sanitary sewer system to collect and convey wastewater to the future CCMA water reclamation plant off Trainer Hale Road in Southern Schertz. The system consists of approximately 19,000 linear feet of 30” gravity wastewater line running generally along Woman Hollering Creek from the existing Sedona lift station on FM 1518 to a new lift station on IH 10 and approximately 6,000 feet of force main from the lift station to CCMA plant. It also includes an additional 18” gravity line approximately 1,500 feet in length that will first serve the Hallie’s Cove Subdivision. The system is necessary for the new CCMA plant to begin operation and to allow the existing Woman Hollering Lift Station at Sedona to be taken out of service. o Project Status: Construction o Projected Completion: Summer 2026 o Project Cost: Engineering/Design $1,187,594, Land purchases, ROW, legal and advertising $700,810, Construction $11,200,000, and miscellaneous costs for a project total of $13,088,404 o Design Engineer: Cobb Fendley & Associates, Inc. o Owner’s Representative: AGCM, Inc. o Contractor: Thalle Construction Co, Inc. Project Update: No change from the last update. The collection and conveyance system including the lift station was put into operation March 3, 2025. The CCMA South Plant is operational. The Woman Hollering Package Treatment Plant has been shut down and is being cleaned and removed from the leased property location. The Sedona Lift Station and the pump and haul operation at Hallie’s Cove have been decommissioned. The contractor continues to work on correction of items identified on the punchlist for the project to be completed. Work remaining includes correction of pump issues, relocation and elevation of main disconnect, crane and crane foundation testing and potential correction. It is estimated that the remainder of the work on the project may still take several months to complete but as stated, the project is operational. 2. Riata Lift Station Relocation Project Description – Relocation of the Riata Lift Station ahead of TxDOT’s IH 35 NEX project to remove it from conflict with the proposed highway improvements. The design phase included identification of a new site for the list station, design of new lift station and design of the abandonment of the existing lift station. Property and easement acquisitions were required. The new lift station is needed to maintain sewer services. o Project Status: Begin Construction 4th Quarter of 2024. o Projected Completion: Summer 2026 o Project Cost: Design & Acquisition of easements and existing lift station $478,000; Construction: $2,800,000 o Consultant: Utility Engineering Group, PLLC o Contractor: Keystone Construction Project Update: Keystone has set the generator and performed an acceptable start-up with staff. Flows are being diverted to the new lift station, and Keystone is beginning the demo of the old lift station and sewer lines. Riata Lift Station Location 3. FM 1518 Utility Relocations Project Description – Relocation of water and sewer utilities to avoid conflicts as part of the TxDOT FM 1518 Improvement Project. o Project Status: Construction o Projected Completion: The City’s utility relocation portion of the project is expected to be completed in the Fall of 2026. o Project Cost: Design NTE $980,000, Construction Joint Bid $8,986,837/Aztec 16” Line $884,270 o Consultant: Halff Associates o Contractor: SER Construction Partners (TxDOT’s General Contractor)/Qro Mex Construction (Aztec 16” Line-completed) Project Update: No change since last update. SER has slowed down on the installation of water and sewer on the north end of the project due to CCMA working on their utility relocations within the same area. Once CCMA is completed in the area, SER will resume utility installation. 4. Corbett Ground Storage Tank Project Description – Construction of a new 3-million-gallon Ground Storage Tank (GST). The GST will be used to fill the existing Corbett Elevated Storage Tank and provide additional water storage capacity. This new GST will receive water directly from the Schertz Seguin Local Government Corporation. o Project Status: Construction Phase o Projected Completion: Spring 2026 o Project Cost: Design $547,100, Construction $8,665,220 o Consultant: Unintech Consulting Engineers o Contractor: Pesado Construction Co. Project Update: Pesado is waiting on pressure switches to ship and complete the installation. Once installed a final start-up will be scheduled with the contractor and staff to confirm the operation of the pumps and controls. 