19-R-40 - Amendment to the Existing GMP Agreement with the Construction Manager at Risk Agreement for the construction phase servics to Fire Station #3RESOLUTION NO. 19 -R -40 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING AN AMENDMENT TO THE EXISTING GMP AGREEMENT WITH THE CONSTRUCTION MANAGER AT RISK AGREEMENT FOR THE CONSTRUCTION PHASE SERVICES TO FIRE STATION #3 AND OTHER MATTERS IN CONNECTION THEREWITH WTIEREAS, the City staff of the City of Schertz (the "City ") has recommended that the City authorize an Amendment to the existing Agreement with Thomas S Byrne, Ltd. as the Construction Manager at Risk for the Construction Phase Services for Fire Station #3; and WHEREAS, the City Council has determined that it is in the best interest of the City to amend the existing Agreement with Thomas S Byrne, Ltd and the Amendments are attached hereto as Exhibit A (the "Amendment "). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes the City Manager to execute and deliver Change Orders to the existing Agreement with Thomas S Byrne, Ltd for the Construction Phase Service. The total Guaranteed Maximum Price (GMP) amount payable under this Agreement shall increase from Six Million Three Hundred Sixty One Thousand One Hundred Seventy Seven Dollars and no cents ($6,361,177.00) to Six Million Seven Hundred Four Thousand Three Hundred Fifty Nine Dollars and no cents ($6,704,359.00) plus an Owner controlled contingency of Fifty Thousand Dollars and no cents ($50,000.00) for a total not to exceed Guaranteed Maximum Price of Six Million Seven Hundred Fifty Four Thousand Three Hundred Fifty Nine Dollars and no cents ($6,754,359.00). Additionally it authorizes the City Manager to pay delays claims up to $65,000.00. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. it is officially found, determined, and declared that the meting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND ADOPTED, this 26th day of March, 2019. CITY OF S RTZ, TEXAS ignael R Carpenter, Mayor ATTEST: Bre n a Dennis, City Secretary BYRIhE CONSTRUCTION SERVICES 1_10° '1 Byrne Construction Services SubJob Project: 1568 - Schertz Fire Station No. 3 14220 Northbrook Dr., Suite 400 Type 11917 Lower Sequin Road San Antonio, Texas 78232 NIA Schertz, Texas 78154 Phone: (210) 402 -3335 Sub Contract $ 84,803.00 Fax: (210) 402 -3376 N/A 020- 0250- 200 -Site Utilities Prime Contract Potential Change Order #0A: Site Utility Changes - All Sub Bonds Utilities Up to Lower Seguin Crossing TO: City of Schertz FROM: Thos. S. Byrne, Inc. For Subcontract Amount 1400 Schertz Parkway 551 E Berry St 4 Schertz Texas, 78154 Fort Worth Texas, 76110 PCO NUMBER/REVISION: 007A / 0 CONTRACT: 1 - Schertz Fire Station No. 3 Prime Contract REQUEST RECEIVED FROM: CREATED BY: Chad Reinicke (Thos. S. Byrne, Inc.) STATUS: Pending - In Review CREATED DATE: 3112/2019 REFERENCE: PRIME CONTRACT None CHANGE ORDER: $ 352.00 FIELD CHANGE: No 017 -0170800 - Builder's Risk LOCATION: ACCOUNTING Amount Based 8 METHOD: 999- 9999 -900 - JOB FEE SCHEDULE IMPACT: TBD PAID IN FULL: No Subtotal: TOTAL AMOUNT: $96,383.00 POTENTIAL CHANGE ORDER TITLE: Site Utility Changes - All Utilities Up to Lower Seguin Crossing CHANGE REASON: Design Revision POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) ,E #024 - Site Utility Civil Revisions - For Utilities up to Lower Sequin Crossing Attached is PCO #007A. Revised pricing is based off revised drawings received from O'Malley Strand on 3/5/2019. PCO# 007A is for all utility work up to the Lower Seguin Crossing. Ir.% i li§IN111&_3 # SubJob Cost Code Description Type Amount 1 NIA 020- 0250 -200 - Site Utilities Sub Contract $ 84,803.00 2 N/A 020- 0250- 200 -Site Utilities For Change Order Sub Bonds $2,120.00 3 NIA 020- 0250 -200 - Site Utilities For Subcontract Amount Sub Bonds $ 4,580.00 4 NIA 017 -0170 -500 - Performance and Payment Bonds Other Costs $ 964.00 5 NA General 017 -0170-015- Comprehensive Liabilit Other Costs $ 506.00 6 N/A 017-0170-010- Umbrella Insurance Other Costs $ 352.00 7 NIA 017 -0170800 - Builder's Risk Other Costs $ 24.00 8 N/A 999- 9999 -900 - JOB FEE Fee $ 3,034.00 Subtotal: $96,383.00 Grand Total: $96,383.00 Byrne Construction Services page 1 of 2 Printed On: 3/12/ 2019 05 :48 PM AJ CONSTRUCTION SERVICES Approval Needed By: Tuesday, March 19, 2019 We are awaiting your approval prior to proceeding with this work. In order to prevent any delay, this change must be approved by the date X shown above. We are