Loading...
13-R-94-D Wilson Const-Baseball FieldsRESOLUTION NO. 13 -R -94 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING A MODIFICATION TO THE EXISTING CONSTRUCTION CONTRACT FOR THE CONSTRUCTION OF THREE BASEBALL FIELDS, AN EQUIPMENT STORAGE BUILDING AND ASSOCIATED SUPPORT SYSTEMS AND OTHER MATTERS IN CONNECTION THEREWITH WHEREAS, the City staff of the City of Schertz (the "City ") has recommended that the City amend the current agreement with D. Wilson Construction Company, Inc. for the construction of three baseball fields, an equipment storage building and associated support systems; and WHEREAS, the City Council has determined that it is in the best interest of the City to amend the Agreement with D. Wilson Construction Company, Inc., and the Change Orders attached hereto as Exhibit A (the "Change Orders "). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes the City Manager to execute and deliver a Contract Modification with D. Wilson Construction Company, Inc. The total amount payable under this Contract shall not exceed $1,520,056.00 plus $10,000.00 of City contingency funds for a total amount of $1,530,056.00. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect ftom and after its final passage, and it is so resolved. PASSED AND ADOPTED, this M�day ofA�2013. CITY , TEXAS Michael R Carpenter, Mayor ATTEST: Brenda Dennis, City Secretary (CITY SEAL) 50234811.1 EXHIBIT A D WILSON CONSTRUCTION COMPANY CONTRACT %.- %—OF Iv--_7 1 "LOY%. I ff%.ofAY QL%.Jo, Request for Change Order RCO 1- SAWS Schedule Delay Architect Luck Design Owner City of Schertz General Contractor D Wilson Construction Scope of work: 2 -Month Time Extension due to SAWS not demobilizing from the Baseball Complex Site Time Extension (1) Month Contractor Total D Wilson $ 24,500.00 Brand Co. 3,00g,PO Total Request for Change Order- RCO 2- Additional Haul Off Architect luck Design Owner City of Schertz General Contractor D Wilson Construction Scope of work: Additional Maul off above the stated 10,000 yards of material Time Extension (4) Days Contractor Total D Wilson $ - Brand Co. $ Total $ 6,075.00 "' Approximately 2,000 Yards @ $75Road Request for Change Order- RCD 3 - Fite Line, 3" Domestic Water and Street Crossing Architect Luck Design Owner City of Schertz General Contractor D Wilson Construction Scope of work: Fire line /Street Crossing with Flowable fill and City required 10' asphalt patch 3" Domestic water revisions Storm Drain /Street Crossing with Flowable fill and City required Time Extension (4) Days Contractor Total D Wilson $ - Southern Archer Fire Line $ 13,547.00 3" Water line $ 3,178.00 Storm $ 4 5 0+ Total $ 21,381.00 Amounts over conlingency will require Bond, Insuranc and OH &P Request for Change Order- RCO 4 Conduit Repairs Architect Luck Design Owner City of Schertz General Contractor D Wilson Construction Scope of work: As Builts not correct, unforseen electrical conduit and wire repairs Time Extension (4) Days Contractor Total D Wilson $ - Gerard Electric 4 131.00 Total I 11 Amounts over contingency wIII require Bond, Insuranc and OH &P Request for Change Order- RCO 5 Irrigation Repairs Architect Luck Design Owner City of Schertz General Contractor D Wilson Construction Scope of work: As Builts not correct, unforseen Irrigation and wire repairs Time Extension (4) Days Contractor Total D Wilson $ - Maldonado Landscape $ 969,00 Total 969.00 Amounls over contingency will require Bond, Insuranc and OH &P