The Transportation Safety Advisory Commission (TSAC) convened for a Called Meeting on
Thursday, November 5, 2026, at 5:30 PM in the Council Chambers, Building #4
1400 Schertz Parkway, Schertz, Texas 78154
Present: Richard Dziewit, Chair; Roy Ragsdale, Commissioner; Chris Hormel, Commissioner; Paul Wiley,
Commissioner; Steven Icke, Commissioner; Jonathon Marquez, Commissioner; Rick Jamison,
Commissioner; Nathan Serna, Alternate; Scott Newquist, Alternate
Absent: Jay Starr, Commissioner; Mark Davis, City Council Liaison; Ferrando Heyward, Vice Chair Larry
Busch Jr, Public Works Director; Demetrio Martinez, Streets Crew Supervisor;
Staff Present: Kathy Woodlee, City Engineer; Brian James, Deputy City Manager; Bull Morehouse, Police
Sergeant; Robert Martinez, Street Supervisor; Lee Harris, Senior Engineer; Serena Contreras,
Associate Engineer; Tammy Lawrence, Administrative Assistant;
1. Call to Order/Roll Call – Transportation Safety Advisory Commission
Called at 5:30 PM by Chairman Richard Dziewit.
2. Hearing of Residents
None
3. Minutes: Consideration/Action for approval of October 1, 2026, TSAC Meeting Minutes
Motion was made by Commissioner Wiley. Seconded by Commissioner Newquist.
Motion passed.
4. Traffic Related Item Updates:
a. Ashley Park Speeding
Lee Harris stated good evening. So have an update here for Ashley Park speeding. The work out there has
been completed, so we have striped new bike lanes out there along with our new center line. I have a couple
pictures here for you. So now that the striping has finished, we will be looking at doing some additional
counts here. After a little bit, give people a little time to get used to it, and then we can come back and give
you some information and update you on how this is all working out there with our speeding issue that we
received the complaint on.
b. Crest Oak & Golden Oak
Serena Contreras stated the speed humps were placed. We had three speed humps that were placed. New
counts were taken after the placement in red are the October numbers. So, they did decrease. City staff is
going to determine if additional speed humps are going to be needed. And then we'll do recounts after the
holidays because these were just a few weeks after.
1320 Crest Oak – 20 mph speed limit (July/Oct)
North South
ADT- 490/505 ADT- 453/431
85th perc speed- 30.3/27.2 mph 85th perc speed- 32.4/32.0 mph
Combined ADT – 944/936
85th perc. speed 31.5/29.4 mph
1405 Circle Oak – 20 mph speed limit (July/Oct)
North South
ADT- 365/369 ADT- 402/420
85th perc speed- 24.0/27.7 mph 85th perc speed- 33.3/28.7 mph
Combined ADT – 767/790
85th perc. speed 30.3/28.3 mph
1529 Circle Oak – 20 mph speed limit (July/Oct)
North South
ADT- 467/494 ADT- 466/492
85th perc speed- 28.5/23.6 mph 85th perc speed- 28.3/22.4 mph
Combined ADT – 933/987
85th perc. speed 28.3/23.1 mph
4313 Golden Oak– 20 mph speed limit (July/Oct)
North South
ADT- 377/372 ADT- 403/404
85th perc speed- 32.4/21.3 mph 85th perc speed- 23.6/24.0 mph
Combined ADT – 781/777
85th perc. speed 28.9/23.2 mph
c. FM 1518-Aviation-Aztec Way
Lee Harris stated staff are going to be reaching out with Universal City. We're going to see if we can get in
touch with them about the jurisdiction and who owns, uh, the different areas because it still is kind of up in
the air. So, we will be meeting with them to try to clarify all of that, especially with us purchasing some land
over in this area, because that is also going to change, who owns what. But we did want to clarify that with
this situation. We do have the stop bar that is farther back. So legally we have to keep it there and you are
allowed to stop but then move up. And when you do move up to the, um, probably where the more appropriate
stop location should be, you do have visibility and that kind of coincides with many other intersections that
we have throughout the city where you have to do this. So with that, we will still have that meeting and try
to figure out exactly and let people know who owns that one corner where the tree trimming, kind of needed
to happen, but we will be considering this resolved and moving forward and taking this off the agenda. So
it's still kind of in process as it were. But as far as updates after this, we'll kind of consider it closed from here
on out. There's the black dot showing the location that we're actually looking at and the current boundaries
that will be changing after annexations and other things happen.
d. Primrose/Medical Building accessing Schertz Parkway
Lee Harris stated we are currently working to finalize our purchasing, uh, and on call contract for concrete
work. With the new fiscal year in October that got rebid out, and we're trying to finalize that. And the new
contractor, once that is finalized, will be sent out to this location so we can perform the work
5. Staff Comments and/or New Requests
a. Buffalo Valley South Signage
Serena Contreras stated traffic counts were taken at these three locations on First Street and Mill. Street.
