20-R-25 - Expenditures with Kimley-Horn Associates relatng to the 2020 SPAM resurfacing project for FY2019-2020RESOLUTION NO. 20 -R -25
A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF
SCHERTZ, TEXAS AUTHORIZING EXPEDITURES WITH KIMLEY-
HORN ASSOCIATES, INC., TOTALING NO MORE THAN $200,000, FOR
PROFESSIONAL ENGINEERING - RELATED SERVICES ON THE 2020
SPAM RESURFACING PROJECT AND OTHER MINOR PROJECTS
DURING THE 2019 -2020 FISCAL YEAR, AND OTHER MATTERS IN
CONNECTION THEREWITH
WHEREAS, the City staff of the City of Schertz (the "City ") has determined that the City
requires professional services relating to engineering and design for the 2020 SPAM Resurfacing
Project; and
WHEREAS, City staff has determined that Kimley -Horn and Associates, Inc. (Kimley-
Horn) is uniquely qualified to provide such services for the City; and
WHEREAS, City staff has determined that Kinley -Horn is uniquely qualified to provide
engineering and design services for various small projects ( <$50,000) for the City; and
WHEREAS, Kimley -Horn is an approved On -Call Engineering Firm for the City of
Schertz; and
WHEREAS, pursuant to Section 252.022(a)(4), the City is not required to seek bids or
proposals with respect to a procurement for personal, professional, or planning purposes; and
WHEREAS, the City Council has determined that it is in the best interest of the City to
contract with Kimley -Horn pursuant to the On -Call Task Order Agreement attached hereto as
Exhibit A (the "Agreement ") and to authorize future Task Order Agreements up to a maximum
total aggregate amount of $200,000.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS
"t M,
Section 1. The City Council hereby authorizes the City Manager to execute and
deliver the Task Order Agreement with Kimley -Horn in accordance with their approved Master
Agreement in substantially the form set forth on Exhibit A in the amount of $135,000.00 and
authorize the City Manager to execute and deliver other Task Order Agreements for various
projects in a not to exceed total aggregate amount of $200,000.00.
Section 2. The recitals contained in the preamble hereof are hereby found to be true,
and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a
part of the judgment and findings of the City Council.
Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with
any provision of this Resolution are hereby repealed to the extent of such conflict, and the
provisions of this Resolution shall be and remain controlling as to the matters resolved herein.
Section 4. This Resolution shall be construed and enforced in accordance with the
laws of the State of Texas and the United States of America.
Section 5. If any provision of this Resolution or the application thereof to any person
or circumstance shall be held to be invalid, the remainder of this Resolution and the application
of such provision to other persons and circumstances shall nevertheless be valid, and the City
Council hereby declares that this Resolution would have been enacted without such invalid
provision.
Section 6. It is officially found, determined, and declared that the meeting at which
this Resolution is adopted was open to the public and public notice of the time, place, and subject
matter of the public business to be considered at such meeting, including this Resolution, was
given, all as required by Chapter 551, Texas Government Code, as amended.
Section 7. This Resolution shall be in force and effect from and after its final
passage, and it is so resolved.
PASSED AND ADOPTED, this 10a` day of March, 2020.
ATTEST:
Brenda Dennis, City Secretary
ti
t
50077397.1
CITY OF I TE31kS
am�,Mayor
EXHIBIT A
SERVICES AGREEMENT
50077397.1 A -1
TaskOrder
TASK ORDER FORM
This is Task Order
No. 2 , consisting of
14 pages.
[NOTE TO USER: Modify as to scope, compensation, schedule, and other key items.]
In accordance with Paragraph 1.01 of the Agreement Between Owner and Engineer for Professional Services — Task
Order Edition, dated i[ October 17, 2019 11 ( "Agreement "), Owner and Engineer agree as follows:
1. Background Data
Effective Date of Task Order:
b. Owner: The City of Schertz
C. Engineer: Kimley -Horn & Associates, Inc.
Specific Project (title): 2020 Roadway Improvements
e. Specific Project (description): Work associated with this project is associated with the City's
Street Maintenance & Preservation Program. Kimley -Horn will assess approximately 135 streets
totaling nearly 27 centerline miles, identify base repair and overall chip seal quantities, prepare
limited construction drawings and contract documents, assist the City with project
advertisement and Contractor selection, and provide limited construction phase services
2. Services of Engineer
A. The specific services to be provided or furnished by Engineer under this Task Order are:
■ as follows:'[ Reference Engineer scope and fee proposal dated January 29, 2020 )
B. Resident Project Representative (RPR) Services: Does Not Apply
C. Designing to a Construction Cost Limit: Does Not Apply
D. Other Services: None
E. All of the services included above comprise Basic Services for purposes of Engineer's compensation
under this Task Order.
2. Additional Services
A. Additional Services that may be authorized or necessary under this Task Order are:
as follows: ';[ Exclusions identified in scope and fee proposal dated January 29, 2020 are
considered additional services to this project. In the event_ additional services are required for
Task Order Form
EJCDC■ E -505, Agreement Between Owner and Engineer for Professional Services— Task Order Edition.
