Loading...
Memo Resolution Aviation Heights Water Line - Phase IIIAgenda No. 6 CITY COUNCIL MEMORANDUM /RESOLUTION City Council Meeting: November 9, 2010 Department: Engineering Subject: Contract # 10- PW- 25 -C -04- Aviation Heights Water Line — Phase III BACKGROUND The City annually allocates funding for upgrading the water system in the older part of Schertz. The 2009 -2010 project was bid on July 15, 2010 with eleven contractors submitting. The low bidder was RTM Construction Co., LTD with a base bid of $229,739.75. Council awarded the contract on August 27, 2010. The Engineer's estimate was $350,426.50. Funds remaining in the 2009 -2010 budget line item encumbered to 2010 -2001 amount to $135,260.25. By amending the contract and extending the scope of work using these available funds, an additional distribution line can be replaced now rather than in the future. Amending the contract will save approximately $15,000 in costs associated with bidding the work. FISCAL IMPACT Budgeted in 2009 -2010 Water Operating Account (encumbered in 2010- 2011): $ 400,000.00 Current Estimated total cost, including engineering, construction and incidentals: $ 264,739.75 Amendment, including engineering, construction and incidentals: $ 94,674.50 Additional engineering: $ 7,000.00 Under budget: $ 33,585.75 RECOMMENDATION The City Engineer recommends that Council approve an amendment to the contract Aviation Heights Water Line — Phase III Project awarded to RTM Construction Co., LTD in the amount of $97,674.50. The amended contract amount will be $324,414.25. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ: Staff recommendations that the above stated are hereby approved and authorized. PASSED AND APPROVED at a regular meeting of the City Council of the City of Schertz, Texas this 9th day of November, 2010, at which meeting a quorum was present, held in accordance with the provisions of V.T.C.A., Government Code, §551.001 et seq. AddlDeduct Worksheel CITY OF SCHERTZ AN'IATIO,\ HEIGHTS IVATER LL\E INIPROIrENIENTS PHASE 3 CHANGE ORDER WORKSHEET OWNER'S PROJECT NO.: 10- PW- 25 -C -04 ENGINEFITs PROJECT NO.: 1124.63D3 CONTRACTOR: RIM Construction Corupany, LTD CONTRACT FOR: Wright Avenue and Lindheigh Ave water line replacement DATE: 1 0/2 512 0 1 0 CHANGE ORDER NO.: 1 ORIGINAL CONTRACT TIMES ITEM ORIGINAL CONTRACT PRICE: $229,739.76 ORIGINAL CONTRACT DATE 14- Sep -10 PREVIOUS CHANGE ORDERS: $0.00 ORIGINAL CALENDAR DAYS 90 CONTRACT PRICE $229,739.76 ORIGINAL SUBSTANTIAL COMPLETION: I3 -Dec -10 1 PREVIOUS CHANGE ORDERS 0 S 1,075.00 REQUEST FOR THIS CHANGE ORDER (CALENDAR DAYS) 35 LS REVISED CALENDAR DAYS 125 1.25 SUBSTANTIAL COMPLETION WITH THIS CID: 17- Jan -11 Tufflc Coutr0l anti Re ulalioo Oak sheet ITEM DESCRIPTION UNIT ORIGINAL QUANTITY UNIT PRICE FINAL QUANTITY CHANCESIN CONTRACTCOST I TPDES -Storm Water Pollution Prevention Plan LS 1 $ 2 150.00 1.6 S 1,075.00 2 niobilizafion LS 1 $ 17,500.00 1.25 S 4,375.001 3 Tufflc Coutr0l anti Re ulalioo LS 1 $ 500.00 1.5 S 260.00 4 Water Pipe (PVC 0900 ) (DR14) (Coat 11de (Open cut (6 in ) LF 2171 $ 22.50 2231 S 1,360.00 5 Water Pi ,o PVC C900) (DR14 (Cornplete Opea cut 8 in LF 553 $ 25.50 1902 $ 31,049.60 6 Water Tie -in Com 4tete 8 in EA- 5 $ 850.00 8 S 1,550.00 7 Fire H •dram Assemb Com lele EA. 3 $ 2,6 6 S 5,350.00 8 Fife Hydrant Branch Ductile Iron) 6 in) ,ca Cut LF 30 $ 30.00 60 S 600.00 9 Gate Valves 6 io EA. 9 $ 675.00 12 $ 2,026.00 10 Gate Valves 8 in) EA. 3 S 975.00 6 S 2,925.00 11 Blow Off Valve (Cornp Icte 2 is rent i EA. 5 $ 1,150.00 10 S 6,750.00 12 Site Restoration LU fility Construction- Oak Stree 0 LF 0 $ 25.00 1309 S 32,725.00 13 THEnIOPLASTIC PAWNTENT 14ARKENGS %"TE 8 IN LF 0 $ 2.00 1060 $ 2,100.00 14 THERMOPLASTIC PAVEMENT SYNIBOL-S BICYCLE LANE EA 0 $ 250.00 7 $ 1,760.00 SUBTOTAL $94,674.60 ADJUSTMENT TO CONTRACT PRICE: $94,674.60 CONTRACT PRICE WITH APPROVED CHANGE ORDER: $324,414.26 City Council Memorandum Page 2 APP- P"VF..n ATTEST: Brenda Dennis, City Secretary