There are speeding issues on Mill and one on Zuehl. Engineering determined that additional signage is going
to be needed. So the four black dots that are on this exhibit is where Public Works will be installing additional
speed limit signs.
FIRST STREET – 20 mph speed limit
North South
ADT - 85 ADT - 119
85th perc. Speed - 23.1 mph 85th perc. Speed – 23.5 mph
Combined ADT – 205/23.3 mph
MILL STREET – 20 mph speed limit
North South
ADT - 37 ADT - 38
85th perc. Speed - 27.5 mph 85th perc. Speed – 27.3 mph
Combined ADT – 75/27.4 mph
ZUEHL STREET – 20 mph speed limit
North South
ADT - 35 ADT - 35
85th perc. Speed - 21.8 mph 85th perc. Speed – 26.8 mph
Combined ADT – 70/23.8 mph
b. Woodland Oaks pavement markings
Serena Contreras stated exhibits have been made and Public Works is working on the cost estimates.
c. Rose Garden Elementary at FM 1518 safety concerns
Lee Harris stated we had several complaints come in for FM 1518 at Rose Garden Elementary. There were a
couple accidents, I think, that happened out there during pick up and drop off. So that's what brought all of
this to our attention. The city staff has reached out to TxDOT, as well as the contractor out there performing
the work. With this being in a construction zone, the contractor takes over the responsibility of maintaining
that and making sure pavement markings are correct and that this is a safe intersection. So they've gone out
and they've made some improvements out there with the construction zone striping. We also reached out to
the school to see if they would want to add a police officer, because if that is something that they would want
to do, they would have to then organize and pay for that police officers. But that is on the school. So we are
aware of it. TxDOT is aware of it. The contractor is also out there monitoring it. So we'll be kind of staying
on top of this throughout the construction as different phases and traffic gets moved back and forth. And we'll
kind of keep monitoring it and making sure that this is hopefully as safe as possible and that the striping and
everything kind of stays up to date with the contract.
d. Lantana – Turning Left onto Cibolo Valley Drive
Lee Harris stated we also received a complaint from a subdivision over here off of Cibolo Valley Drive. Their
only entrance and exit to their subdivision is there in the red circle. They are having trouble making left hand
turns out of their subdivision to go to the highway. So what we are looking at doing is hiring one of our
engineering firms to do some evaluation. This intersection right here is pretty close to the existing signal
that's located at Old Wiederstein Road there to the south. So putting another signal in there for them is not
really, we're not advising that. We're trying to not put another signal kind of keep traffic moving. So what we
would like to do is have them evaluate the three signals that are there circled in green and evaluate timing of
those signals to try to help give gaps so that they can make left hand turns out easier. With that, we have three
jurisdictions that each own a signal there. So Cibolo, the City of Schertz and TxDOT. So there's going to be
a lot of coordination, making sure everyone is okay with all the changes that we would look at trying to
implement after they do their evaluation. But that is what we are moving forward with at the current time.
And we are waiting for a proposal back from our consultant.
e. Signage/Lighting at Trainer Hale at Weir Road
Serena Contreras stated we did get a complaint due to an accident at this area. So after reviewing the signage,
signage plans, pavement markings, and lighting in the area, city staff recommends increasing the size of the
large arrow sign. You can see it slightly in this photo to the left. Upgrading the stop sign, adding additional
speed limit signs approaching that intersection, as well as refreshing all of the pavement markings and looking
into the possibility of streetlights and rumble strips.
Commissioner Dziewet asked is that item a something that has to be voted on or gotten approval on?
Serena Contreras stated No.
Commissioner Dziewet stated but that's in in the stage of being completed at some point?
Serena Contreras stated Yes.
6. TXDOT presentation
Dale Picha stated I am glad to be here. I've been to a few of your meetings over the years. I always enjoy
coming back and telling you about some things we're doing. I'd be glad to answer any questions as well on
any of our projects. If I can't answer it, I know people that know people that can answer the question. First
thing I wanted to tell you all about, and we do this at all of our public presentations is our current campaign
is called Drive Like a Texan. And we do this because we have an epidemic of fatalities on our public
roadways. That hasn't stopped for many years. In fact, today's November 5th, right? So in two days,
November 7th is the 26th anniversary, a streak that we've had at least one death on our highways every day
for the past 26 years. So in other words, November 7th, 2000 was the last day that we had a deathless day
on our highways. So a lot of our fatalities are behavior related, probably about 2/3. You'd be surprised. We
still have about only a 90% use of seatbelts in the state of Texas. Speeding, distracted driving and of
course, impaired driving. Those are all big contributors to about 2/3 of all fatalities, sadly. So we've got a
lot of work to do that requires all of us folks sitting behind me, folks sitting in front of me. So appreciate
your help. But our drive like a Texan campaign is to be kind, courteous, and safe on the roadway.
