Loading...
EastDietzatBorgfeld Plans #14-PW-52-C-03-Omni a_m 0 A[ 9 9K L 9 9 4 ""1 as 1!U11ERTZ Nore-31& Mayor :Michael Carpenter C ity Council Members Jim Fowler -� Grumpy Azzoz Daryl John -� Cedric Edwards City Manager : John C. Kesel Public Works Director: Sam Willoughby r 2 TFIC FORD ENGINEERING INC. ENGINEERING SURVEYING PLANNING 10927 WYE DRIVE, SUITE 104, SAN ANTONIO, TEXAS 78217, (210) 590 -4777 PROJECT NO.: 1124.84 19 www.fordengineering.com DATE: December 3, 2014 Wire, nylon or 3:1 Max, 3:1 Max, polypropylene binding loverlap tops of 2" I Hay _BcJ. F-ilter fabric 3' min. width Flow MAN\ N, Backfill & hand tam p. A ltk Embed posts 18" min. 11 An saes or anchor if in rock. _j" min.. to Flow 9� toward adjacent bale ? height 6" ly/ Ditch Flowline of bale A I A\ SECTION B-B PLAN VIEW SECTION A-A Angle first stake Fill voids between toward previously bales with hay Angle stakes toward laid bale SEDIMENT CONTROL FENCE USAGE GUIDELINES L adjacent bale 4" min. to-\ ?" Did. rebor or 2" x 2" A sediment control fence may be constructed near the ? height B wood stakes of bale downstream perimeter of a disturbed area along a contour to intercept sediment from overland runoff- A 2 year storm frequency may be used to calculate the flow rate to be filtered. Sediment control fence should be sized to filter a max. flow through rate of 100 GPM FT . S9diment control fence is no area not larger than recommen d 2 e d to c acres, ontrol erosion from a drainage PLAN SHEET LEGEND PROFILE VIEW Sediment Control Fence scF GENERAL NOTES BALED HAY FOR EROSION CONTROL L I .30 PLANS SHEET LEGEND o 1. The guidelines shown hereon are suggestions only and may be modified by the Engineer. Baled Hay GENERAL NOTES r.0- I E 1. Hay bales shail be a minimum of 30" in length and weigh a minimum of 50 Los. 0 2. Hoy bales shall be bound by either wire or nylon or polypropylene string. The bales shall be composed entirely BALED HAY USAGE GUIDELINES of vegetative matter. ,X E 4 min. steel or wood posts spaced at 6' to 8'. A Baled Hay installation may be constructed 3. Hay bales shall be embedded in the soil a minimum of 4" and Softwood posts shall be 3" min. dia. or nominal 2"x4". near the downstream perimeter of a disturbed where possible ? the height of the bole. Connect the ends of Hardwood posts shall have a min. cross section of 1.5" x 1.5". area along a contour to intercept sediment from 4. Hay bales shofl be placed in a row with ends tightly abutting successive reinforcement overland runoff. A two year storm frequency 1E sheets or rolls a min. of may be used to calculate the flow rate to the adjacent bales. The bales shall be placed with bindings 6 times with hog rings, lFaster, fabric to top strand of welded wire mesh (W.W.M.) be filtered. The installation should be parallel to the ground. by hog rings or cord at a max. spacing of 15". sized to filter a maximum flow thru rate of 5 GPM/FT2 of cross sectional area. Baled hay 5. Hay bales shall be securely anchored in place with ?" Dia. may be used at the following locations: rebor or 2" x 2" wood stakes, driven through the bales. 4 steel Softwood do Hardwood posts or st r asts wood shall shall "a I a'd pas ' e 3 have F. n fabric by g rings S A I Attach the W.W.M. & fabric on end posts The first stake shall be angled towards the previously using 4 evenly spaced staples for laid bale to force the bales together. wooden posts (or 4 T-Clips or sewn 1. Where the runoff approaching the baled hay 2" vertical pockets for steel posts). flows over disturbed soil for less than 6. The guidelines shown hereon are suggestions only and may be o E 100'. If the slope of the disturbed soil E exceeds 10%, the length of slope upstream modified by the Engineer. Z 0,2 Golv. W.W.M. (12.5 Go. min.) go- the baled hay should be less than 50. C') b max. opening size shall be REVISION HISTORY °L 2" x 4". 2. Where the installation will be required _a3+7exas Department of Transportation 0 Woven filter for less than 3 months. Design Division (Roadway) fabric 3. Where the contributing drainage area is less than ? acre. TEMPORARY EROSION, For Baled Hoy installations in small ditches, SEDIMENT AND WATER T j I the additional following considerations apply. Place 4" to 6' of fabric against the trench , � 0 1. The ditch sideslopes should be graded POLLUTION CONTROL MEASURES side and approx. 