01-25-2022 Agenda PacketMEETING AGENDA
City Council
REGULAR SESSION CITY COUNCIL
January 25, 2022
HAL BALDWIN MUNICIPAL COMPLEX COUNCIL CHAMBERS
1400 SCHERTZ PARKWAY BUILDING #4
SCHERTZ, TEXAS 78154
CITY OF SCHERTZ CORE VALUES
Do the right thing
Do the best you can
Treat others the way you want to be treats
Work cooperatively as a tea
City Council will hold its regularly scheduled ti at :iii} p.m., Tuesday, January
25, 2022, at the City Council Chambers. In lieu of attending the eeti in person,
residents will have the opportunity to watch the meeting via live stream n tile City's
YouTube Channel.
Call to Order
Opening Prayer and Pledges of Allegiance to the Flags of the United States and State of Texas.
(Mayor Pro -Tem Dahie)
Presentations
1. Presentation: Annual Fleet Performance Update (FY 2020 - 202]) and some highlights
for current FY 2021 -2022.
City Events and Announcements
• Announcements of upcoming City Events (B. James /C. Kelm/S. Gonzalez)
• Announcements and recognitions by the City Manager (M. Browne)
• Announcements and recognitions by the Mayor (R. Gutierrez)
January 25, 2022 City Council Agenda Page 1
Hearing of Residents
This time is set aside for any person who wishes to address the City Council. Each person should fill
out the speaker's register prior to the meeting. Presentations should be limited to no more than 3
minutes.
All remarks shall be addressed to the Council as a body, and not to any individual member thereof.
Any person making personal, impertinent, or slanderous remarks while addressing the Council may
be requested to leave the meeting.
Discussion by the Council of any item not on the agenda shall be limited to statements of specific
factual information given in response to any inquiry, a recitation of existing policy in response to an
inquiry, and /or a proposal to place the item on a future agenda. The presiding officer, during the
Hearing of Residents portion of the agenda, will call on those persons who
have signed up to speak in the order they have registered.
Consent Agenda Items
The Consent Agenda is considered self - explanatory and will be enacted by the Council with one
motion. There will be no separate discussion of these items unless they are removed from the Consent
Agenda upon the request of the Mayor or a Councilmember.
2. Resolution No. 22 -R -14 - Consideration and/or action approving a Resolution by the City
Council of the City of Schertz, Texas authorizing EMS debt revenue adjustments, Utility
Billing debt revenue adjustments and Schertz Magazine debt revenue adjustments for certain
inactive outstanding receivables and other matters in connection therewith. (M. Browne /J.
Walters)
3. Ordinance No. 22 -T -03 - Consideration and /or action approving an Ordinance by the City
Council of the City of Schertz, Texas, authorizing an adjustment to the Fiscal Year
2021 -2022 Budget to provide funding for the purchase of HVAC equipment for the Civic
Center HVAC Replacement Project, repealing all ordinances or parts of ordinances in conflict
with this ordinance; and providing an effective date. (Final Reading) (C. Kelm /S.
Williams /S. McClelland)
4. Resolution No. 22 -R -1 I - Consideration and/or action approving a Resolution by the City
Council of the City of Schertz, Texas authorizing the City Manager to enter into a job order
contract with Sullivan Contracting Services for the purchase of HVAC equipment relating to
the Civic Center HVAC .Replacement Project. (C. Kelm /S. Williams /S. McClelland)
Discussion and Action Items
5. Ordinance No. 22 -S -01 - Consideration and /or action approving an Ordinance by the City
Council of the City of Schertz, Texas on a request to amend the Comprehensive Land Use
Plan by changing approximately 363 acres of the Future Land Use Map from Agricultural
Conservation and Estate Neighborhood land use designation to Single - Family Residential
land use, generally located 6,050 feet east of the intersection of Trainer Hale Road and FM
1518, also known as Bexar County Property Identification Numbers, 310053, 310060,
January 25, 2022 City Council Agenda Page 2
310061, and 310121, City of Schertz, Bexar County, Texas. Final Reading) ( *B. James /L.
Wood/M. Harrison)
Roll Call Vote Confirmation
Workshop
6. Appointment of the Mayor Pro Tem - Discussion and consideration and/or action regarding
the confirmation, appointment or election of the Mayor Pro -Tem. (Mayor /Council)
Roll Call Vote Confirmation
Closed Session
7. City Council will meet in Closed Session under Section 551.071 of the Texas Government
Code, Consultation with the Attorney regarding contract negotiations with Schertz- Seguin
Local Government Corporation (SSLGC) and Cibolo Valley Local Government Corporation
(CVLGC) regarding water development projects.
8. City Council will meet in Closed Session under Section 551.074 of the Texas Government
Code, Personnel Matters, to conduct the annual evaluation of the City Manager Dr. Mark
Browne.
Reconvene into Regular Session
7a. Take any action based on discussions held in Closed Session under Agenda Item 7.
8a. Take any action based on discussions held in Closed Session under Agenda Item 8.
Roll Call Vote Confirmation
Information available in City Council Packets - NO DISCUSSION TO OCCUR
9. Monthly Update - on Major Projects in progress /CIP. (B. James /K. Woodlee)
Requests and Announcements
• Announcements by the City Manager.
• Requests by Mayor and Councilmembers for updates or information from staff.
• Requests by Mayor and Councilmembers that items or presentations be placed on a future City
Council agenda.
January 25, 2022 City Council Agenda Page 3
• Announcements by Mayor and Councilmembers
• City and community events attended and to be attended
• City Council Committee and Liaison Assignments (see assignments below)
• Continuing education events attended and to be attended
• Recognition of actions by City employees
• Recognition of actions by community volunteers
Adjournment
CERTIFICATION
I, SHEILA EDMONDSON, DEPUTY CITY SECRETARY OF THE CITY OF SCHERTZ, TEXAS, DO HEREBY
CERTIFY THAT THE ABOVE AGENDA WAS PREPARED AND POSTED ON THE OFFICIAL BULLETIN BOARDS
ON THIS THE 21 ST DAY OF JANUARY 2022 AT 4:30 P.M., WHICH IS A PLACE READILY ACCESSIBLE TO THE
PUBLIC AT ALL TIMES AND THAT SAID NOTICE WAS POSTED IN ACCORDANCE WITH CHAPTER 551, TEXAS
GOVERNMENT CODE.
SHEILA EDMONDSON
I CERTIFY THAT THE ATTACHED NOTICE AND AGENDA OF ITEMS TO BE CONSIDERED BY THE CITY
COUNCIL WAS REMOVED BY ME FROM THE OFFICIAL BULLETIN BOARD ON DAY OF
, 2022.
TITLE:
This facility is accessible in accordance with the Americans with Disabilities Act. Handicapped parking spaces are available.
ff you require special assistance or have a request for sign interpretative services or other services, please call 210 - 619 -1030.
The City Council for the City of Schertz reserves the right to adjourn into closed session at any time during the course
of this meeting to discuss any of the matters listed above, as authorized by the Texas Open Meetings Act.
Closed Sessions Authorized: This agenda has been reviewed and approved by the City's legal counsel and the presence
of any subject in any Closed Session portion of the agenda constitutes a written interpretation of Texas Government
Code Chapter 551 by legal counsel for the governmental body and constitutes an opinion by the attorney that the items
discussed therein may be legally discussed in the closed portion of the meeting considering available opinions of a
court of record and opinions of the Texas Attorney General known to the attorney. This provision has been added to
this agenda with the intent to meet all elements necessary to satisfy Texas Government Code Chapter 551.144(c) and
the meeting is conducted by all participants in reliance on this opinion.
COUNCIL COMMITTEE AND LIAISON ASSIGNMENTS
Mayor Gutierrez Councilmember Scagliola — Place 5
Audit Committee Cibolo Valley Local Government Corporation - Alternate
Investment Advisory Committee Hal Baldwin Scholarship Committee
Main Street Committee Interview Committee for Boards and Commissions - Alternate
Schertz- Seguin Local Government Corporation
Councilmember Davis— Place 1 Councilmember Scott — Place 2
Interview Committee for Boards and Commissions Interview Committee for Boards and Commissions
Main Street Committee - Chair Schertz Animal Services Advisory Commission
Schertz Housing Authority Board
TIRZ II Board
January 25, 2022 City Council Agenda Page 4
Councilmember Whittaker — Place 3 Councilmember Dahle — Place 4
Audit Committee Cibolo Valley Local Government Corporation
TIRZ II Board Interview Committee for Boards and Commissions
TIRZ II Board
Councilmember Heyward — Place 6 Councilmember Brown — Place 7
Animal Advisory Commission Main Street Committee
Audit Committee Schertz- Seguin Local Government Corporation - Alternate
Investment Advisory Committee
Main Street Committee
January 25, 2022 City Council Agenda Page 5
Agenda No. 1.
CITY COUNCIL MEMORANDUM
City Council January 25, 2022
Meeting:
Department: Facility & Fleet
Subject: Presentation: Annual Fleet Performance Update (FY 2020 -2021) and some
highlights for current FY 2021 -2022.
BACKGROUND
The goal of Fleet's vehicle maintenance program is to increase fiscal efficiencies while also
increasing the service life of each piece of equipment and vehicle by making timely repairs and
completing consistent maintenance. For example, PD vehicles are usually replaced every four years and
with our vehicle maintenance program the service life is extended allowing the vehicle's service life to
be extended to five -six years. As a result, over a twenty -year period, one PD vehicle would be replaced
five times without a vehicle maintenance program. Under the current maintenance program, one PD
vehicle would be replaced only four times, which is a savings of approximately $70,000 on just one PD
vehicle. This program is enhanced by the vehicle replacement program which replaces vehicles and
equipment before failure, allowing personnel to maintain operations efficiently and safely.
Attachments
Fleet Updated Presentation
_�_ 7 e
Schertz City Council January 25,2022
F�
OAP
Overview
i
• Maintenance Program
• Replace t Schedules
• Bldg.
2
Goals and Objectives
0 Maintain/repair and equipment increase service life
Maintain • improve vehicle and equipment safety
a
3
Fleet Authorized Staff
Fleet Manager x 1
El
Fleet Authorized Vehicles
o 204 Vehicles Assigned
® it Admin x ] ® Fleet x 3 ® Dept. x 20
- w «
d d ^ \
9 Fire Dept. x 21'
® Motorpool X 6 Police {. x 75
X\
® s Dept.
�
® Planning ]]
Streets Dept.
R
Take Home Palicy
• Accountability / Vehicles better maintained / Lower Maintenance Cost
• More vehicles available during special events / emergencies
• Higher visibility / Quicker response
9 1 Water Department (on-call) * 5 EM2
Performance Measures
FY 18-19 Work Order Count
i T DR 319 rag o
1,01112018 to 9,13,01,201 9
,'.QMD�
37.9,
S2,38-5.00,
368,2.47
5 8.67
S-1,096.14
14
',LNI%IAL CON'TROL
I86.70
S16,S03.00,
S-5.281.12'
S?O.N
S22,OS4.1el
73
'CTVIC CENTER
53.50,
S4,915.010
S4', 15.
SO.010,
S6.0-30.99'
20
zDp 4L TA
470.1 0
S 41OS5.010
S28.319.8S
S302.39
S 7,G . 70 7. 2" 7
169
'E . 13EV.
13.11
S1,179.0
07.18
510.010
s1"586.i8
3
El, tls
1;'33.30
S 15 5 919 71. 00
S223.832.73
S20'.35
S1280.:D37.08
474
X9.24' 1
S. 00
S2 49.45
S1,91.00
S7;377.45
25
FACILITY 2�VILLN
'T
9121. SIC
H.352M
S4,099.27
&G.00
S12,45,G.27
3 7
`FACILM" SERVICE
93.9,
S8,424.00,
S-3,451.83
30.00
S11,475.83
35
'F= DEIFY
418.1 '
S37,638.(G
S116,.778.87
S3,02. "A
5154,719.15
11619
"FLEH
446.50
S36,15U.Nl
S9.037.38
skiloo
S46,6053S
III
'I.T.
38.90
53321. W
S1.330.87
Saw
S5.65 1. 8 7
1 9
POOL
134.15
Sll,:931.0
S,3,,3,5 S. 79
51,1534.43
S16,S24.22
14,9
'PARKS
3 7 6.90,
S33.921M
531..136.90
Ste. Do
S55.1059.9t
149
PLAN & CUM DEN
1401.51
513,6 5.d1
S3, S2. S3
S01.00,
SIS,427.,H
64
�OL ICE DEPT
1.175.w
3201.750.00
S62.83 5.04
533., 24
5168.618.28
6,3
'PURCHASING
1.00
S90.00
S1.159,
S0.0
S102.59,
1
IURCHASD G DEPT
ll.W
sisilot
S�).0
SHC
S1 SIG.
I
"S=T
5SOA5
S51,932.50
515,185.17
SIM,
567,127.67
20,9
BILLDTG
47.10
S4 "39.00
--L
�i. I.L I.L �
Sl.,3S'."7
K,.OG
5'6;6 "e' 1. 2 79
.110
'.)VATER
749.10
S6"-,41qm
S42,100.87
S30.47
Sl °,839.34
258
Grzn Totals 6.793.10 S611.019.50 S44 .940.90 53.652.83 S2.0,64.613.23 x.755
Created WO's 2755 COMMUNITY
SERVICE 7
SCHHERTZ I OPPORTUNITY
Performance Measures
FY 19-20 Work Order Count
I GJI 12,019 to 913,0120,20
Gn-and To tai s 7.25,7.45 .6 "50,494.50 S,337,76,8.1 S. 8 66..E 1,12 0 S 99 ',12'9. 2,40,5
I - -0
COMMUNITY
SCHHERTZ I SERVICE 8
OPPORTUNITY
8.00
S715.00
S350.70
'S'ago
0
X1,065.70
`maMvLkL CIO =0L
154.70
S13, 13.0,a
S,3,699.64
sl-al,.
Sl 7,612.64,
48
CF-14=1
27,50
S2,:,4- 5. 00,
S2,35-5.93
30.00
S3,820.93
16,
,,DR.AZNAGE
64 .,R'&
S -57.5 2 5.014
S271;6,3154
S,5,G,2.2 6
S'S 5,6,6)a. So
185
"E CO. DEV.
