20-R-16 - Contract with Fuquay inc relating to the SPAM resurfacing projectRESOLUTION NO. 20 -R -16
A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ,
TEXAS AUTHORIZING A CONTRACT WITH FUQUAY, INC.
RELATING TO THE 2018 SPAM RESURFACING PROJECT AND
AUTHORIZING THE BUDGET EXPENDITURES FOR THE PROJECT
WHEREAS, The City staff of the City of Schertz (the "City ") has recommended that the
City accept the bid from Fuquay, Inc. relating to the 2018 SPAM Resurfacing Project and
approve the project expenditures; and
WHEREAS, City staff has received qualifications indicating that Fuquay, Inc. is qualified
to provide such services for the City; and
WHEREAS, the project will be funded from Certificates of Obligation for Road
Improvements.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS
THAT:
Section 1. The City Council hereby authorizes the City Manager to execute and
deliver the contract with Fuquay, Inc. for an amount of $686,191.77 with an amount not to
exceed $755,000.00.
Section 2. The recitals contained in the preamble hereof are hereby found to be true,
and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a
part of the judgment and findings of the City Council.
Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with
any provision of this Resolution are hereby repealed to the extent of such conflict, and the
provisions of this Resolution shall be and remain controlling as to the matters resolved herein.
Section 4. This Resolution shall be construed and enforced in accordance with the
laws of the State of Texas and the United States of America.
Section 5. If any provision of this Resolution or the application thereof to any person
or circumstance shall be held to be invalid, the remainder of this Resolution and the application
of such provision to other persons and circumstances shall nevertheless be valid, and the City
Council hereby declares that this Resolution would have been enacted without such invalid
provision.
Section 6. It is officially found, determined, and declared that the meeting at which
this Resolution is adopted was open to the public and public notice of the time, place, and subject
matter of the public business to be considered at such meeting, including this Resolution, was
given, all as required by Chapter 551, Texas Government Code, as amended.
Section 7. This Resolution shall be in force and effect from and after its final
passage, and it is so resolved.
PASSED AND ADOPTED, this 11th day of February, 2020.
ATTEST:
50506221.1
CITY OF SCHERTZ, TEXAS
-2-
BID TABULATION
BID /RF- 12020 -006 BID /RFP NAME: SPAM Resurfacing Project Pu *lA
NILE WHIRE
VENDOR ONE (1)
VENDOR TWO (2)
VENDOR THREE (3)
Company Name
ALAMO CITY CONSTRUCTORS, INC
FUQUAY,INC
WAGNER MATERIALS AND CONSTRUCTION
Point Of Contact
GREGORY ALEXANDER
OARRELLCIIRnS
STEVE WAGNER
Phone Number
Email Address
Slurry Seal Option
chipk.10pu.n
CHIPSEALOPTION
Comments
Remit
CM
UOM
Item Price
Extended Price
kern Price
Extended Price
Item Price
Extended Price
Schedule A - Mobilization
s,r -arA
1
LS
$12,320.00
$12,320.00
$15,000.00
$100.00
$15,000.00
$15,000.00
$15,000.00
Manhole Adjustment (Sewer)
Sch.dukA 1
10
EA
$2,049.00
$20,490.00
$1,000.00