So I've been asked by city staff to give an update on a few things, including explaining what TxDOT San
Antonio District is in terms of administration and how we're kind of arranged, with offices and things.
What roadways we have here in Schertz, our area office and maintenance sections. So by the time I'm
finished here, you'll be able to speak TxDOTease. You'll be bilingual in TxDOT language.
I'll try to make a short slide about pavement markings. Interestingly, Lee's already done that somewhat.
And then I've got a couple projects to tell you about as well. So first of all, our district or TxDOT in general
is broken up around the state in 25 regional districts. And I assume you can see this in front of you. We
have our district is called the San Antonio District. It's really the metro area of 12 counties surrounding
Bexar County, from Kerr to the northwest and the Hill Country to McMullen County, McMullen County
to the south. And it's about 2.7 million residents in this in these 12 counties. And I've highlighted kind of
what we see. The urban counties, where you all are with Comal, Guadalupe, Bexar, Kendall, and then the
rest are mostly rural counties, but still populated with medium sized cities like Uvalde and Floresville and
Kerrville, Bandera and Kerrville and Boerne, things like that. So deep diving a little bit different or a little
bit deeper into our district. We have what we call area offices. Area offices are kind of our subregional
offices that manage the construction and maintenance on our roadways. I am not in an area office. I'm at a
district headquarter staff over transportation operations; we have five area offices. You all fall within two of
those offices. The light blue New Braunfels area office and the green. Because part of your city limits are in
Bexar County. So you're in the, what we call the Bear Metro Area office. So going a little bit deeper into
that, the roadways and Schertz. And it's not my fault that your city limit boundaries are all over the place.
But you all span from IH 35 to IH 10. I don't think you quite crossed I-10, but you border I-10. we'll call it
to the south. And the TxDOT roads. I think I got them all here, I-35, I-10. These are in or near Schertz.
Loop 1604, FM 3009, FM 1518, FM 1103, FM 78, FM 2252, FM 482. Those are all crossing or near. All of
these have street names, obviously that locals give. So FM 3009, Roy Richard and FM 1518 is Main Street,
at least north of FM 78. FM 2252 - Nacogdoches Road. I don't think FM 1103 has an official street name
by any of the cities. Lastly, I put a link there on the bottom of that slide. It's called our statewide planning
map. If you haven't been to that website, just do an internet search of TxDOT statewide planning map. And
it's a good, it's a lot of good information on our roadways, our boundaries. It even has the top 100 taco
places in the state. So you can find a lot of different unique things on that map. You can just click on and
off different layers on the map, zoom in, zoom out. But a really good information. That website managed
by some folks in Austin, they've done a really good job. I use it every day to look things up on that. So it's
probably equivalent to maybe what city staff uses on GIS maps. So, I was talking about area offices. So,
that same app I was showing earlier with the roadways. Now I'm showing the county. So you can see the
yellow is your city limit boundaries. Your across 3 different counties of Bexar, Comal and Guadalupe
counties. Comal and Guadalupe counties are under what we call the New Braunfels Area Office. Mr. Jeff
Smith is our area engineer. Some of you may remember Will Lockett retired about a year and a half
ago, and Jeff is now the new area engineer. And our maintenance supervisors for Comal County is Duane
Hofrichter. And I have to say that fast enough because I can't say it right. And then Rick Martinez is our
Guadalupe County maintenance supervisor. He has been on the job there about a month. It took Travis
Young's place. So anything that's really in those two counties, Duane and Rick, are our points of contact
and Jeff and then everything, I guess, let's say south of the river or similar creek is in Bexar County. That's
under our metro area office. Christen Longoria and y'all will have a copy of all this for future reference.
And Gil Romo is our East Bexar County maintenance supervisor. The only exception to what roadways that
don't fall within the jurisdictions of these maintenance offices and area offices is FM 1518 from FM 78 up
to IH 35, is actually maintained by Bexar Metro, even though it's in Guadalupe County. So just any
questions on that? This is why I look at the statewide planning map occasionally, just to remind myself
what section to call, if there's a complaint on FM 1518 or FM 78 or things like that. Okay. I think my next
slide is an even deeper dive into FM 1518 because it takes a little bit of zigzag. obviously, we're working on
construction of widening FM 1518 to the south of FM 78. That's what Lee was talking about earlier, north
of FM 78. FM 1518 actually zigzags up on FM 78. And then First Street is actually part of FM 1518.
