Loading...
Memo Resolution Interlocal Agreement with Universal CityCITY COUNCIL MEMORANDUM /RESOLUTION City Council Meeting: Department: September 16, 2008 Administration Agenda No. 5 Subject: Interlocal Agreement — Interlocal Agreement with City of Universal City for a portion of new construction across the Cibolo Creek. BACKGROUND City Manager Don Taylor met with City Officials for the City of Universal City on entering into an Interlocal Agreement for participation in a bridge construction project over the Cibolo Creek at Aviation Drive. Project cost for Universal City would be $255,154.53, the City of Schertz is responsible for the construction and oversight of the project; Universal City's role would be to participate financially. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ: That the City of Schertz agrees to enter into an Interlocal Agreement with the City of Universal City providing for the City of Universal City to pay the City of Schertz the amount of $255,154.53 for a portion of the cost of new construction across Cibolo Creek. PASSED AND APPROVED at a regular meeting of the City Council Texas this 16th day of September, 2008, at which meeting a quo accordance with the provisions of V.T.C.A.; Government Code, §551.001 D Hal Baldwin, Mayor ATTEST: Brenda Dennis, City Secretary of the City of Schertz, rum was present, held in et seq. AGREEMENT FOR IMPROVEMENTS TO BRIDGE AND OTHER RELATED MATTERS This Agreement is entered into on this the lG day of zJ , 2008, by and between THE CITY OF UNIVERSAL CITY, STATE OF TEXAS, Acting by and through its City Manager, hereinafter referred to as "First Party", and THE CITY OF SCHERTZ, STATE OF TEXAS, Acting through its City Manager, hereinafter referred to as "Second Party', is as follows: WITNESSETH: Whereas, a low water crossing and bridge are indicated in the attached Exhibit "A ", which is incorporated herein for all purposes; and whereas it is not clear who now owns it, and WITNESSETH: Whereas, the Parties jointly desire and agree to pay for the construction of a new low water crossing and bridge improvements at the area described on Exhibit "A" hereto; and WITNESSETH: Whereas the Second Party, on or about the 20th day of April, 2008, contracted for the construction of the low water crossing and bridge improvements described on Exhibit "B" hereto and incorporated herein for all purposes; and WITNESSETH: Whereas, it is the desire of the First Party and Second Partythat First Party agrees to pay the Second Party the sum of $255,154.53 in accordance with Exhibit "C" hereto for the cost of the low water crossing and bridge improvements located within the First Party's corporate boundaries. Now Therefore, the parties agree as follows: 1. It is Agreed that the parties jointly desire and agree to pay for the construction of new low water crossing and bridge improvements at the area described in Exhibit "A" attached hereto; 2. It is Agreed that on or about the 20th day of April, 2008, the Second Party contracted for the construction of the low water crossing and bridge improvements described in Exhibit "B" hereto; 3. It is Agreed that it is the desire of the First Party and Second Party that First Party agrees to pay the Second Party the sum of $255,154.53 in accordance with the Exhibit "C" hereto; and 4. It is Agreed that, upon completion of the low water crossing and bridge improvements, each party shall own the portion of the low water crossing and bridge improvements located within its corporate boundaries. 5. It is further agreed by the parties that should the project not be completed due to the fault of the contractor or it becomes necessary to bring a suit against the contractor for any purpose, each of the parties hereto shall be entitled to receive their pro -rata share of the net proceeds collected. 