2" across trench bottom in Z as flat as possible to maximize the -t upstream direction. Minimum trench size 0 drainage flowrote thru the hay. FENCED & BALED HAY R shall be 6" square. Backfill and hand tamp. 2. The ditch should be groded large enough to contain the overtopping drainage when sediment has filled to the top of the EC(l)-93 TEMPORARY SEDIMENT CONTROL FENCE baled bay. FILE-. EC193.DGN ON: HEJ m. HEJ ow: BGD CK: JZ Bales should be replaced usually every 2 months (DT00T JUNE 1993 -R- AID PRO- or more often during wet weather when loss of REVISIONS structural integrity is accelerated. COWT�YCDNTROLSECT 109 HIOHWAY o _c, aaa Ew� 0 'o - O� vyc 0 -0 Cc .0 0 0 8 Ln �:�5 0 1Z 40 60 6 aeQ -0 E NN T "l 10 i Urn E16 Drain to sediment trapping device 50' Min. PLAN PROFILE CONSTRUCTION EXIT (TYPE 1) GENERAL NOTES 1. The length of the type I construction exit shall be as indicated on the plans, but not less than 50'. 2. The coarse aggregate should be open graded with a size of 4" to 8". 3. The approach transitions should be no steeper than 6:1 and constructed as directed by the Engineer. 4. The construction exit foundation course shall be flexible base, bituminous concrete, portland cement concrete or other material as approved by the Engineer. 5. The construction exit shall be graded to allow drainage to a sediment trapping device. 6. The guidelines shown hereon are suggestions only and may be modified by the Engineer. 4" FILTER DAM AT TOE OF SLOPE RFD TYPE 1 Dfo. PLAN VIEW 3', 6' or 9' TYPE 4 (SACK GABIONS) 3:1 Max. 3:1 Max. "V" SHAPE (Plan View) PLANS SHEET LEGEND Type 1 Rock Filter Dam Type 2 Rock Filter Dom Type 3 Rock Filter Dom Galvanized Steel SECTION A-A Drain to sediment trapping device 50' Min. Treated timber plank Typical dimensions 5" X 10" X 13' PLAN F in. PROFILE CONSTRUCTION EXIT (TYPE 2) GENERAL NOTES 1. The length of the type 2 construction exit shall be as indicated on the plans, but not less than 50'. 2. The treated timber planks shall be attached to the railroad ties with ?"x 6" min. lag bolts. Other fasteners may be used as approved by the Engineer. 3. The treated timber planks shall be #2 grade min., and should be free from large and loose knots. 4. The approach transitions shall be no steeper than 6:1 and constructed as directed by the Engineer. 5. The construction exit foundation course shall be flexible base, bituminous concrete, partland cement concrete or other material as approved by the Engineer. 6. The construction exit should be graded to allow drainage to a sediment trapping device, 7. The guidelines shown hereon are suggestions only and may be modified by the Engineer. Excavation (If shown on const. dw9s.) C A "V" Shape may be used for higher velocity flows. (See "V' Shape Plan below) FILTER DAM AT SEDIMENT TRAP OR TYPE 1 OR TYPE 2 Galvanized woven See Note 4 <1, 2 1 T7 4" PROFILE 2' Mi SECTION C-C ROCK FILTER DAM USAGE GUIDELINES Rock Filter Dams should be constructed downstream from disturbed areas to intercept sediment from overland runoff and/or concentrated flow. The dams should be sized to filter a maximum flow through rote of 60 GPM/FT of Gross sectional area. A 2 year storm frequency may be used to calculate the flow rate. Type 1 (15" high with no wire mesh .T e .1 may be used at the toe of slopes, around inlets, in small ditches, and at dike or swate outlets. This type of dam is recommended to control erosion from a drainage area of 5 acres or less. Type 1 may not be used in concentrated high velocity flows (approx. 8 Ft/Sec or more) in which aggregate wash out may occur. Sandbags may be used at the embedded foundation (4" deep min.) for better filtering efficiency of low flows if called for on the plans or directed by the Engineer. Type 2 (18" high with wire mesh): Type 2 may be used in ditches and at dike or swale outlets. Type 3 (36" high with wire mesh): Type 3 may be used in stream flow and should be secured to the stream bed. Type 4 (Sock gabions): Type 4 May be used in ditches and smaller channels to form an erosion control dam. ;s 1 6: Z = ii Type 3 = 36" R.O.W. Disturbed Soil Area J Stabilized _--See note 2 2" X 8" treated timbers nailed anti abutted ends of wood sheets 9" Min. thick plywood or pressed wafer board sheets -A Paved Roadway PLAN ?" Min. thick treated plywood or pressed water board sheets SECTION A-A CONSTRUCTION EXIT (TYPE 3) 2" X 8" Timbers Nailed onto ends of wood sheets soil 1� Penny Nails @ 1 on centers. GENERAL NOTES 1. The length of the type 3 construction exit shall be as shown on the plans, or as directed by the Engineer. 