18.70
S1,503.00
&2,66,.6 3
510.00
S1:,769.63
5
67.70
S2,03,573. N,
S83,617.93
S 1. 15 8 1. -21 5
S288.772.18
455 ,
'EN GD=,D7G
38.70
S3,43.00,
1; 77.
w, 6
is,
',FACIL= lAALNTT
161.N
1,14,4901.01G,
517.551.67
377.2, o
531,918.82
515
TA=rrf SERVICE
74.70
S6 713.0
1 ,D
3.2, O7 .84
S3,783. 4
37
DEPT
503.10
345,114.0'D
3 ,63,264.47
S789.69
Sd ,168.16
235
',FLFZT
316.20
S2 7,82S.00
53,943:97
S3,217.75
S34,:9489.72
819,
I.T.
14.50
S I a 5. C*1
51,94.26
sc,.0,0,
S1.49,9-2 7'
9
"'MOTOR POOL
.28.80
5,2,587.01 D
59,15.11
59,61.61
54,463.72
76
'PARY's
365.50
532,555.00,
57IL6018191
S83.97 ,
545,2,41.86
1.43
,PLAN & CONDA DEV
101.60
S,9:06,9.0,D
301.0
S14.260.0,9
58
LICE DEPPT
952.75
SS5,547.5,D
S42,325.62
(555.357
S1261817.29
471
"PU FCHASD-TrT
SO.00
SIGIM,
SOMI
I
131=,T
93:. NO
S44.66 5,.O,2 CV
S17,321.10
S120.00
S62,106.10
197
= BILLING
49-50
S4,36om,
S,6.SO4.93
'S0.00,
S-11,164. 99
27
'NVA'=
1,035.60
S,93,084.00
543,279.33
5,1.588.30
S 14 2,9 -5.2. 18
,7,G
Gn-and To tai s 7.25,7.45 .6 "50,494.50 S,337,76,8.1 S. 8 66..E 1,12 0 S 99 ',12'9. 2,40,5
I - -0
COMMUNITY
SCHHERTZ I SERVICE 8
OPPORTUNITY
Performance Measures
FY 20-21 Work Order Count
1011 1,202D, to 9,130,120,21
'-ALD11R�
4.55
S403, _S 0
S105.37
310M,
S514.87
5
',AMhL4LL C0=0L
103.1 #
3,134. D
S4,69,8.6,6
513,832.6,6,
57
%C0,11C CF-11=1
18.
31,5901.00
S2,209.87
S15..00`
14.87
25
AGE,
44;-6.50,
S39,43,0M
S49,340.52
S452.39,
S99,722.91
18-7
'EC O. DEgg.
4.00,
S3 .00,
S2162
SIOM
S577.6.2
5
1.5215.91a
5, 35.063-50
S9,2.284.52
S2.026.58
5.29.364.6,E
451
"ENGEqE = -G
43.95
S3,845.50,
S1,243.19
S101.00
S5,ogs.
28
',FA== lvi=
35.70,
53.128. ,
53,175.97
sla%ol
S6.303.S[7
35,
TAM= =110E
26.30,
S121IS100
S5.
,,1,99A7
SO.W
S7:48L47
31
'F= DEPT
398.15
535.133.5,0
S127-367.75
52.138.43
5264,639. 6.8
1247
FLEET
13.?
514433.00
514.191.43
52,M1632
9-2
'I.T.
I I . 651a
S9,94.00
510,5.93
5 5
51. . 3
8
1 10TOR POOL
49.80
S4,39,2.0�0,
S1,6-75.27,
S,78,6.53
S,6-,S,53.S0
75
250.55
iSvS�.50
S,21 A
S,26.4
`97.45
S263.99�
S48, 26,9.34
178
'PLAN CONS1 DEN'
83.25
S7,
.,332.50,
S5.11 25434
S01.0G
S12,586.84
63
LICE DEPT
714.15
IS 6 3: 63 6 . 5 0',
S48:166.68
S,20,840
5212., 11.58
4659,
IRMCs ING
9.00
SSMOAD
376.1 6
S876.16
2
IS-MEET
32,2.4ri,
518;694.00
S15,69,2-22
53,&.42
S44,,476,.F,,,3
SILLD�G
54.60
54 alt 4.00,
S-,2,.,-3 4-2.3 7
58.69
57,07-5.06
28
WA=
476.60
S418210.0,a
S52, 2 6.08
5.563.69
S94.41319.7 7
X39,
Grani Totals 4.741.8 54,18 6, 1.5 0 S4, 152, = -70. 819, S';7 5.
58'8 808.2 2;. .1
W 1 -0 M.
ll� 74IN&SIMMEH
COMMUNITY
SCHHERTZ I SERVICE 9
OPPORTUNITY
Performance Measures
FY 21-22 Work Order Count
1041 J2,0,21 to 1119,12,0,22
'-kNMIAL L.
7.51
31665.191)
36,98.29
50.1010
31.27 .1
14
",CMC CEN=
0.00
S11,01.01a
37.30,
37.30
3
"1 TAGS
'5.1()
3"7,259'.00
S13,"."72.15
S61.21.00
S,15.59,3.15
403
'ECO. DEV.
0.00
2
"EMS
254.15
S,22,86&50
S,23.' 086.06
S 6,2.3 6
S46%016�9,2
115
'1 IENT=G
3.50
S-31.5.00
S.12 0, 13. 6
3, -528.06
6"
',FACU-= NLk=,
7.25
S652.50-,
336,2.43
3;1.0,14.93
91
TACILM7 SERVICE
1.00
3245.19
'Slavco
533 3.1 9
5
T= DEPT
6.87
3628.30
S1.3434.88
S20.42
S1.4,073.6,,G,
46
TLEET
S-53,424.00
S1,740.75
3234.00
S5 513,9,8.7-5
24
110T OR POOL
Q.,DC
slal. in"
S1016.19
SIX36.67
3212.861,
24
'PARKS
13.6,5
S1.228.510
&2.�00,95
'SlOG
S3,241.45
30
"PL,AN,&- CONal DEV
31.65
S12-11 848.50,
S2,679.26
S61.00,
5..5 Ls
26,
'POLICE D=
63.41
S 8 1. go,
S7,R2,5.76
S12.w
S13,619.6,6,
138
'ISTREZT
x,&.70
3.3.213.00_.
,3,213.0fD
: 7 -13,.?6
S76.60
S 7. 63.3 -5
612
U== BILLING
3.98
5349.20
S707.42
S0�00
SlR56.6,2
7
"WAI=
25�15
S,,2.2 63 . 5 a
S8,459,42
&Mlo
S10.722.92
54
�SRT
Gran6 Totals : 1,,0 73.17 S9,6,545.30, S,78;745.9,1 S, 5 8 3.x' -5 S'175,874-26
COMMUNITY
SCHHEIRTZ I SERVICE 10
OPPORTUNITY
wa
Em
V) 200
cc
LLJ
0
CC 15G
0
�14
cc IGO
0
U- 50
0
U 0
Performance Measures
Fleet Comparison Chart WO Created/Completed
WORK ORDER CREATED/COMPLETED COMPARISON CHART
0, to ah M m a CD 0 0 0 0 0 0 0 0 0 0 ,-1
Ln CA
Ln, r� 14 Ln
MONTH/YEAR
siCREATED imCONAPLETED
iF
Examples of Scheduled
Maintenance
P K28
..................... . .. .... . . .. ............................. .................................................................................................................................................................
ASSET: PK28 MINI
COOLANT SERVICE 98% 21112022
EXCAVATOR 100 5
ASSET: D05 201-3
CHEF" SILV DUMP
........... .........................................................
OIL CHANGE SERVICE 99 % 71912021
%
....................................................... ............................. ...............
TRUCK
U09ASSET:
U09 2012
FORD F350
COOLANT SERVICE 31112022 ..................................................................................
D�] CM8
...................... ...................................................................
PATROL TAHOE
. . ........ I ................................................
=99%
OIL CHANGE SERVICE 11/1/2021
ASSET; S0317 2017
2009-201,4
S0317
FORD F1,50
COOLANT SERVICE D�] 311/2022 ASSET' U04 EH
P7217
PATROL EXPLORER
U04 REAR
COOLANT SERVICE 9 �T� 2
ENGINE
WACHS VALVE
OIL SERVICE 98% 1/1712022
,3/112022
TRAILER
P7317
PATROL EXPLORER
COOLANT SERVICE =9,7% 31112022
ASSET: 23,1/2-33
-
P7617
PATROL EXPLORER
231,
COOLANT SERVICE 9 31112D212
PUMPER TRUCK
OIL SERVICE 1/2412022
D�:]
ASSET: PK28 MINI
PK28
OIL SERVICE 21112022
L!
ASSET U 00
EXCAVATOR
--' iE
STATE T---�PE 211/2022
TRUCK
el I
U'
ASSET:
U0 -.1
ATE _PE=O' 1/61 21112022 "PK5121
ASSET:PK5121 EXMARKr MOVVER
TRANSMISSION SERVICE [�� 31412022
,E1.1
F i.
ASSET 1E1. 14
A �"Spr 21117,:)22 �P6716
-,F
PATROL TAHOE 2015-2017
TRANSMISSION SERVICE =86% 1131/2022
266
ASSET: 2662008
41 -- 2111,0,, NS 1611
STATE INSPECT10r, 94 %
[=-
ASSET; CM6 2011 CHEF` 1500
TRANSMISSION SERVICE 7125/2022
FORD AMBULAY14CE
NS1,816
ASSET: NS1316 2016 CHEF 1500
TRANSMISSION SERVICE 612812022
SO,317
ASSET: 50317 2017
FORD F150
STATE INSPECT`10f� 94 21112022
ASSET: 2-314 2018
U09
ASSET: U09 2012 FORD F350
J, TRANSMISSION SERVICE �IJ1012022
2314
CHEV TAHOE
STATE INSPECTIOr� 94 N. zy:1/20 =
Pis
ASSET: P13 2011 CHEV 1,500
TRANSMISSION SERVICE 1012412022
U0419
D316- 2019 FORD 1. 5
TON TRUCKS 6-10)
STATE INSPECTIOr, 94'% 21112022 FM0708
ASSET: FM0708 2008 CHEV,1500
TRANSMISSION SERVICE 612712022
S23
ASSET: HVY TRAILER 0,41p,j 7500LB)
STATE INSPECTICIt' 'q4% 2111`2022
P9518
ASSET: 2018 CLUB
CAP, GOLF CART
STATE 1NSFIECT10f, 94 21112022
P9618
ASSET: 2016 CLUB
CAP, GOLF CART
STATE INSPECTIOt, 94 21112022
ASSET: 230 2015
230
PIERCE PUMPER
STATE INSPECTIOP 914 21I12022
TRUCK
P 31D 18
ASSET:P3018 HONDA.
MOTORCYCLE
STATE INSPECTIOT, 94 2,f11?-022
P99
ASSET: P99 CAT
STATE INSPECTIOT, 94% 21IM22
ENGINE MRAP
MP 308
ASSET: MP3108 2008
CHEVIMPALA
STATE INSPECTIOr" 95, % 2,f7/202-2
COMMUNITY
SCHHEIRTZ
I SERVICE
12
OPPORTUNITY
Scheduled vs Unscheduled Work Orders
Exaniples of Ur"ischeduled Work Orders
m', Af I AL CO
13
Performance Measures
Scheduled vs Unscheduled WO Count Completed
FY 18-19 Scheduled vs Unscheduled Work Order Count
Scheduled WOs Unscheduled WOs Tata I WOs Scheduled Ccvsts Unscheduled C s,, TGta I Costs
777777=
832.00 2:653.00 51194-394.97 3801,73 2.61 3996,:127.5
8
FY 19-20 Scheduled vs Unscheduled Work Order Count
89LOG 1-436M 2.327.00 51 61.666:77 5683.885:74
FY 21-22 Scheduled vs Unscheduled Work Order Count
S845,552.51
ON=
14
10 Year Replacement Forecast
ADMIN
$
-
$
$ 45,000.00
$
$
$
$ 40,000.00
$
-
$
-
$
$
ANIMAL SERVICES
$
_ 65,000.00
$ ._
$ -
$
$
$
$ 15,000.00
$
75,000.00
$
76,000.00
$
$ 80,000.00
ECO DEVELOP
$
_
$
$
$
$
$
39,000.00
$
-
$
$
$
ENGINEERING
$
-
$
$
$ 38,000.00
$
$
38,000.00
$
$1,508,000.00
$
40,000.00
$ 42,000.00
$
FACILITY SERVICES
$
30,000.00
$ 32,000.00
$ 33,000.00
$ 70,000.00
$
$
-
$
$
-
$ -
$ -
FLEET SERVICES / MOTORPOOL
$
122,000.00
$ 34,000.00
$ 136,000.00
$ 36,000.00
$
$
$
34,000.00
$
-
$ -
$ 39,000.00
FIRE LT. DUTY
$
75,000.00
$ 30,000.00
_
$ 235,000.00
$ 75,000.00
$ 190,000.00
$
$
_ 145,000.00
$
60,000.00
$ 200,000.00
$ 145,000.00
IT
$
29,000.00
$
$
$
$
$,.
