Loading...
13-R-51 - Renovation of Soccer Fields Concession Buildings & Parking LotsRESOLUTION NO. 13-R-51 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING THE CONSTRUCTION CONTRACT FOR THE RENOVATION OF THE EXISTING SOCCER FIELDS AND CONSTRUCTION OF A NEW CONCESSION BUILDING AND PARKING LOTS AND ASSOCIATED SUPPORT SYSTEMS AND OTHER MATTERS IN CONNECTION THEREWITH WHEREAS, the City staff of the City of Schertz (the "City") has recommended that the City enter into an contract with Alpha Building Corporation for the renovation of the existing soccer fields and construction of A new concession building and parking lots and associated support systems; and WHEREAS, the City Council has determined that it is in the best interest of the City to contract with Alpha Building Corporation and the Contract attached hereto as Exhibit A (the "Contract"). THAT: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS Section 1. The City Council hereby authorizes the City Manager to execute and deliver the Contract with Alpha Building Corporation in substantially the form set forth on Exhibit A. The total amount payable under this Contract shall not exceed $3,504,037.00 plus $35,000.00 of City contingency funds for a total amount of $3,539,037.00. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the Laws of the State of Texas and the United States of America. Section S. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject . matter of the public business to be considered at such meeting, including this Resolutian, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND ADOPTED, this 25~ day of June, 2013. CITY OF ERAS Michae R. Carpenter, Mayor ATTEST: Brenda Dennis, City Secretary (CITY SEAL} 50234811.1 EXHIBIT A D WILSON CONSTRUCTION COMPANY CONTRACT t~~1 \~ J ..:.. ='~~~= Document A101'~ - 2001 Standard Form ofAgreement Between Owner and contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the 25th day of June in the year 2013 (In 1<vords, indicate day, month acrd year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Schertz City of Schertz, 1400 Schertz Parkway Schertz, Texas 78154 and the Contras#or: (Name, legal status, address and other information) Alpha Building Corporation 4738 Whirlwind Drive San Antonio, Texas 78212 for the following Proj ect: {Name, location and detailed description) Soccer Field Renovations and Concession Building 75 Maske Road Schertz, Texas 78154 The Architect: (Name, legal status, address and other information) Luck Design Team, LLC 9600 Escarpment Blvd Austin, Texas 78749 The Owner and Contractor agree as follows. This documenl has Important legal consequences. Gonsultation wilh an allorney Is encouraged with respect to its completion or modification. AlA Document A209 TF3 2007, Goners! Gondliians of the Contract for Construction, Is adopted In this document by reference. l7o not use vvilh other general conditions unless this document Is modfied. AfA Documenk Ai01,u-20D7. Copyright®9915,1918,1925,1937,1951,1958,1961,1963,1967,1374,1977, 7987,1991,1997 acrd 2007 by The American Institute of Init. grchr~eds p11 rights reserved. WARNING: This AIA°oocument is protected by U.5. Copyright Law and [nlernafional Trestles. tJnauihorized reproduction or ,~ distribution of Ihts AIAoDocvrnent, or any portion of f~ may result in severe civil and crim]nal penatdes, and aril[ be prosecuted to the maximum extent possible t under the lam. This document was creased on 06/18/201 3 1 3:22:01 under the farms of AIA Documents-on-DemandTM order no. 2008592526 ,and is not forresate. This document is licensed by IheAmerican institute of Aroh;lects for one-time use only, and may not Ue reproduced prior la its completion. TABLE OF ARTICLES THE