5. Water Loop Lines Project Description – Install 12” water main lines to provide a looped distribution system from Ware Seguin to Lower Seguin and Pfeil Road to N Graytown Road. o Project Status: Design/Easement Acquisition o Projected Completion: Fall 2026 o Project Cost: Design NTE $254,974, Construction Estimate $4,400,000 Project Update: No change since last update. Staff continues to work on the easement acquisition for this project. A resolution to use the City’s power of eminent domain for an easement for which negotiations have been futile will likely be brought before Council in an upcoming meeting. Our consultant is looking further into the conservation easement that is the concern of the landowner and also compiling his correspondence and offers made to support the need for eminent domain should this be the City’s only option to secure the necessary easement. The project is being broken into two separate construction projects so that the line between Graytown and Pfeil can proceed to construction while outstanding work acquiring easements for the line between Lower Seguin and Ware Seguin is still being done. 6. IH 35 NEX-North Utility Relocations Project Description – Relocation of water and sewer utilities to avoid conflicts as part of the TxDOT IH 35 NEX project. o Project Status: Design - Construction o Projected Completion: Joint Bid Construction is planned for Fall 2027 o Project Cost: Design & Easement Acquisition Services - $1,250,000 o Project Cost: Construction Sewer Only - $1,787,074 ($2,000,000 NTE) o Consultant: Halff Associates Project Update: Blackrock Construction continues the construction effort along IH 35. Halff is working with TXDOT to confirm timing of other utility providers to relocate their facilities and not interfere with the sewer relocation. Extent of IH 35 NEX – Northern Segment 7. Robin Hood Way Waterline Replacement Project Description – Replacement and upsizing of water line in Robin Hood Way, Sherlock Lane, and Nottingshire. The main replacement is to increase flows in the area, particularly to meet fire flow requirements. The project also includes street resurfacing and rehabilitation work that was previously removed from the SPAM project. o Project Status: Design o Projected Completion: Spring 2027 o Project Cost: $5,350,000 o Consultant: Kimley- Horn & Associates Project Update: A design contract amendment is on tonight’s agenda for approval. The amendment covers some additional design effort to add more water line replacement; perform additional design and cost reduction efforts for the street work; and additional design to address some drainage issues. As the design progresses and with Council approval, the additional design efforts are completed, a revised project cost estimate will be provided. 8. Bell North Sewer Extension Project Description – Ten commercial properties on the west end of Bell North Drive are served by private grinder pumps that pump into a public wastewater force main that discharges into a manhole near 17316 Bell North Drive. This project is the construction of a gravity sewer main within Bell North Drive that will flow toward and discharge into the main on Doerr Lane. o Project Status: Construction o Projected Completion: Summer 2026 o Project Cost: Design $95,000 o Project Cost: Construction $513,900 ($575,000 NTE) o Consultant: Freeland Turk Engineering Group LLC o Contractor: RL Jones, LP Project Update: RL Jones has mobilized and construction is underway at Bell North Drive. 9. Northcliffe Country Club Estates Water and Wastewater Main Replacement Project Description – replacement of the water and wastewater mains and rehabilitation of the streets in the Northcliffe Country Club Estates subdivision. o Project Status: Design o Projected Completion: Spring 2027 o Project Cost: $8,733,400 (estimated) o Consultant: Unintech Consulting Engineers, Inc. Project Update: No change from previous update. Staff has reviewed the preliminary plans and provided comments to our consultant. Our consultant is revising the plans, and staff expects the final plan submittal in very soon. Northcliffe Country Club Estates 10. Cibolo West Wastewater Trunk Main Project Description – Installation of approximately 21,680 LF of gravity wastewater trunk main that will collect wastewater at the location of the Saddlebrook Wastewater Lift Station as well as areas north of Schaefer Road and convey flows south along a route including along Weir and Trainer Hale Roads and the west side of Cibolo Creek to the CCMA South Water Reclamation Plant. Having this line in place will ultimately allow the decommissioning of the Corbett and Saddlebrook Lift Stations. The project is a collaboration between the City of Schertz and Green Valley Special Utility District (GVSUD). o Project Status: Easement Acquisition o Projected Completion: Fall 2027 o Total Project Cost: $26,743,000 o Consultant for Route Study: Lockwood, Andrews, & Newnam, Inc. o Consultant for Easement Acquisition: TBD Project Update: No change since last update. Staff continues working on a scope to request a task order proposal for the next phase of this project – easement acquisition. The scope will likely include a preliminary design to further refine the specific route of the trunk main in order to identify the necessary easements. 