Sometimes some of our staff don't fully realize that, but that's the way I guess a lot of people before us
determined that was the alignment of FM 1518. I put an arrow there to kind of show; I think that's where
the First street traffic signal is. Any questions on that?
I think I'm going to move now to markings. I think I to try to make pavement markings exciting is only
something a traffic engineer can appreciate. So in our 12-county tech site district, we have 11,319 lane
miles. Quite a bit of roadways. About a year ago, I was doing an analysis of all the dollars we spend on
pavement markings alone, just through contract, through construction, through maintenance, through in-
house. And we spent about $35 million dollars a year. I was doing that because I also needed to know if we
have 11,319 lane miles, how much do we really need to spend to be able to restripe roadways on a kind of
recurring basis to keep those stripes fresh? We actually need about $50 million to keep up with our system.
So we are underfunded in our striping budget right now, which means that we're really at the mercy of
complaints, because we are chasing, just to be honest with you. We are chasing complaints a lot to try to
keep up with striping issues. Again, all 12 counties. We do rumble strips and profile markings. Those are
safety enhancements on some of our higher speed roads to remind drivers that may start drifting off the
roadway, it gives you a little bit of rumble effect. There's some new standards that require us to now do 6”
wide markings. We used to do 4” inch. So 6” inch, you're putting more product down. It's more expensive.
Then contrast markings, that image on the far-right kind of shows when you're working or driving on light
colored pavement, like concrete, that white doesn't pop out real well except at night. So daytime we do a
contrast. We call it a lead lag. So we put a black stripe at the tail end of the white stripe, and it kind of gives
that driver a little better visibility of the markings on the roadway. So those are just some things that we are
doing on the pavement marking side. I think you guys had some questions, or I'd be glad to answer any
questions about striping.
Commissioner Dziewet stated there's an area in Cibolo, Main Street, the area from the let's say HEB and
Walmart section down there. As it turns down, who is generally responsible for getting those things started?
Like those haven't been looked at, I guess, for a long time now. And the access into like Main Street down
because it has this curvature, especially when you know, darker when it gets at night, there's nothing that
you can see there. So is that a TxDOT situation?
Dale Picha stated If it's on FM 1103, it definitely is us. So let's back up a little bit. FM 1103 on Main Street
the traffic signal there by HEB, that is a TxDOT owned and maintained traffic signal. Generally we have a
written agreement with all of our cities called a municipal maintenance agreement. And that agreement says
that cities are responsible for the signs and markings on their streets that approach our roadways. So the
stop signs, stop bars, things like that are generally the city's responsibility to maintain if it gets knocked
down or needs to be refreshed. But at traffic signals, we generally have kind of an unwritten agreement that
we'll maintain all the markings related to the signals, you know, so the crosswalks, if there's I think we have
crosswalks there, we've got turn arrows and things like that. So we will, when we come through, we're not
just going to do FM 1103, we're going to do the side street as well because it's a traffic signal and then
anything upstream or downstream on FM 1103 curves or whatever is. TxDOT’s responsibility.
I'll be glad to come back to this to you at the end of the presentation. I got a couple more slides, a couple
updates. I want to talk about our IH 35 northeast expansion. I'm sure you may have seen a little bit of work
on IH 35 recently. Then our work on FM 1518 and just so that we are equally offending everybody, we will
soon destroy FM 3009 and FM 78 intersection. So IH 35 Northeast Expansion. It's broken up. I'm showing
a picture here of what we call the central phase. This was the one that bid first. There's a south phase one, a
south phase two, and there's a north phase. The North phase is going to go from FM 3009 to FM 1103. But
that will be probably next year sometime. Overall all four phases about $3.2 billion dollars. It's probably the
largest project we've ever had in our district single corridor project. This central phase from basically FM
3009 down to 410 was in the neighborhood of about $1.5 billion. It was referred to as a design build
contract. FM 1103 down to Frost Bank center drive is about 20. You can see the elevated structures. There's
going to be three lanes each direction, two general purpose lanes and one HOV lane. And with this central
project, we're building flyover connectors, or we call them direct connectors at 1604 and 410. Those are the
only direct connectors to other freeways. That's part of the next project. The date keeps moving a little bit,
but we're slated to open the southbound elevated lanes by the end of the year. So in less than two months.