Copyright ® 2014 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1
this task order, a separate scope and fee proposal will be submitted to Owner as an amendment
to the existing task order. Per contract, advance authorization to perform additional services is
required by Owner. ]
3. Owner's Responsibilities
Owner shall have those responsibilities set forth in Article 2 of the Agreement and in Exhibit B, subject to
the following: [ No additions or modifications to Exhibit a are required for this project]
4. Task Order Schedule
In addition to any schedule provisions provided in Exhibit A or elsewhere, the parties shall meet the
following schedule:
The following schedule is proposed for this project, assuming a Notice to Proceed of February 17,2020.-
Notice to Proceed — February 17, 2020
Street Assessment & Preparation of Interim Construction Drawings — 60 days
Schertz Interim QC — 7 days
Finalize Construction Drawings & Contract Documents — 30 days
Project Bid — May I8, 2020
Construction Phase — Estimated at 3 months
Party
Schedule
Engineer
Furnish [ NA ] review copies of the Report
Within [NA] days of the Effective Date of the
and other Study and Report Phase
Task Order.
deliverables to Owner.
Owner
Submit comments regarding Report and
Within [ NA ] days of the receipt of Report
other Study and Report Phase deliverables
and other Study and Report Phase
to Engineer.
deliverables from Engineer.
Engineer
Furnish [ NA ] copies of the revised
Within [ NA ] days of the receipt of
Report and other Study and Report
Owners comments regarding the Report
Phase deliverables to Owner.
and other Study and Report Phase
deliverables.
Engineer
Furnish [ 5 ] review copies of the
Within [ 60 ] days of Owners authorization to
Preliminary Design Phase documents,
proceed with Preliminary Design Phase
Task Order Form
EJCDC• E -SOS, Agreement Between Owner and Engineer for Professional Services — Task order Edition.
Copyright ® 2014 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2
S. Payments to Engineer
A. Owner shall pay Engineer for services rendered under this Task Order as follows:
Task Order Form
EJCDC® E -505, Agreement Between Owner and Engineer for Professional Services — Task Order Edition.
Copyright ® 2014 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3
opinion of probable Construction Cost, and
services.
other Preliminary Design Phase
deliverables to Owner.
Owner
Submit comments regarding Preliminary
Within [ 7 ] days of the receipt of Preliminary
Design Phase documents, opinion of
Design Phase documents, opinion of probable
probable Construction Cost, and other
Construction Cost, and other Preliminary
Preliminary Design Phase deliverables to
Design Phase deliverables from Engineer.
Engineer.
Engineer
Furnish [ NA ] copies of the revised
Within [ NA ] days of the receipt of
Preliminary Design Phase documents,
Owners comments regarding the
opinion of probable Construction Cost, and
Preliminary Design Phase documents,
other Preliminary Design Phase
opinion of probable Construction Cost, and
deliverables to Owner.
other Preliminary Design Phase
deliverables.
Engineer
Furnish [ 5 ] copies of the final Drawings.
Within [ 30 ] days of Owners authorization
and Specifications, assembled dFaft of
to proceed with Final Design Phaseservices.
athp Construction Contract Documents,
the dfaft bidding - related documents (or
requests for proposals or other construction
procurement documents), and any other
Final Design Phase deliverables, to Owner.
Owner l
Submit comments and instructions
Within [ NA ] days of the receipt of the final
regarding the final Drawings and
Drawings and Specifications, assembled drafts
Specifications, assembled drafts of other
of other Construction Contract Documents,
Construction Contract Documents, the draft
the draft bidding - related documents (or
bidding - related documents (or requests for
requests for proposals or other construction
proposals or other construction
procurement documents), and any other Final
procurement documents), and any other
Design Phase deliverables from Engineer.
Final Design Phase deliverables, to
Engineer.
Engineer
Furnish [ NA ] copies of the revised final
Within [ NA ] days of the receipt of Owner's
Drawings and Specifications, assembled
comments and instructions regarding the final
Construction Contract Documents, bidding-
Drawings and Specifications, assembled drafts
related documents (or requests for
of other Construction Contract Documents,
proposals or other construction
the draft bidding - related documents (or
procurement documents), and any other
requests for proposals or other construction
Final Design Phase deliverables, to Owner.
procurement documents), and any other Final
Design Phase deliverables
S. Payments to Engineer
A. Owner shall pay Engineer for services rendered under this Task Order as follows:
Task Order Form
EJCDC® E -505, Agreement Between Owner and Engineer for Professional Services — Task Order Edition.
Copyright ® 2014 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3
Task
Description of Service
Amount
Basis of
Compensation
1
Subconsultant Services
$ -
[ NA ]
2
General Services
$ 19,380.00
[ Lump Sum ]
3
Field Review & Preparation of Construction Drawings
$ 85,500.00
[ Lump Sum ]
4
Bid Phase Services
$ 8,635.00
[ Lump Sum ]
5
Construction Phase Services*
$ 7,260.00
[ Lump Sum ]
6
Project Expenses
$ 2,100.00
[ Lump Sum ]
Total Compensation (Tasks 1 -6)
$122,875.00
[ Lump Sum ]
2 1
Additional Services (Part 2 of Exhibit A)
I [ NA ]
[ NA ]
*Based on a [ 3 ] -month continuous construction period.