11. Elevated Storage Tank Pipe Replacement and Tank Painting Project Description – Rehabilitation of vertical fill and drain line piping in the East Live Oak and Northcliffe elevated storage tanks due to increased signs of fatigue at the welded joints. The project also includes the painting of the interior and exterior of the East Live Oak and Northcliffe elevated tanks and the Ware Seguin ground storage tank. o Project Status: Design o Projected Completion: Design expected to be complete by Spring 2026. o Total Project Cost: $2,600,000 Estimated Total o Consultant for Study: Unintech Consulting Engineers, Inc. Project Update: The inspection of the tanks and final report is complete. Samples from the pipes have been analyzed and replacement pipe selection is currently under review. Replacement pipe material is being evaluated so the most cost-effective material is selected. 12. Schertz Parkway 16” Water Transmission Main Replacement Project Description – Replacement of approximately 1,200 linear feet of 16” water transmission main along Schertz Parkway between Mare Way and Maske Road. o Project Status: Design o Projected Completion: Winter 2026 o Project Cost: Design $180,824 ($245,000 NTE), Easements $50,000, Construction Estimate $1,500,000 o Consultant: Unintech Consulting Engineers, Inc. o Contractor: TBD Project Update: No change since last update. Final design plans have been received, and staff is currently reviewing the design. Staff and consultant have made contact with the property owner for the necessary easement for the new waterline and will continue to negotiate and work on obtaining the necessary easement. 13. FM 3009 18” Water Transmission Main Replacement Project Description – Replacement of approximately 7,600 linear feet of 18” water transmission main. o Project Status: Design o Projected Completion: Fall 2027 o Project Cost: Design $431,752 ($550,000 NTE), Construction Estimate (including easement acquisition) $4,800,000 o Consultant: Unintech Consulting Engineers, Inc. o Contractor: TBD Project Update: No change from previous update. Unintech has completed the survey and is working on the preliminary design for the transmission main. Staff expects preliminary plans will be ready in March for review. 14. IH 35 Ground Storage Tank and Pump Station Project Description – Construction of a 3-million-gallon ground storage tank and pump station adjacent to the existing IH 35 elevated storage tank to provide storage capacity that can be filled during non-peak hours of the day. o Project Status: Design o Projected Completion: Fall 2027 o Project Cost: Design $728,068 ($800,000 NTE), Construction Estimate (including land acquisition $13,750,000 o Consultant: Unintech Consulting Engineers, Inc. o Contractor: TBD Project Update: Staff has reviewed the preliminary engineering report provided by Unintech. We plan to meet with the consultant to discuss proposed system operations. 15. Lift Station Decommissioning Project Description – Decommissioning of Elbel and Whisper Branch Lift Stations including regulatory documentation and physical demolition and abandonment. The project also includes the development of a lift station decommissioning standard guidance document that can be used by the City for future lift station decommissioning projects. o Project Status: Design o Projected Completion: TBD o Project Cost: Design $49,635 Construction Estimate TBD o Consultant: Utility Engineering Group o Contractor: TBD Project Update: No change since last update. UEG is working on the preliminary design for the decommissioning and a draft of the guidance document. Staff has provided some decommissioning needs of the electrical components at each site. A submittal is expected from UEG within the next few weeks. Street Projects: 1. Main Street Improvements Project Project Description – The project will improve sidewalks, provide street lighting, way-finding signage, landscaping, utility relocations, and architectural elements such as decorative concrete, decorative lighting, screening, and area signage. This project will also replace aging water and sanitary sewer mains and reconstruct the street with a new, stronger pavement section. Additionally, Lindbergh between Main and Exchange will be reconstructed. o Project Status: Design o Projected Completion: Spring 2028 o Project Cost: $25,880,893 o Consultant: Kimley- Horn Associates Project Update: No change from last update. Our consultant is continuing to revise the project plans. The plans and bid package are expected to be completed in a few months. This will put the project on track to bid by early Summer and construction starting before the end of this fiscal year. As the plans get close to being finalized, more detailed public outreach for the project will begin. Staff will also start acquiring the GVEC easements needed for relocating the electrical lines underground. 