12-R-48 Agreement with Ford Engineering relating to the Waterline replacement on IH 35 between Mobile Villa Estates and Schertz ParkwayRESOLUTION NO. 12-R-48
Section 1. The City Council hereby authorizes the City Manager to execute and
deliver the Agreement with Ford Engineering, Inc. in substantially the form set forth on Exhibit
A.
Section 2. The recitals contained in the preamble hereof are hereby found to be true,
and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a
part of the judgment and findings of the City Council.
Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with
any provision of this Resolution are hereby repealed to the extent of such conflict, and the
provisions of this Resolution shall be and remain controlling as to the matters resolved herein.
I "Ifflaufflug1
Section 5. If any provision of this Resolution or the application thereof to any person
or circumstance shall be held to be invalid, the remainder of this Resolution and the application
of such provision to other persons and circumstances shall nevertheless be valid, and the City
Council hereby declares that this Resolution would have been enacted without such invalid
provision.
Section 6. It is officially found, determined, and declared that the meeting at which
this Resolution is adopted was open to the public and public notice of the time, place, and subject
matter of the public business to be considered at such meeting, including this Resolution, was
given, all as required by Chapter 551, Texas Government Code, as amended.
PASSED AND ADOPTED, thia�Ldl-a
EMM
(CITY SEAL)
50077397.1
ENGINEERING SERVICES AGREEMENT
50477397.1 A-1
FORD ENGINEERING-,-INC.
City of Schera
Public Works Department
10 Commercial Place
Sate rt;�, Texas 78154
Attn: Mr. Sam Willoughby
Publie Works Dimetor
Re: Water Line Relocation on 1H 35 ® Schertz Parkway to Mobil Villa
We are pleased to provide this proposal to provide professional engineering services to
the City of Schertz for design of the above referenced project. '
water line along the North Bound Frontage Road (NBFR) of IH 35 from So
Parkway to Mobil Villa.
572717; oT sut 1,77je enng Xc- win roV1 ft
P
topographical survey of the existing site and TXDOT right-of-way to det
locations of existing utilities and pertinent topographic feabuw. The City will pr0c
'potholing' services to locate the existing water lines as neede& 31V11
Ford Engineering, Inc. will have a representative available for pre-construction and
monthly project meetings during construction. It anticipated that constmetion and
installation will be aDDroximate1v 3 months. with two site viLit per month. After
construction has been completed Ford Engineering Inc. will participate in 2
walkthrough of the project to assist in preparing a punch-list of corrections for the
10927 WYE DRIVE, SUITE 104, SAN ANTONIO, TEXAS 78217 (210) 59044777 FAX. 590-4940
1-800-332-3109 Web Site. www.fordengineedng.com TBPE Nc� F-1 162
contractor. Once the work is approved by the Owner, Ford Engineering Inc. and its
team will incorporate any changes made during constructior4 as indicated by the
contractor on a marked up set of plans, into a set of Project Record Drawings.
BagiLjeriraF'
Compensation for these services will be in the amount of $22,7".00 which will cover
all costs associated with the scope described above,
-AM4"A Ur At ME' rinanon is needed, please do not hesitate
to call me at 210-590-4777.
t6bq