proceeding with this work. Please provide written notice immediately if we are to stopwork associated with this change and await further direction. Please provide approval of this change by the date shown above. This work is complete. Please provide approval of this change by the date shown above. Funding Source: X This proposed change will be funded by City of Schertz via a future Change Order increasing or decreasing the Contract per the amount listed above. This proposed change will be funded by the Owner's Contingency within the GMP and GMP amount will not change This proposed change will be funded by the Contractor's Contingency within the GMP and GMP amount will not change. Our breakdown is attached for your review and approval. Please return one signed copy of this Proposed Change approving the associated costs, time extensions, and funding source indicated herein. Jennifer Bettioi (BRW Architects, Inc.) City of Schertz 1400 Schertz Parkway Schertz Texas 78154 Thos. S. Byrne, Inc. 551 E Berry St Fort Worth Texas 76110 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Byrne Construction Services page 2 of 2 Printed On: 3/12/ 2019 05:48 PM HYMN CONSTRUCTION SERVICES Analysis of Estimate Project: Schertz Fire Station #3 11917 Lower Seguin Schertz, Texas 78154 Byrne Jab No. 1568 Date: March 12.2019 Documents: PC No. 7A Revision:0 Description: She Utility Revisions Arch Ref No.: N -ip6on Vmdorlsubmntraclor Quanby UM Mat1UP Alan Total Labor UP LebarTotal Vaior Purchase Order Subcanlrml Sub Bond 6 B 1 Site Wiry Revisions and Additions RTM 1 LS 0 0 84,803 2,120 0 0 2 RTM Bonding for Subcontract Byrne 1 LS 0 0 0 4,580 0 0 3 0 0 0 0 0 4 0 0 0 0 0 5 0 0 0 0 0 6 0 0 0 0 0 7 0 0 0 0 0 8 0 0 0 0 0 9 0 0 0 0 0 10 0 0 0 0 0 11 0 0 0 0 0 0 01 1 Sub - Totals $ - $ - $ - $ 84,803 $ 6,700 MaterialTotal. ...................................................................................... ............................................... $ MaterialSales Tax ................................................................................................. ............................... Included TSBLabor ............................................................................................................ ............................... $ - TSBLaborBurden......................................................... ............................... . 45.00 %........................ $ - Purchase Order Sub Total ....................................................................................... ............................... $ - SalesTax on PO's .................................................................................................. ............................... Included SubcontractWork Total ........................................................................................... ............................... $ 84,803 Sub -Total $ 84,803 PrintinglPostage/ Courier .......................................................................................... ............................... $ - Small Tools/ Equipment (5% of Material & Labor-fatal) .......... ............................... 5.00 %........................ $ PM/Estimaling/ Supervision ...................................................................................... ............................... $ Saf ety........................................................................... ............................... 2.00 %........................ $ - ................................................................................... ............................... 0.00% ........................ $ - ................................................................................... ............................... 0,00% ........................ S - Sub -Total $ 84,803 Sub- Bonds ........................................................................................................... ............................... $ 6,700 BondPremiums ( Byme) ................................................... ............................... 1.00 %........................ S 964 General Liability Insurance ............................................... ............................... 0.525 %........................ $ 506 Umbrella Insurance Premiums .......................................... ............................... 0.365 %........................ $ 352 Builders Risk insurance ................................................... ............................... 