08-25-2014 BOA MinutesBOARD OF ADJUSTMENT MINUTES
August 25, 2014
The Schertz Board of Adjustment convened on August 25, 2014 at the Municipal Complex, Council
Chambers, 1400 Schertz Parkway Building #4, Schertz, Texas.
BOARD OF ADJUSTMENT
Richard Dziewit, Vice Chairman
David Reynolds
Earl Hartzog
Reginna Agee
Marls Tew, Alternate
BOARD MEMBERS ABSENT
Frank McElroy, Chairman
1.
2.
3.
4.
CALL TO ORDER/ROLL CALL
CITY STAFF
Michelle Sanchez, Director Development Services
Lesa Wood, Senior Planner
Bryce Cox, Planner I
Patti White, Executive Asst. of Development
OTHERS PRESENT
Michelle Haussmann, Land Use Solution
James Griffin, Brown & Ortiz
Mr. Dziewit called the regular meeting to order at 6:08 P.M. and recognized members present.
SEAT ALTERNATE TO ACT IF REQUIRED
Mr. Dziewit seated Mr. Tew as a voting member.
CONSENT AGRENDA
A. MINUTES FOR MARCH 31, 2014 REGULAR MEETING
Mr. Hartzog moved to approve the minutes as presented. Mr. Reynolds seconded the motion. Vote
was 5 -0. Motion carried.
PUBLIC HEARING:
A. BOA 2014 -006 Enterprise Industrial Park Lot 3, Block 1— Glazing
Hold a public hearing, consider and act upon a request for a variance to Article 9, Section
21.9.5(C), Multifamily and Nonresidential Exterior Material Requirements, on approximately
19 acres located in the Enterprise Industrial Park Subdivision generally located at Lookout
Road and Schertz Parkway.
Mr. Dziewit opened the Public Hearing at 6:09 P.M.
Mr. Cox presented this item by stating that the property owner is requesting a variance to the Unified
Development Code (UDC), Section 21.9.5 (C) (1) Exterior Construction and Design Standards with
regard to the percentage of windows and doors required to install on the front fagade of the building
which requires at least fifteen percent (15 %) of the front fagade, on the ground floor level, to consist
of windows and doors that allow for visibility into the commercial building or store. The requested
variance, if granted will allow for coverage of windows and doors, equal to twenty eight percent
(28 %) of the front fagade, distributed around the entire building fagade on the ground level floor.
Minutes
Board of Adjustment
August 25, 2014
Page 1 of 4
The public hearing notice was published in "The Daily Commercial Recorder" on August 8, 2014
and in the "Herald" on August 13, 2014. There were three (3) notices mailed to surrounding
property owners on August 14, 2014. At the time of this staff report no responses have been
received for the proposed request. The property owner is proposing to construct an approximately
325,000 square foot office/ warehouse on the 18.6+ acre tract of land located north of the intersection
of Schertz Parkway and Lookout Road.
Through discussions with the applicant and architect it was determined that the installation of the
windows and doors over the entire building fagade instead of the front fagade does not violate the
spirit and intent of the UDC because it does provide for visibility into the building as well as an
aesthetic appeal to the entire building instead of the font fagade only.
If the variance is granted the result would be the construction of an approximately 325,000 square
foot building with windows and doors totaling twenty eight percent (28 %) of the front fagade,
installed over the entire building fagade. Staff recommends approval of BOA 2014 -006.
Ms. Haussmann, representing the Applicant, gave a presentation with the following points:
• Project Team:
• Weeks Robinson Properties: Applicant
• Beaty Palmer Architects: Architect
• Land Use Solutions: Planning Process
• Project Details:
0 18.68 acres
0 325,000 sf office /warehouse
o Estimated nine month construction
• Variance Request:
o Request:
• Increase percentage of windows and doors of font fagade;
• Distributed on all exterior facades
o Support:
• Meets spirit and intent of criteria: Aesthetically pleasing appearance on all
four sides
• Increased aesthetic value for adjacent properties: Windows provided rather
than solid masonry walls
• Impact on functionality of building: Building security and natural lighting
Mr. Dziewit closed the Public Hearing at 6:22 P. M.
Mr. Hartzog moved to approve the request for a variance. Ms. Agee seconded the motion. Vote was
5 -0. Motion carried.
B. BOA 2014 -007 Schertz 3009 Market — Landscaping
Hold a public hearing, consider and act upon a request for a variance to Article 9, Section
21.9.7 — Landscaping from the requirement that a twenty foot (20') landscape buffer with trees
and shrubs be provided adjacent to a residential use or residentially zoned property; and
adjacent to all perimeter parldng lots and vehicular use areas for a depth of at least ten (10') at
711 FM 3009.
Minutes
Board of Adjustment
August 25, 2014
Page 2 of 4
Mr. Dziewit opened the Public Hearing at 6:22 P.M.
Mr. Cox presented this item by stating that the property owner is requesting three (3) variances to the
Unified Development Code (UDC), Article 9, Landscaping. All requests are specifically related to
the south side of the property which is adjacent to a residential use.