2. The type 3 construction exit may be constructed from open graded crushed stone with a size of two to four Inches spread a min. of 4" thick to the limits shown on the plans. 3. The treated timber planks shall be #2 grade min., and should be free from large and loose knots. 4. The guidelines shown hereon are suggestions only and may be modified by the Engineer. COUNTY FILTER DAM AT CHANNEL SECTIONS OR Za OR TYPE 1 OR TYPE 2 GENERAL NOTES 1. If shown on the plans or directed by the Engineer, filter dams should be placed near the toe of slopes where erosion is anticipated, upstream and/or downstream at drainage structures, and in roadway ditches and channels to collect sediment. 2. Materials (aggregate, wire mesh, sandbags, etc.) shall be as Indicated by the specification for "Rock Filt& Dams for Erosion and Sedimentation Control". 3. The rock filter dam dimensions shall be as indicated on the SW3P plans. 4. Side slopes should be 2:1 or flatter. Dams within the safety zone shall have sideslopes of 6:1 or flatter. 5. Maintain a minimum of I' between top of rock filter darn weir and top of embankment for filter darns at sediment traps. 6. Filter dams should be embedded a minimum of 4" into existing ground. 7. The sediment trap for ponding of sediment laden runoff shall be of the dimensions shown on the plans. 8. Rock filter dam types 2 & 3 shall be secured with 20 gouge galvanized woven wire mesh with 1" diameter hexagonal openings. The aggregate shall be placed on the mesh to the height & slopes specified. The mesh shall be folded at the upstream side over the aggregate and tightly secured to itself on the downstream side using wire ties or hog rings. In stream use the mesh should be secured or staked to the stream bed prior to aggregate placement. 9. Sack Gabions should be staked down with YT dia. rebor stakes. 10. Flow outlet should be onto a stabilized area (vegetation, rock, etc.). 11. The guidelines shown hereon are suggestions only and may be modified by the Engineer. REVISION HISTORY *Texas Department of Transport, Ar Design Division (Roadway) TEMPORARY EROSION, SEDIMENT AND WATER POLLU11ON CONTROL MEASURES ROCK FILTER DAMS EC(2)-93 [1;1LE:T0]E�CZ93.DGN ION:"HEJ" IOK: HF�i=_: X0 T ... .. UTOOT JUNE 1993 DISTRICT FEDERAL AID PROJECT St REASONS COUNTY 8 Z,j W, -3 LLI tYM "L WW MTZ t- tD p Zw co ow pfl0 U. 0 z W W F- W Cs 10 I- W, w M s ED 8 T LLI fl� a. w W 'OL z w rz z 0 < 0 ZF- Lij w in LU IM 0 co zr LLI 0- W f.- N wad W Z : 0 F- b 8 L) w M w w w iE < up Z co-- 000 LU W Z M Uj a 95 705 700 695 690 685 680 676 -1 706 700 696 690 685 680 675 IM 705 700 695 690 685 680 675 -100 -90 -80 -70 -60 -50 40 -30 -20 -10 0 10 20 30 40 50 60 70 du btu' 1UU 11 1�U 13U 14U IOU IUU I (U 16u IVU zuU Z-Ju TO (D N 00 cq C4 C4 C9 4 m CO Do co (n EO 0) CD w co co (1w (n ui LD m r- 'd � 'd � 6 un us LFF C) CD tz m w Go w co co 5, co co co w oD 'a M q, G) w UD MD co I w to co w, w to m w 03 w to to UD Q0 to ID w 'a to 'a to 10 -100 -90 -80 -70 -60 -50 -40 -30 -2U -1U 0 10 2U 3U 4U OU IOU fu M blu I UU -flu Izu 1111.1 Iqu It 0 1 1 1 1 1 1 1 1 w I co I q � 0 Me , W q S; M w 11� LO -� S; (q w r-� 9 ci� c! cli C4 ci rl� ui O� �7 C4 9 . 0! 1- , t6 2 oz vi "I r- w 'd M to IR , P.: M CR CD il: ci 00 q d 't 'd P- , 11 M 9 (0 w R, cl is = M w 0 11 go W cc w co w 8, W$ W w 03 .0 (0 M w to W to (0 w Zo co co to co w Q0 to to In 0 co cc d[1 oo � N 'T P w CD M Ln to 00 ua d t., 10 on M co w co 00 to a1' i01 0, 00 cd "D ki oo co w 11 c* <0 Q w QD co w (0 to J -J- EPTI 680 675 680 675 Materiaf() at station 1+00.00 Material Nam Area Volume Cumulative Volume Ground Removed 93.411 0.00 0.00 Ground Fill 39.37 0.00 0.00- Material($) at Station 1-5000 Material Name Area Volume Cumulative Volume G..ndRa...d Ground Fill 115.46 108.19 192.98 194.54 192M 194.64 ae 690 680 675 Mat erial(s ) at Station 2+00.00 Material Name Area Volume CumuMm Volume Ground Removed Ground Fill 111.65 167.67 218.57 429.34 47I.55 623.88 NOTE: ALL SECTIONS ARE SHOWU LEFT 1W.1111 I 1 -0 1 I a 11MA R H 101-114 Siff.11 I I co E • z 0 (D F- z Z (D < • U) 0 Uj F- D U) A W pP w hti 04 cr) JECT NO. 1124.841 JULY 8, 2014 7 OF 10