Loading...
18-R-66 - Bexar Metro 911 budget FY2019RESOLUTION NO. 18-R -66 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING THE APPROVAL OF THE BEXAR METRO 911 BUDGET FOR FISCAL YEAR 2019, AND OTHER MATTERS IN CONNECTION THEREWITH WHEREAS, Bexar Metro 911 provides 911 telephone access for Bexar, Comal and Guadalupe Counties by developing and maintaining, a reliable emergency communication telephone network; and WHEREAS, since its inception in 1987, the Bexar Metro 911 authority has operated with the same fees for wired phone lines without any increase in those fees for thirty years; and WHEREAS, with the increase in wireless phone lines and a reducing number of wired phone lines, the Bexar Metro 911 Board of Directors is recommending an increase in wired telephone service fees; and WHEREAS, the City staff of the City of Schertz (the "City ") has recommended that the City send its approval to the Bexar Metro 911 Board of Directors of its Fiscal Year 2019 budget; and WHEREAS, the City Council has determined that it is in the best interest of the City to support the growth and expansion of the 911 telephone access systems as planned for in the 2019 budget attached hereto as Exhibit A, for the public safety of Schertz citizens. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes the approval of the Bexar Metro 911 budget as presented in Exhibit A. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND ADOPTED, this 12th day of June, 2018. CITY OF HERTZ, TEXAS R. Carpenter, Mayor ATTEST: r_�A City Secretary, Brenda Dennis (CITY SEAL) 50506221.1 - 2 - BEXAR METRO 9 -1 -1 Network 1M_I_?I ►yi 0 MA i! I Dili M I TO: County Judges and City Mayors FROM: W. H. Buchholtz, Chief Executive Officer SUBJECT: Fiscal Year 2019 Proposed Budget DATE: May 18, 2018 _S _2 ) -) S' Enclosed for your review and comment is the Bexar Metro 9 -1 -1 Network District's Proposed Fiscal Year 2019 Budget. The Bexar Metro Board approved this proposed budget at a regularly scheduled and properly noticed meeting. Please address your written comments to the Chairman of the Board at the address on the bottom of this memorandum. The Bexar Metro Board will review your comments, make changes as necessary, and adopt the Fiscal Year 2019 Budget at a board meeting to be scheduled in late July, 2018. Please forward your comments to ensure arrival at the Bexar Metro office not later than 4:00 p.m. on July 20, 2018. Enclosed is a post card to facilitate your response. The contents of this post card are consistent with the provisions of the Texas Health & Safety Code, Chapter 772.309, which enables each participating jurisdiction to either approve or disapprove the Bexar Metro Fiscal Year 2019 Budget. Should a jurisdiction choose to take no action, budget approval is by operation of law on the sixty -first day following the jurisdiction's receipt of the proposed budget. Please call me if you have questions or require further information or clarification. Sincerely, W. Buchholtz Chief Executive Officer 911 Saddletree Court • San Antonio, Texas 78231 -1523 -7- -�� Phone: (210) 408-3911 • Fax: (210) 408-3912 PURPOSE: The purpose of this document is to obtain consensus approval of Bexar Metro 9 -1 -1 Network's (Bexar Metro or District) Fiscal Year 2019 (FY 2019) operational and financial plans by the District's board of directors and the governing bodies of its thirty -nine participating jurisdictions; and provide the continuing operational and fiscal authority necessary for the staff to aggressively establish and maintain a highly su- rvivable and resilient 9 -1 -1 system. Am AUTHORITY: The authority for Bexar Metro is the Texas Health and Safety Code, Chapter 772, 2/060/1007P. Subchapter D, Section 772.301 — formerly Vernon's A� otaed Civil Statutes Article 1432e, as approved by the Texas 69t" Regular Legislative Sess "pn in -Senate Bill 750 on May 21, 1985; and subsequently approved by a local election uary 17, 19/ This legislation's purpose is to enable the provision of affordable, high / 11 ality, countywid enhanced 9 -1 -1 service through the establishment of emergency cornrnication districts. '11 MANAGEMENT: A governing board of directors, apps intedG ccording to orb e is in the enabling legislation, establishes policy and pJ /ides over g�itof%t e� district. The board members and their appointing authority include: Member James C. Hass�lo'e`r' r���/ Stephen R. Scf ,eider Sherman Krause Dudley Wait _ 010 CathyW_ Talcott Suzan de Leon Principal S rvice Provi( To implement