2. Lookout Road Reconstruction Project Description – The project involves reconstruction of Lookout Road from Schertz Parkway to Doerr Lane. A traffic signal at the Lookout Road/Schertz Parkway intersection will also be installed. The project also includes the replacement and upsizing the existing sanitary sewer main in Lookout Road from Doerr Lane to Schertz Parkway. o Project Status: Design o Projected Completion: Summer 2027 o Project Cost: Design $571,000 ($20,000 from Selma), Construction estimate $6,738,092 ($100,000 from Selma) o Design Consultant: Halff Associates Project Update: The construction plans are undergoing final plan review. The Republic Distributing property owner at the northeast corner of Doerr Lane and Lookout Road has accepted our offer for the Right-of-Way needed from his property. On tonight’s Council is an item authorizing the City Administrator to execute the documents needed to formally acquire the Right-of-Way. Staff and our consultant met with CAT to discuss the Right-of-Way acquisition offer sent to them for the northwest corner of Doerr Lane and Lookout Road. Staff hopes to have an agreement with CAT very soon. 3. Lower Seguin Road Reconstruction Project Description – The project will reconstruct a 2.9-mile segment of Lower Seguin Road to widen and improve the street to the section identified in the Master Thoroughfare Plan. The City intends to pursue Federal DCIP funding for project construction. o Project Status: Design o Projected Completion: Fall 2027 o Project Cost: $18,200,000 o Consultant: Halff & Associates Project Update: No change from last update. Our consultant has identified a grant program that could be used to pay for the water line relocations needed for the project. Staff is working with our consultant to identify the effort needed to apply for the grant. Grant applications are due this Summer. Staff will bring a grant recommendation to Council in the near future for consideration. Work continues on refining the project plans and addressing utility conflicts. 4. Buffalo Valley South Resurfacing and Rehabilitation and Utility Replacements Project Description – Water and sanitary sewer main replacements and street rehabilitation of Buffalo Valley South, specifically Mill Street, 1st St, 2nd St, Bowman St, Lee St, Church St, Zuehl St, and Wuest. PCI data was used to select the streets in the project. Project will be funded with a combination of SPAM funding (for the street rehabilitation) and ARP funding for the utility replacement. o Project Status: Construction o Projected Completion: Winter 2026 o Project Cost: $5,977,000 o Design Consultant: Unintech Consulting Engineering o Contractor: E-Z Bel Construction, LLC Project Update: The last segment of sewer main has been completed and is in service. This completed all the utility work on the project. The concrete work has also been completed. Paving of all the streets is expected early this month. With the paving completed, the project will be “Substantially complete.” 5. Boenig Drive Reconstruction Project Description – Reconstruction of Boenig Drive between Ware Seguin Road and Graytown Road. The reconstruction includes reconfiguration of the intersection with Ware Seguin Road to improve efficiencies and eliminate having two street intersections side-by side on Ware Seguin Road. o Project Status: Design o Projected Completion: Winter 2026 o Project Cost: $3,240,000 o Consultant: Unintech Consulting Engineers, Inc. Project Update: Nothing new to report. A couple of segments of water line need to be relocated to accommodate the new street section and profile. These relocations are being incorporated into the plans. Plans are expected to be completed in early 2026. 6. 2024 SPAM Rehabilitation Project Description – Rehabilitation of St. Andrews, Maple, and part of the Silvertree Subdivision streets. Rehabilitation involves removing the existing pavement, applying cement stabilizing to the material underneath, and placing a new layer of pavement on the street. o Project Status: Construction o Projected Completion: Summer 2026 o Project Cost: $3,581,000 o Consultant: Kimley-Horn Associates o Contractor: E-Z Bel Construction, LLC Project Update: The streets that were torn up in Dove Meadows have been paved. In the diagram below, the purple highlighted areas are the sections that have been paved. The contractor still has some work to do in this area – some sidewalk work; backfilling; sodding; and clean-up. Concrete replacement work has started in the orange highlighted areas. The contractor plans to do just the concrete work first, then remove the pavement and do the cement stabilization. This will help reduce dust in the project area and minimize the time residents will need to drive on a “gravel street.” As the concrete work get close to being completed, another crew will start doing concrete replacement on Maple, the final project area in this contract. 