So you may see it but there's an on ramp right there by Evans Road in IH 35 that kind of slips under what is
the future bridge is going north, but the on ramp going southbound still under construction. You'll get on
there and you'll be able to go all the way to 410. You won't be able to get off at 1604 yet, because that's still
all that purple there on 1604. Still being managed and built, but you'll be able to take it all the way to 410 to
get off there at 410. That's kind of a general high-level overview of 35 NEX. I try to not drive that roadway
very much, but I know we all can't avoid it. But are there any questions on any 35 NEX that I could try to
answer?
Commissioner Dziewet stated I guess, you know, the biggest question is always you look at it and say, all
right, when is this going to get done? You know, after all the work that is being done in the area. FM 1103
is being worked on, has been worked on for a while. Are there notifications given to the city or just in
general as to the completion time?
There's an official website and each phase that I talked about, the central, the north and the two south
phases all have different completion times. The overall ultimate completion I think is around 2032 if I'm
not mistaken, because that's the last phase. The fourth phase, which will go to construction sometime next
year, is probably another four to five years to stack on top of what we've already been living through. So
but notices not too far away. We do have a, probably, a growing list of stakeholders that get notified every
week of major closures at night or weekends, because you've probably seen all that where we have to close
to put those large beams up and things like that. So there's probably ways to get on that notification list, I
couldn't tell you how to do it here, but the website probably has that information.
FM 1518, so that project bid in October of 2023 and usually we don't start construction right away. So
construction probably started sometime in mid-2024. It's a $75 million-dollar project. SER is a Houston
based construction company. They're the prime contractor. This roadway is being widened from two to four
lanes in each direction with a turn lane or raised median. The limits are from FM 78 down to IH 10. We're
also incorporating bike lanes and sidewalks, maybe shared use paths I can't remember. Shared use paths or
just wider sidewalks on the side. As of earlier this week, we have a consultant helping us manage the
construction of this project. We're about 65% complete. They actually told me 64.3% complete. So I'll go
with 65. And we're a little bit ahead of schedule because we're 60% of the time has surpassed on this for
their commitment to get it done in summer of 2028 is the expected completion probably substantial
completion a little bit earlier than that, probably by end of 2027, the end of next year. So I think we're
running traffic in the future northbound lanes right now while we're building the southbound lanes, I drove
it probably two or three weeks ago. So it may have changed. Things may have changed a little bit, but
there's some bridge widening still to be done, some intersection work to be done at several cross-street
intersections. So yes, it's a pain, I'm sure for folks that live there, go to school there and have to drive
through there.
The last one is FM 3009. This is a recent development that our rail division in Austin, we're you know, I
mentioned our 25 districts around the state. We also have policy divisions in Austin, and we have a railroad
division that manages a lot of rail coordination issues that help us at the district level with rail issues.
They've been chasing grant funds for several grade crossings around the state. There was an announcement
a couple of months ago. I haven't followed it too closely, really kind of outside my wheelhouse, but it was a
close to a $1 billion-dollar grant award to the state of Texas for several at grade, grade crossing
improvements, including FM 3009 at FM 78. The estimated amount at this intersection to separate it is over
$100 million. Right now, the grant is actually $100 million. So there's some TxDOT funds that we're
adding to that. And I'm sure there'll be some local dollars for right-of-way acquisition and things like that,
which usually happens on these projects. But, you know, we've all been through there. I've been going
through that intersection for 25 years. And it's outlived its capacity for sure. So, obviously with the base,
Randolph and the peak traffic going to and from there every morning, every afternoon, that intersection is
very congested. And we're just really ten pounds of potatoes in a five-pound bag right now. We can't push
any more traffic through there unless we started cutting off other driveways and stuff through there. But
that's not realistic. So there is an open house that's been advertised. It's coming up on November 17th;
Kathy just told me earlier that it's the same night as the council meeting. I'm not sure how that happened. I
apologize for that. There may be a workaround because our meeting is an open house meeting where it's
come and go anytime between 5-7pm. I have no graphics to show you right now of what that grade
separation is going to look like. We have some concepts, but we'll probably be showing some of those on
the 17th. And I put also here the civic Center, but I think it's actually the Community Center. I understand
it's two different buildings. So our public notification says the community center. I can try to answer any
questions on that, but we're still very early. I would guess probably several years away from actually
starting construction on that, because alot of environmental and right of way acquisition to go through on
that project.
Commissioner Wiley stated I know that relief on FM 78 and FM 3009 can't come fast enough. My biggest
concern has always been the amount of backup in that center lane, especially when there's a long, slow train.