boar licy ar appointed W. H. Buchiol#z as tied a %ouniy Bexar���bunty e mal County y Guadalupe County �j City of San Antonio City of San Antonio City of New Braunfels Member at Large on- Vang) Vacant manage the day -to -day operations, the board of directors r Metro's Chief Executive Officer. �iya /iii MISSION: The Districts miss on is to deploy and maintain a state -of- the -art 9 -1 -1 emergency communication system that enables citizens in distress to quickly communicate their request for police, fire, or emergency medical assistance; and to ensure member jurisdictions have the appropriate 9 -1 -1 tools necessary to efficiently and accurately receive and process those requests. RESPONSIBILITY: To successfully accomplish the mission, Bexar Metro must deploy and manage a technology neutral network that routes all 9 -1 -1 requests to the appropriate answering and responding jurisdiction; create and maintain a time - sensitive, highly accurate database that displays the location, callback number, and owner's name of the specific instrument used to call 9 -1 -1; procure, install, and maintain the specialized 9 -1 -1 equipment utilized by each authorized answering and responding jurisdiction; coordinate with municipal and jurisdictional addressing authorities to ensure the database contains accurate, standardized, and logical location information to ensure each citizen is easily and quickly locatable during times of critical emergencies; and construct, deploy, and - maintain a spatially accurate geographic digital map to support location determination technologies and enhance computer aided dispatch systems. Bexar Metro also is responsible for providing effective backup solutions for its Public Safety Answering Points (PSAPs) that may be required to evacuate their local facility in the event of a natural or manmade disaster. FUNDING: The District's source of revenue is the, 9 -1 -1 specified telephone access lines located in Bexar, Comal, a Health and Safety Code, Chapter 772, Section 772.314, aut; emergency service fee not exceeding six percent of they%. �e�� %�%N, principal service supplier. The fee applies to all residentlal1i business lines at one location. The fee does nopply to �x . the board calculates the amount of the fee in com' cation wit annual budget. By law, the fee has uniform must generate revenue sufficient to match curj related to the District's mission and responsib for contingencies and equipment reps „acement. The proposed Fiscal Year 2019 em In addition tc. service fee =f g, law at $0:`5Z wireless tell the network. Residential Lines business SIN ice Business T. ees assessed orb "'gip1111 m each wireless < WHOM pier line, recogzE lone user sho�ild T/1 1so is in recoa and reasonable port meeting the federal adequate to support p n of the handate ion in emergency service fee applied to ndGuadalupe Counties. The Texas TOY tes the board to impose a 9 -1 -1 monthly base rate charged by the N, and up to the first one hundred W^, state,and federal lines. Each year h derel.opment and approval of the ea ipating jurisdiction and and projected opernal expenses directly as well as providing reasonable reserves ;�) $ 1.00 d'r'eline`te1eonesBexar Metro also receives an emergency d�p�ONI j y set by Texas cess line wifhrn <its jurisdiction. This month) fee, t af��e wireless telephone is a link to 9 -1 -1 services and a /.iii erefore-share a portion of the financial burden for provisioning rion of the cost recovery mechanism required to defray a fair Iuvork infrastructure expense the wireless providers incur in J wireless Enhanced 9 -1 -1. The current fee structure is Ifspending in FY 2019. OVERVIEW: The District's provision of 9 -1 -1 service to member entities began in January 1987 with the provision of Basic 9 -1 -1. Since that time, Bexar Metro has made several significant upgrades that enabled keeping pace with the explosion in communication and computer technology that is the foundation of the next generation 9 -1 -1 network. The District has developed and deployed a sophisticated Geographic Information System that is the backbone of the 9 -1 -1 call delivery system; and has also installed and managed various iterations of Customer Premise Equipment (CPE) including the current state -of- the -art Internet Protocol (IP) system. Bexar Metro is currently in a two -year project to upgrade that first - generation IP equipment with new CPE that will include features that accommodate next generation features once the Emergency