$100.00
$1,000.01)
xn.dak A
Valve Box Adjustment 10
EA
$646.00
$6,460.00
$50.00
$500.00
$300.00
$1,000.00
sd'dw-
Removal of Curb and Gutter
86
LF
$40.00
$3,440.00
$20.00
$1,720.00
$10.00
$860.00
xhedW.A
Asphalt Surface Wedgemill
2902
LF
$8.00
$23,216.00
$1.00
$2,902.00
$3.50
$10,157.00
Scl Wd A
Roadway Excavation (6 ")
92
CY
$45.00
$4,140.00
$71.00
$6,532.00
$20.00
$1,840.00
Replacing Base and Pavement with 6"
181
TN
$164.00
$29,684.00
$160.00
$28,960.00
$280.00
$50,680.00
s,nedme a
Type B Asphalt (PG 64 -22)
StluWUIeA
RPM Type II A -A (Blue)
3
FA
S8.00
$24.00
$15.75
$47.25
$8.00
$24.00
S hedukA
4" Double Yellow Thermoplastic Stripe
6818
LF
$3.00
$20,454.00
$2.10
$14,317.80
$1.28
$8,727.04
smmw. A
4" White Thermoplastic Stripe
5608
LF
$2.00
$11,216.00
$1.05
$5,888.40
$0.64
$3,589.12
srA.dde A
4" Dashed White Thermoplastic Stripe
50
LF
$2.00
$100.00
$1.58
$79.00
$0.75
$37.50
SchetlJe A
24" White Thermoplastic Stripe
1146
LF
$11.00
$12,606.00
$8.40
$9,626.40
$6.20
$7,105.20
5[hetlukA
White Thermoplastic Bike Symbol
20 EA
$473.00
$9,460.00
$475.00
$9,500.00
$265.00
$5,300.DO
Straight White Thermoplastic Arrow
20 EA
$394.00
$7,880.00
$131.25
$2,625.00
$138.00
$2,760.00
khedul.A
(Bike)
xhedul.A
Concrete Curb and Gutter
86
LF
$63.00.
$5,418.00
$76.00
$6,536.00
$40.00
$3,440.00
X .kkA
Chip Seal / Slurry Seal
18010
SY
$7.30
$131,473.00
$3.00
$54,030.00
$3.30
$59,433.00
Total Schedule A
$298,381.00
$159,263.85
$170,952.116
sd,edw.B
Mobilization
1
LS
$12,153.00
$12,153.00
$10,000.00
$10,000.00
$20,000.00
$20,000.00
xA.eld. e
Removal of Sidewalk and Driveway
80
SY
$44.00
$3,520.00
$40.00
$3,200.00
$10.00
$800.00
SNletlule B
Removal of Curb and Gutter
83
LF
$42.00
$3,486.00
$20.00
$1,660.00
$10.00
$830.00
smedmee
Roadway Excavation (6 ")
126
CY
$49.00
$6,174.00
$64.00
$8,064.00
$20.00
$2,520.00
Replacing Base and Pavement with 6"
247
TN
$160.00
$39,520.00
$162.00
$40,014.00
$280.00
$69,160.00
smedme B
Type B Asphalt (PG 6422)
Portland Cement Concrete Driveway
80
SY
$189.00
$15,120.00
$98.00
$7,840.00
$95.00
$7,600.00
S,r�a.s
(Residential)
xheduk B
24" White Thermoplastic Stripe
36
LF
$16.00
$576.00
$8.40
$302.40
$6.20
$223.20
Schedule B
Concrete Curb and Gutter
83
LF
$43.00
$3,569.00
$80.00
$6,640.00
$40.00
$3,320.00
sd,edme B
Valley Gutter
167
SY
$39.00
$6,513.00
$145.00
$24,215.00
$135.00
$22,545.00
xhetlule B
Chip Seal /Slurry Seal
33577
SY
$7.30
$245,112.30
$2.76
$92,672.52
$3.30
$110,804.10
TOTAL SCHEDULE B
$335,743.10
$194,607.92
$237,802.30
X4sa3.c
Schedule C - Mobilization
1
LS
$16,394.00
$16,394.00
$10,000.00
$10,000.00
$30,000.00
$20.00
$30,000.00
$7,280.00
s--c
Roadway Excavation (6")
364
CY
$48.00
$17,472.00
$58.00
$21,112.00
Replacing Base and Pavement with 6'
713
TN
$165.00
$117,645.00
$160.00
$114,080,00
$280.00
$199,640.00
xhed,kc
Type B Asphalt (PG 64.22)
sm -c
Chip Seal /Slurry Seal
67800
SY
$7.30
$494,940.00
$2.76
$187,128.00
$3.30
$223,740.00
TOTAL SCHEDULE C
$646,451.00
$332,320.00
$460,660.00
TOTALS I GRAND TOTAL ALL SCHEDULES
VENDOR 1 TOTAL
$1,280,575.10
VENDOR2TOTAL
$686,191.77
VENDOR 2 TOTAL
$869,415.16
SPAM Projects Current Status
Tri County Parkway reconstruction — Started January 23. Completion March.