Compensation items and totals based in whole or in part on Hourly Rates or Direct Labor are estimates
only. Lump sum amounts and estimated totals included in the breakdown by phases incorporate
Engineer's labor, overhead, profit, reimbursable expenses (if any), and Consultants' charges, if any. For
lump sum items, Engineer may alter the distribution of compensation between individual phases (line
items) to be consistent with services actually rendered, but shall not exceed the total lump sum
compensation amount unless approved in writing by the Owner.
B. The terms of payment are set forth in Article 4 of the Agreement and in the applicable
governing provisions of Exhibit C.
6. Consultants retained as of the Effective Date of the Task Order: Kimley -Horn & Associates, Inc.
Z Other Modifications to Agreement and Exhibits:
j Scope associated with this task order is identified in scope and fee proposal dated January 29, 2020. ]
& Attachments: Engineer scope and fee proposal (January 29, 2020)
9. Other Documents Incorporated by Reference: None
Task Order Form
EJCDC° E -505; Agreement Between Owner and Engineer for Professional Services— Task Order Edition.
Copyright ® 2014 National Society of Professional Engineers, American Council of Engineering Companies,
and American society of Civil Engineers. All rights reserved.
Paee 4
10. Terms and Conditions
Execution of this Task Order by Owner and Engineer shall make it subject to the terms and conditions of the
Agreement (as modified above), which Agreement is incorporated by this reference. Engineer is authorized to
begin performance upon its receipt of a copy of this Task Order signed by Owner.
The Effective Date of this Task Orderis [
OWNER:
By:
Print Name: Dr. Mark Browne
ENGINEER:
Print Name: Jeffrey A. Farnsworth, PE
Title: City Manager Title: Asst. Secretary
DESIGNATED REPRESENTATIVE FOR TASK ORDER:
Name: Kathryn Woodlee, PE
Title: City Manager
Address: 10 Commercial Place, Schertz, TX 78154
E -Mail
Address: kwoodlee @schertz.com
Phone: 210 - 619 -1823
Engineer License or Firm's
Certificate No. (if required): 80190
State of: Texas
DESIGNATED REPRESENTATIVE FOR TASK ORDER:
Name: Stephen J. Aniol, PE
Title: Project Manager
Address: 601 NW Loop 410, San Antonio, TX
78216
E -Mail
Address: stephen.aniol@kimley- horn.com
Phone: 210 -321 -3404
Task Order Form
EJCOC° E -505, Agreement Between Owner and Engineer for Professional Services — Task Order Edition.
Copyright ® 2014 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Paee 5
�
f
By.
i
4
Print Name: Jeffrey A. Farnsworth, PE
Title: City Manager Title: Asst. Secretary
DESIGNATED REPRESENTATIVE FOR TASK ORDER:
Name: Kathryn Woodlee, PE
Title: City Manager
Address: 10 Commercial Place, Schertz, TX 78154
E -Mail
Address: kwoodlee @schertz.com
Phone: 210 - 619 -1823
Engineer License or Firm's
Certificate No. (if required): 80190
State of: Texas
DESIGNATED REPRESENTATIVE FOR TASK ORDER:
Name: Stephen J. Aniol, PE
Title: Project Manager
Address: 601 NW Loop 410, San Antonio, TX
78216
E -Mail
Address: stephen.aniol@kimley- horn.com
Phone: 210 -321 -3404
Task Order Form
EJCOC° E -505, Agreement Between Owner and Engineer for Professional Services — Task Order Edition.
Copyright ® 2014 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Paee 5
Kimley »>Horn
January 29, 2020
John Nowak, PE
Project Manager
City of Schertz - Engineering
10 Commercial Place
Schertz, Texas 78154
RE: 2020 Roadway Improvements (Chip SeallSlurry Seal Projects) — Fee Proposal
Dear Mr. Nowak:
Kimley -Horn is pleased to submit this fee proposal for professional services for the 2020 Roadway
Improvements project, which consists of City wide pavement preservation projects associated with the
Street Preservation & Maintenance (SPAM) Program.
PROJECT UNDERSTANDING
Per the project scoping meeting held on January 2, 2020, the goal of this project is to install a chip seal to
the existing street surface and complete necessary structural pavement repairs (base repairs), which
typically extends the pavement life before street maintenance or rehabilitation is required. The street list
provided to Kimley -Horn includes 135 streets that are spread throughout the City, totaling approximately
27.2 miles. This project will be bid consistent with past SPAM projects, but will also include a bid alternate
for consideration of a slurry seal mix in lieu of chip seal.
SCOPE OF SERVICES
The following tasks outline the proposed scope of services to be completed by Nmley -Horn for this
project and the assumptions made to develop the proposed fee:
Task 1: Subconsultant Support Services
Subconsultant support services are not required for this project.
Task 2: General Services
A. Project Management
B. TxDOT coordination for 8 streets that tie to FM 3009 and IH 35 N Frontage Road
C. Quality Control /Quality Assurance (QC /QA) reviews for 70% and 100% design milestones
D. 70% & 100% plan submittals. 100% plan submittal will include final contract documents and
specifications.