7. 2025 SPAM Resurfacing Project Description – Resurfacing of the streets in the Ashley Woods, Woodbridge, and Rio Vista subdivisions. Resurfacing involves performing localized concrete repairs; base repairs; asphalt level up; crack sealing; and applying a slurry seal to the surface of the streets. o Project Status: Design o Projected Completion: Summer 2026 o Project Cost: $1,282,231 o Consultant: Kimley-Horn Associates Project Update: No change from last month. The bid package continues to be further refined to try to reduce the project costs. Construction costs continue to increase and there may not be enough project budget available to do all the originally planned work. Staff is working to identify what can be completed now and what portions will need to shift to the next SPAM Resurfacing project. 8. Kramer Farm Rehabilitation Project Description – Rehabilitation of the western streets in Kramer Farm Subdivision. Rehabilitation involves removing the existing pavement, applying cement stabilizing to the material underneath, and placing a new layer of pavement on the street. o Project Status: Design o Projected Completion: Fall 2026 o Project Cost: $1,446,582 o Consultant: Kimley-Horn Associates Project Update: Nothing new to report. Comments on plans have been sent to our consultant, and the bid package is still being refined. Kramer Farm Rehabilitation 9. 2026 SPAM Resurfacing Project Description – resurfacing of the streets in the Fairway Ridge; Woodland Oaks; and Horseshoe Oaks Subdivisions. The project also includes the TSAC-recommended crosswalk improvements. o Project Status: Design o Projected Completion: Fall 2026 o Project Cost: $1,780,000 o Consultant: Kimley-Horn Associates Project Update: No change from last update. All the design fieldwork has been completed, and plan preparation is nearing completion. The consultant expects to submit plans to the City this month. The project scope is expected to change as portion as the 2025 SPAM Resurfacing are delayed due to funding constraints. As those elements are added to this project, some of these elements may need to shift to a future SPAM Resurfacing project. 10. Savannah Drive Overlay Project Description – Resurfacing of Savannah Drive from the Selma City Limits to FM 3009. o Project Status: Construction o Projected Completion: Fall 2026 o Project Cost: $1,460,000 o Consultant: Kimley-Horn Associates Project Update: No change from last update. This project is “bundled” with the 2026 SPAM Resurfacing project. The geotechnical testing has been completed, and the project plans are being refined based on the testing results. Plans are expected for Staff review next month. 11. FM 3009 Overpass Project Description – TxDOT project for overpass construction at the FM 3009/FM 78 intersection to elevate the main lanes of FM 3009 over the railroad tracks and FM 78. On and off ramps will be provided so vehicles can travel between FM 3009 and FM 78 at the intersection. The project includes some improvements to FM 78 to improve operational efficiencies of the on and off ramps. o Project Status: Schematic Design and Environmental Clearance o Projected Completion: TBD o Project Cost: $100,000,000 (TxDOT) o Consultant: Kimley-Horn Associates Project Update: From Council Action at an earlier meeting, TxDOT has applied for Railroad Grant funding for the project. Staff received a copy of an earlier TxDOT public meeting presentation. Based on information in that presentation, TxDOT expects to conduct some additional public meetings concerning the project this Summer. Staff is working with TXDOT and their consultant to get some additional information on the project to address comments and questions made during the recent Council meeting. Once Staff has received the additional information, it will be provided to Council. Parks & Recreation Projects: 1. Schertz Soccer Complex Irrigation Water Storage Project Project Description – Upgrading electrical components, upsizing well pump and piping, and adding storage capacity for irrigation of the Schertz Soccer Complex. o Project Status: Under Construction o Projected Completion: Spring 2026 o Project Cost: $200,000 (estimated total) o Consultant: Unintech Engineering o Contractor: Kutscher Drilling Project Update: No change from last update. Drilling construction for the new well has been completed and the old well has been capped. Staff is acquiring bids for the storage tanks to