Schertz Parkway reconstruction (Maske to Woodland Oaks) — Start in March. Complete in June
Northcliffe, Randolph reconstruction, and Schertz Parkway overlay (Live Oak to Beck) —
contract award February 11. Hoping for construction to start during the Spring 2020.
Chip seal (Randolph Avenue, a segment of Curtiss Avenue, Live Oak Road, Greenfield Village
subdivision, The Estates at Wilson's Preserve subdivision, Deer Haven subdivision, and Lone
Oak subdivision) — contract award February 11. Hoping for construction to start during the
Summer 2020.
2020 SPAM chip seal/slurry seal — Resolution to award consultant contract anticipated to go to
City Council on February 25, 2020 for approval. Hoping for construction to start during the
Summer of 2020.
2020 SPAM reconstruction/rehabilitation — Resolution to award consultant contract anticipated
to go to City Council on February 25, 2020 for approval. Hoping for construction to start during
the Summer of 2020.
2020 SPAM design — Under review.
AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
THIS AGREEMENT is by and between City of Schertz
FUQUAY INC
Owner and Contractor hereby agree as follows:
ARTICLE 1— WORK
( "Owner ") and
( "Contractor").
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The
Work is generally described as follows:
ARTICLE 2 —THE PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as
follows: 2018 Street Preservation and Maintenance Project
ARTICLE 3 — ENGINEER
3.01 The part of the Project that pertains to the Work has been designed by Lockwood, Andrews, &
Newnam, In
3.02 The Owner has retained the City of Schert_z Engineerinig Department ( "Engineer ") to act as
Owner's representative, assume all duties and responsibilities, and have the rights and authority
assigned to Engineer in the Contract Documents in connection with the completion of the Work
in accordance with the Contract Documents.
ARTICLE 4 — CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.
Contract Times: Days
B. The Work is expected to be substantially completed within 45 calendar days after the date
when the Contract Times commence to run as provided in Paragraph 4.01 of the General
Conditions, and completed and ready for final payment in accordance with Paragraph 15.06
of the General Conditions within §0 calendar days after the date of substantial completion.
4.02 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01
above and that Owner will suffer financial and other losses if the Work is not completed
and Milestones not achieved within the times specified in Paragraph 4.02 above, plus any
extensions thereof allowed in accordance with the Contract. The Contractor acknowledges
and recognizes that the Owner is entitled to full and beneficial occupancy and use of the
completed work following expiration of the Contract Time. The Contractor further
acknowledges and agrees that, if the Contractor fails to substantially, or cause the
Substantial Completion of any portion of the Work within the Contract time, the Owner will
Page A -1 of 9
sustain actual damages as a result of such failure. The exact amount of such damages will
be difficult to ascertain. Therefore, the Owner and Contractor agree that, if the Contractor
shall neglect, fail, or refuse to achieve substantial completion of the Work by the
Substantial Completion date, subject to proper extension granted by the Owner, then the
Contractor agrees to pay the Owner the sum of:
1. Six hundred dollars ($600.00) per day for each day in which such Work is not
completed, not as penalty, but as liquidated damages, for the damages ( "Liquidated
Damages ") that would be suffered by Owner as a result of delay for each and every
calendar day that the Contractor shall have failed to have completed the Work as
required herein. The Liquidated Damages shall be in lieu of any and all other damages
which may be incurred by Owner as a result of the failure of Contractor to complete
within the Contract Time.
