Addendum No. 2 for New Baseball Fields #13-PK-07-C-01ADDENDUM NO. 2 March 22, 2013 City of Schertz Baseball Complex RFCSP No. 13- PK- 07 -C -01 Issued by: LUCK Design Team 9600 Escarpment Boulevard, Suite 745 -4 Austin, Texas 78749 Phone: 512.810.0684 Contact: Brent Luck bluck @luckdesignteam.com ��,pNDSCgp ��Q�'•QENTO* � C 0 � y Cz O� GO "i • 1896 y The contract documents are herby revised or clarified per the following comments. This addendum is to be noted on the bid form and becomes part of the contract documents for this project. Item Reference Description 1 Construction Addition: Sheet A2.2: a note was added specifying the type of Documents drinking fountains at the storage building (see attached). 2 Construction Modification: Sheet P -1: Under "Plumbing Fixture Connection Documents Schedule" the remarks for fixture DF has been modified to read as follows: "a. ELKAY #LVRCDS, Wall Mount, Barrier Free, Vandal Resistant'. 3 Construction Modification: Sheet P -1: Under "Plumbing Fixture Connection Documents Schedule" the remarks for fixture DF -1 has been modified to read as follows: "a. ELKAY #LVRCDS, Wall Mount, Barrier Free, Vandal Resistant'. 4 Project Manual Addition: Specification 16528 " Exterior Athletic Lighting Performance Specification ": Section 1.1, Line C5 has been added to read as follows: "Clarification of Pole re -use for City of Schertz Baseball Phase 2 — Revision 1: Existing Field, Poles A8 & A9 • These poles will remain in place and be re -used. • (3) new lamps will be provided for each pole. Existing Field, Poles B10 & B11 • These will be brand new, complete poles End of Addendum No. 2 Field 1, Poles B8 & B9 • These poles are re- located from the Existing Field B poles. • These poles retain the same labeling that they previously had on Existing Field. • (1) new base and (3) new fixtures will be used out for these poles. Field 1, Poles B 12, B 13, C5, C6 • These will be brand new, complete poles Field 2 & Field 3, All poles • These will be brand new, complete poles" 5 Addendum No. 1 Modification: Addendum No. 1, Item 6: Detail 9, Sheet L5: the detail for the field light pole bases has been modified (see attached). End of Addendum No. 2 ,- T 00 - A4- CD o90 O N N O O � ,W M �> = rn N 77 z � N C 3 UO M D X 0 < M W z °z C N W N N N O_ W Schertz Baseball Complex City of Schertz ILUCK DESIGN TEAM PLANNING LANDSCAPE ARCHITECTURE 600 Escarpment Boulevard - Suite 745 -4 ° Austin, Texas 78749 • 512.810.0684 231-611 I W Cn 0 " 12._ �� O \ °' . C) - N M x � m O C m 0 n C M N rn (.� C c N rn \ = c m M m = �O 0O 6 c 6 cn N cn .., M rn rn D 0 O O z. z --,\ - '. 0 � '-'�. E F A -. 