0.025 %........................ $ 24 Acct gllT........................................................................ ............................... 0.330 %........................ $ - Sub -Total $ 93,349 GeneralJob Overhead .................................................... ............................... 10.00 %........................ $ - Sub -Total $ 93,349 Fee.............................................................................. ............................... 3.25% ........................ $ 3,034 Sales Tax .................................... ............................... Included or Excluded 8.250% ........................ $ - Tax Exempt TOTAL this Estimate $ 96,383 -/ q - RCQOH GO 31v. 18- 123 -00 03 CMI Revisions r Rherta Fire Stalion 93 Takeoff Total Labor Total Material Total Unit Bidltem Bld Description Units Quantity &Equip Cust &Sub Cost Bid Total U.P. 100 WATER 110&'x9'CUt in Teew /Sleeves EA 1 1625 3467.39 509239 5092.39 120 9Hot Tap EA -1 910 1203.22 2113.22 - 2113.22 1308: Gate Valve w /accessoAosIfor item 110) EA 2 185 992A6 1172,16 2354.92 14018'6orew /Casing Pipe LF 24 105.44 489.78 595.22 14285.28 ]50 6' C -900 OR -18 LF -64 21.04 16.99 38.02 - 2433.28 160 B'C -901) DR - 18 LF 262 2458 19,44 44.02 1153324 170 2.5' S h 90 PVC LF -179 16.95 5.93 1293 4304.47 180 2 Srh. 40 PVC LF 184 16.95 5.48 22.43 4127.12 1906'Gate Valve. /.heboe &ACC EA 2 185 26236 1047.36 2094.72 220 M1Fittingsw/ Accessories, bends, anchor nipples,etc LS 1 602.36 4564.17 5166.53 5166.53 210 Additional Fire Hydrant FA 1 150936 3689.17 5198.53 5198.53 221 Bell Joint Restraints, All Thread Rods, Accessories LS 1 664.52 813.21 1477.73 1477 -73 222 Casing5pacerier8 EA 6 16.42 93.46 109.82 659.28 223 Poly Wrap Tape, Kopper KOte, Tracer Wire LS 1 324.18 462.91 787.09 787 -09 224 Concrete Thrust Block plus short load fee CY 1.4 44.31 257.21 301.52 422.13 230 Spoes Haul.ff CY 88 1.75 10.25 12 1056 240 Trench Protection LS 1 183.8 M034 534.14 534.14 240 SANOARYSEWER 2706'PVCCasing Open Cut IF 160 19.87 46.22 66.09 30574.4 275 6' Be a Extension LF 44 14.77 20229 217.06 9550.64 280 L25'PEDR- 11 Force Maln LF 44 19.87 1L06 30.93 136092 290 125' PE DR -11 Force Malt (Lt 56 & L- Seguln Crossing) LF 413 37.81 1106 48.87 2018331 3206'Sch 40 PVC LF 3 20.02 12.36 32.32 97.14 340 FM Fittings, ConcThrust Blocks, PVC Fittings, Fusion Machine LS 1 190658 220731 4113.89 4113.99 341Casing5pacers, End Seals,Straps, Dunnage LS 1 855.37 1106.31 1961.68 1961.62 342 Additional Rental of Roll Out Toiler for 2' Force Main LS 1 687.82 69792 687.82 343 Tracer Wire, Detectable Tape, Pressure Test LF 457 2.03 499 6.92 3162.44 350 Trench Protection LS 1 178.22 2106.48 2294.7 21643 3605pa6s Hauloll CY 29722 1.75 10.25 12 356694 400 STORM ORM 430 All pipe to he SOR -26 NOTE LS 1 3116.19 3116.19 3116.19 Sub-Total: $106,797.89 ISXOH&P: $16,019.68 Total: $122,817.57 O F- [O O U C (0 O F- i6 �L O) m G O F- L O J a✓ O F- a-+ C d 0 O 01 Y f0 F- W N N 00 00 d' F� N N m m M W O1 m O d• m N Cl N N N ri I4 Ln L'� n N O -! O r I N M q Ln m m d' h [t LO W r� m i- N LD m -i Ln W m m O N m LD Ol f, Ln 00 N Ln m O r-i m N d• Ln a-I ri O ri r-1 ct LO I- I�t O Ln Ln N N N -1 c}' N Ln Ln c-1 ri In 4L/1- to to iA V1 V} to to n 00 N LO N N N m m LO m m t+'i 00 m N N V M N c* N O O in -;f m m Ln t- 00 O Ln ri ci N M 1, M 00 4 N N 1� 6 00 1< O1 h c1 4 171 r-1 1-I m M d• N N It LO m I� O 00 O m O -1 r-1 Ln O e1 e-i :Y -i r\ M Ln L!1 N r-I c-1 Ln Ln .-1 00 N lD 00 00 lzt 00 00 LO I� I,, �H LO r-1 li In M N�� Ol Zt M Ch M ri ri N d• Ol N N M 1� M N m LD M Ln M N d' m m m N I- O O LO O Ol 00 r-1 -1 LO lD w ri m LD m c-i m m F*4 O1 ct 00 � m 00 -:T m N Ln O Ln �t It w Ln Ln Ln w LD N N 00 ri Ln W N -i 00 o Ln M m w m m Ln Zt c-1 m r` m LD Ql ri ll'1 ri Gt LD 6 1-1 N O1 4 LD 4 4 r4 00 O N N ci ri 0 0 LD 11 N 'T r-1 r-I LO Ln LO m r-1 c-I ci N Ct d• N m I:T N -i -i li LD c-1 �t 00 r-i N LO LD 1- 00 00 N ci c-i a-� C iL0 U -0 O > CD C _ 41 O to O Q1 v 4J L 7 4-- u 41 L 4— +-+ > > LL C: U .0 O 41 ca FU M> O> f a co N to O +, F a v o 0 2 C Ln Ln L 41 = a O L 7 4 - a-+ O 001 001 Ln -C +� a�''., O O7 bD -C fa i X 00 u � (3) m O O Q GL m ?: 00 00 00 ri LO 00 N N LD Q m U m L.3 Ln F- 0 0 0 0 0 0 0 0 0 0 0 c--I N M-zl- 0 0 c i N m c}• m w I\ 00 m N -1 N N N N m tt r-1 r-1 ri -i ci r-i li li ri N N N N N N N N E Lv u3ri' 3w"lr'iri: Cl) 00 Cl N N O M 00 00 Ol LO N M I-� LD LO M 1-1 00 d• LO N m m 00 00 LD N n rl �t rI O 00 N lD N I- N 00 