CONTRACT DOCUMENTS THE WORK OF THIS CONTRACT DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TE12M1NATION OR SUSPENSION e MISCELLANEOUS PROVISIONS 8 ENUMERATION OF CONTRACT DOCUMENTS ttl INSURANCE AND BONDS ARTICLE 7 THI=CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Speciftcations, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and ModiFcations issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the ContractDocumen#s to bathe responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (.Insert the date of commencemen! if it dyers from the date of this Agreement or, if applicable, stale thaT the dare wil! be fixed in a notice to proceed.) Tf, prior to the commencement of the Work, the Owner requires time to file mortgages and other security interests, the Owner's time requirement shall be as follows: § 3.2 The Contract Time shall be measured from the date ofcommencement. A!A documentAlOiT"--2007. Copyright®1995,1918,1925,1937,1951, 9958,1961,1963,1967,1974,1977,1887,1991,1997 and 20076y iheAmerican InsL~ule or Init. Arcfiiteds Afl rights reserved. WARNING: This AIAeDocument is protected by US. Copyright Lawand lntemational Treaties. Unauthorized reproduction or 2 dislrlbutian of this AlA®Oocument, or any portion of it, may resuR in severe civil and criminal penalties, and will be prosecuted to tho maximum extent possible T under the taw. This documentwas created an Otili0l20i313:22:Ui under the terms of A1A Documents-on-Demandr~ order no. 200tS612526 , arrd Is not for resa]e. "fhb document is licensed try tire American Institute of Arciidects iwone-time use Doty, and may not be reproduced prior to ils comple5on. § 3.3 The Contractor shall achieve Subs#antial Cample#ion of the entire Work not later than Three Hundred Fifty Four ( 354 }days from the date of commencement, or as follows: (Insert number of calendar days..4lternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the Worl~) Portion of il,e Work Substantial Completion Rate subject to adjustments of this Contract Time as prodded in the Contract Documents. (Insert provisions, if any, for ligaridafed damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Wor7G) ARTICLE 4 CONTi7ACT SUM § 4,1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Three Million Five Hundred Faur Thousand and Thirty Seven Dollars ($ 3,504,037.00 ~, subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the foflowing alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other ident~cation of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this flgreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) AIpha Building Corporation Letter of May 28, 2012 herein refered to as ATTACHIVII;NT A § 4.3 Unitprices, if any: (Identify acrd state the 4rnid price; state quantity limitations, if any, to which the unit price will be applicable.) Item NONE Units and t.imitations Price per Unit (~D.00) A!A Document A104T~-2807. Copyright®1945, 4918,1925,1937, 4951, 4958, 9981, 1963, 1387,1974,1477,1987,1999,1997 and20W b1' The Ameripn instiiuteo4 Intl. p~ All rights reserved. WARNING: This A!A°Documenl Is protected by U,S. Copyright Law and Intemat3onal7reaUes. Unauthor9zed reproductlon or 3 dlshihuUon ortlrl5 AtA®Documenl, crony portion orit, may resuR hr severe civil and criminal penaflies, and will be prosecuted to tl~o maximum extent possl6le t under the taw. Tttls doaimenlwas created an 06118!2013 13:22:04 under the terms of AtA Documents•on-DemandTw order no. 2o9B612526 ,and Is not for resale. This document fs licensed by the American institute oFArohflects Tor one-time use Doty, and may not foe reproduced prior to its completion, § 4.4 Allowances included in the Contract Sum, if any: (Iderrt~ allowance acrd