Loading...
20-R-17 - Contract with R.P. Constructors Inc - construction of the E. Live Oak Pump additionsRESOLUTION NO. 20 -R -17 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS, AUTHORIZING A CONTRACT WITH R.P. CONSTRUCTORS, INC. RELATING TO THE CONSTRUCTION OF THE E. LIVE OAK PUMP ADDITIONS PROJECT. WHEREAS, the City of Schertz (the "City ") has a need to install redundant pumps and associated piping at the existing E. Live Oak tank site; and WHEREAS, the City solicited competitive proposals from qualified vendors for construction services related to the E. Live Oak Pump Additions Project; and WHEREAS, City staff has determined that R.P. Constructors, INC. is qualified to provide such services for the City; and WHEREAS, City Council has authorized funding for the E. Live Oak Pump Additions Project from the Water and Sewer Operating Fund. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes the City Manager to execute and deliver a contract in substantially the same form as Attachment A with R.P. Constructors, INC. for an amount of $1,560,000.00 with a contingency amount of $78,000.00 for an overall not to exceed amount of $1,638,000.00. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND ADOPTED, this 25h day of February, 2020 ATTEST: Brenda Dennis, City Secretary CITY OF SCHERTZ, TEXAS - 4*�� Ral 6 juti -z, Mayor -2- 00000000'00 °000 o00 a 0 d 0 0 d d d d 0 d d 0 0 0 0 0 0 0 0 o g o e e d 0 o 0 d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Y � Hi 69 V3 Vi fA 69 fA 69 K fA b9 69 Q rl fA N� yM.. 0 V2 o'o`00000000 0 0 0 0 w 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w •y o 0 0 C 0 0 0 0 0 C 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 �'�' �oovi vi ri o 0 o' of o "vi o "0 d ,� fA69 69 69 M N' M f5 69 69 b9 b9 69 69'fA 69 N b9 O 0,0 0 0 0 0 0 0 0 OI O S 0 0 0 0 0 0 O O O 7 O 1� N N O p OD' v1 �D ISO 7 00 O � 1 fA N �M l n �. 14 lc� O O O O O O: 0 0 0-0 0 o0 C O q 0 0 OI a 0 0 0 0 0 a O O h 0 0 1 0i O C O O Q O O 0 0 VJ .-- N� � M �' 7 0o O h 69 N h M •--' �y � f .N-i Vi 69 f9 69, 69. M� bN9 M� EA 69 69 69 M� 1 0 0 0 0 0 0 F U o 0 o a o a 0 0 0010 0 0 0 0--.-9-.000 0 0 0 0 0 0 0 0100 0 0 0 o g co o 0 0 o g o 0 0 0 o\ 7�0-� M 0 7� b D Vi C N a 0 0 oo 0 0 0 0 0 0 0 0 0 0 0 0';0 0 0 0o g o 0 e 0 0 o o 0 e 0,0 oo 0 0 0 0 00�.9 0 0 0 9 0 o 0 0 0 0 0 0 0 e 0 9 o C o e e a o 0 0 0:0 0 0 0 0 0 0.0 0 0 e h N C N d 0 4H 61 fA 69 Hi 6M9. 6N9 5M9 69 69 b9 N A 69 6N9 A 4N9 O L p 0 0 0 0 0 0 O O O O O O W co p 0 0 000000050009 0 0 0 0 0 0 0 0 0 0 O O 00 a 0 0 0 0 0 0 0 y 0. 0 0 O o O' O 0 h 0 0 0 0 0 0 0 o O' O O O 0 0 � O C 0 N 69 43 fA 69 69 M N M 69 f9 b9 fA N .� Va].V VJ VJ VJ -VJ VJ Vi .. V] fn a .aa.S.aII.a..a.4 j a.5 E a o A; d v V N W •p C F+ A g Z o. ° q,. 0.41 F ° o'. p, ,p m U y C o.°ol 8 �?I z a°r 0 w N h .0.i •L 15 O .2 � y� [�,. N N� N .`• O 6� ti N ii N O. ;fi Qv"w °w °vxa°wwuw� 30= - r R � °•r O O A O O d z z m 0 0 0 O O O O O O O O O O O •�. F 'p u � W � fV e�i 7 v1 � n 00 T O .-. N .+ a\ N a 9:2 1 W F d a W F1 PO 0. P7 d' ORD ENGINEERING, INC January 27, 2020 Project No. 1124.9215 Scott McClelland City of Schertz 10 Commercial Place, Building 2 Schertz, TX 78154 Re: E. Live Oak Water Plant Pump Additions, #2020 -004 Recommendation of Award Four (4) bids were received on the above referenced project at City of Schertz City Hall on January 21, 2020. The bid is to be awarded per a qualified bidder criteria established by the City of Schertz. Review of the tabulation and scoring of bid packages received indicates that the apparent low bidder is R.P. Constructors, INC. with a Base Bid of $1,272,000.00 and Alternate Bid of $288,000.00. The Engineer's Estimate for the Base Bid construction was $1,065,500.00. The average Base Bid was $1,355,525.00. Ford