ARTICLE 5 — CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract
Documents the amounts that follow, subject to adjustment under the Contract:
A. For all Unit Price Work, an amount equal to the sum of the extended prices (established for
each separately identified item of Unit Price Work by multiplying the unit price times the
actual quantity of that item):
Page A -2 of 9
BID SCHEDULE A - RANDOLPH /CURTISS CHIP SEAL I
Item
Description
Unit
Estimated
Bid Unit
Bid Price
No.
-]
LS
Quantity
1
Price
1502
-
Mobilization
$15,000.0
$15,000.00
Manhole Adjustment (Sewer)
0
2086.2
EA
- -
10
$100.00
$1,000.00
2086.3 Valve Box Adjustment
EA
10
$50.00
$500.00
2221.8
Remove Curb and Gutter
LF
86
$20.00
$1,720.00
2221.10
Asphalt Surface Wedgemill
LF
2902
$1.00
$2,902.00
2315.2
Roadway Excavation (6 ")
CY
92
$71.00
$6,532.00
2741.4
Replacing Base and Pavement with 6"
TN
181
$160.00
$28,960.00
Type B Asphalt (PG 64 -22)
2764.3
RPM Type II A -A (Blue)
EA
3
$15.75
$47.25
2767.1
4" Double Yellow Thermoplastic Stripe
LF
6818
$2.10
$14,317.80
2767.2
4" White Thermoplastic Stripe
LF
5608
$1.05
$5,888.40
2767.3
4" Dashed White Thermoplastic Stripe
LF
50
$1.58
$79.00
2767.4
24" White Thermoplastic Stripe
LF
1146
$8.40
$9,626.40
2767.8
White Thermoplastic Bike Symbol
EA
20
$475.00
$9,500.00
2767.9 Straight White Thermoplastic Arrow EA 20 $131.25 $2,625.00
(Bike)
2771 Concrete Curb and Gutter LF 86 $76.00 $6,536.00
SUP -4 Chip Seal SY 18010 $3.00 $54,030.00
$159,263.85
Total of All Unit Price Bid Items - Schedule A
Page A -3 of 9
BID SCHEDULE B — GREENFIELD VILLAGE CHIP SEAL
Item
Description Unit
Estimated
Bid Unit
Bid Price
No.
I
Mobilization LS
Quantity
Price
$10,000.00
1502
1
$10,000.0
$10,000.00
0
2315.2
2221.1
Removal of Sidewalk and Driveway
Removal of Curb and Gutter
Roadway Excavation (6 ")
SY
80
$40.00
$3,200.00
2221.8
LF
83
$20.00
$1,660.00
2315.2
CY
TN
126
$64.00
$8,064.00
2741.4
Replacing Base and Pavement with 6"
247
$162.00
$40,014.00
$2.76
Type B Asphalt (PG 64 -22)
Portland Cement Concrete Driveway
2754.1
SY
80
$98.00
$7,840.00
(Residential)
24" White Thermoplastic Stripe
Concrete Curb and Gutter
Valley Gutter
2767.4
LF
36
$8.40
$302.40
2771
LF
83
$80.00
$6,640.00
SUP -3
SY
167
$145.00
$24,215.00
SUP -4
I Chip Seal
SY
33577
$2.76
$92,672.52
Total of All Unit Price Bid Items —Schedule B 1 $194,607.92
BID SCHEDULE C — ADDITIONAL CHIP SEAL
Item
Description
Unit
Estimated I Bid Unit
Bid Price
No.
Quantity Price
1 $10,000.0
$10,000.00
1502
Mobilization
LS
2315.2
Roadway Excavation (6 ")
CY
364
$58.00
$21,112.00
2741.4
Replacing Base and Pavement with 6"
TN
713
$160.00
$114,080.00
Type B Asphalt (PG 64 -22)
SUP -4
Chip Seal
SY
67,800
$2.76
$187,128.00
Total of All Unit Price Bid Items — Schedule C
Total of All Unit Price Bid Items — Schedules A, B, and C (Base Bid Items)
$332,320.00
$686,191.77
The extended prices for Unit Price Work set forth as of the Effective Date of the Contract
are based on estimated quantities. As provided in Paragraph 13.03 of the General
Conditions, estimated quantities are not guaranteed, and determinations of actual
quantities and classifications are to be made by Engineer.