state exclusions, if any, from the allowance price.) Item NONE Price ($D.OD} ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1.1 Based upon Applications for Payment submitted to the Architec# by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments an account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the first day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the last day of the same month. If an Application for Payment is received by the Architect after the application date fxed above, payment shall be made by the Owner not later than forty-five { d5 }days after the Architect receives the Application for Payment (Federal, state or local laws may require payment within a certain period of time.) § 5.7.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5,1,5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of ttte period covered by the Application forPayment. § S.T.S Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .i Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of five percent ( 5 %}. Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.9 of ATA Document A201T"~20D7, General Conditions of the Contract for Construction; ,2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing}, less retainage of five percent ( 5 %}; .3 Subtract the aggregate ofprevious payments made by the Owner; and .4 Subtract amounts, if any, for which the Architect has withheld or outfitted a Certificate for Payment as provided in Section 9.5 ofATA Document A241-2007. AIA DocumentA949r'~-2047. Copydght®1915, i99f1, 9925,1937, 1951,1959,1961,1963,1967,1979,1977,1987, 1991,1997 arxi 2(147 by TheAmerican Institute of Inlt. ArchHeds. All rights reserved. WARNING: Thls AIA°Document ]s protected by U.S, Copyright Law and Intemational7reaties. Unauthorized reproduction or 4 disMbuQon of Uiis AlA°Document, orany portion of it, may result In severe civil and cdminal penalties, and wlil be prosecuted to the maximum e~dent possible t under the law.'rhis documentaras created on 46ti6l2413 13:22:01 under the terms of AIADocuments-an-Demand" order no. 2A48612526 ,and Is not for resale. This document is licensed b1r the American lrutitute of ArchiSeGs for one-time use Doty, and may not be reproduced priorio its completion. § 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, Iess such amounts as the Architect shall determine far incomplete Wotk, retainage applicable to such work and unsettled claims; and (Section 9.8.5 ofAl.4 DocumerrtA201-2007 requires release of applicable retainage upon Substantial Completian of Work with consent of surety, if any.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201 2407. § 5,1,8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire WorlS to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 acrd S.l.b.2 above, and this is not explained else>vhere irr the Contract Documents, insert here provisions for such reduction or limitation.) NONE ' § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers far materials or equipment which have not been delivered and stored at the site. § 5,2 FINAL PAYMENT § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Snm, shall be made by the Owner to the Contractor when .1 the Contractor has fully perfotmed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201-2007, and to satisfy other requirements, if any, which extend beyond fmal payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner's final payment to the Cantractor shall be made no later than 34 days after the issuance of the Architect's foal Certificate for Payment, or as follows: ARTICLES DISPUTE RESOLUTION § 6.1 ENITIAL OI=CiSION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (Ifihe parties mutually agree, insert