30,000.00
$
31,000.00
$
$
$
PARKS
$
-
$
$ 38,000.00
$ 51,000.00
$
$
27,000.00
$
96,000.00
$
40,000.00
$ 75,000.00
$ 71,000.00
PLANNING & COMM. DEV
$
29,000.00
$
$ -
$ -
^
$
30,000.00
$
31,000.00
$
-
$ -
$ -
PD
$
544,000.00
$ 560,000.00
$ 601,000.00
$ 518,000_00 ;$' 812,000.00
$
624,000.00
$
482,000.00
$
656,000.00
$ 672,000.00
$ 688,000.00
STREETS
$
31,000.00
$230,000.00
$ 64,000.00
$ 17WJJ>-* 18,000.00
$
116,000.00
$
127,000.00
$
94,000.00
$
$ 65,000.00
$
$ 886,000.00
$1,152,000.00
0
$1,050,000.00
$
904,000.00
$1,021,000.00
$
966,000.00
$ 989,000.00
$1,088,000.00
925,000.00
$,
FIRE TRUCK
$1,200,000.00
$ -
$ -
$1,00,000.00
$ -
$
800,000.00
$
-
$
850,000.00
$ -
$ 900,000.00
TOTAL GENERAL FUND:
$ 2,125,000.00,
$ 886,000.00
$1,152,000.00
$1,963,000.00,
$1,050,000.00
$1,704,000.00
$1,021,000.00
$1,816,000.00
$ 989,000.00
$1,988,000.00
WATER
$
179,000.00
$ 30,000.00
$ 200,000.00
$
40,000.00
$ 68,000.00
$ 40,000.00
$ 80,000.00
$ 524,000.00
, $ 284,000.00
$ 152,000.00
DRAINAGE
$
107,000.00
$152,000.00
$ 65,000.00
$
131,000.00
$ 48,000.00
$ 290,000.00
$ 8,000.00
$ 15,000.00
$ 48,000.00
$ 182,000.00
EMS
$
440,000.00
$ 440,000.00
$ 565,000.00
$
550,000.00
$ 570,000.00
$ 640,000.00
$ 490,000.00
$ 525,000.00
$ 470,000.00
$ 480,000.00
TOTAL ANNUAL COST:
$
2,851,000.00
$1,508,000.00
$ 1,982,000.00 ;
$
2,684,000.00 ,
$ 1,736,000.00
$ 2,674,000.00
$ 1,599,000.00
$ 2,880,000.00
$1,791,000.00
$ 2,802,000.00
COMMUNITY
SCHHERTZ I OPPORTUNITY
15
FY 22-23 Replacement List
0 Drainage Dept x 3
0 Inspections x 1
0 Motorpool X 1
0 Parks Dept. x 2
0 Police Dept. x 10
0 Water Dept. x 1
16
Fleet Maintenance Facility Bldg. 27
• �`•" • •
i i • i •', • it • •" •
17
Conclusion
r
��irw
Agenda No. 2.
CITY COUNCIL MEMORANDUM
City Council January 25, 2022
Meeting:
Department: Finance
Subject: Resolution No. 22 -R -14 - Consideration and /or action approving a Resolution by
the City Council of the City of Schertz, Texas authorizing EMS debt revenue
adjustments, Utility Billing debt revenue adjustments and Schertz Magazine debt
revenue adjustments for certain inactive outstanding receivables and other
matters in connection therewith. (M. Browne /J. Walters)
BACKGROUND
In the EMS, Utility Billing, and Magazine functions, services are provided to customers up front and
billing is settled later. Since services are provided before receiving payment, inevitably the City has
customers that do not pay for the services provided.
When this occurs, staff reaches out to the customer to try to collect the outstanding payment including
follow -up notices and phone calls to try to reach out to the customer to remind them of the outstanding
balance and encourage payment. However, the longer the customer account goes without a payment the
less likely that any payment will be received.
Once a customer account reaches 180 days without payment, Staff brings those accounts to the City
Council to be "written off'. This process is an accounting procedure following the Generally Accepted
Accounted Principles (GAAP), which lays the framework of accounting practices in the U.S. This
designation means it is unlikely those outstanding balances will ever be collected. This leads to an
accounting adjustment on the City's Financial Statements to accurately show how much is still
outstanding and is reasonable to expect collection.
If a customer's account has been written off, this does not erase or forgive that debt. The city can and
does collect some portion of the amount owed by those customers. This can be through the debt
collection agency used by EMS or if the customer returns to the City and requests new services through
the Magazine or Utility Billing.
On August 27, 2019, City Council approved the Schertz EMS Charity Care Policy. Approving the
Charity Care Policy benefits our citizens who do not have insurance and do not have the ability to pay
for ambulance services. In the past, these accounts were sent to collections and written off throughout
year with little expectation to recover any revenue.
The resolution authorizes the debt for these areas that is more than 1.80 days outstanding as of
Decemberl, 2021, to be written off. These write -offs come before council quarterly and last came
before council on September 28, 2021.
Previous Write off Amount:
February 2017: $621,138.97
June 2017: . $544,944.16
September 2017: $510,516.01
January 2018:
$510,637.79
March 2018:
$433,427.15
June 2018:
$439,627.14
September 2018:
$521,281.82
December 2018:
$727,307.39
March 2019:
$564,227.77
June 2019:
$580,155.10
September 2019:
$586,664.65
December 2019:
$591,829.90
March 2020:
$616,900.00
June 2020:
$552,157.34
September 2020:
$605,161.66
December 2020:
$467,802.06
With Charity
Care
March 2021: $1,330,234.88
June 2021: $904,511.15
September 2021: $750,502.47
December 2021: $587.362.56
Charity Care for March 2021 was for an entire year, August 2019 through July 2020. For June 2021,
Charity Care was for 5 months, August 2020 through December 2021. Going forward, these
adjustments will be done quarterly.
GOAL
To approve write -offs of bad debt in accordance with the standards laid out by GAAP.
COMMUNITY BENEFIT
This will show the City's Financial Statements according to national standards and City policy.
SUMMARY OF RECOMMENDED ACTION
Approve Resolution No. 22 -R -14 to write off receivables that are older than 180 days.
FISCAL IMPACT
This accounting adjustment will not affect the City's Budget or financial standing. The amount written
off is estimated during the budget process and is accounted for in the revenue estimations and the bad
debt expense accounts. The action taken tonight will reduce the amount shown as owed to the City by
$587,362.56 and set it equal to the amount seen as still reasonably collectible. The breakdown is as
follows:
EMS - $438,024.86
EMS Charity Care - $108,298.00
Utility Billing - $41,039.70
Magazine - $0.00
RECOMMENDATION
Staff recommends Council approve Resolution No.22 -R -14.
Attachments
Resolution 22 -R -14
RESOLUTION NO. 22 -R -14
A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ,
TEXAS AUTHORIZING EMS DEBT REVENUE ADJUSTMENTS, UTILITY
BILLING DEBT REVENUE ADJUSTMENTS AND SCHERTZ MAGAZINE
DEBT REVENUE ADJUSTMENTS FOR CERTAIN INACTIVE OUTSTANDING
RECEIVABLES AND OTHER MATTERS IN CONNECTION THEREWITH.
WHEREAS, the City staff of the City of Schertz (the "City ") has recommended
that the City maintains quarterly debt revenue adjustments for inactive outstanding
accounts; and
WHEREAS, The Centers for Medicare and Medicaid Services requires a charity
care policy to continue participating in the Texas Ambulance Services Supplemental
Payment Program (TASSPP); and
WHEREAS, the City Council has determined that it is in the best interest of the
City that all inactive outstanding accounts after 180 days nonpayment will be sent to City
Council for consideration for write offs.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ,
TEXAS THAT:
Section 1. The City Council hereby authorizes the write off, including Charity
Care, in the amount and distribution of accounts below:
Function ( Amount
EMS $438,024.86
Charity Care $108,298.00
Utility Billing $41,039.70
Magazine $0.00
Total ( $587,362.56
Section 2. The recitals contained in the preamble hereof are hereby found to
be true, and such recitals are hereby made a part of this Resolution for all purposes and
are adopted as a part of the judgment and finding of the City Council.
Section 3. All resolutions or parts thereof, which are in conflict or inconsistent
with any provision of this Resolution are hereby repealed to the extent of such conflict,
and the provisions of this Resolution shall be and remain controlling as to the matters
resolved herein.
Section 4. This Resolution shall be construed and enforced in accordance with
the laws of the State of Texas and the United States of America.
Section 5. If any provision of this Resolution or the application thereof to any
person or circumstance shall be held to be invalid, the remainder of this Resolution and
the application of such provision to other persons and circumstances shall nevertheless be
valid, and the City Council hereby declares that this Resolution would have been enacted
without such invalid provision.
Section 6. It is officially found, determined, and declared that the meeting at
which this Resolution is adopted was open to the public and public notice of the time,
place, and subject matter of the public business to be considered at such meeting,
including this Resolution, was given, all as required by Chapter 551, Texas
Section 7. This Resolution shall be in force and effect from and after its final
passage, and it is so resolved.
PASSED AND ADOPTED, this 20th day of January, 2022.
CITY OF SCHERTZ, TEXAS
Mayor Ralph Gutierrez, Mayor
0174 0 1 MIS
City Secretary, Brenda Dennis
(CITY SEAL)
Agenda No. 3.
CITY COUNCIL MEMORANDUM
City Council
January 25, 2022
Meeting:
Department:
Public Works
Subject:
Ordinance No. 22 -T -03 - Consideration and /or action approving an Ordinance by
the City Council of the City of Schertz, Texas, authorizing an adjustment to the
Fiscal Year 2021 -2022 Budget to provide funding for the purchase of HVAC
equipment for the Civic Center HVAC Replacement Project, repealing all
ordinances or parts of ordinances in conflict with this ordinance; and providing
an effective date. (Final Reading) (C. Kelm /S. Williams /S. McClelland)
BACKGROUND
The Schertz Civic Center has been providing rental space for the community since 2006. Recently, the
HVAC system in the facility is experiencing outages, performance and reliability issues. In addition to
having the City's on -staff HVAC Technician diagnose the ongoing issues, the City also entered into a
task order with M &S Engineering (one of the City's on -call engineering firms) to do a full redesign of
the facility's HVAC system.
The new system being proposed for the Civic Center is a system that is more conventional for a facility
of this size. New package units will be installed on -grade on the exterior of the building. The variable
air volume (VAV) units will be distributed to each zone within the facility by VAV terminal units. A
large portion of the existing duct work will be able to remain in place allowing for less disruption
within the facility during construction.
Due to long lead times, City Staff is recommending ordering the HVAC equipment prior to the final
design being completed. This will shorten the overall construction schedule which will minimize the
impacts on the Civic Center operations. This ordinance allocates funds from the Hotel Occupancy Tax
reserves in order to fund the purchase of the HVAC equipment for the project.
A separate resolution will be brought to City Council authorizing the agreement for the purchase of the
HVAC equipment.
City Council approved this item on first reading at their meeting of January 4, 2022.
GOAL
The goal of this ordinance is to amend the fiscal year 2021 -2022 budget to provide funding for the
purchase of HVAC equipment for the Civic Center.
COMMUNITY BENEFIT
Replacing the existing HVAC system will allow the Civic Center to continue to provide high -end event
rental space to the community.
SUMMARY OF RECOMMENDED ACTION
Staff recommends that the City Council approve Ordinance 22 -T -03 on final reading authorizing the
budget adjustment to allow for the purchase of new HVAC equipment.
FISCAL IMPACT
Funding for the equipment procurement and construction of the project will be paid for using existing
Hotel Occupancy Tax Funds which are permitted to be used on Capital Improvements at the Civic
Center.
RECOMMENDATION
Staff recommends that the City Council approve Ordinance 22 -T -03 on final reading authorizing the
budget adjustment to allow for the purchase of new HVAC equipment.
Attachments
22 -T -03
ORDINANCE NO. 22-T-03
A ORDINANCE BY THE CITY COUNCIL OF THE CITY OF SCHERTZ,
TEXAS AUTHORIZING AN ADJUSTMENT TO THE FISCAL YEAR
2021 -2022 BUDGET TO PROVIDE FUNDING FOR THE PURCHASE OF
HVAC EQUIPMENT FOR THE CIVIC CENTER HVAC REPLACEMENT
PROJECT, REPEALING ALL ORDINANCES OR PARTS OF
ORDINANCES IN CONFLICT WITH THIS ORDINANCE; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, pursuant to Ordinance 21 -T -38, the City Council of Schertz, Texas, (the
"City ") adopted the budget for the City for the fiscal year 2021 -2022 (the "Budget "), which
provides funding for the City's operations throughout the 2021 -2022 fiscal year; and
WHEREAS, the City needs to authorize a budget amount of $250,000 for the purpose of
purchasing HVAC equipment related to the Civic Center HVAC Replacement Project; and
WHEREAS, City Staff recommends that the City Council of the City adjust the Budget
and approve the ordinance; and
WHEREAS, the City Council of the City has determined that it is in the best interest of
the City to adjust the Budget and approve the budget transfer for the Civic Center HVAC
Replacement Project, as more fully set forth in this Ordinance; and
WHEREAS, the City has identified a need to replace the existing HVAC system at the
Civic Center; and
WHEREAS, the City has Hotel Occupancy Tax Funds available to be used on Capital
Projects at the Civic Center; and
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS
Section 1. The City shall transfer a budget of $250,000 from the Hotel Occupancy Tax Fund
to the Civic Center HVAC Replacement Project.
Section 2. The recitals contained in the preamble hereof are hereby found to be true, and
such recitals are hereby made a part of this Ordinance for all purposes and are adopted as a part
of the judgment and findings of the City Council.
Section 3. All ordinances, or parts thereof, which are in conflict or inconsistent with any
provision of this Ordinance are hereby repealed to the extent of such conflict, and the provisions
of this Ordinance shall be and remain controlling as to the matters resolved herein.
Section 4. This Ordinance shall be construed and enforced in accordance with the laws of
the State of Texas and the United States of America.
50234811.1
Section 5. If any provision of this Ordinance or the application thereof to any person or
circumstance shall be held to be invalid, the remainder of this Ordinance and the application of
such provision to other persons and circumstances shall nevertheless be valid, and the City
Council hereby declares that this Ordinance would have been enacted without such invalid
provision.
Section 6. It is officially found, determined, and declared that the meeting at which this
Ordinance is adopted was open to the public and public notice of the time, place, and subject
matter of the public business to be considered at such meeting, including this Ordinance, was
given, all as required by Chapter 551, Texas Government Code, as amended.
Section 7. This Ordinance shall be in force and effect from and after its final passage, and it
is so resolved.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS, THAT
THIS ORDINANCE WAS PASSED AND APPROVED on first reading, this 4th day of
January, 2022.
PASSED, APPROVED, and ADOPTED on second reading this the 25th day of January, 2022
CITY OF SCHERTZ, TEXAS
Ralph Gutierrez, Mayor
ATTEST:
Brenda Dennis, City Secretary
(CITY SEAL)
50234811.1
Agenda No. 4.