Task 3: Field Review & Preparation of Construction Drawings
A. Develop aerial schematic exhibit sheets to utilize for each street field review. We propose to
conduct our site visits with these sheets to mark and dimension approximate structural pavement
repairs and other items noted in task 3B below. These will aide in the development of quantities
and provide an approximate area as to where structural pavement and concrete repairs are
recommended. These sheets will not be included in the overall construction drawings, but can be
turned over to the City for reference during the construction phase
B. Field review for each street to assess existing condition, note structural pavement repairs (base
repairs), pavement markings that require replacement, and identify visible low spots that may
require concrete curb replacement.
601 NW Loop 410, Suite 350, San Antonio, TX 78216
Kimley > >> Horn Page 2
C. Download photos and site documentation information
D. Prepare quantities per street based on street observations. Street lengths and widths will be
approximated based on aerial imagery, with a small contingency factor added
E. Prepare cover /index sheet
1. Project will be broken into 6 areas and will be identified on the cover map
F. Develop supplemental general notes sheet (chip seal)
G. Develop master quantity summary sheet that identifies individual pay items summarized by area
H. Develop project layout sheet per area (6 sheets) that includes street list and applicable pay items
that are summarized for area as a whole. Quantities broken down per street will not be illustrated
on the construction drawings
I. Develop Contractor access and staging sheet (up to 2 sheets) consistent with previous SPAM
project
J. Develop structural pavement repair detail sheet
K. Incorporate required Schertz construction and TxDOT traffic control standards
L. Prepare opinion of probable construction, cost (chip seal)
M. Develop supplemental general notes sheet (slurry seal Bid Alt. 1)
N. Develop master quantity summary sheet that identifies individual pay items summarized by area
(slurry seal Bid Alt. 1)
O. Prepare opinion of probable construction cost (slurry seal Bid Alt. 1)
P. Coordinate with Schertz Purchasing Department for contract development
Q. Assemble contract documents and specifications
1. Prepare Table of Contents and Invitation to Bidders document
2. Prepare Bid Schedule (Base Bid and Bid Alt. 1)
3. Prepare Agreement between Owner & Contractor
4. Prepare Supplement Conditions to include governing, special and supplemental
specifications and special provisions)
R. Address comments from Schertz Purchasing Department & finalize contract
documents/specifications package
Task 4: Bid Phase Services
A. Assist Schertz with project advertising
B. Remark base repair patches for pre-bid meeting
C. Prepare meeting agenda for & attend pre -bid meeting
D. Prepare and submit pre -bid meeting notes
E. Prepare & issue addenda (Up to 2 Addenda)
F. Attend formal bid opening
G. Assist Schertz with Contractor qualification & bid evaluation
H. Prepare bid tabulation
I. Assist Schertz with bid negotiations
J. Prepare and submit construction contract award recommendation letter
k 5: Construction Phase Services
A. Attend pre - construction meeting
B. Review Contractor material submittals/shop drawings (Up to 3 submittals)
C. Construction site visits & reporting
1. One (1) site visits per month based on 3 -month construction schedule
2. Prepare and submit 1 construction observation report per month
Kim ey >>> Horn Page 3
D. Respond to Contractor Request for Information (RFI) (Up to 2 RFI)
E. Review and respond to Contractor Change Order Proposal (Up to 1 proposal)
F. Review Contractor monthly pay estimate & updated construction schedule (1 per month totaling
3)
Task 6: Project Expenses
The following reimbursable expenses are requested for this project:
A. Field review and design site visits (Estimate 30 trips)*
B. Bid /construction phase site visits (Estimate 10 trips)*
C. Field marking paint to mark structural pavement repairs in street
*Mileage to be reimbursed based on the 2020 standard business mileage rate of 57.5 cents per mile.
EXCLUSIONS
The following services are excluded from the basic scope of this project, but can be completed by Kimley -
Hom upon execution of an additional service should the City request it:
A. Subconsultant services to include geotech, survey, environmental, SUE, or other service that may
be required due to a change in scope
B. It is assumed TxDOT permits will not be required for this project.
C. It is assumed that the Contractor will provide necessary SWPPP design drawings.
D. It is assumed the Contractor will provide necessary detailed traffic control plans should they
deviate from available TxDOT standards.
E. Completion of final base repair schematics to be included in construction drawings
F. Roadway, utility or drainage design. It is assumed that any necessary pavement or concrete
repairs will be coordinated with Schertz and the Contractor during construction. In the event
substantial repairs are required to eliminate low spots in the road, or extensive structural
pavement repairs are needed, IGmley -Horn will notify the City for further direction.
G. Design milestones in addition to what is proposed for this project
H. Review Contractor provided construction schedule
I. Review Contractor provided traffic control plan
J. Monthly project meetings during construction phase
K. Attend substantial completion walk & issue punch list
L. Attend final completion walk & issue Notice of Acceptability of Work
M. Resident Project Representative (RPR) Services — Kimley -Hom can provide this service should
the City request it
N. It is assumed that material testing and inspection services will be completed by the City
O. Any other services not listed in the basic scope of services
SCHEDULE
Kimley -Horn estimates a total design schedule of 3 months, including Schertz review time and
preparation of final contract documents. Based on notice to proceed (NTP) of February 17, 2020, Kimley -
Hom projects this project will be ready to bid by May 18, 2020, barring any unforeseen schedule changes.