1. A variance to Sec. 21.9.7.G with regard to required number of trees and shrubs planted
within the twenty foot (20') landscape buffer for the entire length of the south property line.
2. A variance to Sec. 21.9.7.H.1.c with regard to the number of trees required to be planted in
the planter islands with in the parking lot.
3. A variance to Sec. 21.9.7.H.2 with regard to the number of trees required to be planted on the
entire length perimeter area of the south property line and for the shrubs required to be
planted where off - street parking abuts a residential property line for approximately 170'.
The Board of Adjustment previously considered and approved this request by unanimous decision on
April 22, 2013, September 26, 2013, and February 24, 2014. In accordance with the UDC a variance
is effective for a period of 180 days after the date of approval. During the 180 day period the owner
has not filed for a building permit as required by UDC Section 21.4.12(C)(3)(c) and the variance will
expire on August 23, 2014.
The property owner is proposing to construct an approximately 41,000 square foot retail
development on the 6.36+ acre tract of land located at the corner of Elbel and FM 3009. GVEC has
indicated that planting trees is prohibited within their easement but the planting of shrubbery is
permitted within their easement. These existing easements and restrictions limit the property owner's
ability to comply with the Unified Development Code (UDC) landscaping requirements. Staff
recommends approval of BOA 2014 -007.
Mr. Griffin, representing the Applicant, stated that they are submitting construction plans as quickly
as they can and in asking for the variances again, it will give them another 180 days.
Mr. Dziewit asked if there is a limit to the number of times to request a variance. Mr. Cox stated that
there is no limit. Mr. Tew asked if they are planning on submitting construction plans in the next
180 days. Mr. Griffin stated that they are planning on getting the plans in within 180 days and to start
construction in the summer of 2015.
Mr. Dziewit closed the Public Hearing at 6:24 P.M.
Mr. Hartzog moved to approve the request for a variance. Mr. Reynolds seconded the motion.
Vote was 5 -0. Motion carried.
C. BOA 2014 -008 Schertz 3009 Market — Glazing
Hold a public hearing, consider and act upon a request for a variance to Article 9, Section
21.9.5(C), Multifamily and Nonresidential Exterior Material Requirements, to allow a variance
from the required thirty percent (30 %) windows and doors on the front facade on the ground
level floor, in order to permit a twenty six percent (26 %) coverage of windows and doors on the
entire facade on the ground level floor at 711 FM 3009.
Mr. Dziewit opened the Public Hearing at 6:25 P.M.
Minutes
Board of Adjustment
August 25, 2014
Page 3 of 4
5.
6.
Mr. Cox presented this item by stating that the property owner is requesting a variance to the Unified
Development Code (UDC), Section 21.9.5 (C) (1) Exterior Construction and Design Standards with
regard to the percentage of windows and doors required on the front fagade of the building which
states that at least thirty percent (30 %) of the front fagade, on the ground floor level, must consist of
windows and doors that allow for visibility into the commercial building or store. The requested
variance, if granted will allow for a total of twenty six percent (26 %) of windows and doors
( "glazing "). The requested variance, if approved, will allow for the glazing requirement to be
extended to all four sides of the building instead of front fagade only.
The Board of Adjustment previously considered and approved this request by unanimous decision on
April 22, 2013, September 26, 2013, and February 24, 2014. In accordance with the UDC a variance
is effective for a period of 180 days after the date of approval. During the 180 day period the owner
has not filed for a building permit as required by UDC Section 21.4.12(C)(3)(c) and the variance will
expire on August 23, 2014.
In theory the installation of windows and doors on a front fagade (building storefront) is to provide
an inviting aesthetic appearance which allows for innovative window display in a walls- able
environment. The applicant is requesting to install 26% windows and doors distributed around the
exterior building facades instead of the front fayade only. In this case, the requirement for the
window and door installation on the front fayade has a direct impact on the functionality of the
building. The grocery store has a pharmacy and refrigerated units that are located on the perimeter
walls, as well as perishable foods such as produce that are impacted by the sunlight and visibility into
the store. Staff recommends approval of BOA 2014 -008.
Mr. Dziewit closed the Public Hearing at 6:26 P.M.
Mr. Reynolds moved to approve the request for a variance. Ms. Agree seconded the motion. Vote
was 5 -0. Motion carried.
REQUESTS AND ANNOUNCEMENTS
A. Announcements by Members
• Mr. Dziewit stated that he would like more involvement with other groups to get some of the
items closer with P &Z, Parks, etc. Mr. Cox stated that Staff is working on UDC changes and
will be sending out a draft of the ordinance to the Board, and the focus group soon.
B. Announcements by City Staff
• None.
ADJOURNMENT
The meeting adjourned at 6:30 P.M.
it man, Board of Ad'a tment
Minutes
Board of Adjustment
August 25, 2014
Page 4 of 4
ga,-4� a� I �"I-
Recording Secretary, City of Schertz