the name, address acrd other contact information of the Initial Decision Maker, if other thau the Architect.) Init. A1A Document A101~"-2807. Copyrights 1945,1918,1925.1937,1851,1958,1961,1963,1967,1974,1977,1987, 1997,1997 and 2007 by7heAmerignlr~lituteoi Architects. All dghls reserved. WARFlING: Thls A!A°DOCUment Is protected Uy U,S. Copyright La~vand tntemational 3'reaties. Unauthorized reproduction or ~ dlstrihulfort of this AIA®Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted tv the maximum extent possihle J under the law. This documentwas created on 06/1 812 01 3 1 3:22:01 under the terms of AIA pocuments-on-pemandn+ order no. 2008612528 ,and is not far rosale. Tfus document is licensed by the American lnslihrte of Architects torone-time use only, and may not he reproduced prior to its ~mpfetion. § 6.213Wt}1NG D1SpUTE RESOLUTION For any Glaim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201 2007, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Otvner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdictiorr.J ^ Arbitration pursuant to Section 15.4 of AIA Document A201-2D07 Q Litigation in a court of competent jurisdiction Q Other: (Specify) Mediation as first step of dispute resolution ARTICLE 7 TERMINATION OR SUSPENSION § 7.i The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201 2007. § 7.2 The Work may be suspended by the Owner as provided in Article l4 of AIA Document A201-2007. ARTICLE 8 M[SCELLANEOUS PROVISIONS § 8.i Where reference is made in this Agreement to a provision of AIA Document A201--2007 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contrac# shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) Percentage (%) Per Texas Prompt Payment Act § 8,3 The Owner's representative: (Name, address acrd other information) Jackson A&E Associates, Inc 8300 White Stallion Trail McKinney, Texas 75070 § S.a The Contractor's representative: (1Vame, address and other information) Andrew E Hicks Alpha Building Corporation 4738 Whirlwind Drive San Antonio, Texas 78212 § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. AIA documenE A401TM~ 2007. Copyrights 4946, 4998, 4925, 4937, 4954, 4958, 4964,1963, 4967, 4974, 4977, 9987, 4991, 4997 and 2007 gYTheAmerican Ins6tula of Intl. Ardrileds. All rights reserved. WARNIb[G;'i'hts A!A°Dacument is protected by U,S. Copyright Lawand International Trea4es, Unauthorized reproduction or 6 dls6ibution otthls AIA®tocument, oranyportlon oFit, may result In severe civil and criminal penalties, and will be prosecuted to the mazlmum extentposslble t under the law. This documenlwas created on 06/98/2093 43:22:09 under the terms of AIA pocumenls-on-Demandn order no. 2p08692626 ,and is not for resale. This document fs licensed by the American Institute of Architects For one-iimo use only, and may not be reproduced prior to its complotion. § 8.6 Otherpro~isions: .1 It is expressly understood that the team "Architect" as used in this document shall be deemed to be the "Landscape Architect". ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sec#ions below. § 9.1.1 The Agreement is this executed AIA Document A101-2007, Standard Form of Agreement Between Owner and Contractor. § 9.1.2 The Genera! Conditions are AIA Document A201 2007, General Conditions of the Contract for Construction. § 9.1,3 The Supplementary and other Conditions of the Contract: Document Title Date Pages § 9,1.4 The Specifications: (Either dis[ the Spec cations here ar refer to an exhibit attached to ihis.4greement.J The Specifications listed in Attachment B Section 7it1e Date Pages Iglt. AlADocument A101T"-2007. Copyright®1915,1618, 1925,1937,1951, 1958,1961, 1963,1987,1974,1977,1987, 1991,1997 and 2007 try The