Construction phase services proposed for this project is based on a 3 -month construction timeline. Per
project scoping meeting with Schertz, daily coordination with the Contractor will be handled internally by
Schertz staff, so the expected service Kimley -Horn will provide during the construction phase is limited to
the scope outlined in task 5 above. Should construction exceed this duration due to conditions beyond the
1 t Loop F1 ,quite X50, Rntcrrtio, T 73218 - - 210 541 91
i1 '
Kim ley > >�" L,i_)L' ""
Page 4
control of Kimley -Horn, a supplemental service will be submitted to the City for Kimley -Horn to continue
providing construction phase services for the remainder of the project.
FEE AND BILLING
Kimley -Horn will perform the above outlined scope of services, including project expenses, for a lump sum
fee of $122,875, according to the following task breakdown:
Task 1: Subconsultant Services
$0
Task 2: General Services
$19,380
Task 3: Field Review & Preparation of Construction Drawings
$85,500
Task 4: Bid Phase Services
$8,635
Task 5: Construction Phase Services
$7,260
Task 6: Project Expenses _ _
$2,100
Total:
$122,875
We appreciate the opportunity to be of service to the City and look forward to successfully completing this
project. Please don't hesitate to contact me at stephen.aniolrla- kmlgy- horn.00m or (210) 321 -3404 should
you have any questions on the proposed scope and fee
Sincerely,
KIMLEY -HORN AND ASSOCIATES, INC.
TBPE# 928
By: Stephen J. Aniol, P.E.
Senior Project Manager
Attachments
Fee Breakdown by Task
Cc: Scott McClelland, EIT
I, al' au ��.
d
i m
Z E
)
C 6
0 E W
cW a
'� E Y
W O S N
f0 d' �, °
m Z
N E V L
ONY 0
z
m
rn
m
O
e
a
Y
LD
m
Q
° a
to
o
V Li
'
0
0
Ln
H
cri
m
m
err
m
LL
Z5
Q �
s
°
c F•
Q m
LL
c
O
O
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0
0
0 0
0 0
O
0 0
O. O
O
0 0
O O
O
0 0
G7 0
O
0 0
0 0
0 0
0 0
0 0
0 0
IG7 �0
0 0
0 0
O )0
0 O'O
0 0
0
0 0
O
0 0
0 0
LO O
O
O
O
O
O
O
w
O O
O O
o o
D
O O
co R
0
M
0 0
O O
0 0
W R
0 0
W O
O
�
O
O N
O'
v O
O
w 10
O
M O
N'Y7
V O
8]
N 10
O)'h
M v
O O
0 m
N
h h
m
O
a
0
M'
W O
=F-
M V
GD
Ih
WGO
M--
cl
Y)
w
NLO
m
GC It
f2
IT Mh
hC)GOQ
M-
OHO
wrh
V
MRMW
M
v
G7
tOMO
m
N
0 0
,;
—
O
LL
fA
tl9
K! b%
El! fA
Nd 69
bro
60 N)
fA B9
69 04
bs 69
d9 6%
69 66
6% 63
6.i fH
to 09
09, 69
fA Ni
09.
69
(N f!!
Lo
O
m w
wNOwgwm
N
Omvv
ODNO
"tOw
Mr
1°h
M10
M 10
m M
M V
MN
O
O
O) �O
NO
_
O
O
S
B
O
H
Y
O
in
~
a
0
O
O
O
O
EU
=
c
oc
re m
o
o
10
0 r) V
2
O
Coo °O
(O
WN
V
NN
m F
—
O
O
C
M
r
0 .
N
v
N
CO I
N
f00
vIt
N
of
S
c
W
y�
O
O
Pm0)
P C
N
N
0)
La
3
O
M m
t0
N
M.N
N
m
GD
N'
r
NN
r N
N
N
O
N
�m
S
`m
o
o
W
N
U
S
a
C
to
_
O
A
'O
B
E
m
m
m
E
@
n
m
c
°
m
°
co
U
c
E
-o
m
m
IE ,
i�
m
cc E
sr
U1
m m
�tAp
CD
=
n
c
W
Q
•C
m
H_
c
h
l0 N
m
-'
c
N
p
a
fn
L
W i�
?
U
Q
01
c
LL
Gil
c
'0
®
E
m
o
U
�t/)c
7
G
m
O
E
C
c
rpo
mS
:3
�'m
j
C
U�NUC.Q70(
C y
EU'°
m
E
m
c
3•
c
o
ffi�-
m
m
m
o
c
m
c
F
()
E.ffiv
a :�Yl�
Cl
m
m
rt
fq
3L
m
toi
c
o
m
�rLa'cG�
M
m ,U
d
dam
C
p
O
n
Ox
L m
= E
7
ti E
C
m
a
iii
m
2
7 a
In :•'
Gib u
E m
O
v
�A OC
v
° a
0
cm
m
m
c
H m
pc
m O
L
c
aJa
E
0
c•�
c
yd
O
a
m
Q
(p O
Z
e
0 3
m
h .s
C,
c
0
b
O. M
r
O
O
Q
m Z
L—
O
m
=
E
$ m
m
cl)
p
p E
m
-0
a
c Z
a
c
�
mod
O p�
>
C
p m
m
V1
Q
a d
c
N
m
m Y
O
m
>
0
a
mc�
Em=
'c p[
0
ii
s7
c
g3o13'ixm��
m
a
�p
m°dNty�m��mcaci�m
J
a-
co
a
c�S
m
'=
a
a
L
a
t
m m
E
o
0
E
S
c m
m {'j
a
t CO)
aa.m
m
m E
je m?
cmmfq
c m
U)
E co
ma
m
m
��
rn c
ty
=v:9
c
z o
m
°tnt��U
d m
m
m
c Q
Q
U
Q
-0
c Q
°
oQm
m a
oy
V
Q a
Q
v
v
€
m
° =
SE 'r.
