12-R-42 Ford Engineering Waterline Relocation Woman Hollering CreekRESOLUTION NO. 12-R-42
A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF
SCHERTZ, TEXAS AUTHORIZING A PROFESSIONAL SERVICES
AGREEMENT WITH FORD ENGINEERING, INC., RELATING TO
ENGINEERING, DESIGN AND HYDRAULIC STUDY FOR WATERLINE
RELOCATION ON FM 1518 AND WOMAN HOLLERING CREEK AND
OTHER MATTERS IN CONNECTION THEREWITH
WHEREAS, the City staff of the City of Schertz (the "City") has determined that the City
requires professional services relating to engineering, design and hydraulic study for the
Waterline Relocation on FM 1518 and Woman Hollering Creek TX-Dot Bridge Improvements ;
and
WHEREAS, City staff has determined that Ford Engineering, Inc. is uniquely qualified to
provide such services for the City; and
WHEREAS, pursuant to Section 252.022(a)(4), the City is not required to seek bids or
proposals with respect to a procurement for personal, professional, or planning purposes; and
WHEREAS, funds for this project are to be appropriated in the budget and $150,000 will
be transferred in from the Water & Sewer Fund Balance; and
WHEREAS, the City Council has determined that it is in the best interest of the City to
contract with Ford Engineering, Inc. pursuant to the Engineering Services Agreement attached
hereto as Exhibit A (the "Agreement").
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS
THAT:
Section 1. The City Council hereby authorizes the City Manager to execute and
deliver the Agreement with Ford Engineering, Inc. in substantially the form set forth on Exhibit
A.
Section 2. The recitals contained in the preamble hereof are hereby found to be hue,
and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a
part of the judgment and findings of the City Council.
Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with
any provision of this Resolution are hereby repealed to the extent of such conflict, and the
provisions of this Resolution shall be and remain controlling as to the matters resolved herein.
Section 4. This Resolution shall be conshued and enforced in accordance with the
laws of the State of Texas and the United States of America.
Section 5. If any provision of this Resolution or• the application thereof to any person
or circumstance shall be held to be invalid, the remainder of this Resolution and the application
of such provision to other persons and circumstances shall nevertheless be valid, and the City
Council hereby declares that this Resolution would have been enacted without such invalid
provision.
Section 6. It is officially found, determined, and declared that the meeting at which
this Resolution is adopted was open to the public and public notice of the time, place, and subject
matter of the public business to be considered at such meeting, including this Resolution, was
given, all as required liy Chapter 551, Texas Government Code, as amended.
Section 7. This Resolution shall be in force and effect from and after its final
passage, and it is so resolved.
PASSED AND ADOPTED, thi~ day of ~ 11 .2012.
CITY-O`F~°C~HERTZ, TEXAS
Mayor Pro-Tem
ATTEST:
City~ry
(CITY SEAL)
50077397.1
EXHIBIT A
ENGINEERING SERVICES AGREEMENT
50077397.1 A-1
FORD ENGINEERING
Apr1124, 2012
City of Schertz
Public Works Department
10 Commereiat Place
Schertz, Texas 78154
Attn: Mr. Sam Willoughby
Public Works Director
Re: Water Line Relocation on FM 1518 at Woman Hollering Creek
We are pleased to provide this proposal to provide professional engineering services to the City
of Schertz for design of the above referenced project.
Our understanding of the scope of work is generally as follows: Ford Engineering Inc will
provide necessary civil engineering professional consulting services for tfie City to bid and
wnstruct the relocation of the 12-inch water line on FM 1518 at Woman Hollering Creek to
remove it from conflict with proposed TxDOT improvements, as well as drainage
improvements immediately downstream of the creek crossing.
Pro'eci t Scone
In order to facilitate the delivery of said project, Ford Engineering Inc will provide the
topographical survey of the existing site, adjacent eastern propertylexisting water line easement,
and TXDOT right-of--way to determine locations of existing utilities and pertinent topographic
features. It is understood that TXDOT has plans for the creek crossing reconstruction, and that
any CAD files and hard copies of the plans available to the City will be provided to Ford
Engineering Inc, within a reasonable time frame to aid in our design. The City will provide
`potholing' services to locate the existing water lines.
Ford Engineering will prepare a drainage analysis and design calculations for the downstream
drainage improvements. The desigo will be incorporated to the construction plans and a report
will be compiled for submittal and review.
Ford Engineering will prepare a set of construction plans, specifications, and quantity estimate,
for review, approval, and construction with associated details par the standards indicated in
Statement of Work. Plans and specifications will be in conformance with City of Schertz
standards of construction and materiels. Plans will include the pipe line layout' pipe profiles (as
required), channel improvements, and details for construction. Ford Engineering will prepare
the necessary exhibHs to facilitate the obtaining of a TxDOT utility and drainage permit, and a
City of Schertz Flood Plain permit.
Ford Engineering will have a representative available for pre-construction and periodic project
meetings during construction. Ford Engineering will provide construction stalling to consist of a
single line of stakes with guard stakes showing the stationing, and offset of horizontal PI, PC
and PT of the pipe alignment, locations of tees and bends, points of tie-in to existing system,
10927 WYE DRIVE, SUITE 104, SAN ANTONIO, TEXAS 78217 (210) 540-4777 FAX: 590-4940
1-600-332-3104 Web Site: wwwfordengineering.com TAPE No. F-1162
and major appurtenances. When the construction stakes have been set, the preservation of such
stakes as to position, elevation and marking shall become the responsibility of the contractor.
After construction has been completed and work approved by the Owner, Ford Engineering will
incorporate any changes made during construction, as indicated by the contractor on a marked
up set of plans, into a set of Project Record Drawings.
Engineering Fee
Compensation for these services will be in the amount of $22,000.00 which will cover all costs
associated with the scope described above.
The above engineering fee is based on a discussion with the City that a Jurisdictional
Determination (JD) has been made on the creek at this point, and the original high water mark
(OHWM) has been established, and there will be no disturbance within the limits of OHWM. It
is also understood that the area to receive channel improvements has had an environmental site
assessment (ESA) completed which indicates no endangered species or wetlands associated
with the project. The City will supply Ford Engineering with these documents. If these
documents are not available, it will i>a considered additional services for Ford Engineering Inc.
to obtain the JD, ESA, and any additional permitting not stated above.
Additional services and significant changes will be compensated for as provided by Attachment
1 to the Second Amendment to agreement for Engineering Services between the City of Schenc~
and Ford Engineering, Inc. dated April 1, 2012 (the "Second Amendment). Further, the services
described in this letter shall be subject to the terms of the Agreement For Engineering Services
between the City of Schertz and Ford Engineering, Inc. dated February 9, 2010, as amended by
the First Amendment to Agreement for Engineering Services dated October 1, 2011 and the
Second Amendment.
Should there be any questions or if further information is needed, please do not hesitate to call
meat 210-590-4777.
Sincerely,
FORD ENGINEERING INC.
/v`~
Mark B Hill, P.E.