So people traveling eastbound, they start moving into that middle lane before they even reach cloverleaf and
the Lone Oak subdivision. And I frequently go to that subdivision. I’ve avoided dozens of head-on collisions
because of people moving into that lane too soon. And then, of course, they're blocking it. And sometimes a
line has been so long, they even blocked a left turn lane at the intersection where Dairy Queen is. And it’s
just, for people trying to make a left turn westbound from a traffic lane has always been a big concern to me
as well. And I just wish there was something we could do in the interim to try to relieve some of that. I don't
know if medians or something like that. Like what they did in converse over there by Walzem. I don't know
if that's a solution or not, but I certainly welcome any kind of relief.
Dale Picha stated yes. Eastbound on FM 78. As you're making that left turn you've probably seen we
convert lane number two to a left turn lane in the afternoon because of that high peak demand coming from
Randolph in the morning time. It's just a single left turn lane. But when you introduce that dynamic lane
assignment, you've got to stop everybody coming the other direction. And then we're able to run two lanes.
But to be able to run two lanes all day with protected arrows would probably jam up the westbound
direction more so than it already is. So it's again, it's you're trying to spread the delay equitably around the
intersection as best you can without making too many people mad. You've got two lanes turning in the PM
peak and you got two lanes receiving on FM 3009. It's like I said, ten pounds of potatoes and a five-pound
bag. So I mean the only really other solution is to try to give that time more green time to clear that
movement so you can resolve some of that stacking in that turn lane. But I think a lot of people get in that
turn lane, not realizing that the second lane also can turn left. So especially if the first time going through
there.
Commissioner Jamison stated I've noticed when you've got a train that goes through there and you've got
eighteen wheelers that are making a left turn or you've got a school bus, um they can get maybe one or two
cars during that cycle. Right. Has there been any consideration you just brought up maybe extending those
lights a few more extra seconds for the eastbound lane during a train preemption moment? No, just to
incorporate that, um, time frame so it would help the rest of the time but might help more with the school
bus or an eighteen-Wheeler.
Dale Picha stated Yes, sir. Yeah, absolutely. And you're talking about eastbound FM 78 to go north on FM
3009.
Commissioner Newquist stated I guess once you have a train stop there or a train going through, is it stacks
up? Is there any, does that change the timing at all to. Once it's passed to clean out the clean out the left lanes
more. Or is. It will increase time to turn the lane after the trains. The trains have passed after trains already
cleared.
Dale Picha stated probably the critical movement to clear first is at FM 3009 movement. I'm guessing right
now that's probably the first one to start up and clear that first. That's usually the track side is what we clear
first. But that's a good question.
7. Action Item- TSAC Approval to purchase and utilize Urban SDK software for Traffic Counts
Lee Harris stated Engineering and the Police department have been in talks with urban SDK on this traffic
count software. Ad both of us have been through multiple demonstrations with them. And we are both in
agreement that we do like the software. So on the screen here, um, that table that you see there on the left,
that's kind of what we get generated currently when we do a speed study with our current traffic counters.
One of the things that we've kind of seen with our current traffic counters, if you kind of look closely in there,
you can see that it's picked up some cars and it says that they're doing 75, 80, some 85 to 90. We don't believe
that on some of these streets on Wilderness Oak and Oak Grove Park. A car getting up to that speed just
doesn't, does not seem feasible. So we think that we may have some, some calibration issues and some other
things with the current traffic counters that we do have. So that's one, one reason that we were looking at
some of this new software with this urban SDK software. We can go on and we can actually click different
sections of the street, and we can get reports generated with this software to the right. Kind of shows you
some portions of what we get. They give you some information on the data and how it was kind of collected.