Page A-4 of 9
ARTICLE 6 — PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the
General Conditions. Applications for Payment will be processed by Engineer as provided in
the General Conditions.
6.02 Progress Payments, Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of
Contractor's Applications for Payment on or about the �Qth day of each month during
performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such
Applications for Payment have been submitted in a timely manner and otherwise meet the
requirements of the Contract. All such payments will be measured by the Schedule of
Values established as provided in the General Conditions (and in the case of Unit Price
Work based on the number of units completed) or, in the event there is no Schedule of
Values, as provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal
to the percentage indicated below but, in each case, less the aggregate of payments
previously made and less such amounts as Owner may withhold, including but not
limited to liquidated damages, in accordance with the Contract
a. 05 percent of Work completed (with the balance being retainage); and
b. 95 percent of cost of materials and equipment not incorporated in the Work (with
the balance being retainage).
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total
payments to Contractor to the full amount of the contract, less such amounts set off by
Owner pursuant to Paragraph 15.01.E of the General Conditions, and less such amounts as
the Engineer shall determine for incomplete Work, retainage applicable to such work and
unsettled claims.
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of
the General Conditions, Owner shall pay the remainder of the Contract Price as
recommended by Engineer as provided in said Paragraph 15.06.
ARTICLE 7 — INTEREST
7.01 All amounts not paid when due shall bear interest at the maximum rate allowed by law, not to
exceed 1% per month.
ARTICLE 8 — CONTRACTOR'S REPRESENTATIONS
8.01 In order to induce Owner to enter into this Contract, Contractor makes the following
representations:
A. Contractor has examined and carefully studied the Contract Documents, and any data and
reference items identified in the Contract Documents.
B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site
and adjacent areas, and become familiar with and is satisfied as to the general, local, and
Site conditions that may affect cost, progress, and performance of the Work.
Page A -5 of 9
C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect
cost, progress, and performance of the Work.
D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface
conditions at or adjacent to the Site and all drawings of physical conditions relating to
existing surface or subsurface structures at the Site that have been identified in the
Supplementary Conditions, especially with respect to Technical Data in such reports and
drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if
any, at or adjacent to the Site that have been identified in the Supplementary Conditions,
especially with respect to Technical Data in such reports and drawings.
E. Contractor has considered the information known to Contractor itself; information
commonly known to contractors doing business in the locality of the Site; information and
observations obtained from visits to the Site; the Contract Documents; and the Site - related
reports and drawings identified in the Contract Documents, with respect to the effect of
such information, observations, and documents on (1) the cost, progress, and performance
of the Work; (2) the means, methods, techniques, sequences, and procedures of
construction to be employed by Contractor; and (3) Contractor's safety precautions and
programs.
F. Based on the information and observations referred to in the preceding paragraph,
Contractor agrees that no further examinations, investigations, explorations, tests, studies,
or data are necessary for the performance of the Work at the Contract Price, within the
Contract Times, and in accordance with the other terms and conditions of the Contract.
G. Contractor is aware of the general nature of work to be performed by Owner and others at
the Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or
discrepancies that Contractor has discovered in the Contract Documents, and the written
resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey understanding of
all terms and conditions for performance and furnishing of the Work.
J. Contractor's entry into this Contract constitutes an incontrovertible representation by
Contractor that without exception all prices in the Agreement are premised upon
performing and furnishing the Work required by the Contract Documents.
ARTICLE 9 — CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement (pages A -1 to A-7, inclusive).