American InsStute of Archilecs. All rights reserved. WARNING: Thls A1A°Document Is protected by U.S. Copyright Lawand [nlernatlonal Treaties. Unauthorized reproduction or 7 d[stributlon of thls AIA°DOCUment, or any portion of it, may result In severe civil and crim]nal penalties, and wilt be prosecuted to the maximum extent possible ~ under the Iaw.Thls documenlwas created on 06!1812013 13:22:01 under the terms oFAIA I]ocumenls-on-flemand'" order no. 2008612526 , ar~d is not for resale. This document Is licensed by the American Institute of Architects forone-time use only, and may not be reproduced prior to its completl~on. § 9.1.5 The Drawings: (Either list the Drawings here or refer to do exhibit attached to this Agreement.} The list of Drawings listed in Attachment C Number Title bate § 9.7.6 The Addenda, if any: Number NONE Date Pages Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requn•ements are also enumerated in this Article 9. § 9,1,7 Additional documents, if any, forming part of the Contract Documents: .1 AlA Document E201T"~2007, Digital Data Protocol Exhibit, if completed by the parties, or the following; Other documen#s, if any, listed below: (List here any additional documents that are intended to form part of the Contract Documents. AL4 Document.4201-2007 provides that bidding requirements such as advertisement or invitation to bid, Instructio>?s to Bidders, sample forms and the Contractor's laid are not part of the Contract Documents unless enumerated in this ~4greement. they should be listed here only if intended to be part of the Contract Documenis.J AIA DocumentAlD1 T"-2007. Copyrlght~ 1995,1918, 7925, 7937,1959, 1958, 9989, 9863,1487,1974,1977,1987,1999,1997 and 2007 bYThe American Institute ~ loft, pis All rights reserved. WARRING: 7hls AlA°Dotument Is protected by U.S. Copyright Lawand International Treatles.llnautltorized reproductlpn or $ distrihutlon of this AIA@Document, oranyportion of if, may result In severe cnril and criminal penatbes, and t~ritl ire prosecuted to the maximum extent possible t under the law. This dowmont was created on D6l9 812013 7 3:22:01 under tho terms orAlA Documents-on•bemand*" order no. 2008812528 ,and Is not for resale. This document Is licensed by the American Institute of ArdnRects forone-Sme use only, and may not 6e reproduced prior to its conrptetion. A1ZTICLE 90 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and proWide bonds as set forth in Article I 1 of AIA Document A201-2007. (State bonding requirements, if any, acrd limits of liabihtyfor insurance required irr.4rticle 11 ofAhst Document A201 2007.) Type of insurance ar Bond Limit of Liability or Bond Amount ($D.00) Insurance as required by the City of Schertz, Teas This Agreement entered into as of the day and year first written above. OWNER atrrre) CONTRACTOR (Signature) Jahn C Kessel, City Manager Andrew E Hicks, Corporate Secretary (Printed name acrd title) (Printed name and title) A1A Document A10i"'-2807. Copyright®1995,1918,1925, 1937,1951,1958,1961,1963,1967, i97q,1977,1987, 1991,1897 and 2007 by The American Ir>Sshlule of Init. A~h~ All rights reserved. WARNING: This A!A°Documenf Is protected by U.S. Copyright Law and lntemafionat Treaties. iJnauthorized reprod~c6on or 9 dtstrihuUon of Uds AIA®Docu ment, or any portion of it, may resuR In severe civic and criminal pe nalGes, and will be prr3secuted to the maztmum ezteni possihfe t under the law. Th{s doarmentwas created on 06!18120 9 3 1 3:22;D1 under the terms of AIA Documents-on-Demand"' order no. 2008(112526 ,and Is not for resale. This document Is licensed by the Ameocan Instidrle of Arclrffects for one-lima use only, and may not be reproduced prior to its comp[e&on. AL~NA