Engineering Inc. recommends that R.P. Constructors, INC. be awarded the contract for the above referenced project in the amount of $1,272,000.00. Should there be questions, or if further information is needed, please do not hesitate to call me at 210 -590 -4777. Sincerely, Mark B. Hill, PE FORD ENGINEERING, INC. 10927 WYE DRIVE SUITE 104 SAN ANTONIO, TX 78217 P. (210) 590 -4777 F. (210) 590 -4940 1- 800- 332 -3109 www.fordengineering.com TBPE No. F -1162 TBPLS No. 10018400 0 0 0 0 0 0 0 0 0 0 -0 0 0 o 0 o 0 0 0 0 o O o o 0 e 0 0 o 0 0 e 0 0 0 0 0 0 0 0 0 0 O e 0 o o e 0 v o d O o 0 0 0 0 0 0 0 o C 0 o 0 0 0 0 0 0 0 0 0 0 0 o 0 0 D o e F 0 r 0 h h M F 4Y b9 Vi Vi Vi E/i 6N^. 69 EA 69 fA fAQ 69 �N � 0 0 0 U � oo'o o0 0 000 0�00 may+ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E L7 O O O G C C C C O C G O C O Oo 0 0 0 0 0 0 0 0 0 o a 0 0 o 0 OHO O O O h O O �O N O r r o0 N O a0 N h h �D z 0 0 0 0 0 0 0 0 00010 o c o 0 0 0 0 0 0 0 0 0 0 0 o O.e D o e a g000gaooSS000 So= U d n =dGt n 0000T 0.,00.. 00.e M C O IAN N O �p OD o h M V1 O'. V1 0 �,. fI9 fA 69 £A M� GNA M� A fA fA f? 69 � FR s s9 0 o W o o0 0 0 0 0 00 0 0 0 0 0 0 0 0 0'0 0 0 0 0 O o 0 0 0 o c o 0 O O O e 0 O O 0 0 O 0 0 o 0 0 w �noovioocoo� -°° � c° O O h h O VJ 69 Vi 69 69 M N M 64 �� fA b9 fA FA b9 Hf M 64 isi ] - OOO O G 0 0 0 0 OHO C p .a o60 O0 O O O O O O COo e oo a iJ F 69 fA. -+ •N N Vi b9 fA I � sv to fA •� uv ss ss vs .i ;� a F-& O-o o o'o -o`o 0 0 0 o-o F U o 0 ao 0 0 0 0 0 0 0,0 0 0 .� O 0 C O O O C C C O C C O 0 0 0 0 0 0 0 0 Og O O o 0 0 0 0 0 0 0 O O O O O v1 QI Vi D\ O M O z U3 fh 69 M N 69 69 69 69 fA EA iA V3 V3 69 M 69 O p C C O O O O O O O O O O O C. O O C O C O 0000 O O C O O 0 0 0 0 0 0 0 0 C 0 C O O O C O O O O O O O O O O O O O O O O O 7 d O O O O O O O O N O Vi M N 1 1 O m 64 N, N r .66 N � 00 w O 69 69 69 69 69 69 6N9 � 59 69 F + L 1 p iTa O O O O 0 0 0 0 0 0 0 0 0 0 V IVy 0 0 0 0 0 0000000 O O py 0 0 0 0 0 0 0 0 0 0 0 0 ocoovioocoNO O O d F �O M 0169 N h coo N �D 69 69 69 69 69 M N M 65 69 Vi 69 N a a.iaa.Sa�a.Sl.a� -aa.a a� a c � i 3 ° F e U3 v d c F ti, v k IF y a N V Q N A rn_w °w °vxa °Owwc�wvU w °C7 3 o a -- �� Z oo 0000000 °00 00 y�;:y N O o 0 0 0 0 0 0 0 0 00 °o °0 0 0 °o 0 o e: o lc v c o0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 u 0 c 0 o 0 0 0 0 c 0 0 0 0 0 3 b 0 o 0 0 0 0 0 0 0 o 0 0 o 0 O O 0 0 o 0 0 0 0 0 0 RR 0 ooc clnnPo- 16 uIll i 000 tp N l0 M N N m O\ N M IA N N N tCl N VT VF N1 Vf N iA i/! iA H N V! {h V! t/1 O O O O g N In o o i oo e. � q N d vi v r M m o 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 o 0 o o 0 0 0 0 0 0 Y N O O V1 O O o 0 o 1!1 O O O V1 I- w N O P' m N lc Ill N O N O c M m n N N O O O O O O O N N CO Ol 00 o m O1 Ilf O O V o N .-I M N Vf V?N Vf NN NthN to to V1 VpF.. V1N N O 3° o m rn y' � o ems° of o I°n vi N Y Q d In O In m N O o O O o o O O O O O O O O O O O 0 0 0 O 0 O 0 O IA O u O O 0 0 o 0 O O 0 0 0 0 0 0 O O-C� O O N o M o R N V1 N O O o O vi o N' o 0 O m o vi o O O N N a N N N M N Ill N N N V! VF 1A 4A V? Vf V VF VT VF L! SA Vf 0 O to 0 O V1 O O O O o p 0 0p 0 0 0 0 0 0 0 0 0 0 0 0 0p 0 0 0 0 0 0 p0p p 0 0 0 0 0 p 0 O O O O '0 d c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O 'O 0 0 0 0 V1 O O O O N O �/1' N W o oo Z l0 M l0 m N Vf m V1 N O 01 M N u1 1� N N lD N a0 N r � C W' 2 N V} N N V/ N 4h Vl 1A V} V! V1 G O O 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 o 0 0 0 0 0 c o d d o 0 o 0 0 o 0 o 0 o 0 o 0 0 0 0 0 0 0 0 0 0 0 0 ,� g o 0 0 0 0 0 c 0 0 0 0 0 0 0 ad a • O l0 O O M 1p O M u1 N O Vf O Ilf O O O O1 N O N m I!1 N ER N N M N M 69 V? V! iA Vf V! N VF V' VT VF N VF V} V} C e-I . N N N N N N N N N N N N V1 Vf Vf i VI i 1A i Vf LA VI VI V1 Vf f J J Z a c E o m a C Y _ O O C 0 ? y a r] C 3 c C O > >> N m c c Ea m O Z z = aO. c to O 3 c PO .