2. Performance bond (pages IPB -1 to k -3, inclusive).
3. Payment bond (pages 7PYB -1' to FYB-31 „ inclusive).
4. General Conditions consisting of 73' pages of a modified version of EJCDC C -700, having
a title page with the general title: STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT.
5. Supplementary Conditions (pages kA to ` inclusive).
Page A -6 of 9
6. Specifications as listed in the table of contents of the Project Manual.
7. Drawings (not attached but incorporated by reference) consisting of 43 sheets with
each sheet bearing the following general title: Schertz Street Preservation Program!.
8. Addenda (numbers 1 to _ 1 inclusive).
9. Exhibits to this Agreement (enumerated as follows):
a. Contractor's Bid (pages 13F4 to jGF-14!, inclusive).
10. The following which may be delivered or issued on or after the Effective Date of the
Contract and are not attached hereto:
a. Notice to Proceed.
b. Work Change Directives.
c. Change Orders.
d. Field Orders.
B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as
expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in
the General Conditions.
ARTICLE 10 —MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the General Conditions and
the Supplementary Conditions.
10.02 Assignment of Contract
A. Unless expressly agreed to elsewhere in the Contract, no assignment by a party hereto of
any rights under or interests in the Contract will be binding on another party hereto
without the written consent of the party sought to be bound; and, specifically but without
limitation, money that may become due and money that is due may not be assigned
without such consent (except to the extent that the effect of this restriction may be limited
by law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty or
responsibility under the Contract Documents.
10.03 Successors and Assigns
A. Owner and Contractor each binds itself, its successors, assigns, and legal representatives to
the other party hereto, its successors, assigns, and legal representatives in respect to all
covenants, agreements, and obligations contained in the Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under
any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue
to be valid and binding upon Owner and Contractor, who agree that the Contract
Documents shall be reformed to replace such stricken provision or part thereof with a valid
Page A -7 of 9
and enforceable provision that comes as close as possible to expressing the intention of the
stricken provision.
10.05 Contractor's Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive
practices in competing for or in executing the Contract. For the purposes of this Paragraph
10.05:
1. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of
value likely to influence the action of a public official in the bidding process or in the
Contract execution;
2. "fraudulent practice" means an intentional misrepresentation of facts made (a) to
influence the bidding process or the execution of the Contract to the detriment of
Owner, (b) to establish Bid or Contract prices at artificial non - competitive levels, or (c)
to deprive Owner of the benefits of free and open competition;
3. "collusive practice" means a scheme or arrangement between two or more Bidders,
with or without the knowledge of Owner, a purpose of which is to establish Bid prices
at artificial, non - competitive levels; and
4. "coercive practice" means harming or threatening to harm, directly or indirectly,
persons or their property to influence their participation in the bidding process or
affect the execution of the Contract.
10.06 Other Provisions
A. Owner stipulates that if the General Conditions that are made a part of this Contract are
based on EJCDC® C -700, Standard General Conditions for the Construction Contract,
published by the Engineers Joint Contract Documents Committee®, and if Owner is the
party that has furnished said General Conditions, then Owner has plainly shown all
modifications to the standard wording of such published document to the Contractor,
through a process such as highlighting or "track changes" (redline /strikeout), or in the
Supplementary Conditions.
Page A -8 of 9
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement.
This Agreement will be effective on (which is the Effective Date of the Contract).
OWNER:
By: Dr. Mark Browne
Title: City Manager
Attest:
Title:
Address for giving notices:
City of Schertz
1400 Schertz Parkway
Schertz, Texas 78154
CONTRACTOR:
By:
Title:
(if Contractor is a corporation, a partnership, or a
joint venture, attach evidence of authority to
sign.)
Attest:
Title:
Address for giving notices:
Fuquay, Inc
P.O. Box 310946
New Braunfels, Texas 78131
License No.:
(where applicable)
(If Owner is a corporation, attach evidence of
authority to sign. If Owner is a public body, attach
evidence of authority to sign and resolution or
other documents authorizing execution of this
Agreement.)
Page A -9 of 9