CITY COUNCIL MEMORANDUM
City Council January 25, 2022
Meeting:
Department: Public Works
Subject: Resolution No. 22 -R -11 - Consideration and /or action approving a Resolution by
the City Council of the City of Schertz, Texas authorizing the City Manager to
enter into a job order contract with Sullivan Contracting Services for the
purchase of HVAC equipment relating to the Civic Center HVAC Replacement
Project. (C. Kelm /S. Williams /S. McClelland)
BACKGROUND
The Schertz Civic Center has been providing rental space for the community since 2006. Recently, the
HVAC system in the facility is experiencing outages and performance and reliability issues. In addition
to having the City's on -staff HVAC Technician diagnose the ongoing issues, the City also entered into a
task order with M &S Engineering (one of the City's on -call engineering firms) to do a full redesign of
the facility's HVAC system.
The new system being proposed for the Civic Center is a system that is more conventional for a facility
of this size. New package units will be installed on -grade on the exterior of the building. The variable
air volume (VAV) units will be distributed to each zone within the facility by VAV terminal units. A
large portion of the existing duct work will be able to remain in place allowing for less disruption
within the facility during construction.
City Staff is recommending awarding the equipment procurement and construction contracts to Sullivan
Contracting through a job order contract. Sullivan has a Job Order Contract agreement with the Choice
Partners Group Purchasing Cooperative ( "CP "). CP completed a Request for Proposals for Job Order
Contracts in February 2018. A total of 571 vendors were invited to participate in the procurement
process. Twenty -five responses were received and evaluated by a three member evaluation team.
Evaluations were done on the basis of Price, Vendor's experience and reputation, Quality of
products /services, Compliance with local, state, and federal law, safety record, financial capability,
marking plan, and value add products /services. The program intended to award to all vendors scoring an
overall score of 70 or better to allow for a variety of specialties including roofing, fencing,
interior /exterior construction, and HVAC. A total of 15 vendors were awarded under this procurement.
Although Sullivan was not the highest ranked vendor in the procurement it is due to the limited scope of
services they proposed. This procurement was for a wide range of services from building
construction, renovation, plumbing and HVAC. Vendors who could provide services across all
categories were scored higher. Sullivan proposed services specifically related to HVAC which led to a
lower overall score. In addition, Sullivan comes highly recommended by M &S Engineering, the Design
Engineer for this project, based on Sullivan's work for Comal County, the City of New Braunfels, and
the City of Seguin.
By contracting with Sullivan via the Choice Partners Group Purchasing Cooperative, the City will save
significant time and resources on this project. City Staff is recommending awarding the project in two
phases. The first phase, being awarded with this resolution, will be to order the HVAC equipment for
the project prior to the design being completed. Phase two will award the construction phase of the
project, which will be awarded after the design is completed. By awarding the project in two phases,
City Staff anticipates being able to cut the construction schedule by 6 weeks due to current equipment
lead times.
GOAL
The goal of this resolution is to award a job order contract to Sullivan Contracting for the purchase of
HVAC equipment for the Civic Center.
COMMUNITY BENEFIT
Replacing the existing HVAC system will allow the Civic Center to continue to provide high -end event
rental space to the community. By contracting with Sullivan via the Choice Partners Group Purchasing
Cooperative, the City will save significant time and resources on this project.
SUMMARY OF RECOMMENDED ACTION
Staff recommends that the City Council approve Resolution 22 -R -11 to allow for the purchase of new
HVAC equipment for the Civic Center.
FISCAL IMPACT
Funding for the equipment procurement and construction of the project will be paid for using existing
Hotel Occupancy Tax Funds which are permitted to be used on Capital Improvements at the Civic
Center and will not exceed $205,000.
RECOMMENDATION
Staff recommends that the City Council approve Resolution 22 -R -11 to allow for the purchase of new
HVAC equipment for the Civic Center.
Attachments
F• . m
Schertz Civic Center HVAC Replacement - CP - REVISED 1. 19.22 - Proposal
Sullivan JOC - Choice Partners Contract
05_18 -029JN JOC IDIQ_Eval Summary
06_18 -029JN JOC IDIQ_Bid Tabulation
RESOLUTION NO. 22 -R -11
A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ,
TEXAS AUTHORIZING THE CITY MANAGER TO ENTER INTO A JOB
ORDER CONTRACT WITH SULLIVAN CONTRACTING SERVICES
FOR THE PURCHASE OF HVAC EQUIPMENT RELATING TO THE
CIVIC CENTER HVAC REPLACEMENT PROJECT
WHEREAS, the City of Schertz (the "City ") has a need to replace the entire HVAC
system at the Civic Center; and
WHEREAS, Sullivan Contracting Services has a Job Order Contract agreement with the
Choice Partners Group Purchasing Cooperative; and
WHEREAS, the City is a member of Choice Partners and has confirmed that their
procurement methods align with the City's requirements; and
WHEREAS, the City has dedicated Hotel Occupancy Tax funds for the completion of this
project.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS
Section 1. The City Council hereby authorizes the City Manager to execute and
deliver an agreement in compliance with Choice Partners standards with Sullivan Contracting
Services for the purchase of HVAC equipment for an amount not to exceed $205,000.00.
Section 2. The recitals contained in the preamble hereof are hereby found to be true, and
such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part
of the judgment and findings of the City Council.
Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any
provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions
of this Resolution shall be and remain controlling as to the matters resolved herein.
Section 4. This Resolution shall be construed and enforced in accordance with the laws
of the State of Texas and the United States of America.
Section 5. If any provision of this Resolution or the application thereof to any person or
circumstance shall be held to be invalid, the remainder of this Resolution and the application of
such provision to other persons and circumstances shall nevertheless be valid, and the City Council
hereby declares that this Resolution would have been enacted without such invalid provision.
Section 6. It is officially found, determined, and declared that the meeting at which this
Resolution is adopted was open to the public and public notice of the time, place, and subject
matter of the public business to be considered at such meeting, including this Resolution, was
given, all as required by Chapter 551, Texas Government Code, as amended.
Section 7. This Resolution shall be in force and effect from and after its final
passage, and it is so resolved.
PASSED AND ADOPTED, this 25th day of January, 2022
CITY OF SCHERTZ, TEXAS
Ralph Gutierrez, Mayor
ATTEST:
Brenda Dennis, City Secretary
(CITY SEAL)
50664954.1 - 2 -
Office (830)272- ,3812 /Fax ('8310401 -5888
FAO FOX 2610 Seguin, Ad1 76156
wWW' Sce- tx.com
• .
The Pounds Group LLC dba Sullivan Contracting Services Choice Partners Contract #: 21/039MR -14
Send to: City of Schertz Phone: 210.619.1809 1/19/2022
10 Commercial Place, Bldg. 2 Job #: 621229
Schertz, TX 78154
Email: smcclelland @schertz.com
Attn: Scott McClelland Job Name: Schertz Civic Center HVAC Replacement - CP
Job Description
Pricing below reflects the UPDATED equipment only for HVAC per schedules and specifications
designated on sheets M401, M501, & M701.
Equipment is as follows:
• (3) Package Units (3) EA. @ $53,286.32 $159,858.96
• (13) VAVs (13) EA. @ $1,980.00 $25,740.00
Current Lead Times for equipment:
• PKG Units - 11 to 13 weeks
• VAV Boxes - 8 to 10 weeks
* *Pricing below includes Performance and Payments Bonds **
Exclude: After Hours, Structural Design /Fees, Electrical, HVAC, Plumbing, Fire Sprinkler /Alarm,
Permitting, Testing, any items not listed above.
* *Price excludes any owner mandated COVID -19 Testing, Procedures, and /or changes
to normal work practices not covered above. **
* *Due to current volatility in the market, proposal has potential to only be guaranteed for
15 days **
CostWorks Base
95% Coeff
Owner Contingency
Sub Total
Bond
PROJECT TOTAL
$191,537.01
$181,960.16
$0.00
$181,960.16
$3,639.20
$185,599.36P/us applicable sales tax
Respectfully submitted,
K'gle r)aLer
!'C'- ed
�,
CSP #18 -029JN
These Contract Terms and Conditions are part of the final contract in each product and/or service contract awarded as a
result of this CSP and are part of the terms and conditions of each Purchase Order, Job Order, or proposal forms issued in
connection with this CSP. Vendors are responsible for identifying any exceptions to these terms and conditions. ANY
EXCEPTIONS MUST BE NOTED DIRECTLY BELOW EACH OF THE RESPECTIVE TERMS AND
CONDITIONS. Proposals that are qualified with conditional clauses, items not called for, or other irregularities may be
considered non - responsive by HCDE /CP and eliminated from further consideration.
CONTRACT BETWEEN
HARRIS COUNTY DEPARTMENT OF EDUCATION AND
FOR
JOB ORDER CONTRACTING, IDIQ PUBLIC WORK,
MINOR CONSTRUCTION, MAINTENANCE, AND RENOVATION WORK
This Contract is entered into between HCDE /CP and Vendor, having submitted a proposal in response to this CSP issued
by HCDE /CP and whose proposal has been accepted and awarded by HCDE. In consideration of the mutual covenants
and conditions contained in this Contract and other good and valuable consideration, the receipt and sufficiency of which
are hereby acknowledged, HCDE /CP and Vendor, intending to be legally bound, and subject to the terms, conditions, and
provisions of this Contract, agree as follows:
5.1. Definitions
The terms used in this Contract shall have the meanings assigned to them in Section 1.0 Notice of Intent of the
CSP.
5.2. Use of Contract by CP members
Vendor agrees and understands that this CSP and Contract may be used to accomplish work for HCDE /CP, a
local governmental entity. Vendor further agrees and understands that this CSP and Contract may also be utilized
by CP members pursuant to the piggyback method, as contemplated in the U.S. Department of Agriculture
Memorandum SP 35 -2012, Procuring Services of Purchasing Cooperatives, Group Purchasing Organizations,
Group Buying Organizations, etc. ( "SP 35- 2012). Vendor agrees and understands that CP members include
"school food authorities," as that term is used in SP 35- 201.2.
5.3. Contract Terms; Amendment
The terms and conditions of this Contract shall govern all procurements conducted hereunder. No pre - published
terms on Vendor's Purchase Order, acknowledgments, invoices, or other forms shall have any force or effect
unless expressly agreed to by the CP member and Vendor. No amendment of this Contract shall be permitted
unless and until first approved in writing by HCDE /CP and, if necessary, the CP member(s), and no such
amendment shall have any effect unless and until a written amendment to this Contract is executed by the HCDE
Superintendent or his designee after any necessary approvals have been obtained from the HCDE Board of
Trustees. In the event that a Vendor has an existing HCDE /CP contract in the same contract title, upon award,
the new contract will immediately supersede the older contract, if applicable.
5.4. Term of Contract; Renewal of Contract
The initial term of this Contract is for a period of two (2) years, with HCDE /CP having the option to renew the
Contract for three (3) additional one -year terms, at HCDE's sole discretion, unless otherwise specified in Section
6.0 Scope of Proposal. Consequently, the total term of the Contract may be for a period of five (5) years. The
phrase "Term" in this Contract shall mean the then - current Term of the Contract, whether an initial term or a
renewal term.
5.5. Termination of Contract; Survival
This Contract shall remain in effect until (1) the Contract expires by its terms or (2) the Contract is terminated
by mutual consent of HCDE /CP and Vendor. All Supplemental Contracts, purchase orders, and/or orders for
goods or services issued by HCDE and/or CP members and accepted by Vendor shall survive the expiration or
eBid JOC CSP (revised 8.28.17) Page 15 of 38
CSP #18 -029JN
termination of this Contract. During the term of any Supplemental Contract entered into between Vendor and a
CP member, all terms of this Contract shall continue to apply to the Supplemental Contract.
In the event of a breach or default of the Contract and/or the CSP by Vendor, HCDE /CP reserves the right to
enforce the performance of the Contract in any manner prescribed by law or deemed to be in the best interest of
HCDE /CP and/or CP members. HCDE /CP further reserves the right to terminate the Contract immediately in the
event Vendor fails to: (1) meet schedules, deadlines, and/or delivery dates within the time specified in the CSP,
this Contract, and/or a Purchase Order; (2) make any payments owed; or (3) otherwise perform in accordance
with this Contract and /or the CSP. HCDE /CP also reserves the right to terminate the Contract immediately, with
written notice to Vendor, if HCDE /CP believes, in its sole discretion that it is in the best interest of HCDE /CP
and /or CP members to do so.
In the event that a material change to the terms of the Contract occurs, then the Contract shall be allowed to
expire and shall not be renewed upon the conclusion of the Contract's term. The phrase "material change" in this
paragraph shall mean a modification that substantially exceeds the terms of the original contract between
HCDE /CP and Vendor. Upon the expiration of the Contract's term, HCDE /CP may issue a new CSP for the
goods or services procured under the previous contract.
Vendor agrees that HCDE /CP shall not be liable for damages in the event that HCDE /CP declares Vendor to be
in default or breach of this Contract and/or the CSP. Vendor further agrees that upon termination of the Contract
for any reason, Vendor shall, in good faith and with reasonable cooperation, aid in the transition to any new
arrangement and/or Vendor.
5.6. Buy America Act; Prevailing Wage Rates
Buy American Act
The Buy American Act, set forth in 7 C.F.R. Part 210.21(d), requires that participants in the National School
Lunch Program and School Breakfast Program use the federal nonprofit food service funds, to the maximum
extent practical, to buy domestic commodities or products. 7 CFR Part 210.21(d) defines a "domestic commodity
or product" as one that is either produced in the U.S. or is processed in the U.S. substantially using agricultural
commodities that are produced in the U.S. "Substantially" means that over 51 percent of the final processed
product consists of agricultural commodities that were grown domestically.
Because many HCDE /CP members participate in the National School Lunch Program and School Breakfast
Program, HCDE /CP requires Vendor to certify whether its products are "domestic commodities or products ", as
defined by 7 C.F.R. Part 210.21(4). Accordingly, Vendor agrees to provide certification of the domestic content
in the parts, components, and other elements contained in the product, including specific information about the
percentage of U.S. content from the supplier (i.e., manufacturer or distributor).