O m Co o Ln o Ol O LO N r-1 N O rn O m -i 'i I� LD V) u c -I 00 00 Zt ch 1- M t\ N 1- O1 ri 00 LO Ln ci LD r-I O L m r-I Y U u3ri' 3w"lr'iri: Cl) 00 Cl N N O M 00 00 Ol LO N M I-� LD LO M 1-1 00 d• LO N m m 00 00 LD N n rl �t rI O 00 N lD N I- N 00 O m Co o Ln o Ol O LO N r-1 N O rn O m -i 'i I� LD V) o �* O1 1- LO 4 tO 00 LO N Ln N M co uIAKFi: I� N Ql 00 LO N ri N ci m 00 LD O LO O r-1 r-1 ci ci N M N Ln O N I� 00 r-1 t\ r-I c-I N N 01 N C O u O O L a (U .s= _ U C O F- L) O O m m r= LO N Cn v c n m O cl ty z O —_ t% Q O O u L C Ln > N ai L n Y U 4 03 O :3 O 0 !Z � m F- a--� O 4 • N Q1 C — O O1 U L U F- O i0 u Q U cm G (0 41 0 3 to > c u + v CJ a V) En O elf — a Ln ro U O d O LL ro c f0 u !! > L U N Li- h0 C O :�' L Q) C o N + -0 U (�B Ln LD w LL LL Q F- ON I- CP c* cl N m m M m o �* O1 1- LO 4 tO 00 LO N Ln N M co uIAKFi: I� N Ql 00 LO N ri N ci m 00 LD O LO O r-1 r-1 ci ci N M N Ln O N I� 00 r-1 t\ r-I c-I N N 01 N C O u O O L a (U .s= _ U C O F- L) O O m m r= LO N Cn v c n m O cl ty z O —_ t% Q O O -;I- olz* d- N C0 Ln w m n m N Ln Lo m m lLS Ln �t O Ln a4 -i N o O m c-I 6 00 m r� ;' LD O m m w m m m _i 1-1 r- 0 00 Ln m ri m l o m o 00 m :Zf G I O- m d c N r� ci 00 N M m N H LD m n W is o rn w Ln io m +1 o rl o Co 14 Y 0 +' 0 is 2 a m 2 p m 0 0 0 0 0 0 -0 g O � O =3 to U :3 ul U N c i d Ln ri 0) lD LD ci N O O m N c--i c-1 to O H -i o N rl rl r- ci r- r` Co co m m r- Ln i ri m Ln 00 dt d' m ri I It ri lzt in C) Ln v 4� o o � J i Ln C C Ln '� 'ccam vi G G a) QJ (ai In U U L L -0 C W W W al U W (] Q Q W W C/') 0 QJ IZ it �$ O = = c- 0 I= N Ln Ln N m LD -i r-i U m o o --r r� C0 m It N N N m BYRI�hE� CONSTRUCTION SERVICES Byrne Construction Services Project: 1568 - Schertz Fire Station No. 3 14220 Northbrook Dr., Suite 400 11917 Lower Sequin Road San Antonio, Texas 78232 Schertz, Texas 78154 Phone: (210) 402 -3335 Fax: (210) 402 -3376 Prime Contract Potential Change Order #007 Site Utility Changes Crossing Lower Seguin & Lot 56 TO: City of Schertz FROM: Thos. S. Byrne, Inc. 1400 Schertz Parkway 551 E Berry St Schertz Texas, 78154 Fort Worth Texas, 76110 PCO NUMBERIREVISION: 007B / 0 CONTRACT: 1 - Schertz Fire Station No. 3 Prime Contract REQUEST RECEIVED FROM: CREATED BY Chad Reinicke (Thos. S. Byrne, Inc.) STATUS: Pending - In Review CREATED DATE: 3/12/2019 REFERENCE: _ PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE _ No LOCATION: ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT. TBD PAID IN FULL No TOTAL AMOUNT- $46,099.00 POTENTIAL CHANGE ORDER TITLE: Site Utility Changes - Crossing Lower Seguin & Lot 56 CHANGE REASON: Design Revision POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #015 - Site Utility Civil Revisions Attached is PCO #0078. Revised pricing is based off revised drawings received from O'Malley Strand on 3/512019. 1) Existing 4 inch line is shown to be running underneath the sidewalk on Hollering Vine. New 1.25 inch sewer is proposed to be ran approximately 10 feet from tree's and irrigation in the lot. 2) City of Schertz Public Works exposed the existing 4" line running underneath Lower Seguin, and depth was approximately 9.5 feet deep, and not 4 feet deep as shown on drawing C4.2. Per discussion with City of Schertz, it will be determined to abandon the line in place, and not use as a sleeve for Lower Seguin Crossing. 3) Tree replacement is currently not included in pricing. 4) Additional required permitting not included in pricing. 5) Due to proposed distance from road, traffic control excluded. 6) Hydroseed and sod excluded. 7) Plans priced based on coordination meeting on 3/1/2019, and drawings received 3/5/2019. Any additional revisions made from comments from City of Schertz Public Works on 3/7/2019 will be priced as additional work. 8) Work Priced based on agreement with the City of Schertz and Property Owner on new proposed route for sewer line. ATTACHMENTS: # SubJob Cost Code Description Type Amount 1 N/A 020 -0250 -200 -Site Utilities Scope Change for Site Utilities Sub Contract $ 38,016.00 2 N/A 020 -0241 -001 -Contractor Installed Silt Fence and Erosion Control Sub Contract $ 4,800.00 System 3 N/A 017- 0170-015 - Comprehensive Other Costs $ 242.00 General Liabilit Byrne Construction Services page 1 of 2 Printed On: 3/12/ 2019 05 :56 PM CONSTRUCTION SERVICES '1 4 N/A 017-0170-010- Umbrella Insurance Other Costs $ 168.00 5 N/A 017 -0170 -600- Builders Risk Other Costs $ 12.00 6 N/A 999 - 9999 - 900 -JOB FEE Fee $ 1,451.00 7 N/A 020- 0250 -200 - Site Utilities Sub Bonds for PC04007 Sub Bonds $ 950.00 8 N/A 017 -0170 -500 - Performance and Payment Bonds Other Costs $ 460.00 Subtotal: $46,099.00 Grand Total: $46,099.00 Approval Needed By: Tuesday.