BUlLbING CORPORATION fi-s! Choire For FarFlilies Rerlovaliao & Corulrurfiori ATTACHMENT A Alpha Building Corporation Cost Proposal Revisions Date: 05/28/13 Owner : City of Schertz 10 Commercial Place, Building 1 Schertz, Texas 78154 Owners Project Manages :Philip R. Gaudreau, Jackson A&E Associates, Inc. Description: Schertz Soccer Complex Deductions: -Roofing: furnish Beridge Cee-lock (interlocking snap-lock design) standing seam roof panels. ($1,400.00} -Hollow metal doors: furnish polystyrene cote doors in lieu of . polyurethane cores. ($ 1,045.00) -Roll-up doors: powder-coat coiling couT~ter doors in lieu of stainless steel. ($ 2,239.00} -Restroom Specialties: furnish toilet accessories as manufactured by Bradley Washroom in lieu of Bobrick Wasliraom. ($ 1,302.00) -Plumbing: plumbing fixture substitutions per submittals provided an 5/1 S/2013. ($ 6,000.00) -Fencing: install 1,1101inear feet of b' tall chain link fence and two double swing chain link gates. Steel wire fence (1801inear feet} and double swing steel wire gates at main entrance to remain per original plans and specs. ($ 24,53bA0) -Landscaping and irrigation: furnish drill seed in lien of hydro mulch and furnish PVC fittings in lieu of cast iron. ($ 31,523.00) -Parking lot: remove 76 car stops from stalls facing new concrete curb. ($ 3,040,00) -Utilities; install the prapo~ed ~xter'ibr d" lateral at l% from 5' outside Elie building to the sewer main comicction in lieu oi'2% as indicated in the construction documents. ~$ 3, l 55.00) -Miscellatieous deductions: ($$7,593.0(1) Adds -Sloan sensor tavafiory faucets and water closetlurinal Gush <<alves, including electrical work. $ 4,037:40 Costs: Original Proposal: $ 3,GG5,563:00 Deductions: ($ I GG,SG3.00) Add: $ 4,037A0 Revised Contract Sum -$ 3,SQ4;{i37.00 pexfQrmance Time: xefer to attached schedule General Canc>l~itions.: $75.00 per day Alpha Building Corporation ~1~~drew E. [licks Project Manager ATTACHMENT B THE CONSTRUCTION OF THE NEW SOCCER FIELDS AND CONCESSION BUILDING 2600 MASKS ROAD SCHERTZ, TEXAS 78754 RFCSP No. 73-PK-72-C-02 City of Schertz Technicai Specifications and Bid Form TABLE OF CONTENTS GENERAL SPEClFICATIONSISITE WORK SECTION 00010 Sheet index SECTION 00300 Bid Form DIVISION 1- GENERAL SECTION 01010- SECTION 01045- SECTION 01120- SECTION 01200- SECTION 01730- REQUIREMENTS Summary of Wark Cutting and Patching Alterations to Existing Construction Project Mee#ings Operation and Maintenance Data DIVISION 2- SITE WORK SECTION 02082 SECTION 02084 SECTION 02085 SECTION 021,10 SECTION 02115 SECTION 02221 SECTION 02221 SECTION 02233 SECTION 02260 SECTION 02315 SECTION 02397 SECTION 02319 SECTION 02320 SECTION 02330 SECTION 02447 SECTION 02509 SECTION 02503 Precast Concrete Manholes Frames, Grates, Rings, and Covers Valve Boxes, Meter Boxes, and Meter Vaults Site Clearing Tree Protection Removing Existing Pavements and Structures Rough Grading Clearing and Grubbing Trench Safety System Roadway Excavation Excavation and Backfill for Utilities Barrow Utility Backfill Materials Embankment Augering Pipe and Conduit Ductile Iron Pipe and Fittings Copper Tubing ATTACHMENT B SECTION 02506 SECTION 02511 SECTION 02512 SECTION 02513 SECTION 02514 SECTION 02515 SECTION 02520 SECTION 02521 Polyvinyl Chloride Pipe Water Lines Water Tap and Service Line Installation Wet Connections Disinfection of Water Lines Hydrostatic Testing of Pipelines Fire Hydrants Gate Valves SECTION 02525 Tapping Sleeves and Valves SECTION 02528 Polyethylene Wrap SECTION 02533 Acceptance Testing for Sanitary Sewers SECTION 02534 Sanitary Sewer Service Stubs or Reconnections SECTION 02631 Storm Sewers SECTION 02632 ~ Cast-In-Place Inlets, Headwalls and Wingwalls