Exceptions to the Buy American provision should be used as a last resort; however, an alternative or exception
may be approved by the CP member, upon request. To be considered for an exception to the Buy American
provision, Vendor may submit a good faith request for an exception, certifying that Vendor reasonably believes
that:
(a) the product is not produced or manufactured in the U.S. in sufficient and reasonable available
quantities of a satisfactory quality; and/or
(b) the costs of a U.S. product are significantly higher than the non - domestic product.
In the event Vendor or Vendor's supplier(s) are unable or unwilling to certify compliance with the Buy American
Provision, or the applicability of an exception to the Buy American provision, HCDE /CP members may decide
not to purchase from Vendor.
Additionally, HCDE /CP members may require country of origin on all products and invoices submitted for
payment by Vendor, and Vendor agrees to comply with any such requirement.
Prevailing Wage Rates
Vendor and all subcontractors of Vendor shall comply with all laws regarding prevailing wage rates, including,
but not limited to, TEX. GOV'T. CODE Chapter 2258, applicable to the construction of a public work, and any
eBid JOC CSP (revised 8.28.1.7) Page 16 of 38
CSP #18 -029JN
related federal requirements, including the DAVIS -BACON ACT. In the event TEX. GOV'T. CODE Chapter
2258 applies to a product or service provided by Vendor to HCDE /CP or a CP member, Vendor and any
subcontractor(s) shall comply with the prevailing wage rates set by HCDE /CP or the CP member.
5.7. Change Orders
Pursuant to TEX. EDUC. CODE § 44.0411(a), for HCDE /CP and CP members that are Texas school districts, if
a change in plans or specifications is necessary after the performance of a Purchase Order or Job Order has begun
or if it is necessary to decrease or increase the quantity of work to be performed or of materials, equipment, or
supplies to be furnished, the CP member may approve change orders making the changes. The total Purchase
Order or Job Order price may not be increased because of the changes unless additional money for increased
costs is approved for that purpose from available money or is provided for by the authorization of the issuance
of time warrants. The CP member may grant general authority to an administrative official to approve the change
orders. A Purchase Order or Job Order with an original contract price of $1 million or more may not be increased
under TEX. EDUC. CODE § 44.0411(a) by more than 25 percent. If a change order for a Purchase Order or Job
Order with an original contract price of less than $1 million increases the contract amount to $1 million or more,
the total of the subsequent change orders may not increase the revised contract amount by more than 25 percent
of the original contract price.
5.8. Compliance with Laws
Vendor shall comply with all applicable federal, state, and local laws, statutes, ordinances, standards, orders,
rules, and regulations, including, as applicable, workers' compensation laws; minimum and maximum salary and
wage statutes and regulations; prompt payment and licensing laws and regulations; anti - discrimination statutes
and regulations (Title VI of the Education Amendments of 1972; Section 504 of the Rehabilitation Act of 1973;
the Age Discrimination Act of 1975; Title 7 C.F.R. Parts 15, 15a, and 15b; the Americans with Disabilities Act;
and FNS Instruction 113 -1, Civil Rights Compliance and Enforcement — Nutrition Programs and Activities); the
Davis -Bacon Act (40 U.S.C. § 276a / 29 CFR Part 5); the Copeland "Anti- Kickback" Act (1.8 U.S.C. § 874 / 29
CFR Part 5); the Equal Opportunity Employment requirements (Executive Orders 11246 and 11375 / 41 CFR
Chapter 60); the McNamara - O'Hara Service Contract Act (41 U.S.C. 351); Section 306 of the Clean Air Act (42
U.S.C. § 1857h); Section 508 of the Clean Water Act (33 U.S.C. § 1368); Executive Order 11738, Environmental
Protection Agency regulations (40 CFR Part 1.5); the Contract Work Hours and Safety Act (40 U.S.C. § 3701-
3708; 29 C.F.R. Part 5; the Solid Waste Disposal Act (Section 6002 as amended by the Resource Conservation
and Recovery Act for procuring solid waste management services in a manner that maximizes energy and
resource recovery when contract amount is in excess of $10,000); the Education Department General
Administrative Regulations ( "EDGAR") (2 C.F.R. Part 200); mandatory standards and policies contained in the
state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub. L. 94-
163, 89 Stat. 871); and all applicable requirements and regulations, including those related to reporting, patent
rights, copyrights, data rights, and those mandated by federal agencies making awards of federal funds to
HCDE /CP and /or CP members. Vendor understands that Vendor is ineligible to receive a contract award with
HCDE /CP if Vendor or its principal(s) is listed on the government wide exclusions in the System for Award
Management (Debarment and Suspension Orders Executive Orders 12549 and 12689) or is 30 days or more
delinquent in paying child support (Tex. Earn. Code § 231.006). For the entire duration of this Contract, Vendor
and all subcontractors shall maintain all required licenses, certifications, permits, and any other documentation
necessary to perform this Contract. All permits will be acquired by Vendor and invoiced to the CP member at
cost as part of the Purchase Order, unless the permits are provided by the CP member. For the entire duration of
this Contract, Vendor and all subcontractors shall also comply with all requirements pertaining to local, state, or
federal health and safety certifications, licensing, or regulations. Vendor must comply with all state and local
building code requirements unless otherwise specifically provided in the CP member's Purchase Order, and
Vendor must pay all fees and charges for connections to outside services and for use of property outside the
project site. The states of individual CP members may have regulations and laws that govern payment retention
and progress payments for public projects. Vendor is responsible for being acquainted with and complying with
each state's requirements. When required or requested by HCDE /CP or a CP member, Vendor shall furnish
HCDE /CP and /or the CP member with satisfactory proof of Vendor's compliance with this provision.
5.9. Confidentiality
Vendor and HCDE /CP agree to secure the confidentiality of all information and records in accordance with
applicable federal and state laws, rules, and regulations. Vendor and HCDE /CP understand that the Family
eBid JOC CSP (revised 8.28.17) Page 17 of 38
CSP #18 -029JN
Educational Rights and Privacy Act (FERPA), 20 U.S.C. § 1232g, governs the privacy and security of
educational records and information and agree to abide by FERPA rules and regulations, as applicable. Vendor
also acknowledges that HCDE /CP and numerous CP members are subject to the Texas Public Information Act,
and Vendor waives any claim against and releases from liability HCDE /CP and CP members, their respective
officers, employees, agents, and attorneys with respect to disclosure of information provided under or in this
Contract or otherwise created, assembled, maintained, or held by Vendor, HCDE, or a CP member and
determined by HCDE /CP or the CP member, the Attorney General of Texas, or a court of law to be subject to
disclosure under the Texas Public Information Act.
5.10. Performance and Payment Bonds
Vendor agrees to provide performance bonds and /or payment bonds as required by law, based on the amount or
estimated amount of any Purchase Order or Job Order for a public work contract, which is defined as a contract
for constructing, altering, or repairing a public building or carrying out or completing any public work. TEX.
GOV'T. CODE §§ 2253.001(4);22269.411. Pursuant to TEX. GOV'T. CODE § 2253.021, aperformance bond
is required if a Purchase Order is in excess of $100,000 for CP members that are governmental entities subject
to Chapter 2253; a payment bond is required if a Purchase Order or Job Order is in excess of $25,000 for CP
members that are governmental entities subject to Chapter 2253 and are not municipalities or a joint board created
under Subchapter D, Chapter 22 of the Tex. Transp. Code, and a payment bond is required if a Purchase Order
or Job Order is in excess of $50,000 for CP members that are governmental entities subject to Chapter 2253 and
are municipalities or a joint board created under Subchapter D, Chapter 22 of the TEX. TRANSP. CODE.
Additionally, Vendor shall provide all bonds, including bid guarantee, performance bond, and payment bond, as
applicable under U.S. Department of Agriculture and /or Texas Department of Agriculture rules.
5.11. Title and Risk of Loss
Whenever HCDE /CP or a CP member is purchasing (and not leasing) a product under this Contract, title and risk
of loss shall pass upon the later of HCDE /CP or the CP member's acceptance of the product or payment of the
applicable invoice.
5.12. Warranty Conditions
All product(s) and /or service(s) provided by the Vendor under this Contract must be warranted to be free from
defects in material, workmanship, and free from such defects in design for a period of one (1) year upon the later
of HCDE's or the CP member's acceptance of the product and/or service or payment of the applicable invoice.
Vendor warrants that all products and/or services furnished under this Contract shall conform in all respects to
the terms of this Contract, including any drawings, specifications, and/or standards incorporated herein,
including, without limitation, those detailed in the CSP and Purchase Order. In addition, Vendor warrants that
products and/or services are suitable for and will perform in accordance with the purposes for which they are
intended. Vendor shall assume all liabilities incurred within the scope of consequential damages and incidental
expenses, as set forth in the Vendor or manufacturer's warranty, which result from either delivery or use of
product, which does not meet the specifications within this Contract, the CSP, or Purchase Order.
5.13. Criminal History Review
Section 10.0 Attachment —SB 9 Contractor Certification: Contractor Employees (Required) and
Attachment —SB 9 Contractor Certification: Subcontractor Form (If Applicable) must be submitted with
packet, if applicable.
Prior to commencing any work under the Contract, if Vendor contracts with HCDE /CP to provide services,
Vendor must certify, on the form provided herein, that for each covered employee of Vendor who will have direct
contact with students, Vendor has obtained, as required by TEX. EDUC. CODE Section 22.0834: (a) state
criminal history record information from a law enforcement or criminal justice agency or a private entity that is
a consumer reporting agency governed by the Fair Credit Reporting Act (15 U.S.C. Section 1681 et seq.) for
each covered employee of Vendor employed before January 1, 2008; and (b) national criminal history record
information for each employee of Vendor employed on or after January 1, 2008. Vendor must also obtain similar
certifications of compliance with TEX. EDUC. CODE, Chapter 22 requirements from any subcontractors on the
form provided herein. Covered employees with disqualifying criminal history are prohibited from serving at
HCDE /CP or at CP school district members' locations; Vendor and any subcontracting entity may not permit a
covered employee to provide services at a school if the employee has been convicted of a felony or misdemeanor
eBid JOC CSP (revised 8.28.17) Page 18 of 38
CSP #18 -029JN
offense that would prevent a person from being employed under TEX. EDUC. CODE § 22.085(a) (i.e., Title 5
felony or an offense requiring registration as a sex offender and victim was under 18 years of age or was enrolled
in a public school at the time the offense occurred). Covered employees do not include employees of a contracting
or subcontracting entity that is providing engineering, architectural, or construction services on a project to
design, construct, alter, or repair a public work i£ (1) the public work does not involve the construction, alteration,
or repair of an instructional facility as defined by Texas Education Code Section 46.001; (2) the employee's
duties will be completed more than seven (7) days before a new instructional facility will be used for instruction;
or (3) for an existing instructional facility, the work area contains sanitary facilities separated from all areas used
by students by a fence at least six (6) feet high, and the Contractor adopts, informs employees of, and enforces a
policy prohibiting employees and any subcontractor's employees from interacting with students or entering areas
used by students. Tex. Educ. Code §§ 22.0834(a -1), .08341. The criminal history record information review
obligation applies only if Vendor contracts with HCDE /CP to provide services; it does not apply to a contract for
the purchase of goods, products or real estate.
5.14. Customer Support
Vendor shall provide timely and accurate technical advice and sales support to HCDE /CP staff, and CP members.
Vendor shall respond to requests for customer support within one (1) business day after receipt of the request.
Vendor shall provide training to HCDE /CP staff and/or CP members regarding products and/or services supplied
by Vendor, at no additional charge, if requested by HCDE /CP or a CP member.
5.15. HCDE /CP and /or CP members' Property
In the event of loss, damage, or destruction of any property owned by or loaned by HCDE /CP or a CP member
that is caused by Vendor or Vendor's representative, agent, employee, or contractor, Vendor shall indemnify
HCDE /CP or the CP member and pay to HCDE /CP or the CP member the full value of or the full cost of repair
or replacement of such property, whichever is greater, within thirty (30) days of Vendor's receipt of written
notice of HCDE's or the CP member's determination of the amount due. If Vendor fails to make timely payment,
HCDE /CP or the CP member may obtain such money from Vendor by any means permitted by law, including,
without limitation, offset or counterclaim against any money otherwise due to Vendor by HCDE /CP or the CP
member.
5.16. Tax Exempt Status
HCDE /CP and all CP members that are Texas governmental entities or agencies are exempt from payment of
Texas State Sales Taxes under TEXAS TAX CODE§ 151.310 for the purchase of tangible personal property.
Laws of other states govern the tax status of CP members in states other than Texas. Vendor represents and
warrants that it shall pay all taxes or similar amounts resulting from this Contract, including, without limitation,
any federal, state, or local income, sales or excise taxes of Vendor or its employees. HCDE /CP and CP members
shall not be liable for any taxes resulting from this Contract, except where otherwise required by law.
5.1.7. Other State Tax Requirements
5.17.1. Payment of Taxes by CP members Outside of Texas — CP members outside of Texas will pay only the
rate and/or amount of taxes identified in Vendor's proposal submitted in response to the CSP as
appropriate to the specific CP member.
5.1.7.2. State and Local Transaction Privilege Taxes —The CP member is subject to all applicable state and local
transaction privilege taxes. Transaction privilege taxes apply to the sales of products and are the sole
responsibility of Vendor, as the seller, to remit. Failure to remit taxes from HCDE /CP and /or the CP
member, as the buyer, does not relieve Vendor, as the seller, from its obligation to remit taxes.
5.18. State of Texas Franchise Tax
By submitting a proposal in response to the CSP, Vendor certifies that Vendor is not currently delinquent in
Vendor's payment of any franchise taxes or other taxes owed to the State of Texas.
5.19. Tax Responsibilities of Vendor and Indemnification for Taxes
Vendor is responsible for complying with the tax laws of states and the federal government. Vendor and all
subcontractor(s) of Vendor shall pay all federal, state, and local taxes applicable to Vendor's operation, any
eBid JOC CSP (revised 8.28.17) Page 19 of 38
CSP #18 -029JN
persons employed by Vendor, and all subcontractors of Vendor. Vendor shall require all subcontractors to hold
HCDE /CP and the CP member harmless from any responsibility for taxes, damages, and interest. If applicable,
contributions required under federal, state, and/or local laws and regulations and any other costs, including, but
not limited to, transaction privilege taxes, unemployment compensation insurance, Social Security, and Worker's
Compensation, shall be the sole responsibility of Vendor.