0
m m
m
m=
U
d
16EI
-�m�
a.-
�7vvcm���
a
c
o
m
>
Q
o
t
m
c S
a
°n
E
m
m W=
E=
wa
m
ua�
5 =1
m'�
E
m
L° -�
Ci It
E�°�
° m'90
Qommo'$�
EC7
c
c
m
° j
m m
L
o m
E m
a) CL
aci v
Z
m
3K
E
m
a
d
as
a)
mPpc=
cg
Eat£
min
hoc
_
00)
3
m
°'-mm
mYrn=
=m
a d.-
mq
m
ca
m��
��
�m
yEc
-°Um00
°.c
mfj
Ea
a
=
Em
QqY�
m
m
m
00
mm
d
2
c
,a
��
•2
�U
mOava�
c c.
¢mm'rn
Y3°
>�,8
m
d
-�lL
m
q
W
m���oem
�.O�m�
dU.m
e'mmoom-
E Ep..tA�.O'@
°�--
°mmvmmmmm`m
mF-mm
ca
m
m�v
m
c
am
�r
y
r
cLim
o
p
to
GEi
m QpxmU°
mYU°
mmm
mm
m$$
mmES`rR
'
vo
LAW
a
U
F-tA
5(L
2ana�Q°
�Q[iQiLQpis
QQQ5,5a.sin
a
aaamdp
m
O
N
0
M
0 0
10 f0
0 0
h GC
0 0
IM
r N
0 0
M of
0 0
t0 <O
0 0
h M
0 O 'O
L. O
r
rN
M
10 <D
h.GO
Q1 O.r
r N.
N
N N
M
N
N
�- N
0 0
N
C
t
`o
V
2
CD
m
c
0
Q
a
O
m
CL
a.
li
c
2 E
cn
c a
0 E w
�W a
Y
lL O ca 00
S N
W N a
L
ONY��
0
0
0
�
c
i
H
CD
LL
to
C
gom
F-
ac
Q m
LL
COO
000
0
0000
0000
O
0
CR
0 0
C.O
000
O
O O
O
O
0000
0
0 00
o
MMOCOIO
Co
MMMAO1
00
-
000
co
w
OC
n0
LO
v
0
w
0000
oww
m f-
co
O4
� M
ao=MI0
N
I�
01M
wwv
N
01
fV
Nv
C
r
O LL
V! V7
V7 V9,
0%
V) V!
d3 V)
V!
di V)
V>
w
01-.1
Lo
1� M
N N
0 10
N V•
m
m m
w
[O M
to
cm
7
O
x
.W.
H
h
12
N 'Cm
C
O
EV
x
69
c
c
0
o
y0
U U
M
Lo
C
U
0
x
0
C �
V�
O
O
N
C
p
7Nm
V'�Y
M.M4D
Nd'N
M
ao
2
c
W
Vs
0
m Im
0
rn
L
Q C
M r
N
N r
N r
O
M M
f D
N r
M
�c
x
V�
m
0
mR
O
W
N
r2
N
C
O
sQ
V
�
a
m
a
c
m
E
r
'—�
7
W
N
m
�
°
9
C
O
[1
�
a
m
f3
o
7
C
O
CD
x
r
0
Q
vw
o
Cl
v
E
n.
W
D
tZ
CL
E
m
o
-�
m
c
O
a
m
o
O
m
2
_
E
a
'w
IoL a
C
,O
W
V
m
;
5
N m
N
.N
..
� N
W
o
M �
o
W
a
CD
O
ma
°0
>
G
N•
W
'
aa
X
cc
m
Q
m
r-
cT
H
C
z Q
o
CO
C�m
O
F
•o
m
m ��
Q
�
Apm
�m
C
�
V%
w
��•W
�
�° ��
•O�
m�
cn
c°�m
Ccm�
a
c
�
c °,�M
a�Oa
LJ c
m
o
Q
t
mma�i
d ~�c
U��S
c;ii
L°
a
n
¢
�aoa
s
om
8
cCgac
�in�°o
.9
m.2�i
E
CL
�c
ti
TLmmtimm2
rt°-,
2IL
.m
ro
o�
°
m
-15
W W
W
C W
W
C
C
C C
•'
•' C
m
•O Q�
3
b
ao.¢8a¢a
Ua�c`3����
E
im'ii
o
0
a a
a.