0 � � , � � � . I .. . , . ... , . . .. , , .' . , . . � , . . � � � . . - � . . . . :' ; I � , .. . . �� . - . . . - , - . , . . . . : ; - w . . : t - , * � � '. . . I . - - 1 .1 . I . . .. : - . , z I ��. . , , , . � - : , * .� : - E ; I " . '� . . , ;; , I . .. .. L � , ' � � : . - . L . . 7 � 1� '. L I � . I . I - I � � L ' , L . L , 'L _ : � ' ' L , , ' : 1 �� L ' � � , L ,' " !7�� ' � � � : L,' ., , I , . - - - 7 . , .. , . . . � �� -f '.. � - "F O . . .. - . , : , , : 4� , . .. . I .. . . . . � - . . I "" \ � L . . . I i - - I �: . I �� LF � : , �.- , L 00 I I � - � �� I- , ..' . ..' .::.' ... .:- r . - _ -� M `=' � ., : —::*-�� .m�� 1 , F�" .- — .- iL — _� C/) � IE �] �� *..' : i -. . .' *t ...... U ' . : : * : -�-7 . :: . � k7F - U) r-- � . .' . � . .. �* 1. . �� �.' . I:" H'.. � ��E *n I Z — - ., - , L, L, . - E . I L ­ m-' � I .L.L . � . -1 - . . 77�7 .. . I I ' , . '.' "''. -­�'� ] ;1 1: . L�' . — D -- - . , � . ' . . - .' N + — — — / I - * / . ': , .. — — - .1 .� .. � , � , � — ' ' E ' " '� � - - - � - � . ---" ' . , ' * . . . . W�. ' . '. I , * ' � I : ' � I � . 11 , L - D" > nD Z M = 0 D O m D ��CA Z� m70 .. ... . . - E ��z = O O � . ' . . , - .�-. .. . - � I . .1 . " * : .. �, I . I : . " - M o O ...,... ... -. . , 1Oz �-n DO 0U) < M -' � zD �m M0 �C CO --A E: CO O� pcn m -< =m -0 D �O = =m -0 D = Di Dm z Dm z I. mC mC G) X M < D r � -< D r D-u �� D-0 �� m O m O O i c 0 O n� c 0 O O O O O =m =m M M 2 n = n Dm z Dm z m� M m� M -c X —c X < r- -< r- � >� = D > � O � O m= z K) O p O p = Z j 70 X z D O 1 cn <U) u=rn %� 0) D D zEf - M N� IN 1 D p O = 00 o _ O ,p Cn m 1�rn r °rn M r M 1N rn N� �rn < . 7 . . . . : I IL ,1 . � : � - - _� 'r I . � 1, I I L . - � I I .1 - � -.. - � - . .. � .� �: !=� . � - , . .. I � - . . I I . I � I L - : .11 � E - -i I I I L L m O O o� z rn r 1. rn �_ O z � ; I .. ,'� I ' I � I 1� . - �' .. . .... .. . � - . . .... 1, . , .. ' . I ... e '% . . \ .: Z ,: 'L I ! . �. �. -. , 1 �': � .� � :1 . ' L I ' . . L, ., � \ . � . % : . '. � ; . I I .. : .. � � 7 . . , I - L L �. _ L I . . I , IF MG) iz X� ODDOD O D n O NZ �m cnO ... 77" . -.!- � . �. �'. I, ... ....'� / D m m 2 . D : ' .1 . . � .: , I � � 1* 77- .. � - / / 231-611 M � 1 � ,- T 00 - A4- CD o90 O N N O O � ,W M �> = rn N 77 z � N C 3 UO M D X 0 < M W z °z C N W N N N O_ W Schertz Baseball Complex City of Schertz ILUCK DESIGN TEAM PLANNING LANDSCAPE ARCHITECTURE 600 Escarpment Boulevard - Suite 745 -4 ° Austin, Texas 78749 • 512.810.0684 LIGHT STRUCTURE STEEL POLE BY MUSCO LIGHTING (SEE POLE ID) z O U W O Q m a � W Q c U ¢ m w � F d < w U w w � v a O N POLE FOUNDATION SCHEDULE POLE DESIGNATION FORCES DRILLED PIER MOMENT (M) FT -LBS SHEAR (V) LBS VERTICAL (P) LBS (1.) DIAMETER INCHES EMBEDMENT DEPTH CONCRETE