-March 19 2019 We are awaiting your approval prior to proceeding with this work. In order to prevent any delay, this change must be approved by the date X shown above. We are proceeding with this work. Please provide written notice immediately if we are to stopwork associated with this change and await further direction. Please provide approval of this change by the date shown above. This work is complete. Please provide approval of this change by the date shown above. Funding Source: X This proposed change will be funded by City of Schertz via a future Change Order increasing or decreasing the Contract perthe amount listed above. This proposed change will be funded by the Owner's Contingency within the GMP and GMP amount will not change This proposed change will be funded by the Contractor's Contingency within the GMP and GMP amount will not change. Our breakdown is attached for your review and approval. Please return one signed copy of this Proposed Change approving the associated costs, time extensions, and funding source indicated herein. Jennifer Bettiol (BRW Architects, Inc.) City of Schertz 1400 Schertz Parkway Schertz Texas 78154 SIGNATURE Byrne Construction Services DATE Thos. S. Byrne, Inc. 551 E Berry St Fort Worth Texas 76110 SIGNATURE DATE SIGNATURE DATE page 2 of 2 Printed On: 3112/ 2019 05:56 PM BYRIS CONSTRUCTION SERVICES Analysis of Estimate Project: Scheriz Fire Station #3 11917 Lower Seguin Schertz, Texas 78154 Byrne Job No. 1568 Date: March 12, 2019 Documents: PC No. 78 Revision: 0 Description: Site Utility Revisions Arch Ref No.: D"vipbn WrdorlSubcontraclor Ouanlry UM Mat1UP Man Tatal Lb., UP LeborTaial Major Purchase Order Subcont -t Sub Bond 0 0 1 Site Utility Revisions and Additions RTM 1 LS 0 0 38,016 950 0 0 2 SWPPISilt Fence Byrne 1 LS 0 0 4,800 0 0 0 3 0 0 0 0 0 4 0 0 0 0 0 5 0 0 0 0 0 6 0 0 0 0 0 7 0 9 0 0 0 8 0 0 0 0 0 g 0 0 0 0 0 10 0 0 0 0 0 11 0 0 0 0 0 0 0 Sub - Totals $ - $ - $ - $ 42,816 $ 950 MaterialTotal ........................................................................................................ ............................... S MaterialSales Tax ................................................................................................. ............................... Included TSBLabor ............................................................................................................ ............................... S - TSBLabor Burden .......................................................... ............................... 45.00%........................ $ PurchaseOrder Sub Total ....................................................................................... ............................... $ - SalesTax on PO' s .................................................................................................. ............................... Included Subcontract Work Total ........................... ........................................................................ :...................... S 42,816 Sub -Total $ 42,816 Prinf ing/ Postage/ Couriec ......................................................................................... ............................... $ - Small Tools lEquipment(5%ef Material &Labor Total) .......... ............................... 5.00 %........................ $ - PMIEstimatinglSupervision...................................................................................... ............................... S - Saf ety........................................................................... ............................... 2.00 %........................ $ - ................................................................................... ............................... 0.00 %........................ $ - ................................................................................... ............................... 0.00 %........................ $ - Sub -Total 0 $ 42,816 Sub - Bonds ........................................................................................................... ............................... $ 950 Bond Premiums ( Byme) ................................................... ............................... 1.00 %........................ S 460 General Liability Insurance ............................................... ............................... 0.525 %........................ S 242 Umbrella Insurance Premiums .......................................... ............................... 0.365 %........................ $ 168 Builders Risk Insurance ................................................... ............................... 0.025 %........................ $ 12 Amtg/ IT ........................................................................ ............................... 0.330 %........................ $ - Sub -Total $ 44,648 GeneralJob Overhead .................................................... ............................... 10.00 %........................ S - Sub -Total $ 44,648 Fee.............................................................................. ............................... 3.25 %........................ $ 1,451 Sales Tax... ................................................................ Included a Excluded 8.250 %........................ $ - Tax Exempt TOTAL this Estimate $ 46,099 R CON WD. 18- 123{0-03 CAI R visions Srherts fire Sia0nn d1 Takeoff Total Labor Total Material Tob"""' Bidltesn Bid Oescdptlon Units Quantity 8, Equip rest &Sub Cost Bid TOtalu.p. 100 WATEII 110 e'Y8'COtin Tee. /sleeves EA 1 1615 3467.38 509238 5092.38 120 8' Hot Tap EA .1 910 1203.22 2113.22 - 2113.22 1308'Ga1e Valve W /ac -ries If., Rem 110) EA 2 185 99246 1177A6 2354.92 140 18' Bore W / Casing Pipe LF 24 105.44 489.78 595.22 3428519 150 6' C-900 DR -18 LF -64 2L04 1698 38.02 - 2433.28 160 9' C-900 DR -12 lF 262 24.58 19.44 44.02 11533.24 170 2.5' Sch 90 PVC LF -179 1695 5.93 I2-93 - 4104.47 180 2' Sch. 40 PVC LF 284 16.95 SAS 2243 4127.12 1:06: Gate Valve w /valve box &Am EA 2 185 86236 104736 2094.72 220441 Fittings. /Accessories, bends, anchornipples,etc IS 1 602.36 4564.17 516653 51:5.53 210 Additional Fire HVdrant EA 1 150936 3689.17 519853 5198.53 221 Bell Joint Restraints, All Thread Rods, Accessories IS 1 664.52 813.21 1477.73 1477.73 222 Casing Space, 19.9 EA 6 16.42 93.46 109.88 659.28 223 POly Wrap Tape,Koppar KOte,T.,e,VV.,e IS 1 324.18 46291 787.D9 787.09 224 ConueteThrusl Block plus short load fee CY 1.4 44.31 257.21 301.52 422.13 7_305poils Haulaff CY 88 1.75 10.25 12 1056 240 Trench Protection LS 1 183.8 35034 534.14 534.14 240 SANITARY SEWER 270 6' PVCCasing Open Cut LF 160 1997 46.2E 66.09 10574.4 275 6' Bore Extension IF 44 14.77 202.29 217.06 9550.64 280 1.25' PE DR -11 Force Main LF 44 19.87 11.06 30.93 1360.92 2901.25'PE DR -11 Force Main (Lot 56& LSVr Seguin Crossing) LF 413 37.81 IL06 48.87 2018331 3206'5ch40PVC LF 3 20.02 12.36 32.38 97.14 340 FM Fittings, ConcThnsst Blocks, PVC Fittings, Fusion Machine LS 1 190659 2207.31 4113.89 4313.89 341 Casing Spacers, End Seals, Straps, Dunnage IS 1 855.37 1106.31 196168 1961.68 342 Additional Rental of Roll OutTrails for 2' Force Main IS 1 687.82 687.82 687.82 343 Tracer Wire, Detectable Tape, Pressure Test IF 457 2.03 4.89 692 3162.44 350 Trench Protection LS 1 178.22 2106.48 2284.7 2284.7 360 Spolls Hauloff CY 197.77 175 10.25 12 3566.64 400 STORM DRAW 410 All pipe to be SDR -26 NOTE IS 1 3116.19 3116.19 3116.19 Sub -Total: $106,797.89 15`,1 OH&P: $16101168 Total: $122,817.57 m .N O H m h O U �C Z) m O H m 'L a) M 75 O I— O J O A •++ C ru C( O QJ Y H 0o N N 00 oa �* -F-Z N N M M M M M M O �t M N al N N N e-1 tl, M M tl N O ri O ri N M ct Ln M M d' r\ lzt LD 00 n Ql r- N l0 [t M ri Ln OO M M O N M LO M t- M w N M M O r-1 M N't M ri ri O .-1 r-1 Izi- O h�t O M Lrj N N N r q N L/1 Ln .--I ri i4 i/? in i/? V)• in i/)- i/> 4J} +Jh i/>• iA. ir? i/} is i/)- V/ 00 N LO N N N M M O M M M 00 0) N N M N d• N O O m ct M Ln Ln P� 00 O Ln r-i ri N M n Ln 00 4 N N N LO W n 01 r-: r-I M ri r� 01 M 'ct (N N CI' LD 0) r- 0 00 O M O ri ri Lr) O r-I ri Ct ri i\ M Ln Ln N r-I ri Ln M r-i 00 N w 00 00 It 00 00 LO t, h r-I tD ri ri Ln ct M NZj- t- m T al d' M r1 -1 N;T m N N M rl M N M LD M L/) Ln N-;t 01 M M N t� 0 0 LO O Ol 00 -1 cq LO LO O0 ri 01 LD Ln -i Ln I;T N Ol 00 Ln LD 00 1:t N M M r-i I;zt M Ln O Ln �t Ct OO Ln Ln Ln LO LD N N 00 r-i Ln W N c-I OO It O M M M 00 M M In -zt -4 M f\ O Ql -1 Ln -4 d' l0 Lo LD Gt d' c-I 00 O N N ri ri O O w ri N ct r1 ri LO Ln LD M ri r-i c-I N It d' N 01 Ct N ri r-I ri lD c-1 d• 00 ri N LO LD t- 00 r..,1 00 � N ri ri 41 C M u O � m C _ o Ln L P = L u o a) > > Lt + O U L 0 41 00 ca- 75 .