i
My
Lom�OO)O
rN
M�10
CO
rNM
O O
O O
O O
O r
O O
0
0 0
O
0 0
0
�O
f0
Schertz 2020 Roadway Improvements
Street List
Area
Street
Limits
Length
Unit
Charleston Ln
Fairways Dr to Country Club Blvd
1,569
ft
Columbia Dr
Covers Cove to Fairways Dr
4,585
ft
Foxbriar Ln
Fairways Dr to Country Club Blvd
1,670
ft
Wimbeldon Dr
Fairways Dr to Country Club Blvd
1,692
ft
Fairways Dr
Charleston Ln to Wimbeldon Dr
835
ft
St Andrews
Country Club Blvd to Pebble Beach
890
ft
Pebble Beach
Cul -de -sac to Columbia Dr
2,583
ft
1
Black Diamond
Cul -de -sac to Pebble Beach
140
ft
Whistling Straits
Cul -de -sac to Pebble Beach
95
ft
Crooked Stick
Cul -de -sac to Pebble Beach
78
ft
Tuckatoe
Cul -de -sac to Columbia Dr
116
ft
Pelican Hill
Cul -de -sac to Columbia Dr
60
ft
Mahogany Bay
Cul -de -sac to Columbia Dr
91
ft
Merion Way
Columbia Dr to cul -de -sac
162
ft
Covers Cove
IH -35 FR to Columbia Dr
2,142
ft
Crest Oak Ln
Roy Richard Dr to Private Entrance
1,631
ft
Circle Oak Ln
Roy Richard Dr to Chestnut Oak
3,181
ft
Lazy Oak
Crest Oak Ln to Circle Oak Ln
938
ft
Shady Oak Ln
Crest Oak Ln to Circle Oak Ln
924
ft
Spanish Oak dr
Crest Oak Ln to Circle Oak Ln
970
ft
Crown Oak Pass
Crest Oak Ln to Circle Oak Ln
925
ft
Golden Oak
Crest Oak Ln to Private Dr 2
1,141
ft
Willow Oak
Cul -de -sac to Bench Trail
514
ft
2
Bench Trail
Golden Oak to Chestnut Oak
1,749
ft
Private Dr 1
Golden Oak to Silver Oak Rd
716
ft
Private Dr 2
Golden Oak to Silver Oak Rd
770
ft
Silver Oak Rd
Private Dr 1 to Rainy Brook
406
ft
Turkish Oak
Bench Trail to Canyon Oak
290
ft
Canyon Oak
Circle Oak Dr to Chestnut Oak
926
ft
Chestnut Oak
Bear Oak to Circle Oak Dr
895
ft
Bear Oak
Cul -de -sac to Chestnut Oak
128
ft
Newrock Creek
Cul -de -sac to cul -de -sac
758
ft
Freeport Dr
Cul -de -sac to Victoria Point
114
ft
Victoria Point
Dead end to Samantha Dr
2,040
ft
Dusty Crossing
Samantha Dr to Frank Baum Dr
1,064
ft
Samantha Dr
Dusty Crossing to Victoria Point
1,067
ft
Fallen Stone
Cul -de -sac to Victoria Point
152
ft
Prichard PI
Cul -de -sac to Victoria Point
444
ft
Rosewell PI
Cul -de -sac to Victoria Point
297
ft
Ashley Park
Victoria Point to Ashley Oak Dr
2,800
ft
Ashley Park Cir
Ashley Park to Ashley Park
250
ft
Emerson Pass
Ashley Park to Twin Point Creek
347
ft
Twin Point Creek
Emerson Pass to Wayward Pass
745
ft
Camaron Woods
Ashley Park to Cul -de -sac
370
ft
Emerald Point
Cul -de -sac to Ashley Park
400
ft
Wayward Pass
Ashley Pass to Davenport
1,766
ft
Schertz 2020 Roadway Improvements
Street List
Area
Street
Limits
Length
Unit
Fresno PI
Ashley Park to Cul -de -sac
399
ft
Baldwin Park
Ashely Park to Waywayd Pass
620
ft
Davenport
Ashley Park to Drayton
2,065
ft
Windway Creek
Ashely Park to Boxer Pass Dr
636
ft
Ashley Oak Dr
Sycamore to Roy Richard Dr
3,485
ft
Sycamore
Grove Park to Cul -de -sac
1,051
ft
3
Chasefield Dr
Sycamore to Cul -de -sac
464
ft
Smokey Creek
Sycamore to Bridgemont PI
771
ft
Bridgemont PI
Ashley Oak Dr to Smokey Creek
429
ft
2 Courts Way
Cul -de -sac to Ashley Oak Dr
260
ft
Ashley Meadow
Cul -de -sac to Ashley Oak Dr
275
ft
Olde Moss St
Cul -de -sac to cul -de -sac
1,411
ft
Boxer Pass Dr
Windway Creek to Olde Moss St
1,288
ft
Abercorn
Davenport to Hull St
769
ft
Whitaker
Abercorn to Cul -de -sac
927
ft
Forsyth Park
Whitaker to Drayton
1,402
ft
Hull St
Abercorn to Forsyth Park
500
ft
Emmet Park
Cul -de -sac to Whitake
100
ft
Tattnall
Savannah Dr to Drayton
387
ft
Drayton