5.20. IRS W -9
To receive payment under this Contract, Vendor shall have a current I.R.S. W -9 Form on file with the CP
member.
5.21. Assignment of Contract
Vendor may not assign this Contract or any of its rights, duties or obligations hereunder without the prior written
approval of HCDE. Any attempted assignment of this Contract by Vendor shall be null and void. Any Purchase
Order or Job Order made as a result of this Contract may not be transferred, assigned, subcontracted, mortgaged,
pledged, or otherwise disposed of or encumbered in any way by Vendor without the prior written approval of
HCDE /CP and, if applicable, the CP member.
5.22. Notification of Material Change
Vendor is required to notify HCDE /CP when any material change in operations occurs, including changes in
distribution rights for awarded products, bankruptcy, material changes in financial condition, change of
ownership, and the like, within three (3) business days of such change.
5.23. Performance
Vendor agrees to use commercially reasonable best efforts to provide the product(s) and/or service(s) subject to
this Contract. Vendor shall furnish all supervision, labor, tools, equipment, permits, licenses, transportation,
insurance, material, and supplies necessary to complete any scope of work, Purchase Order, or Job Order under
this Contract. Vendor shall use skilled, trained personnel, who shall be supervised by Vendor.
5.24. Subcontractors
If Vendor uses subcontractors in the performance of any part of this Contract, Vendor shall be fully responsible
to HCDE /CP and CP members for all acts and omissions of the subcontractors. Nothing in this Contract shall
create for the benefit of any such subcontractor any contractual relationship between HCDE /CP and any such
subcontractor, nor shall it create any obligation on the part of HCDE /CP or CP members to pay or to see to the
payment of any monies due any such subcontractor except as may otherwise be required by law. Vendor
represents and warrants that it is willing, able, and capable of obtaining, supervising, and being responsible for
any subcontractors who perform and/or provide products and services related to this Contract.
If Vendor uses subcontractors in the performance of any Purchase Order or Job Order issued as a result of a Job
Order Contract awarded via this procurement solicitation, subcontractors must issue their Job Order Quotes using
the same pricing method(s) outlined in the procurement solicitation and according to Texas Government Code
Chapter 22269, Subchapter I, Job Order Contracts Method.
5.25. Non - Appropriation
Renewal of this Contract, if any, will be in accordance with TEX. LOCAL GOV'T. CODE § 271.903 concerning
non - appropriation of funds for multi -year contracts. Notwithstanding any other provision of this Contract or
obligation imposed on HCDE /CP or any CP member by this Contract, HCDE /CP and CP members shall have
the right to terminate this Contract, any Supplemental Contract, Purchase Order, and/or Job Order without default
or liability to Vendor resulting from such termination, effective as of the expiration of each budget period of
HCDE /CP or any CP member if it is determined by HCDE /CP or any CP member, at their sole discretion, that
there are insufficient funds to extend this Contract, any Supplemental Contract, any Purchase Order. The parties
agree that this Contract, any Supplemental Contract, any Purchase Order, and/or any Job Order are commitments
of the current revenue of HCDE /CP and CP members only.
5.26. Ordering Procedures
Purchase Orders /Job Orders are issued by HCDE /CP and/or CP members to the Vendor according to this Contract
and any Supplemental Contract between HCDE /CP and the CP member. CP members must send Purchase
eBid JOC CSP (revised 8.28.17) Page 20 of 38
CSP #18 -029JN
Orders /Job orders to HCDE /CP, unless otherwise stipulated by HCDE /CP. HCDE /CP may request confirmation
of receipt of the Purchase Order /Job Order from Vendor.
HCDE /CP also may elect to require c- commerce functionality, in which Purchase Orders /Job Orders are sent
directly to Vendor and reported by the CP member to HCDE /CP on a specified basis. The e- commerce approach
must be approved by HCDE /CP prior to the start date of any Term of the Contract.
5.27. Invoices; Payments
5.27.1. Vendor shall submit invoices, in duplicate, directly to HCDE /CP or the CP member at the appropriate
location(s) specified by HCDE /CP or the CP member. Each invoice shall include HCDE's or the CP
member's Purchase Order /Job Order number and HCDE /CP Contract Number. All invoices shall be
itemized to include the type of product(s) and /or service(s) rendered. Vendor shall submit invoices
within a timely manner during HCDE's or the CP member's fiscal year in which the product(s) and /or
service(s) are purchased. The shipment tracking number or pertinent information for verification of
HCDE's or the CP member's receipt shall be made available upon request by HCDE /CP or the CP
member.
5.27.2. HCDE /CP or the CP member will make payments directly to Vendor. HCDE /CP or the CP member
placing the Purchase Order /Job Order with Vendor shall alone be liable and/or responsible for payment
for product(s) and/or service(s) ordered and must be invoiced directly by Vendor. Neither HCDE /CP
nor any CP member shall be liable for the indebtedness of any one CP member.
5.27.3. TEX. GOV'T. CODE § 2251.021 shall govern when payments are due to the Vendor. Payments are due
to Vendor by HCDE /CP and any CP member whose governing body meets only once a month or less
frequently, within forty -five (45) days after the later of the following: (1) the date HCDE /CP or the
CP member receives the products and services under the Contract; (2) the date the performance of the
service under the Contract is completed; or (3) the date HCDE /CP or the CP member receives an
invoice for the products or service. For CP members whose governing bodies meet more than once a
month or more often, payments are due by those CP members within thirty (30) days after the later of
the following: (1) the date the CP member receives product(s) under the Contract; (2) the date the
performance of the service under the Contract is completed; or (3) the date the CP member receives an
invoice for product(s) or service(s). Vendor agrees to pay any subcontractors the appropriate share of
the payment received from HCDE /CP or the CP member not later than the tenth (10th) day after the
date the Vendor receives the payment from HCDE /CP or the CP member.
The exceptions to payments made by HCDE, a CP member, and /or Vendor listed in TEX. GOV'T.
CODE § 2251.002 shall apply to this Contract.
5.28. Reporting
The Vendor shall provide HCDE /CP with a detailed monthhl report showing the total dollar volume of all sales
under this Contract for the previous month in Microsoft Excel format, in the format and with the information
specified by HCDE /CP. Reports are due on the fifteenth (15) day of the month, after the close of the previous
month and shall provide information regarding Purchase Orders /Job Orders during the previous month. Vendor
is responsible for collecting and compiling all sales under this Contract from all CP members and submitting one
(1) consolidated monthly report. The monthly report shall include, at a minimum, the date of each Purchase
Order /Job Order, Purchase Order /Job Order number, CP member name, city /town, and Purchase Order total
dollar amount. Reports shall be submitted in an electronic format to HCDE /CP at 6005 Westview, Houston,
Texas 77055, or electronically mailed to facilityreporti�choicepariners .org. Reports are required even if
there is no activity to report.
5.29. Pricing Changes
All prices and discount percentages in Vendor's proposal shall be firm for the Term of this Contract. Pricing may
be negotiated during the Contract renewal period. Vendor agrees to promptly lower the proportionate price of
any product purchased through this Contract following a reduction in the price the Vendor is paying suppliers.
All pricing submitted to HCDE /CP in Vendor's proposal shall include the administrative fee to be remitted to
eBid JOC CSP (revised 8.28.17) Page 21 of 38
CSP #18 -029JN
HCDE /CP by Vendor. It is Vendor's responsibility to keep all pricing up -to -date and on file with HCDE /CP. All
price changes shall be presented to HCDE /CP for acceptance or rejection by HCDE /CP, in its sole discretion,
using the same format as was accepted in Vendor's original proposal; all price changes for products and /or
services provided under this Contract must be approved, in writing, by HCDE /CP prior to taking effect.
The following documentation shall be provided to support a request for a price change:
justification for change /increase
terms and conditions
market conditions
manufacturers' /distributors' impact, if any
All price decreases shall be allowed for all products and /or services.
5.30. HCDE /CP Administrative Fee
HCDE /CP will invoice Vendor for the HCDE /CP Administrative Fee of 4 %, subject to the Administrative
Incentive Clause, below. HCDE /CP reserve the right to modify the Administrative Fee at any time, upon notice
to Vendor. The invoice for the Administrative Fee will be based on total sales made through this Contract.
Vendor shall remit payment of the HCDE /CP Fee to HCDE /CP no later than thirty (30) days following the end
of the month. Failure to pay the HCDE /CP Administrative Fee in a timely manner may result in Vendor
breaching this Contract and may result in HCDE /CP suspending or terminating this Contract. Vendor shall honor
and pay HCDE /CP the HCDE /CP Administrative Fee for any sales resulting from this Contract that occurred
within thirty (30) days of the expiration or termination of this Contract. All rebates, discounts, and other
applicable credits granted by Vendor as a result of any Supplemental Contracts entered into between Vendor and
CP members shall accrue exclusively to CP member(s).
Administrative Fee Incentive Clause. The following incentives will be determined in the sole discretion of
HCDE /CP and will be based on amounts actually billed by Vendor. Vendor's failure to abide by the Contract's
terms and conditions, including, without limitation, Vendor's requirement to report sales to HCDE /CP, may
result in HCDE /CP voiding the Administrative Fee Incentive, in HCDE /CP's sole discretion.
One -Year Term(s)
Gross sales above $5M invoiced by Choice Partners = 3% for remainder of the then -
current Contract Term
Subsequent renewal 1 -year Term = 3.75% and Vendor must maintain production of
$5M to keep 3.75% fee for the next subsequent renewal 1 -year Term
Individual Job Orders
$2M or above = 3.5% only in the Contract Term in which they are invoiced
$1M or above = 3.75% only in the Contract Term in which they are invoiced
5.31. Records Retention
Vendor shall maintain its records and accounts in a manner that shall assure a full accounting for all product(s)
and/or service(s) provided by the Vendor to HCDE /CP and/or CP members under this Contract. These records
and accounts shall be retained by Vendor and made available for review and copying by HCDE /CP and CP
members for a period of not less than three (3) years from the date of completion of the service(s), receipt of
product(s), the date of the receipt by HCDE /CP or the CP member of Vendor's final invoice or claim for payment
in connection with this Contract, or the date HCDE /CP or the CP member makes final payments and closes
pending matters in connection with a federal grant, whichever is later. If an audit or a compliance review has
been announced, the Vendor shall retain its records and accounts until such audit or compliance review has been
completed.
When federal funds are expended by HCDE or any CP member pursuant to this Contract, Vendor certifies that it
will comply with the record retention requirements detailed in 2 CFR § 200.333. Vendor further certifies that
Vendor will retain all records as required by 2 CFR § 200.333 for a period of three years after grantees or
eBid JOC CSP (revised 8.28.17) Page 22 of 38
CSP #18 -029JN
subgrantees submit final expenditure reports or quarterly or annual financial reports, as applicable, and all other
pending matters are closed.
5.32. Right to Review, Audit and Inspect
HCDE /CP, CP members, any federal agency that has awarded federal funds /grant(s) to HCDE /CP or a CP
member, and the Comptroller General of the United States, and/or any of their authorized representatives, shall,
upon written notice, have the right to audit and examine all of Vendor's records and accounts relating to this
Contract and inspect any project performed by the Vendor relating to this Contract. Records subject to
audit/review shall include, but are not limited to, all Purchase Orders and /or Job Orders resulting from this
Contract and records which may have a bearing on matters in connection with the Vendor's work for HCDE /CP
and /or CP members, and shall be open to inspection and subject to audit /review and /or reproduction by
HCDE /CP, CP member, and /or their authorized representative(s) to the extent necessary to adequately permit
evaluation and verification of:
5.32.1. Vendor's compliance with this Contract and the requirements of the CSP.
5.32.2. Compliance with procurement laws, policies, and procedures, including, without limitation,
reviewing /comparing pricing on invoices and the appropriate Unit Price Book for JOC work performed
for HCDE /CP and/or CP members.
5.32.3. Compliance with provisions for computing billings to HCDE /CP and/or to CP members.
5.32.4. Any other matter related to this Contract.
5.33, Indemnification
VENDOR SHALL INDEMNIFY AND HOLD HARMLESS HCDE /CP AND EACH CP MEMBER
INCLUDING HCDE'S AND CP MEMBERS' TRUSTEES OFFICERS ADMINISTRATORS EMPLOYEES
AND AGENTS, FROM ALL CLAIMS, LIABILITIES, COSTS, SUITS OF LAW OR IN EQUITY,
EXPENSES ATTORNEYS' FEES FINES PENALTIES OR DAMAGES ARISING FROM ACTS OR
OMISSIONS OF VENDOR VENDOR'S EMPLOYEES AGENTS OR SUBCONTRACTORS IN
CONNECTION WITH THIS CONTRACT INCLUDING WITHOUT LIMITATION THOSE ARISING
FROM CLAIMED INFRINGEMENT OF ANY PATENTS, TRADEMARKS, COPYRIGHT OR OTHER
CORRESPONDING RIGHT(S) WHICH IS RELATED TO ANY ITEM VENDOR IS REQUIRED TO
DELIVER. VENDOR'S OBLIGATIONS UNDER THIS CLAUSE SHALL SURVIVE ACCEPTANCE AND
PAYMENT BY HCDE /CP OR THE CP MEMBER.
5.34. Governing Law and Exclusive Venue
The laws of the State of Texas, without regard to its provisions on conflicts of laws, govern this Contract. Any
dispute under this Contract involving HCDE /CP must be brought exclusively in the state and federal courts
located in Houston, Harris County, Texas. Any dispute not involving HCDE /CP but involving a CP member and
Vendor shall be governed by the laws of the state of the CP member, without regard to its provisions on conflicts
of laws, and exclusive jurisdiction and venue shall lie in the city, county, and state of the CP member.