BACKFILL YD (2.) Al2 32,179 849 931 36 10' -0" 1.9 A13 42,090 1,005 1,359 36 10' -0" 1.9 A14 32,611 856 931 36 10' -0" 1.9 B8, B9 32,179 849 931 36 10' -0" 1.9 B10, B11, B14, B15 64,151 1,302 1,764 30 12' -0" 1.5 B12, B13 63,015 1,287 1,764 30 12' -0" 1.5 B16 67,952 1,360 1,854 30 12' -0" 1.5 B17 69,269 1,377 1,854 30 12' -0" 1.5 C5, C6 35,786 904 1,179 36 10' -0" 1.9 C7, C8 40,522 980 1,269 36 1 10' -0" 1.9 V "— SOIL BACKFILL, 1. WEIGHT OF POLE, FIXTURES AND ACCESSORIES. 2. MINIMUM CONCRETE BACKFILL VOLUME, SITE CONDITIONS MAY REQUIRE ADDITIONAL BACKFILL. DRILLED PIER DIAMETER (SEE POLE FNDTN. SCH.) POLE FOUNDATION ELEV. SCALE: NOT TO SCALE SOIL BACKFILL NOTE: THE TOP TWO FEET OF ANNULUS MAY BE BACKFILLED WITH SOIL, WITH A CLASSIFICATION OF CLASS 5 OR BETTER IN ACCORDANCE WITH IBC - TABLE 1804.2. PRECAST BASE IDENTIFICATION PRECAST BASE TYPE PRECAST BASE WEIGHT PRECAST BASE LENGTH SEE NOTE BELOW = w J OUTSIDE DIAMETER 213 1,690 LBS 17' -3" IL o w p. 12.00" 3B 2,470 LBS 20' -0" 8' -0" 12' -0" 13.37" 3 (3) ULIGHT 138,139 LSS60AA 2B STRUCTURE 6.9 B10, B11, B14, B15 LSS70B 313 PRECAST BASE BY g z 612, 613 LSS70B 3B MUSCO LIGHTING 15.0 B16 LSS70B 313 (SEE POLE ID) o B17 LSS70B 3B 7(4+3) � C5, C6 LSS60A 213 4 (4) w Z C7, C8 LSS60A 2B 5 (5) �O d w a. CONCRETE p o BACKFILL J J d n w ❑ w UNDISTURBED, IN -SITU SOIL DRILLED PIER DIAMETER (SEE POLE FNDTN. SCH.) POLE FOUNDATION ELEV. SCALE: NOT TO SCALE SOIL BACKFILL NOTE: THE TOP TWO FEET OF ANNULUS MAY BE BACKFILLED WITH SOIL, WITH A CLASSIFICATION OF CLASS 5 OR BETTER IN ACCORDANCE WITH IBC - TABLE 1804.2. PRECAST BASE IDENTIFICATION PRECAST BASE TYPE PRECAST BASE WEIGHT PRECAST BASE LENGTH PROJECTION ABOVE GRADE STANDARD EMBEDMENT OUTSIDE DIAMETER 213 1,690 LBS 17' -3" 7' -3" 10' -0" 12.00" 3B 2,470 LBS 20' -0" 8' -0" 12' -0" 13.37" POLE IDENTIFICATION POLE DESIGNATION POLE TYPE PRECAST BASE TYPE FIXTURE CONFIGURATION (FIX. PER XARM) FIXTURE AND ACCESSORIES EPA (FT ) Al2 LSS60AA 213 3 (3) 6.9 A13 LSS60A 213 6(3)/(3) 12.6 A14 LSS60AA 213 3 (3) 7.2 138,139 LSS60AA 2B 3 (3) 6.9 B10, B11, B14, B15 LSS70B 313 6 (6) 15.6 612, 613 LSS70B 3B 6 (6) 15.0 B16 LSS70B 313 7(4+3) 17.5 B17 LSS70B 3B 7(4+3) 182 C5, C6 LSS60A 213 4 (4) 9.2 C7, C8 LSS60A 2B 5 (5) 12.0 DESIGN NOTES DESIGN PARAMETERS: WIND: 90 MPH (EXP. C, I = 1.0) PER IBC CODE, 2006 EDITION (ASCE 7 -05). DESIGN WIND PARAMETERS ARE NOTED. ACTUAL WIND SPEED AND EXPOSURE MUST BE VERIFIED FOR THE SITE BY THE PROPER GOVERNING OFFICIAL. GEOTECHNICAL PARAMETERS: ALLOWABLE END BEARING SOIL PRESSURE: 2,500 PSF ALLOWABLE LATERAL SOIL BEARING PRESSURE: 0 PSF /FT (GRADE TO - 2' -0 "), 150 PSF /FT ( -2' -0" TO 4-0 "), 300 PSF /FT (BELOW 4-0 ") IN ACCORDANCE WITH THE 