°_ t� v O J a° LL = N N � CC = C U C O _ m • L .0 a+ u d w W � E M W 0 Ln a N E O .-. N M I!1 1p l� 00 Q\ o'• N N 2 AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) THIS AGREEMENT is by and between City of Schertz ( "Owner ") and R.P. CONSTRUCTORS, INC ( "Contractor "). Owner and Contractor hereby agree as follows: ARTICLE 1 WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: ARTICLE 2 THE PROJECT 2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: E. Live Oak Water Plant Pump Additions Project ARTICLE 3 ENGINEER 3.01 The part of the Project that pertains to the Work has been designed by Ford Engineering Inc. 3.02 The Owner has retained Ithe City of Schert z Engineering Department ( "Engineer ") to act as Owner's representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Contract Times: Days A. The Work is expected to be substantially completed within 2_40' calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 30 calendar days after the date of substantial completion. 4.03 Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with the Contract. The Contractor acknowledges and recognizes that the Owner is entitled to full and beneficial occupancy and use of the completed work following expiration of the Contract Time. The Contractor further acknowledges and agrees that, if the Contractor fails to substantially, or cause the Substantial Completion of any portion of the Work within the Contract time, the Owner will Page A -1 of 20 sustain actual damages as a result of such failure. The exact amount of such damages will be difficult to ascertain. Therefore, the Owner and Contractor agree that, if the Contractor shall neglect, fail, or refuse to achieve substantial completion of the Work by the Substantial Completion date, subject to proper extension granted by the Owner, then the Contractor agrees to pay the Owner the sum of: 1. Six hundred dollars ($600.00) per day for each day in which such Work is not completed, not as penalty, but as liquidated damages, for the damages ( "Liquidated Damages ") that would be suffered by Owner as a result of delay for each and every calendar day that the Contractor shall have failed to have completed the Work as required herein. The Liquidated Damages shall be in lieu of any and all other damages which may be incurred by Owner as a result of the failure of Contractor to complete within the Contract Time, ARTICLE 5 CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amounts that follow, subject to adjustment under the Contract: A. For all Unit Price Work, an amount equal to the sum of the extended prices (established for each separately identified item of Unit Price Work by multiplying the unit price times the actual quantity of that item): Item Estimated Bid Unit No Description Unit Quantity Price Bid Price LS 1 $60,000.00 $60,000.00 1 MOBILIZATION Z SITE WORK To include, sidewalk, grading, SWPPP LS 1 $30,000.00 $30,000.00 requirements, revegetation /restoration, etc. 3 FOUNDATION FOR PUMPS To include concrete foundation, LS 1 $60,000.00 $60,000.00 appurtenances, testing, complete in place 4 FOUNDATION FOR STRUCTURE To include concrete foundation, LS 1 $30,000.00 $30,000.00 appurtenances, testing, complete in place Page A -2 of 10 5 CANOPY STRUCTURE To include pre- engineered steel canopy structure, all framing, metal roof covering, bracing, sealants, caulking, and accessories, assembly, painting, complete in place. 6 HIGH SERVICE PUMP STATION Total amount for furnishing all labor materials, services, connections, fittings, piping, flowmeter, valves, motors, appurtenances, coatings, etc., testing and startup, trenching, backfill in conjunction with and incidental to all work, complete in place. 