5.35. Multiple Contract Awards; Non - Exclusivity
HCDE /CP reserves the right to award multiple contracts under the CSP, including multiple contracts for each
product/service category. Product/Service categories are established at the sole discretion of HCDE /CP. Nothing
in this Contract may be construed to imply that Vendor has the exclusive right to provide products and /or services
to HCDE /CP and /or CP members. During the Term of this Contract, HCDE /CP and CP members reserve the
right to use all available resources to procure other products and /or services as needed and doing so will not
violate any rights of Vendor. In the event that a Vendor has an existing HCDE /CP contract in the same contract
title, upon award the new contract will immediately supersede the older contract.
5.36 New Products
New products that meet the specifications detailed in the CSP may be added to this Contract, with prior written .
approval from HCDE /CP. Pricing of any new products shall be equivalent to the percentage discount or proposed
prices for other similar products. Vendor may replace or add products to the contract if. the replacing products
eBid JOC CSP (revised 8.28.17) Page 23 of 38
CSP #18 -029JN
are equal to or superior to the original products offered or discounted in a similar degree or to a greater degree
and the products meet the requirements of the CSP. No products may be added to avoid competitive procurement
procedures. HCDE /CP may reject any proposed additions, without cause, in its sole discretion.
5.37. No Substitution
Any Purchase Order issued pursuant to this Contract shall conform to the specifications and descriptions
identified in this Contract and the CSP. Vendor shall not deliver substitutes without prior written authorization
from HCDE /CP or the CP member.
5.38 Penalties
If the Vendor is unable to provide the product(s) or services at the prices quoted in Vendor's proposal or if
Vendor fails to fulfill or abide by the terms and conditions of the Contract, the CSP, or a Supplemental Contract,
HCDE /CP or the CP member may take the following action(s), in the sole discretion of HCDE /CP or the CP
member, and Vendor agrees to comply with the chosen action(s):
5.38.1 Insist that the Vendor honor the quoted price(s) specified in Vendor's proposal or the Supplemental
Contract, as applicable;
5.38.2 Have the Vendor pay the difference between the Vendor's price and the price of the next acceptable
proposal, as determined by HCDE /CP or the CP member;
5.38.3 Have the Vendor pay the difference between Vendor's price and the actual purchase price of the product
or service on the open market; and /or
5.38.4 Recommend to HCDE Board of Trustees that the Vendor no longer be given the opportunity to submit
a proposal to HCDE /CP and/or that this Contract be terminated.
5.39. Promotion of Contract Marketing Plan
The marketing of Vendor's company, product, and/or services shall be the sole responsibility of Vendor.
HCDE /CP may only supply Vendor with CP members' contact lists that contain name, address, phone numbers,
and/or email addresses. Other items geared toward the joint - marketing of HCDE /CP and Vendor's company,
product, and/or services shall be at HCDE /CP's sole discretion. Encouraging CP members to circumvent this
Contract by purchasing directly from Vendor may result in suspension or termination of this Contract. For so
long as this Contract is valid and enforceable between the parties, Vendor agrees to display the CP seal in its
marketing collateral materials, such as Vendor's website and related marketing materials. Vendor shall submit
all promotional materials to HCDE /CP and obtain written approval before Vendor finalizes or publishes
promotional material bearing the HCDE /CP or HCDE /CP name or seal. Vendor may not release any press release
or other publication regarding this Contract or HCDE /CP unless and until HCDE /CP first approves the press
release or publication in writing.
5.40. Website Support
Vendor agrees to cooperate with HCDE /CP in publicizing contract particulars on the CP website. Vendor also
agrees to work with HCDE /CP in updating and maintaining current information on Vendor activities related to
the Contract on the CP website. Vendor agrees to provide an electronic version of its logo for use on the CP
website upon Contract award and provide other information as reasonably requested by HCDE /CP to help ensure
that the CP website is current and consistently updated.
5.41. Safety
Vendor, its subcontractor(s), and their respective employees shall comply fully with all applicable federal, state,
and local safety and health laws, ordinances, rules, and regulations in the performance of services under this
Contract, including, without limitation, those promulgated by HCDE /CP, CP members, and by the Occupational
Safety and Health Administration ( "OSHA "). In case of conflict, the most stringent safety requirements shall
govern. Vendor shall comply with all other safety guidelines and standards as required by HCDE /CP or CP
members. Vendor shall indemnify and hold HCDE /CP and/or the CP member harmless from and against all
claims, demands, suits, actions, judgments, fines, penalties, and liability of every kind arising from the breach of
Vendor's obligations under this provision.
eBid JOC CSP (revised 8.28.17) Page 24 of 38
CSP #18 -029JN
5.42. Workforce
Vendor shall employ only orderly and competent workers, skilled in the performance of the services, if any,
which shall be performed under this Contract. Vendor, its employees, subcontractors, and subcontractor's
employees may not use or possess any firearms, alcoholic or other intoxicating beverages, illegal drugs or
controlled substances while on the job or on HCDE /CP and CP members' property, nor may such workers be
intoxicated or under the influence of alcohol or drugs on HCDE /CP and CP members' property.
5.43. Supplemental Contracts
A CP member and Vendor may enter into a separate, Supplemental Contract. Any Supplemental Contract
developed as a result of this Contract and /or the CSP is exclusively between the CP member and Vendor and
shall have no effect or impact on HCDE, any other CP member, or this Contract. Any Supplemental Contract
between Vendor and a CP member is exclusively between that specific CP member and Vendor and will be
subject to immediate cancellation by the CP member (without penalty to the CP member) if, in the opinion of
the CP member, the quality, service, and specification requirements, and /or the terms and conditions are not
maintained as stated in the Supplemental Contract. Vendor shall promptly notify HCDE /CP of any Supplemental
Contract executed between Vendor and a CP member. Supplemental Contracts are entered into pursuant to the
piggyback method delineated in the U.S. Department of Agriculture directive SP 35 -2012.
5.44. Insurance
Vendor is required to provide HCDE /CP and/or the CP member with copies of certificates of insurance, naming
HCDE /CP and/or the CP member as additional insured's for Texas Workers Compensation and General Liability
Insurance, within 14 business days of contract award and prior to the commencement of any work under
this Contract. Certificates of Insurance, name and address of Vendor, the limits of liability, the effective dates
of each policy, and policy number shall be delivered to HCDE /CP and/or the CP member prior to commencement
of any work under this Contract. The insurance company insuring Vendor shall be licensed in the State of Texas
or the state in which the CP member is located, and shall be acceptable to HCDE /CP and/or the CP member.
Vendor shall give HCDE /CP or the CP member a minimum of ten (1.0) days' notice prior to any modifications
or cancellation of said policies of insurance. Vendor shall require all subcontractors performing any work under
or relating to this Contract to maintain coverage as specified below. Vendor shall, at all times during the Term of
this Contract, maintain insurance coverage with not less than the type and requirements shown below. If the CP
member has higher insurance requirements than those listed below, such may be added to the Purchase Order.
Such insurance is to be provided at the sole cost of the Vendor. These requirements do not establish limits of Vendor's
liability.
All policies of insurance shall waive all rights of subrogation against HCDE, CP members, and HCDE /CP and CP
members' officers, employees and agents.
Upon request, certified copies of original insurance policies shall be furnished to HCDE /CP and /or to CP members.
HCDE /CP and the CP member, as requested, shall be named as an "additional insured" on insurance policies.
HCDE /CP and the CP member reserve the right to require additional insurance should HCDE /CP or the CP member
deem additional insurance necessary, in their sole discretion.
Workers Compensation (with waiver of subrogation to HCDE /CP and the CP member) Employer's Liability,
including all states, U.S. Longshoremen, Harbor Workers and other endorsements.
Statutory, and Bodily Injury by Accident: $100,000 each employee. Bodily Injury by Disease: $500,000, policy
limit $100,000 each employee.
Commercial General Liability Occurrence Form including, but not limited to, Premises and Operations, Products
Liability Broad Form Property Damage, Contractual Liability, Personal and Advertising Injury Liability and
where the exposure exists, coverage for watercraft, blasting collapse, and explosions, blowout, cratering and
underground damage. $300,000 each occurrence Limit Bodily Injury and Property Damage combined. $300,000
Products - Completed Operations Aggregate Limit $500,000 per Job Aggregate. $300,000 Personal and
Advertising Injury Limit.
eBid JOC CSP (revised 8.28.1.7) Page 25 of 38
CSP #18 -029JN
Automobile Liability Coverage: $300,000 Combined Liability Limits Bodily Injury and Property Damage
Combined.
5.45. Participation in HCDE /CP
Vendor acknowledges and agrees that continued participation in the HCDE /CP cooperative purchasing program
is subject to HCDE /CP's sole discretion and that Vendor may be removed from the HCDE /CP program at any
time, with or without cause, in HCDE /CP's sole discretion. All work resulting from this Contract must cease
immediately after completion of the final accepted Purchase Order /Job Order. Nothing in this Contract or in any
other communication between HCDE /CP and Vendor may be construed as a guarantee that HCDE /CP or CP
members will submit any Purchase Order /Job Order to Vendor at any time.
At a minimum, to continue participation in the HCDE /CP cooperative purchasing program, Vendor must:
Submit detailed monthly reports of all sales activity (such report is required even if there is no
sales activity for a given month);
Timely remit Administrative Feels) to HCDE /CP;
Market Choice Partners, including inclusion of CP seal on Vendor's website, development and
execution of marketing plan, and participation in at least 5 of marketing events (such as trade
shows and conferences) annually;
Maintain a minimum annual sales activity of $15,000;
Completion of all required forms (such as Form 1295, EDGAR Certifications, etc.); and
Maintain required insurance and submit updated certificate(s) to CP annually
5.46. No Agency or Endorsements
It is the intention of the parties to this Contract that Vendor is independent of HCDE /CP and CP members, is an
independent contractor, and is not an employee, agent, joint venturer, or partner of HCDE /CP or any CP member.
Nothing in this Contract shall be interpreted or construed as creating or establishing the relationship of employer
and employee, agent, joint venturer or partner, between HCDE /CP and Vendor, any CP member and Vendor,
HCDE /CP and any of Vendor's agents, or any CP member and any of Vendor's agents. Vendor has no power or
authority to assume or create any obligation or responsibility on behalf of HCDE /CP or any CP member, and
HCDE /CP and HCE members have no power or authority to assume or create any obligation or responsibility on
behalf of Vendor. This Contract shall not be construed to create or imply any partnership, agency, or joint venture,
nor shall it be construed or deemed an endorsement of a specific company or product. Vendor agrees that
HCDE /CP and CP members have no responsibility for any conduct of any of Vendor's employees, agents,
representatives, contractors, or subcontractors.
5.47. Equal Opportunity
It is the policy of HCDE /CP not to discriminate on the basis of race, color, national origin, gender, limited English
proficiency or handicapping conditions in its programs. Vendor agrees not to discriminate against any employee
or applicant for employment to be employed in the performance of this Contract, with respect to hire, tenure,
terms, conditions and privileges of employment, or a matter directly or indirectly related to employment, because
of age (except where based on a bona fide occupational qualification), sex (except where based on a bona fide
occupational qualification) or race, color, religion, national origin, or ancestry. Vendor further agrees that every
subcontract entered into for the performance of this Contract shall contain a provision requiring non-
discrimination in employment herein specified, binding upon each subcontractor. Breach of this covenant may
be regarded as a material breach of the Contract.
5.48. Force Majeure
Neither HCDE, any CP member, or Vendor shall be deemed to have breached any provision of this Contract as
a result of any delay, failure in performance, or interruption of service resulting directly or indirectly from acts
of God, network failures, acts of civil or military authorities, civil disturbances, wars, energy crises, fires,
transportation contingencies, interruptions in third -party telecommunications or Internet equipment or service,
other catastrophes, or any other occurrences which are reasonably beyond HCDE, any CP member, or Vendor's
control.
eBid JOC CSP (revised 8.28.17) Page 26 of 38
CSP #18 -029JN
HCDE, CP members, and Vendor are required to use due caution and preventive measures to protect against the
effects of force majeure, and the burden of proving that a force majeure event has occurred shall rest on the party
seeking relief under this provision. The party seeking relief due to force majeure is required to promptly notify
the other parties in writing, citing the details of the force majeure event and relief sought, and shall resume
performance immediately after the obstacles to performance caused by a force majeure event have been removed,
provided the Contract has not been terminated. Delay or failure of performance, by either party to this Contract,
caused solely by a force maj cure event, shall be excused for the period of delay caused solely by the force maj cure
event. HCDE, CP members, and Vendor shall not have any claim for damages against any other party resulting
from delays caused solely by force majeure. Notwithstanding any other provision of this Contract, in the event
the Vendor's performance of its obligations under this Contract is delayed or stopped by a force majeure event,
HCDE /CP shall have the option to terminate this Contract. This section shall not be interpreted as to limit or
otherwise modify any of HCDE's or CP members' contractual, legal, or equitable rights.
5.49. Severability
In the event any one or more of the provisions contained in this Contract shall for any reason be held to be invalid,
illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other
provisions, and the Contract shall be construed as if such invalid, illegal, or unenforceable provision had never
been contained in it.
5.50. Waiver
No failure on the part of either party at any time to require the performance by the other party of any term hereof
shall be taken or held to be a waiver of such term or in any way affect such party's right to enforce such term,
and no waiver on the part of either party of any term hereof shall be taken or held to be a waiver of any other
term hereof or the breach thereof. No waiver, alteration, or modification of any of the provisions of this Contract
shall be binding unless in writing and signed by duly authorized representatives of the parties hereto.
5.51. Entire Agreement
The Contract, the CSP, Vendor's proposal submitted in response to the CSP, the attached and incorporated
attachments, addendum, and /or exhibits, if any, and the Supplemental Contract, if any, contain the entire
agreement of the parties relative to the purpose(s) of the Contract and supersede any other representations,
agreements, arrangements, negotiations, or understandings, oral or written, between the parties to this Contract.
In the event of a conflict between this Contract and the CSP or Vendor's proposal submitted in response to the
CSP, this Contract shall control. In the event of a conflict between the CSP and Vendor's proposal submitted in
response to the CSP, the CSP shall control. This Contract supersedes any conflicting terms and conditions on
any Purchase Order /Job Order, invoices, checks, order acknowledgements, forms, purchase orders, or similar
commercial documents relating hereto and which may be issued by Vendor after the Effective Date of this
Contract.