6. This Agreement shall be binding upon the respective parties, their successors and assigns and shall be performable in Bexar and Guadalupe County, Texas, and shall be construed in conformance with the laws of the State of Texas. Page -1- In witness thereof, the Parties of these presents have executed this Agreement in the year and day first above written. FIRST PARTY: SECOND PARTY: CITY OF UNIVERSAL CITY CITY OF SCHERTZ BY: BY: - City Mana er City Manager Page -2- 10 lVS83A1Nn q Z1.83HOS 30 All VIVO 1N31NNOIIV IVINOZ180H ONV 1f10AVl 103rOUd N339) 0109D IV OA19 NQHVIAV W m � } ] P � C 9 °c o o c w mm x o ° c E _ v ' l rm9 A _ a u � o U m l ENNN - O t a t0 c a � n + F v o u x_ a m E _ � l w a H � > Y P 9 Cp tl w *N p O L p U � � a _ c _ C 3 c p « V 0 0 N � D O C JE m g 9_�yN, 5 N� °- d $��'�' VV,N lX�fi j ea g" . mQ d. "$d «en x $ 5 die' ��zaiJi'ii�o 'Lis °��n4,'�SnaJ56a���a «�uaJ$Sb 1115 W m � } ] P � C 9 °c o o c w mm x o ° c E _ v ' l rm9 A _ a u � o U m l ENNN - O t a t0 c a � n + F v o u x_ a m E _ � l w a H � > Y P 9 Cp tl w *N p O L p U � � a _ c _ C 3 c p « V 0 0 N � D O C JE Project No. 08- PW- 09 -D -01 Drainage Bond Improvement Project of Aviation Low Water Crossing CONTRACT STATE OF TEXAS § COUNTY OF GUADALUPE § KNOW ALL MEN BY THESE PRESENTS: That this Agreement made and entered into this 25 day of _4 f2rt I , A.D., 2008, by and between THE CITY OF SCHERTZ, COUNTY OF GUADALUPE, STATE OF TEXAS, Acting through its Contracting Officer, First Party, hereinafter termed the Owner and WINCO Contractors of the City of Schertz, State of Texas, Second Party, hereinafter termed the Contractor. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by said First Party, (Owner), the said Second Party, (Contractor), hereby agrees with the First Party to commence and complete the construction of certain improvements at the prices set forth in the Contractor's Proposal for the City of Schertz Job No.08- PW- 09 -D -01, the same being designated as DRAINAGE BOND IMPROVEMENT PROJECT OF AVIATION LOW WATER CROSSING, respectively. The Contractor shall perform all work shown on the Plans and described in the Specifications and shall meet all requirements of this Agreement. The General and Special Conditions of the Agreement and such Orders and Agreements for Extra Work as may subsequently be entered by the above named parties to this Agreement. The Contractor shall not offer, confer or agree to confer any benefit or gift to any City of Schertz employee. The Contractor hereby agrees to commence work under this Contract within seven (7) days after issuance by the CITY of the written Authorization To Proceed. Under no circumstances shall the work commence prior to the Contractor's receipt of the CITY's issued, written Authorization To Proceed. Computation of Contract Time will begin upon actual commencement of Work by the Contractor during the seven (7) calendar day period referenced above, or upon the eighth (8th) calendar day (assuming the eighth day is a day upon which Work may lawfully and Contractually be performed), whichever occurs first. All work specified in these Contract Documents shall be completed within 200 calendar days. It is agreed and understood by the Owner and the Contractor that the provisions of Article 2368a, Vernon's Annotated Civil Statutes of Texas apply to this contract. The terms of the aforementioned state law are incorporated herein by reference. Contractor and Owner Agree that as a public body, Owner is authorized by such state law to negotiate change orders up to and including the amount of $25,000.00 acting by and through its duly designated administrative officer. It is agreed and understood that any change orders which increase the work of the contract in excess of 25% of the bid contract price, must be subject of a supplemental agreement approved by the City Council of Schertz as in case of original Contract Agreement City of Schertz CA -1- Exhibit "B" (Page 1 of 4) Project No, 08- PW- 09 -D -01 Drainage Bond Improvement Project of Aviation Low Water Crossing contracts. The work of the contract may be decreased over 25% with the consent of the Contractor. The