SECTION 02642 Corrugated Metal Pipe SECTION 02713 Flexible Base SECTION 02741 Asphaltic Concrete Pavement SECTION 02742 Prime Coat SECTION 02743 Tack Coat SECTION 0275'1 Concrete Paving ***See structural drawings for Concrete Associated with Building*~* SECTION 02752 Concrete Pavement Joints SECTION 02753 Concrete Pavement Curing SECTION 02767 Thermoplastic Pavement Markings SECTION 02771 Curb, Curb and Gutter and Headers SECTION 02775 Concrete Sidewalks SECTION 02810 Irrigation SECTION 02870 Site Furnishings SECTION 02923 Landscape Grading SECTION 02930 Hydraulic Seeding SECTION 02951 Pavement Repair and Resurfacing DIVISION 3 -CONCRETE SECTION 03300 Cast-in-place Concrete SECTION 03315 Concrete for Utility Construction DIVISION 4 -MASONRY SECTION 04300 Uriit Masonry System DIVISION 5 -METALS SECTION 05125 Architecturally Exposed S#ructural Steel SECTION 05808 Expansion Joint Assemblies ATTACHMENT B DIVISION 7 -THERMAL AND MOISTURE PROTECTION SECTION 07181 Water Repellant Coating SECTION 07213 Batt and Blanket Insulation SECTION 07620 Sheet Metal Flashing and Trim SECTION 07900 ,loint Sealers DIVISION 8 -DOORS p SECTION 08111 SECTION 08112 SECTION 08305 SECTION 08332 SECTION 08710 ,ND WINDOWS Standard Steel Doars Steel Frames Access Doors Counter Shutters Door Hardware DIVISION 9 -. FIMSHES SECTION 09260 SECTION 09900 Gypsum Board Systems Painting DIVISION 10 -SPECIALTIES SECTION 102116 Soiid Plastic Toilet Compartments DIVISION 16 -ELECTRICAL SECTION 16528 Exterior Athletic Lighting Performance Specification APPENDIX GEOTECHNICAL ENGINEERING STUDY FOR SCHERTZ SOCCER COMPLEX -SCHERTZ, TEXAS; PREPARED BY BABA-KISTNER CONSULTANTS, [NC. DATED MARCH 2, 2012. (This document is prodded for Information only; contractor is responsible for all interpretations of this data.} END OF TABLE OF CONTENTS ATTACHMENT C THE CONSTRUCTION OF THE NEW SOCCER FIELDS AND CONCESSION BUILDING 26Q0 MASKE ROAD SCHERTZ, TEXAS 78954 RFCSP No. 13-PK-92-C-U2 city of Schertz Construction Drawing Sheet Index COVER SHEET C1.1 EROSION CONTROL & DEMO PLAN C1.2 SWPPP NARRATI~/E C1.3 EROSION CONTROL DETAILS C2.1 SITE PLAN ~ OF 2 (BASE BID) C2.2 SITE PLAN 2 OF 2 (BASE BID) C2.3 SITE PLAN 1 OF 2 (ADD. ALT.) C2.4 SITE PLAN 2 OF 2 (ADD. ALT.) C3.1 DIMENSIONAL CONTROL 1 aF 2 C3.2 DIMENSIONAL CONTROL 2 OF 2 C4.1 PAVEMENT AND JOINT LAYOUT C5.1 OVERALL GRADING PLAN C5.2 GRADING PLAN 1 OF 2 C5.3 GRADING PLAN 1 OF 2 C5.4 DETENTION POND DETAILS C5.5 STORM DRAIN PLAN & PROFILE C6.1 OVERALL DRAINAGE AREAS C7.1 ONSITE UTILITY PLAN C7.2 OFFSITE UTILITIES C7.3 OFFSITE UTILITIES C7.4 OFFSfTE UTILITIES C8.1 CIVIL DETAILS 1 OF 3 C8.2 CIVIL DETAILS 2 OF 3 C8.3 _ CIVIL DETAf LS 3 OF 3 C8.4 WATER DETAILS 1 OF 2 C8.5 WATER DETAILS 2 OF 2 C8.6 SEWER DETAILS 1 OF 2 C8.7 SEWER DETAILS 2 OF 2 L1 ACCESSIBILITY ROUTE PLAN L2 PLAN ENLARGEMENTS L3 DETAILS L4 PLANTING PLAN L5 PLANTING DETAILS ATTACHMENT C IR1 IRRIGATION PLAN IR2 IRRIGATION PLAN IR3 IRRIGATION PLAN . IR4 IRRIGATION PLAN iR5 IRRIGATION NOTES AND DETAILS G1.1 CODE COMPLIANCE PLAN A2.1 BUILDING FLOOR PLAN A2,2 REFLECTED CEILING PLAN A2.3 ROOF PLAN A3,1 BUILDING ELEVATIONS A4.1 BUILDING INTERIOR ELEVATIONS. A5.1 BUILDING SECTIONS A5.2 BUILDING SECTIONS M-1 MECHANICAL PLAN M-2 MECHANICAL SCHEDULES M-3 MECHANICAL SPECIFICATIONS P-1 WASTE AND VENT PLAN P-2 HOT & COLD WATER PLAN P-3 WASTE AND VENT RISER DIAGRAM P-4 HOT & COLD WATER RISER DIAGRAM P-5 GREASE WASTE PLAN S1.1 NOTES, DETAILS, & SECTIONS S1.2 CONCRETE BEAM SCHED, & DETAILS S2,1 FOUNDATION PLAN S3.1 LOW ROOF FRAMING PLAN S3.2 HIGH ROOF FRAMING PLAN S4.1 NOTES, DETAILS & SECTIONS E-1 ELECTRICAL SITE PLANS E-2 BUILDING LIGHTING PLAN E-3 BUILDING POWER PLAN E-4 ELECTRICAL SCHEDULES E-5 ELECTRICAL SPECIFICATIONS