They give you your ADT there. They also give you a breakdown. So this is another portion of that report that
you can. Generate with the software that you can show you what section of street you're on. It gives you
breakdown. So this chart here is our 85th percentile speed. And they have the ADT broken down according
to day and then time periods. So with this, we're able to kind of dig in a little bit deeper. Police can run reports
and find out exactly when the speeding is happening. So they know what time of day they can kind of
coordinate and plan when they're going to be out there to kind of enforce or look at trying to get the speeders
out there and try and slow them down. So this software they use is already embedded into all of our newer
cars. It doesn't bring out any information that don't have any owner information, vehicle information. All it
takes from their computer system is what road they were going on, what direction and the speed. That's all
they collect. And then they just use that and compile all of the data. And that's what ends up getting put
into the system. And like I said, with this, you can actually narrow down whatever time frame you're
looking at. It's not immediate. So if you, if you called me up and said, I want you to find what the speed is
today, I can't go on and find it out today but give me two weeks and it'll show up in the system. I'll be able
to select a certain time frame and see if there was if you said someone driving ninety down my street, I could
go and look. And it's assuming it's a one of the newer cars that has one of the computer systems that it tracks
that if you're driving a 1950s car, it's not going. To have that information on it. So there is a little bit of a data
skew on that, but it's not enough to really affect what we're trying to, to accomplish with this traffic counting
software. Another thing that this software does is, like I said, Police can actually go into the software, and
they can run a report, and they can say, okay, give me all the streets that have an 85% percentile and it's
above the speed limit, and it'll shoot out a list of all the streets. So they can actually use that to preemptively
go out and start monitoring those streets and enforcing on those streets before we actually get complaints on
those streets. And they can continually run these after a certain time frame and make sure that the enforcement
that they're doing is actually bringing those down. And you can kind of see where they can shift their time
and resources. And then one last thing that they brought up to us is they have a complaint system along with
this. So if we choose to want to put that on our website, any citizen can go on and submit a complaint to us,
and it'll pop right up on a GIS map and tell us what the location is and what the issue was. And we can then
use that to go out and start looking at enforcing and checking in on those speeders out there and see if we can
help resolve the issues. And with that, I can go ahead and kind of jump in and give you a little bit of a. So
this is kind of their sandbox that they've sent to us, kind of give you an idea of what it looks like. So you can
kind of zoom in. This is average speed, but you can go in and actually select 85th percentile. You can select 85th
percentile and just get you a different map. So this is all the 85th percentiles on the streets. It's not comparing
it to what the actual speed limit is. It's just telling you what the 85th percentile is. So with our city, with our
speed limit being 20-mph on most of our residential, uh, every street on there, if they're following the speed
limit, should be a purple for a 20-mph street. If it's not that purple and it's a that magenta or a red one, that
means that 85th percentile is already over the speed limit. We can look at a map and say, yep, we know we
have to go out there and do some enforcement or do a little deeper dive into what's going on and why they're
speeding. Our main our main corridors, they would be a different color. So, Schertz Parkway, it's you're not
going to have a 20-mph speed out there. It should be the same color along the entire length. So you'll be able
to really look at that and tell right away if you have a speeding problem. Again, you can also go in here. It's
kind of locked for us right now, but I can go in and select whatever month I want a specific day hours, and I
can narrow down my search to figure out exactly how the speeding is happening at that certain day, that
certain time, that time frame. I can also go in and run different reports, which I don't believe they've given us
all the features in the sandbox. But again, police can go in there and run those reports and figure out where
they need to use their limited time and effort into enforcing for the city. Happy to let Bull come up if he wants
to give a deeper dive into what Police and can use this for and what their intent is.
Bull Morehouse stated, absolutely, I appreciate that. We on the traffic side of things, we get numerous
complaints every week. Over ninety percent of them are due to speeding issues. Okay. I got a complaint last
week in a closed off neighborhood. Everybody speeding in this neighborhood. We've got a major problem
here. Two officers went out there. We spent a total of four man hours in this neighborhood. We did not find
a single person driving more than two miles an hour over the speed limit. That's four hours. I could have been
out, you know, had my guys out doing something more productive with this software. I get a complaint in, I
can pop on that street, and it breaks the streets down, even into smaller sections. So if we get a complaint on
Schertz Parkway, I can look at between Live Oak and, you know, Pecan Drive. You don't have to look at the
whole street in general. I can look at it and within five minutes I can tell you if there's a problem, how bad
the problem is, that saves me resources to go out and determine if we even have a problem. On top of that,
we can look and see if our enforcement is working. So if I have the guys out there doing radar on three
thousand and nine, I can go back. The data is, I think, approximately seven days it takes for us to get the data
to us. So if we go out there and we work on Monday from noon to four, I can go back the following
Monday, pull up that data and compare it and say, did our enforcement work? Did the speeds come down
while we were out there working it? If not, what other options do we have? The other thing is, like you said,
we can look at this and say, where are our problem areas? When they were demonstrating this with one of
our assistant chiefs a couple of weeks ago, he said the man demonstrating it said, okay, let's look at where's
your problem areas? Oh, look at this. I'll tell you. It's an area that we hadn't looked at in probably five or six
years. I didn't realize the problem was so bad on this road, but he looked at it and said, oh yeah, you've got a
major issue there. Well, guess where traffic was enforcing the next day. So this is a wonderful time saving
tool on their end of it. They can go out and, you know, instead of, hey, we got to put the speed study out.
Leave it out there for two weeks or whatever they do. Then get the data. It's instantaneous. We can look at
this, see where the problem is and if they do anything. Traffic calming, speed bumps or whatever. A week
later, we're already seeing the data. We don't have to wait two months and then put out the speed study. We
see it within a week. It's instantaneous results. The time and labor money that this will save the city is worth
twice the price they want to charge us. So y'all have any questions on my end?