7 8 LOW SERVICE PUMP STATION Total amount for furnishing all labor materials, services, connections, fittings, piping, flowmeter, valves, motors, appurtenances, coatings, etc., testing and startup, trenching, backfill in conjunction with and incidental to all work, complete in place. ELECTRICALSW ITCH BOARD, CONTROLS, AND INSTRUMENTATION Provide and install all work shown in construction documents including: New switchboard, mini -power zone, concrete pads, electrical grade pull box, lighting, conduit and feeders, electrical service equipment, SCADA system, instrumentation, junction boxes, equipment support rack, and all equipment for a fully functional pump station system. LS 1 1 $25,000.00 1 $25,000.00 LS 1 $350,000.00 $350,000.00 LS 1 1 $250,000.00 LS 1 1 1 $300,000.00 Page A -3 of 10 $250,000.00 $300,000.00 9 ELECTRICAL HIGH SERVICE PUMP and LOW SERVICE BACKUP PUMP I Provide and install all work shown in construction drawings including: New high service soft start enclosure, low LS service pump starter enclosure, conduit and feeders, connections to SCADA system, motor protection _ relays, control wiring. 10 COMMUNICATION TO EXISTING SCADA PANEL Provide and install all work shown in construction documents including: New network switches as required, LS CAT 5E cables from new SCADA panel to existing SCADA panel, converters, extenders, surge protectors, power supplies, and all equipment for a fully functional lift station communication system. _ 11 ELECTRICAL SERVICE ALLOWANCE Allowance for electrical service by local utility. Exact amount will be LS reimbursed to contractor upon submittal of invoice from electric utility 1 $90,000.00 1 1 i 12 i SCADA ALLOWANCE LS 1 Total of All Unit Price Base Bid Items Page A4 of 10 $2,000.00 j $90,000.00 $2,000.00 $20,000 $55,000 $1,272,000.00 ADDITIVE ALTERNATE BID SCHEDULE E LIVE OAK WATER PLANT PUMP ADDITIONS Estimated Bid Unit Description Unit Bid Price Quantity I Price 13 FOUNDATION FOR GENERATOR To include concrete foundation, LS appurtenances, testing, complete in place 14 GENERATOR Provide and install 500 kW diesel generator, sound attenuating enclosure, generator pad, 900 - gallon sub -base fuel tank, testing LS and startup, fuel, and all required appurtenances as shown on plans and as described in specifications for a complete operating system. Total of All Unit Price Additive Alternate Bid Items 1 1 $28,000.00 $260,000.00 Total of All Unit Price Items and Additive Alternate Items Combined $28,000.00 $260,000.00 $288,000.00 $1,560,000.00 i The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer. ARTICLE 6 PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments; Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment on or about the 50th day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments Page A -5 of 10 previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract a. §5 percent of Work completed (with the balance being retainage); and b. b5' percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage). B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to the full amount of the contract, less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions, and less such amounts as the Engineer shall determine for incomplete Work, retainage applicable to such work and unsettled claims. 6.03 Final Payment A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06. ARTICLE 7 INTEREST 7.01 All amounts not paid when due shall bear interest at the maximum rate allowed by law, not to exceed 1% per month. ARTICLE 8 CONTRACTORS REPRESENTATIONS 8.01 In order to induce Owner to enter into this Contract, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents, and any data and reference items identified in the Contract Documents. B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work. D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings. E. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Site - related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of Page A -6 of 10 construction to be employed by Contractor; and (3) Contractor's safety precautions and programs. F. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. J. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 9 CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages A -1 to inclusive). 2. Performance bond (pages P13-1 to IPB -3, inclusive). 3. Payment bond (pages OYB -1'to FPYB-3. inclusive). 4. General Conditions consisting of i73 pages of a modified version of EJCDC C -700, having a title page with the general title: STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT. 5. Supplementary Conditions (pages'] to 5C j, inclusive). 6. Specifications as listed in the table of contents of the Project Manual. 7. Drawings (not attached but incorporated by reference) consisting of X25 sheets with each sheet bearing the following general title: Oumg Additions E. Live Oak Water Plant. 8. Addenda (numbers to inclusive). 9. Exhibits to this Agreement (enumerated as follows): a. Contractor's Bid (pages & -1 to FBF-7, inclusive). 10. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto: a. Notice to Proceed. b. Work Change Directives. C. Change Orders. d. Field Orders. Page A -7 of 10 B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended, modified, or supplemented as provided in the General Conditions. ARTICLE 10 MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 10.02 Assignment of Contract A. Unless expressly agreed to elsewhere in the Contract, no assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, money that may become due and money that is due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.03 Successors and Assigns A. Owner and Contractor each binds itself, its successors, assigns, and legal representatives to the other party hereto, its successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 10.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 10.05 Contractors Certifications A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05: 1. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process or in the Contract execution; 2. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non - competitive levels, or (c) to deprive Owner of the benefits of free and open competition; Page A -8 of 10 3. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non - competitive levels; and 4. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 10.06 Other Provisions A. Owner stipulates that if the General Conditions that are made a part of this Contract are based on EJCDC® C -700, Standard General Conditions for the Construction Contract, published by the Engineers Joint Contract Documents Committee®, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or "track changes" (redline /strikeout), or in the Supplementary Conditions. Page A -9 of 10 IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. This Agreement will be effective on (which is the Effective Date of the Contract). OWNER: By: DR. MARK BROWNE Title: CITY MANAGER Attest: Title: Address for giving notices: CITY OF SCHERTZ 1400 SCHERTZ PARKWAY SCHERTZ, TEXAS 78154 CONTRACTOR: R.P. CONSTRUCTORS, INC By: Title: (If Contractor is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.) Attest: Title: Address forgiving notices: R.P. CONSTRUCTORS, INC 9455 IH 35 N NEW BRAUNFELS, TEXAS 78130 License No.: (where applicable) (If Owner is a corporation, attach evidence of authority to sign. If Owner is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of this Agreement.) Page A -10 of 10