� m O> bD ,H O_ m 0 m OL O O) L D 4- a-1 O O O U L 4- 4� bA L QLJ 1n u X oo Ln -o ) o o U fz G. m 00 00 00 ri LD 00 N N LD G Q M U d. U Ln 1- 0 0 0 0 0 0 0 0 0 0 0 r-i N M d• O O c-I N M d• Ln m t- OO (3) N r-I N N N N M t c-I c-i c-i ri ri c-I c-I c-I c-I N N N N N N N N 01 41 � oq oq � � rn � It t� M n N d' lD O c-i rl (n ri 00 LD 00 LD Lr) c-I LO r-I N Ln M M O d M N M ri Ol 00 01 N N n N O) O M 00 00 0) 4 ri ri LD N M r4.� O 00 LO LD M ri 00 N r-i H O N r-I ct M N M M 00 W ct N ri LD N n i\ ct LD O LO c-i O 00 O r-1 ri N LO ci ri N N M N N 00 O M N Ln O O0 O Ln O N r- Ol O LO N 00 ri r-i N O tl 0) ri ri O M r-I r-i h ri N ri LO Ln N Ol N 7 U L Ln > N l�L d u 1 O1 O :3 CL m 0 Fm 41 4� 01 — N O tn C O U :3 _ � LD N m O u N Q U N C w a) 0 O c Q) a ON 3 Uo U U o CU ° v� v •in (j O C Ln Vl d L O m O M C) C bio U- L m L 41 a Ln :Lj a 0- o — Ln iD lD L)- U- Q f- Ln V) Q N O M M M M Ln LO Q M d' CF' O I;t ::I- N c--1 00 Ln 00 m I- m N In w m m (ID In Ct' O In ,4 i4 N O O m c4 6 00 ul I-z CF t.0 O tr) w 00 6 Ln Ln -4 -1 I- O 00 Ln m r-I 01 O 61 O 00 m ci -; U c-1 O .--I m 00 N 1- ci 00 N m m N ci iJ} ir} i/} -Cr} tr} ir} t'� if} in in i/h lD m I, 00 m O Gl DD LD f6 O F- w ~ 0_ n N O_ 0� O F m S p _ a = m co O O O O O (7 o - o O :3 Ln U zi Lf) :m cn a cn p rn 1--i a N O O m O rl r-1 O N 11 r-4 r,*� 00 0o m d m n m I--1 m m 00 �t �r m -i Ln 4� a O ca J s C C V7 'cam 'ccam vi G G N 4) QJ N U O L L � o O O LL LL W 'in ri c-i vi 1 r-i CL af O 03 w p 0 Q ® W W V) O Q) d d u O ® m N Ln Ln N C, C. lD c--I c-i U Ln O O -i t` 00 rn 'T N N N m CONSTRUCTION SERVICES Byrne Construction Services I Sub Job Project: 1568 - Schertz Fire Station No. 3 14220 Northbrook Dr., Suite 400 Type 11917 Lower Sequin Road San Antonio, Texas 78232 I N/A Schertz, Texas 78154 Phone: (210) 402 -3335 $65,000.00 Fax: (210) 402 -3376 $65,000.00 Grand Total: Prime Contract Potential Change Order #010: Associated General Conditions for Civil Revisions TO: City of Schertz FROM: Thos. S. Byrne, Inc. 1400 Schertz Parkway 551 E Berry St Schertz Texas, 78154 Fort Worth Texas, 76110 PCO NUMBER/REVISION: 010/1 CONTRACT- 1 - Schertz Fire Station No. 3 Prime Contract REQUEST RECEIVED FROM: CREATED BY: Chad Reinicke (Thos. S. Byrne, Inc.) STATUS: Pending - In Review CREATED DATE: 3120/2019 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: _ No . LOCATION: ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: 60 days PAID IN FULL: No TOTAL AMOUNT: $65,000.00 POTENTIAL CHANGE ORDER TITLE: Associated General Conditions for Civil Revisions CHANGE REASON: Design Revision POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #023 - Associated General Conditions for Civil Revisions As per the Time Impact Notification for the Site Utility Revisions, attached is the associated general conditions for the delays incurred by the the Site utility revisions. As of.March 7, 2019 Byrne has still yet to receive an approved Public Works permit and drawings that are deemed acceptable by City of Schertz Public Works. It has been 164 days since the Civil Revisions have began. Due to the 165 day delay, Byrne requests a time extension of 75 days and associated general conditions. Days Added: 60 Total: $65,000.00 Per OAC Meeting held on 3/12/2019, it was agreed that funding outside of current GMP would be provided. ATTACHMENTS: # I Sub Job Cost Code Description Type Amount 1 I N/A 010- 0100 - 100 - General Conditions $65,000.00 Subtotal: $65,000.00 Grand Total: $65,000.00 Approval Needed By: Tuesday, Anril 2.2019 We are awaiting your approval prior to proceeding with this work. In order to prevent any delay, this change must be approved by the date X shown above. We are proceeding with this work. Please provide written notice immediately if we are to stopwork associated with this change and await further direction. Please provide approval of this change by the date shown above. This work is complete. Please provide approval of this change by the date shown above. Byrne Construction Services page 1 of 2 Printed On: 3/20/ 2019 03 :01 PM BYRIhE CONSTRUCTION SERVICES Funding Source: X This proposed change will be funded by City of Schertz via a future Change Order increasing or decreasing the Contract per the amount listed above. This proposed change will be funded by the Owner's Contingency within the GMP and GMP amount will not change This proposed change will be funded by the Contractor's Contingency within the GMP and GMP amount will not change. Our breakdown is attached for your review and approval. Please return one