Davenport to Habersham
1,614
ft
Madison Square
Cul -de -sac to Forsyth Park
137
ft
Habersham
Andrew Low to Ogelthorpe
1,698
ft
Telfair Square
Habersham to Cul -de -sac
80
ft
Andrew Low
Habersham to Olde Moss St
518
ft
Whitefield Square
Andrew Low to Savannah Dr
410
ft
Broughton
William Scarbrough to Savannah Dr
757
ft
William Scarbrough
Broughton to cul -de -sac
1,311
ft
Ogelthorpe
Cul -de -sac to Habersham
826
ft
Dove Meadows
Borgfeld to Silvertree Blvd
931
ft
Mourning Dove
Dove Meadows to Cul -de -sac
350
ft
White Wing
Dove Meadows to Cul -de -sac
353
ft
Grey Feather
Dove Meadows to Cul -de -sac
363
ft
Silvertree Blvd
Roy Richard Dr to Cul -de -sac
1,190
ft
Idlewood
Silvertree Blvd to Cul -de -sac
334
ft
Greenwood
Idlewood to Cul -de -sac
1,126
ft
Spicewood
Cul -de -sac to Greenwood
276
ft
Cedarwood
Cul -de -sac to Greenwood
124
ft
Cherrywood
Roy Richard Dr to Greenwood
274
ft
Cyruss McCormick Rd
Roy Richard Dr to Cul -de -sac
356
ft
Eli Whitney Rd
Roy Richard Dr to Cul -de -sac
231
ft
Emerald Gate
Borgfeld t o Welbrook
156
ft
Welbrook
Cul -de -sac to Turncreek Ln
313
ft
Turncreek Ln
Welbrook to Ivory Creek
1,105
ft
4
Gate Creek Ln
Cul -de -sac to Turncreek Ln
439
ft
Linden Grove Dr
Cul -de -sac to Turncreek Ln
517
ft
Crimson Cove Dr
Cul -de -sac to Turncreek Ln
509
ft
Schertz 2020 Roadway Improvements
Street List
Area
Street
Limits
Length
Unit
Ivory Creek
Cul -de -sac to Turncreek Ln
521
ft
Mill Cross Ln
Ivory Creek to Summer Haven Ln
315
ft
Summer Haven Ln
Cul -de -sac to Bending Brook Dr
602
ft
Bending Brook Dr
Summer Haven Ln to Lauran Park Dr
825
ft
Sandy Ridge Cir
Bending Brook Dr to Bending Brook Dr
1,333
ft
Lauran Park Dr
Cul -de -sac to Bending Brook Dr
462
ft
Cottage Park
Lauran Park Dr to Morning Rose
277
ft
Cross Branch Dr
Morning Rose to Morningmist Ln
827
ft
Quiet Creek Dr
Cul -de -sac to Cross Branch Dr
332
ft
Arbor Dawn Ln
Cul -de -sac to Cross Branch Dr
336
ft
Morningmist Ln
Cul -de -sac to Cross Branch Dr
343
ft
Park Fair Gate
Morningmist Ln to Dietz Rd
159
ft
Linda Ct
Cul -de -sac to Marilyn Dr
136
ft
Melissa Ct
Cul -de -sac to Marilyn Dr
137
ft
Sharon Ct
Cul -de -sac to Marilyn Dr
132
ft
Marilyn Dr
Oak St to Colony Dr
3,655
ft
Chestnut
Marilyn Dr to Maple Dr
619
ft
Colony Dr
Dead end to Maple Dr
741
ft
Colony Dr
Aviation Ave to Brooks Ave
1,037
ft
Pecan Dr
Oak St to Chestnut
1,375
ft
Pecan Dr
Vicki Lynn Dr to Schertz Pkwy
2,439
ft
Vicki Lynn Dr
Pecan Dr to Maple Dr
290
ft
Maple Dr
Oak St to Colony Dr
3,640
ft
Aviation Ave
Oak St to Colony Ave
3,724
ft
5
Mitchell Ave
Oak St to Schertz Pkwy
4,107
ft
Aero Ave
Oak St to Schertz Pkwy
4,115
ft
Brooks Ave
Oak St to Colony Dr
3,728
ft
Winburn Ave
Oak St to William St
2,665
ft
Wright Ave
Oak St to William St
2,667
ft
Curtiss Ave
Beacon to Schertz Pkwy
3,005
ft
Exchange Ave
Cul -de -sac to Schert Pkwy
2,867
ft
Elm
Aviation Ave to Wright Ave
1,713
ft
Beacon
Maple Dr to Curtiss Ave
2,418
ft
Lindberg Ave
Aviation Ave to Exchange Ave
2,460
ft
Pfeil St
Brooks Ave to Main St
1,724
ft
Williams St
Curtiss Ave to Main St
696
ft
Kock St
Curtiss Ave to Exchange Ave
407
ft
Guy Guisborne
Cul -de -sac to Robin Hood Way
493
ft
Robin Hood Way
Ware Seguin Rd to Sherlock Ln
4,235
ft
Wil Cloudsley
Cul -de -sac to Robin Hood Way
427
ft
6
Maid Marian
Cul -de -sac to Robin Hood Way
527
ft
Sherlock Ln
Robin Hood Way to Nottingshire
733
ft
Nottingshire
Sherlock Ln to Ware Seguin Rd
1,054
ft