Owner agrees to pay the Contractor in current funds and to make payments on account, for the performance of the work in accordance with the Contract, at the prices set for in the Contractor's Proposal, subject to additions and deductions, all as provided in the General Conditions of the Agreement. The following documents, together with this Contract, comprise the Agreement and they are as fully a part thereof as if herein repeated in full: The Invitation to Bidders The Instructions To Bidders The Proposal The Payment Bond The Performance Bond The General Conditions of the Contract The Special Conditions of the Contract The Construction Specifications The Standard Drawings Addenda Change Orders The Plans designated DRAINAGE BOND IMPROVEMENT PROJECT OF AVIATION LOW WATER CROSSING, City of Schertz Project No. 08- PW- 09 -D -01 Sheets 1 -46 inclusive. " In witness thereof of the Parties of these presents have executed this Agreement in the Year and day of the first above written. CITY OF SCHERTZ, OWNER BY: Citty anager 14cio r Contractor' TITLE: PMAJi2` Contractor hereby acknowledges and understands that this Contract is subject to Section 151.311 of the Texas Tax Code, as amended. The following amount of money represents that part of the total contract price representative of value of tangible personal property which is to be incorporated into the project realty or which is otherwise exempt from taxation under Section 151.211 of said Code: $427,691.56. Contract Agreement City of Schertz CA-2- Exhibit "B" (Page 2 of 4) In 11 Al fill vt a 0 IM Vim Au a fit 46 set A i a HIM ail VII 11.1 11 Z; Q IM 41 r 9 A 4 A 4k � E- AN R its oil ni 49, Exhibit -d'629 (Page 3 of 4) DONT VOROP.TTO VM931 Ev Exhibit "B" (Page 4 of 4) ITEM NO. JITEM DESCRIPTION W i NCO APPROVED BI D 101 PREPARING RIGHT OF WAY 50% $14,448.00 S 7,224.00 105 EXCAVATION (CHANNEL 50% $8,550.00 S 4,175.00 200 FLEXIBLE BASE 34% $17,374.00 5 5,907.16 354 PLANE ASPHALT CONCRETE PAVEMENT (2 IN-) 100% $6,412.00 $ 6,412,00 432 STONE RIPRAPPROTECTION 18" 80% $3,198.00 S 2,558.40 432 RB'RAP CONC)(5IN.) 509/6 $31,668.00 S 15,834.00 462 CONCRETE BOX CULVERT (10 FT X 8 FT) 50% $102,348.96 S 51,174.48 506 ROCK FILTER DAMS (INSTALL) IT 1 509/6 $2,900.00 $ 1,450.00 REMOVE SMALL ROAD SIGN SUPPORT & 531_ ASSEMBLY 34% $622.00 S 177.48 INSTALL SMALL ROAD SIGN SUPPORT & 531 ASSEMBLY 34% $1,736.00 $ 590.24 622 WOOD POLES 0 $0.00 S 636 STREET LIGHT FIXTURES 0 $0.00 S 1502 MOBILIZATION 50% $61,952.00 $ 15,976.00 1553 TRAFFIC CONTROL AND REGULATION 50% $6,948.00 $ 3,474.00 1570 SEDIMENT CONTROL PENCE 50% $600.60 S 300.30 2221 REMOVE CONC (RIPRAP) _ 50% $2,630.40 $4,076.40 S 1,315.20 2221 REMOVE CONC PAVE 50% S 2,038.20 2221 REMOVE STRUCTURE (PIPE) 50% $780,00 S 390.00 2315 EXCAVATION RDWY 50% $2,982.40 S 1,491.20 2330 EMBANKMENT 34% $30,870.40 S (0,495.94 2632 WINGWALL 5091. $22,202.00, S 11,101.00 2741 HOT MIX ASPHALT BASE COURSE 34% $12,450.0015 4,233.00 2741 ASPHALTIC CONCRETE PAVEMENT (2 IN.} 34% $23,760.00 S 8,078.40 2751 CONCRETE PAVMENT (8 ") 50% $26,676.00 $ 13,338.00 2767 THERMOPLASTIC PAVE MRK (SLD)(4 ")(10 0 $1,984.60 $ 2767 THERMOPLASTIC PAVE MRK iSLD)(49)(W) 0 $130.00'$ 2767 THERMOPLASTIC PAVE MRK (SL 4" )(W 0 $338.001 S - 2767 THERMOPLASTIC PAVE MRK (word) 0 $1,148.00 $ 2767 THERMOPLASTIC PAVE MRK (arrow) 0 $1,020.00 $ 2771 CURB 201% $26,040.00 S 5,208.00 2775 CONCRETE SIDEWALK 201/6 $10,752.00 $ 2,150.40 2911 TOPSOIL 34% $7,346.80 S 2,497.57 2921 HYDRO MULCH SEEDING 345A $3,264.80 S 1,110.03 2926 EROSION CONTROL MATTING 50% $583.30 $ 291.65 TOTAL PROJECT BID $427,691.66 $ 189,091.85 ENGINEERING FEES WITH CHANGE ORDER 50°/0 $84,290.00 S 42,145.00 SURVEYING FEES 50% $5,958.75 S 2,979.38 CONSTRUCTION MANAGEMENT 509 /. $41,876.00 S 20938.00 TOTAL FEES $132,124.75 $ 66,062.38 TOTAL COST TO UNIVERSAL CITY $ 255,154.03 Exhibit "C" Professional EDGE E n gi n eeri ngD esi gn G rou p 509 Main Street * Schertz * TX * 78154 Office 210- 945.0077 * Fax 210 - 566.5144 ,vmff2N siQ eda.com