signed copy of this Proposed Change approving the associated costs, time extensions, and funding source indicated herein. Jennifer Bettiol (BRW Architects, Inc.) City of Schertz 1400 Schertz Parkway Schertz Texas 78154 SIGNATURE Byrne Construction Services Thos. S. Byrne, Inc. 551 E Berry St Fort Worth Texas 76110 DATE SIGNATURE DATE SIGNATURE DATE page 2 of 2 Printed On: 3/20/ 2019 03 :01 PM BYRN CONSTRUCTION SERVICES Analysis of Estimate Project: Schertz Fire Station #3 11917 Lower Seguin Rd Schertz , Texas 78154 Byrne Job No. 1568 Date: March 19.2019 Documents: PC No. 10.00 Description: Addhional GC's per the delays incurred bythe Site Utility Revisions Revision: 1 Arch Ref No.: Descdptian Vendor /Subcontractar Quantity UM Mau UP 61at1 Total Labor lR Labor Total Major Purchase Order Subcontract Sub Bond 0 0 — 1 Additional GC's Byme 60 DYS 0.00 0 1,083.34 65,000 0 0 0 2 0 0 0 0 0 3 0 0 0 0 0 4 0 0 0 0 0 5 0 0 0 0 0 6 0 0 0 0 0 7 0 0 0 0 0 8 0 0 0 0 0 9 0 0 0 0 0 10 a 0 D 0 0 11 0 0 0 01 0 01 6 Sub - Totals - S - $ 65,000 $ - $ - S - MaterialTotal ........................................................................................................ ............................... $ - MaterialSales Tax ................................................................................................. ............................... Included TSBLabor ............................................................................................................ ............................... $ 65,000 TSBLaborBurden .......................................................... ............................... 45.00%........................ S - PurchaseOrder Sub Total ....................................................................................... ............................... S - SalesTax on PO' s .................................................................................................. ............................... Included SubcontractWork Total ........................................................................................... ............................... S - Sub -Total $ 65,000 Ptinfing/ Postage/ Courier .......................................................................................... ............................... $ - Small Tools/Equipment (5 %of Material & Labor Total) .......... ............................... 5.00 %........................ S loW Estimating / Supervision ...................................................................................... ............................... $ - Saf ety........................................................................... ............................... 2.00 %........................ $ - ................................................................................... ............................... 0.00 %........................ $ - ................................................................................... ............................... 0.00% ........................ $ - Sub -Total $ 65,000 Sub- Bands ............................................................................................................ ............................... $ - BondPremiums ( Byme) ................................................... ............................... 1.00 %........................ $ - General Liability Insurance ............................................... ............................... 0.525 %........................ $ - UmbrellaInsurancePremiums .......................................... ............................... 0.365 %........................ S - Builders Risk Insurance ................................................... ............................... 0.025 %........................ $ - Acctgl lT........................................................................ ............................... 0.330 %........................ S - Sub -Total $ 65,000 GeneralJob Overhead .................................................... ............................... 10.00% ........................ S - Sub -Total S 65,000 Fee.............................................................................. ............................... 3.25 %........................ $ - Sales Tax .................................... ............................... Included or Excluded 8.250 %........................ S - Taxable New Construction or Taxable Remodel or Tax Excempt... TOTAL this Estimate $ 65,000