Services IP Network (ESlnet) is completely deployed. The District's call delivery network continues to employ features and functionality concurrent with the technology 2 changes and complexity of emergency communications. In addition to enhancing the technology required to provide the latest proven, state-of-the-art technology, Bexar Metro's Quarry Run Regional Operations Center, that became operational in the summer of 2017, provides the District's PSAPs with an 81,000 square foot, fully redundant, and survivable facility that will permanently house the PSAP operations for the Bexar County Sheriff's Office and serve as a backup facility for the City of San Antonio Police and Fire Communications operations and all other PSAPs served by Bexar Metro. The facility will also provide the infrastructure for data center operations serving not only the District, but also the region and the state. Bexar Metro has paid cash for this facility, using a pay-as;,� ' 'y o financial planning practice. To fund District operations and capital projects Bex FY 2019 draft budget projects revenues from carriers utilizing an increased rate UNROOF V10110% fop, wireli'ft, ees. The increase in fee is required to offset costs for the implementation.,,,,,,; ,'n Emergent / Services Internet Protocol Network (ESInet). The proposed upgrade will" vide a more robust 1 -1 network that removes U any single point of failure from the system. /A The FY 2019 budget expenditures are comprised f operations and"'m"aintenance (O&M) "IMPU/Irrent and future expense, capital projects, and capit5l­ recovery 'Ifil�]/////86ddition to funding operations, the O&M budget continblegl 6 focus on the §/bistrict's most critical resource; its 'M R -crease in funding for personnel to 11:h ­ ' 'I ­//�, - professional staff. The FY 2019 financial, pan Jncludes an7 PIN, enable modest salary adjustments and td,defray'�,,,asi-gnificant,in,i�rease in health care premiums. 'A transitia/69OpM two addition, Bexar Metrol/,�"�O-­"' to full-time employees that contract tract sta -AMAN/0011, � 2/ support District operationW'Th&/Q&IVl expenses,areoprd e.b.-ted to decrease by 11.26 percent in /05 NO W -b deploym nt of the new PSAP CPE. FY 2019, primarily becaose of th6l/bbrnpletiowbo h ing,items1h/Wour strategic survivability plan, including the The capital budget.funds tKnuts comp I etion/dffthemu a n', - 1lIty, tie network and IT infrastructure required to operate at W of 9 -1 CrEbquiprnent. Also included is replacement of aging l/lAnd the de p ., the facility nt PER,, equ pmentat the Districts e.e Court 'facility. The capital budget includes newly este blished ,/tipital Rec n. at reserves dollars for the future replacement of Facility EquipffiQ kVehicles, and IT Systems infrastructure. (PENDITURES: TIJ//6/',, , FY 2019,,J1Bbdget total is $15,726,900. The budget includes $10,103,500 r operations and I narICNI/Lid $5,623,400 for capital improvements. To maintain the strict's pay -as- you -go po11 d underwrite future replacement of equipment, $2,330,000 is fidgeted in dedicated capita 11 recovery accounts its budget matches projected revenue and expense as required by Texas law. To ensure sponsiveness and operational flexibility, the Chief Executive Officer may authorize the ansfer of funds among budget line items if the overall annual budget amount remains 1changed. This budget does not necessitate an adjustment to the current emergency service 3 Revenue Wireline Service Fees Wireless Service Fees Interest Earned Miscellaneous Revenue Total Available Funds Proposed Fiscal $ 4,578,900 $ 11,000,000 - $ 136,000 $ 12,000 $ 15,726,900 ear 2019 Operations 4/V ,/ aintenance Expense Personnel Operations Facilities Education & Training Contingencies Total O&M Expense Proposed Fiscal. $ 307;4,000 000 3, 148 7 0 fiffiffilff an, 51, IM1120/1 If 1,500:000 j A/mAlm'! 159,500 500 009 �,, gear 2019 'ital Budget V M/00 3 PSAP Upgrades I 011111�11�, 24 5 0 0" 10 0 1h, ac-1 I Y, mw'� 71,115-0,000 ag Sadd letree�,�'F` "lit"' /100111 7-11 -n Mission,,Gpdal CommunicatOOR/It, '77 3"000Q, NO I T/ N etwW.§yste m s-';V////; %j'1,023,000 ' Quarry R u n/, ilit 10,000 1XIME Capital Rec 30,000 ov ISO% YES 0/0 MEMO/ n" jja/ ,dr 6 a s ,�kuecrease n Ke8jerve "-52,400 "TIN 'E x p F t a I C ai"'�'i "Maj ensg'­ P5,623,400 0/0 KIF MEN/ WE/ 1001-11 10P I Total FT/14,6,19 Budget $ 15,726 9-00 11AN, Me BEXAR METRO 9-1-1,N Approved by the Bexar Me. -,Board this Twenty Seventh Day of March 2018. By: Name: ames C. Hasslocher Title: Chairman 0