Loading...
12-R-48 Agreement with Ford Engineering relating to the Waterline replacement on IH 35 between Mobile Villa Estates and Schertz ParkwayRESOLUTION NO. 12-R-48 Section 1. The City Council hereby authorizes the City Manager to execute and deliver the Agreement with Ford Engineering, Inc. in substantially the form set forth on Exhibit A. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. I "Ifflaufflug1 Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. PASSED AND ADOPTED, thia�Ldl-a EMM (CITY SEAL) 50077397.1 ENGINEERING SERVICES AGREEMENT 50477397.1 A-1 FORD ENGINEERING-,-INC. City of Schera Public Works Department 10 Commercial Place Sate rt;�, Texas 78154 Attn: Mr. Sam Willoughby Publie Works Dimetor Re: Water Line Relocation on 1H 35 ® Schertz Parkway to Mobil Villa We are pleased to provide this proposal to provide professional engineering services to the City of Schertz for design of the above referenced project. ' water line along the North Bound Frontage Road (NBFR) of IH 35 from So Parkway to Mobil Villa. 572717; oT sut 1,77je enng Xc- win roV1 ft P topographical survey of the existing site and TXDOT right-of-way to det locations of existing utilities and pertinent topographic feabuw. The City will pr0c 'potholing' services to locate the existing water lines as neede& 31V11 Ford Engineering, Inc. will have a representative available for pre-construction and monthly project meetings during construction. It anticipated that constmetion and installation will be aDDroximate1v 3 months. with two site viLit per month. After construction has been completed Ford Engineering Inc. will participate in 2 walkthrough of the project to assist in preparing a punch-list of corrections for the 10927 WYE DRIVE, SUITE 104, SAN ANTONIO, TEXAS 78217 (210) 59044777 FAX. 590-4940 1-800-332-3109 Web Site. www.fordengineedng.com TBPE Nc� F-1 162 contractor. Once the work is approved by the Owner, Ford Engineering Inc. and its team will incorporate any changes made during constructior4 as indicated by the contractor on a marked up set of plans, into a set of Project Record Drawings. BagiLjeriraF' Compensation for these services will be in the amount of $22,7".00 which will cover all costs associated with the scope described above, -AM4"A Ur At ME' rinanon is needed, please do not hesitate to call me at 210-590-4777. t6bq Mark B Hill, P.E.