finish up the project. Still pending bids for the storage tanks as there is a complication in the float valves available versus what was designed. The water storage tank project is currently out for bid with a deadline of April 2; once bids are received, we will move forward with scheduling the work accordingly. I.T. Projects: 1. Asset Management- Work Order System – Open Gov Project Description- Replace the current work order and asset management systems o Project Status: In progress o Projected Completion: Fall 2025 o Project Cost: Approximately $470,000 o Contractor: Open Gov Project Update: Parks, Drainage, and Streets are actively working on providing information on the start-up data templates in order for OpenGov to upload each department’s work-related resources, task titles, activities, equipment, etc. into the sandbox site. Staff have another train-the-trainer event scheduled with OpenGov April 28-30, 2026. Studies and Plans: 1. Master Thoroughfare Plan and Roadway Impact Fee Update Project Description – Update to City’s Master Thoroughfare Plan and Roadway Impact Fee Program. o Project Status: Study o Projected Completion: Schedule Pending o Total Project Cost: $149,460 ($170,000 NTE) o Consultant for Study: Kimley-Horn Associates Project Update: The MTP plan update is nearly complete. Final review of the MTP routes and alignments are underway. Work continues on developing cost estimates for the MTP routes. Staff has provided our consultant with copies of recent bid tabs and Right-of-Way appraisal information so this data can be incorporated into the estimates. 2. Southern Schertz Interim Sewer Service Study Project Description – Until the completion of expansion of the CCMA South Water Reclamation Plant, treatment capacity in southern Schertz is severely limited. This project is a study to identify potential short-term and long-term sewer service treatment options for the City’s southern service area. o Project Status: Study o Projected Completion: Schedule Pending o Total Project Cost: $59,695 o Consultant for Study: Utility Engineering Group Project Update: Staff and the consultant continue to evaluate the potential for retrofitting existing systems to function in an interim capacity. The consultant submitted a technical memo with one of the options for interim capacity (temporary package treatment plant) for staff to review. 3. Regional Flood Planning A Master Drainage Plan for the City of Schertz has been selected as one of the top projects recommended for funding and performance by the Texas Water Development Board (TWDB) through the Flood Management Evaluation (FME) program. The Community Interest Affirmation authorized by Council on March 17, 2026, has been submitted to the TWDB. TxDOT Roadway Projects: Note: If links do not work, please contact engineering@schertz.com 1. FM 1103 Improvement Project: Construction officially began in November 2022 and was originally expected to be complete in fall 2026. Minor progress is being made on the roadway while utility relocation continues. General project updates are available by signing up at this link: FM 1103 Construction Newsletter 2. FM 1518 Improvement Project: SER Construction, LLC, formally began construction on April 9, 2024. The contractor has leased property owned by the City on Schaefer Road to stage construction activities. The first few months of the project will be mainly underground utility construction and will mostly take place outside travel lanes. While there may be some delays, major traffic disruptions should not be experienced much during this phase of the project. The project is currently anticipated to be completed in 2028. Updates regarding the FM 1518 project are available by visiting and subscribing at the following link: FM 1518 Expansion 3. IH-35 NEX (I-410 South to FM 1103): The central segment of the I-35 Northeast Expansion project continues with Alamo NEX Construction handling the design-build project. The central section runs from 410 N to FM 3009. Utility coordination work for the northern segment of the project is underway. TxDOT consultants have met with Public Works and Engineering Staff to begin establishing relocation needs. The City will be reimbursed for the costs of all relocations needed except for any upsizing or improvements above current conditions. Updates about the project can be obtained by signing up at the following link: I 35 NEX Project Updates 4. IH-10 Graytown Road to Guadalupe County Line: Work for the widening of the main lanes and utility relocations continues. Work on the FM 1518 bridge over IH 10 continues and will involve numerous episodes of the rerouting of traffic including shifting lanes and detours as necessary. Updates regarding the IH 10 project are available by signing up at the following link: IH 10 Expansion Information