2006 EDITION OF THE INTERNATIONAL BUILDING CODE, CHAPTER 18. DESIGN SOIL PARAMETERS ARE AS NOTED. ACTUAL ALLOWABLE SOIL PARAMETERS MUST BE VERIFIED ON SITE. REFERENCE SOILS AND FOUNDATION REPORT, NO. ASA12- 078 -00, PREPARED BY RABA KISTNER CONSULTANTS, INC.; SAN ANTONIO, TX. A GEOTECHNICAL ENGINEER OR REPRESENTATIVE OF IS RECOMMENDED (NOT REQUIRED) TO BE AVAILABLE AT THE TIME OF THE FOUNDATION INSTALLATION TO VERIFY THE SOIL DESIGN PARAMETERS AND TO PROVIDE ASSISTANCE IF ANY PROBLEMS ARISE IN FOUNDATION INSTALLATION. ENCOUNTERING SOIL FORMATIONS THAT WILL REQUIRE SPECIAL DESIGN CONSIDERATIONS OR EXCAVATION PROCEDURES MAY OCCUR. POLE FOUNDATIONS WILL NEED TO BE ANALYZED ACCORDING TO THE SOIL CONDITIONS THAT EXIST. IF ANY DISCREPANCIES OR INCONSISTENCIES ARISE, NOTIFY THE ENGINEER OF SUCH DISCREPANCIES. FOUNDATIONS WILL THEN BE REVISED ACCORDINGLY. REVISIONS WILL BE ANALYZED PER RECOMMENDATIONS DIRECTED BY A REGISTERED ENGINEER. ALL EXCAVATIONS MUST BE FREE OF LOOSE SOIL AND DEBRIS PRIOR TO FOUNDATION INSTALLATION AND CONCRETE BACKFILL PLACEMENT. TEMPORARY CASINGS OR DRILLERS SLURRY MAY BE USED TO STABILIZE THE EXCAVATION DURING INSTALLATION. CASINGS MUST BE REMOVED DURING CONCRETE BACKFILL PLACEMENT. CONCRETE BACKFILL MUST BE PLACED WITH A TREMIE WHEN SLURRY OR WATER IS PRESENT WITHIN THE EXCAVATION OR WHEN THE FREE DROP EXCEEDS 6-0 ". CONTRACTOR MUST BE FAMILIAR WITH THE COMPLETE SOIL INVESTIGATION REPORT AND BORINGS, AND CONTACT THE GEOTECHNICAL FIRM (IF NECESSARY) TO UNDERSTAND THE SOIL CONDITIONS AND THE POSSIBILITY OF GROUND WATER PUMPING AND EXCAVATION STABILIZATION OR BRACING DURING PRECAST BASE INSTALLATION AND PLACEMENT OF CONCRETE BACKFILL. CONCRETE: CONCRETE SHALL BE AIR - ENTRAINED AND HAVE A MINIMUM COMPRESSIVE DESIGN STRENGTH AT 28 DAYS OF 3,000 PSI. 3,000 PSI CONCRETE SPECIFIED FOR EARLY POLE ERECTION, ACTUAL REQUIRED MINIMUM ALLOWABLE CONCRETE STRENGTH IS 1,000 PSI. ALL PIERS AND CONCRETE BACKFILL MUST BEAR ON AND AGAINST FIRM UNDISTURBED SOIL. GENERAL NOTES: FIXTURES MUST BE LOCATED TO MAINTAIN 10' -0" MINIMUM HORIZONTAL CLEARANCE FROM ANY OBSTRUCTION. POLES, FIXTURES, PRECAST BASES, ELECTRICAL ITEMS AND INSTALLATION PER MUSCO LIGHTING. PRELIMINARY N W N Z 2 W vJ Q v LL IJ _j 0 m LL LJ Of U U) W ® W 0 m 3n 6., >Lo ago a tO ® I V O N ON 00 O- wOo 0 � Y � O N d O O U z O z ::) z Ow a v H ❑ W N ul z ¢ w w Q Cr O o U ❑ a (n z co PROJECT NUMBER 125491 DATE 22 MARCH 2013 DRAWING NUMBER C1 OF ONE U cc" N `9 m Q (n ,°n ¢ a O LL! > co @ ❑ W LL LLl cn 0 m z 0 Z J J 2 J O¢ Z LL ( ^ v � U 2 w Z Z ir p Q U) Lu < m w z O z ::) z Ow a v H ❑ W N ul z ¢ w w Q Cr O o U ❑ a (n z co PROJECT NUMBER 125491 DATE 22 MARCH 2013 DRAWING NUMBER C1 OF ONE