Commissioner Dziewet stated, to me, it's like a great information support for what you need. Without utilizing
so much manpower out there. So yeah, I think it's a great idea.
Commissioner Ragsdale asked who would administer this, the police department or the city?
Lee Harris stated so with that, they have right now a little I'll call it a special going on. They're going to
basically allow us to have two admin accounts with this for the price of one. So Police and Engineering
will both be able to have an admin account on this, as well as 20 different users that can go in and, and get
the information so we can let Public Works go in. That way. They can check on some things as well. But
the admin we would have one and police would have one. Okay. Basically buy one, get one.
Commissioner Jamison asked is this the only system that y'all have looked at?
Lee Harris stated I would say yes. We've looked at some other things. They had some other counters that
we've been looking at that you would set out there, but they're not really instantaneous, kind of like this.
You'd still have to go out and set them up on like a hook them to a traffic pole, and then you have to wait
the seven days to get the counts to come back. There's some other ones that I've looked at, not
necessarily here, but with another jurisdiction and with that one, it was significantly a higher cost.
When I looked at that one, when I was working in Omaha, they were like $100,000 a year for that software,
which was kind of doing the same thing as this.
Commissioner Jamison asked from the city's perspective, is this something that you recommend for us?
Lee Harris stated yes that it's so nice to be able to get a phone call in saying we've got speeding on our street.
And while I'm on the phone with them, I can jump on this and start pulling up some data and kind of give
them an idea of what we're seeing. And it'll speed the process up of us getting back to residents, because
nothing I think frustrates some of these residents more when they're already mad about speeding. Is that we're
going to we're going to be out there in a week and a half. Maybe if we have, as soon as we get the time,
maybe a week, put out the counters. They sit out there for two weeks, then they don't even hear back from
us. It's you're already a month later. It's going to help calm some of those residents, I hope down that we can
get them immediate answers.
Commissioner Jamison asked is this is this the recommendation of the Police Department?
Bull Morehouse stated Yes, sir. And to piggyback on that, they have these reports that you said I can
instantaneously click on a report, download it as a PDF, and I can email it to the complainant right then and
there and say, absolutely, we got a problem here. Or, you know, I know you think while you're at your
mailbox that they are going too fast, too close to you, but the data doesn't back that up. You know, I hate to
be the one to tell you, but there's not an issue like you think there is. Okay. But I can I can do that. And I
can also come back if there is a problem and say, yeah, we were in your neighborhood. And look, we
dropped the numbers down. So we've addressed your complaint.
Commissioner Newquist stated very good. Thank you. You know, when I saw this on the agenda, I did
some my own looking at the stuff, and it looked it looked pretty nice. Pretty sweet.
Lee Harris stated we were pretty impressed looking at it and going through the demonstrations with them.
Bull Morehouse stated I'll be honest; I am the worst person you want to try to sell something to. The
first time I got on with this guy was because my chief forwarded him to me. And the first five minutes of it,
my, the guy who was on it with me, one of my traffic officers had to text me and say, stop rolling your
eyes. Okay. But then he started going into what it can do, and I have been the one trying to sell it to my
command because I've never seen anything that could be this valuable, not only to my department, but to
Engineering and Public Works.
Lee Harris stated its going to save their (public works) guys a lot of time. And as you know, we're a growing
city. They have a lot of other tasks that they're tasked to do and to take this off of their plate, where they're
not going to have to go out there and spend several hours putting out the counters, picking them back up,
coming back, downloading the data. It's definitely worth its weight in gold.
Commissioner Wiley made a motion to approve to Urban SDK software purchase.
Commissioner Ragsdale seconded the motion.
Motion passed.
Commissioner Dziewet stated the motion has been totally approved. So the purchase is definitely accepted.
And it is something that we look forward that will definitely help the organization and the police
department as well.
8. Future Agenda Items Requests from Commissioners
Commissioner Newquist asked about the Railroad Crossing markings, did that get updated?
Robert Martinez stated we are on schedule for November 16th, Monday. We've been making preparations the
last two weeks. We've got some material coming in. We've made preparations with the railroad and with our
friends from TxDOT as well, too. So, if all weather is good, we'll be starting on Monday and we're looking
at a three-day project, so we'll have Schertz Parkway and Randolph Avenue completed.
Commissioner Ragsdale thanked the City for repairing the manhole on Hollow Ridge.
Commissioner Icke stated nothing here but thank you TxDOT.
Commissioner Jamison stated nothing here. But thank you for a very informative meeting.
9. Adjournment
Motion made by Commissioner Newquist. Seconded by Commissioner Ragsdale. Motion passed.
Meeting ended at 6:28 PM by Chairman Dziewit.