In addition to this Contract, a Supplemental Contract between Vendor and the CP member may be established to
further detail the terms and conditions of the CP member's specific project. In the event of a conflict between
this Contract and the Supplemental Contract, as to HCDE, this Contract shall prevail. In the event of a conflict
between this Contract and the Supplemental Contract, as to the CP member, the Supplemental Contract shall
prevail unless the Supplemental Contract states otherwise.
5.52. Interpretation
Vendor agrees that the normal rules of construction that requires that any ambiguities in this Contract are to be
construed against the drafter shall not be employed in the interpretation of this Contract.
5.53. Notice
Any notice provided under the terms of this Contract by the parties to any other shall be in writing and shall be
given by hand - delivery or by certified or registered mail, return receipt requested. Notice shall be sufficient if
made or addressed to the party at the address listed in the signature line of this Contract. Notice shall be deemed
effective upon receipt. Each party may change the address at which notice may be sent to that party by giving
notice of such change to the other party by certified mail, return receipt requested.
eBid JOC CSP (revised 8.28.17) Page 27 of 38
CSP #18 -029JN
5.54. Captions
The captions herein are for convenience and identification purposes only, are not an integral part hereof, and
are not to be considered in the interpretation of any part hereof.
5.55 Certifications
Vendor hereby certifies that it is not a company identified on the Texas Comptroller's list of companies known
to have contracts with, or provide supplies or services to, a foreign organization designated as a Foreign Terrorist
Organization by the U.S. Secretary of State. Vendor further certifies and verifies that neither Vendor, nor any
affiliate, subsidiary, or parent company of Vendor, if any (the "Vendor Companies "), boycotts Israel, and Vendor
agrees that Vendor and Vendor Companies will not boycott Israel during the term of this Agreement. For
purposes of this Agreement, the term "boycott" shall mean and include terminating business activities or
otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations
with Israel, or with a person or entity doing business in Israel or in an Israeli - controlled territory.
Vendor certifies and agrees that it shall not assist an employee, contractor, or agent of HCDE or of any other
school district in obtaining a new job if the Vendor knows, or has probable cause to believe, that the individual
engaged in sexual misconduct regarding a minor or student in violation of the law. Routine transmission of an
administrative or personnel file does not violate this prohibition. See HCDE Policy CJ (Legal) and (Local).
eBid JOC CSP (revised 8.28.17) Page 28 of 38
AAA Time
American_
Bass
Blackmon
Saver
Technologi
Constuctio
Mooring
Services
es, Inc
n Co., Inc.'
Total Weighted
Evaluation Criteria
Value
;4verage�
; .
(1) Price
Overall Cost of Program
Vendor's proposed coefficient(s)
30
1733
#DIV /0i_ "
15.67
19.00
(2) Vendor's experience and reputation
References for local governmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
20
14.67
#DIV /0i !
15.67
15.67
(3) Quality of Vendor's products /services and extent to which the
products /services meet HCDE and HCDE members' needs:
JOC Project Management
JOC Infrastructure Solutions
Quality of Vendor's Products /Service
Demonstrated Ability to Perform JOC work and the Vendor's
proposed personnel
20
14.00
#DIV /0i ,;
1433
14.33
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB /MWBE /SBE
0
0.00
#DIV /0!
0.00
0.00
(5) Vendor's safety record, including current OSHA safety report
5
167
#DIV /0i
433
3.00
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the
project and the total long -term cost to HCDE /CP and CP
members to acquire the
products /services
10
4.33
#DIV /0i
9.67
8.00
(7) Vendor's past relationship with HCDE /CP and /or CP members,
including Vendor's job order contracting relationship with
HCDE /CP and /or CP members
7
4.00
#DIV /0i <
167
5.00
(8) Marketing Plan
5
333
#DIV /0i
4.00
4.33
(9) Value Add Products /Services
3
0.67
#DIV /0i :
1.67
1.33
Total
100
62.00
0.00
69.00
70.67
Evaluation committee for this RFP:
Invitations sent to 581
Stephen Kendrick
Contracts are in accordance with TEC 44.031
Jay Atkins
It is recommended that the following awards of annual contracts:
Michael Robles
Contract Vendor
18/029JN -01 Blackmon Mooring
18/029JN -02 Centennial Moisture Control, Inc.
Yellow - non - responsive or did not make 70.
18/029JN -03 Falkenberg Construction Company, Inc.
Evaluation committee for this RFP:
Stephen Kendrick
Jay Atkins
Michael Robles
)w - non - responsive or did not m�
Invitations sent to 676 prospective bidders
Contracts are in accordance with TEC 44.031
It is recommended that the following awards of annual contracts:
Contract Vendor
18/029JN -04 floors 2 adore
18/029JN -05 Jamail & Smith Construction, LP
0 18/029JN -06 Mic- Continental Restoration Company
18/029JN -07 Mooring Recovery Services
18/029JN -08 Near Future LLC
Centennial
Falkenberg
floors 2
FRAGMA
:Hallmark
SJ Reynolds'
Moisture
Constructi
adore
Constructi
Mitigation
& Co., Inc.
Control,
on
on
&
Inc.
Company,
Services,
Constructi
Evaluation Criteria
Avery es
(1) Price
Overall Cost of Program
Vendor's proposed coefficient(s)
14.67
1167
22.00
26.00
17.33
#DIV /O!'
(2) Vendor's experience and reputation
References for local governmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
17.00
17.33
15.67
11.33
12.67
#DIV /O!'
(3) Quality of Vendor's products /services and extent to which the
products /services meet HCDE and HCDE members' needs:
JOC Project Management
JOC Infrastructure Solutions
Quality of Vendor's Products /Service
Demonstrated Ability to Perform JOC work and the Vendor's
proposed personnel
16.67
1733
16.67
13.33
15.67
#DIV /O!
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB /MWBE /SBE
0.00
0.00
0.00
0.00
0.00
#DIV /O!
(5) Vendor's safety record, including current OSHA safety report
3.67
3.00
4.33
3.33
3.00
#DIV /O!?
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the
project and the total long -term cost to HCDE /CP and CP
members to acquire the
products /services
8.33
8.67
7.67
6.67
833
#DIV /0!
(7) Vendor's past relationship with HCDE /CP and /or CP members,
including Vendor's job order contracting relationship with
HCDE /CP and /or CP members
5.67
5.67
6.00
0.67
4.00
#DIV /O!
(8) Marketing Plan
3.33
4.00
4.33
3.33
133
#DIV /0!
(9) Value Add Products /Services
0.67
2.00
1.67
0.67
1.00
#DIV /0!
Totall
70.00
T 71.67
78.33
65.33
65.33
0.00
Evaluation committee for this RFP:
Stephen Kendrick
Jay Atkins
Michael Robles
)w - non - responsive or did not m�
Invitations sent to 676 prospective bidders
Contracts are in accordance with TEC 44.031
It is recommended that the following awards of annual contracts:
Contract Vendor
18/029JN -04 floors 2 adore
18/029JN -05 Jamail & Smith Construction, LP
0 18/029JN -06 Mic- Continental Restoration Company
18/029JN -07 Mooring Recovery Services
18/029JN -08 Near Future LLC
Evaluation committee for this RFP:
Stephen Kendrick
Jay Atkins
Michael Robles
Invitations sent to 676 prospective bidders
Contracts are in accordance with TEC 44.031
It is recommended that the following awards of annual contracts:
Contract Vendor
18/029JN -09 Radius Design Works, LLC
18/029JN -10 Reliable Commercial Roofing Services, Inc.
18/029JN -11 SDB Contracting Services (SDB, Inc)
18/029JN -12 Sterling Structures, Inc.
Jamail &
KMD
LMC Corp
L -Sync,
Mid-
Mooring
Smith
Hospitality
s (Lee ?
LLC
Continental
Recovery
Constructi
(KMD
Constructi
Restoratio
Services
on, LP
Hospitality
on and
n
Evaluation Criteria
Average's
(1) Price
Overall Cost of Program
Vendor's proposed coefficient(s)
29.33
#DIV /0!
#DIV /O!
12.33
16.67
21.33
(2) Vendor's experience and reputation
References for local governmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
16.33
#DIV /0!
#DIV /0ii
12.33
17.00
16.00
(3) Quality of Vendor's products /services and extent to which the
products /services meet HCDE and HCDE members' needs:
JOC Project Management
JOC Infrastructure Solutions
Quality of Vendor's Products /Service
Demonstrated Ability to Perform JOC work and the Vendor's
proposed personnel
17.67
#DIV /0!
#DIV /0!
14.00
16.33
16.00
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB /MWBE /SBE
0.00
#DIV /0!
#DIV /Ot
0.00
0.00
0.00
(5) Vendor's safety record, including current OSHA safety report
4.00
#DIV /0!
#DIV /0!!
3.00
4.33
2.33
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the
project and the total long -term cost to HCDE /CP and CP
members to acquire the
products /services
9.67
#DIV /0!
#DIV /0!'
6.33
8.67
9.33
(7) Vendor's past relationship with HCDE /CP and /or CP members,
including Vendor's job order contracting relationship with
HCDE /CP and /or CP members
3.33
#DIV /0!
#DIV /0!1 >
1.67
5.00
4.00
(8) Marketing Plan
4.67
#DIV /0!
#DIV /0!'
3.00
4.33
3.33
(9) Value Add Products /Services
1.67
#DIV /0!
#DIV /O! =
1.67
1.67
2.00
Totall
86.67
0.00
0.00 =
54.33
74.00
74.33
Evaluation committee for this RFP:
Stephen Kendrick
Jay Atkins
Michael Robles
Invitations sent to 676 prospective bidders
Contracts are in accordance with TEC 44.031
It is recommended that the following awards of annual contracts:
Contract Vendor
18/029JN -09 Radius Design Works, LLC
18/029JN -10 Reliable Commercial Roofing Services, Inc.
18/029JN -11 SDB Contracting Services (SDB, Inc)
18/029JN -12 Sterling Structures, Inc.
Evaluation committee for this RFP:
Stephen Kendrick
Jay Atkins
Michael Robles
Invitations sent to 676 prospective bidders
Contracts are in accordance with TEC 44.031
It is recommended that the following awards of annual contracts:
Contract Vendor
18/029JN -13 Sullivan Contractinq Services (Pounds
18/029JN -14 The Fence Ladv Inc.
18/029JN -15 The Thomas Group, Inc.
Near
Radius
Reliable
SDB
Sterling
Future LLC
Design
Commercia
Contractin
Structures,
Works,
I Roofing
g Services
Inc.
LLC
Services,
(SDB, Inc)
Evaluation Criteria
Avers e,$
,
(1) Price
Overall Cost of Program
Vendor's proposed coefficient(s)
21.67
1733
23.00
24.33
28.33
(2) Vendor's experience and reputation
References for local governmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
14.33
17.00
16.00
17.67
18.67
(3) Quality of Vendor's products /services and extent to which the
products /services meet HCDE and HCDE members' needs:
JOC Project Management
JOC Infrastructure Solutions
Quality of Vendor's Products /Service
Demonstrated Ability to Perform JOC work and the Vendor's
proposed personnel
14.33
15.67
12.67
17.67
19.33
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB /MWBE /SBE
0.00
0.00
0.00
0.00
0.00
(5) Vendor's safety record, including current OSHA safety report
2.67
3.33
3.00
4.67
4.67
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the
project and the total long -term cost to HCDE /CP and CP
members to acquire the
products /services
7.67
6.67
8.00
9.67
9.67
(7) Vendor's past relationship with HCDE /CP and /or CP members,
including Vendor's job order contracting relationship with
HCDE /CP and /or CP members
5.00
6.67
533
5.00
633
(8) Marketing Plan
4.00
3.67
133
4.33
4.00
(9) Value Add Products /Services
2.00
2.00
233
0.67
2.00
Totall
71.67
72.33
73.67
84.00
93.00
Evaluation committee for this RFP:
Stephen Kendrick
Jay Atkins
Michael Robles
Invitations sent to 676 prospective bidders
Contracts are in accordance with TEC 44.031
It is recommended that the following awards of annual contracts:
Contract Vendor
18/029JN -13 Sullivan Contractinq Services (Pounds
18/029JN -14 The Fence Ladv Inc.
18/029JN -15 The Thomas Group, Inc.
Evaluation committee for this RFP: Invitations sent to 676 prospective bidders
Stephen Kendrick Contracts are in accordance with TEC 44.031
Jay Atkins It is recommended that the following awards of annual contracts:
Michael Robles
Group)
Sullivan
THE
The
The '
0
Contractin
FENCE
Thomas
Trevino
g Services
LADY INC.
Group, Inc.
Group, Inc.
(Pounds
Evaluation Criteria
Averages
(1) Price
Overall Cost of Program
Vendor's proposed coefficient(s)
25.67
1733
25.67
11.67
#DIV /0!
(2) Vendor's experience and reputation
References for local governmental entities and with a purchasing
cooperative program
Local government agencies within the past 5 years
Other projects completed within the past 10 years
13.33
16.33
17.00
17.33
#DIV /0i
(3) Quality of Vendor's products /services and extent to which the
products /services meet HCDE and HCDE members' needs:
JOC Project Management
JOC Infrastructure Solutions
Quality of Vendor's Products /Service
Demonstrated Ability to Perform JOC work and the Vendor's
proposed personnel
14.67
17.00
15.00
14.67
#DIV /0!
(4) Impact on the ability of HCDE members to comply with laws
and rules relating to HUB /MWBE /SBE
0.00
0.00
0.00
0.00
#DIV /0!
(5) Vendor's safety record, including current OSHA safety report
3.33
4.00
4.33
4.00
#DIV /0!
(6) Whether Vendor's financial capability is appropriate to the size
and scope of the
project and the total long -term cost to HCDE /CP and CP
members to acquire the
products /services
8.33
8.00
6.33
9.67
#DIV /0!
(7) Vendor's past relationship with HCDE /CP and /or CP members,
including Vendor's job order contracting relationship with
HCDE /CP and /or CP members
2.67
6.33
5.00
3.00
#DIV /0!
(8) Marketing Plan
3.33
4.33
4.00
3.33
#DIV /0!
(9) Value Add Products /Services
1.00
2.67
0.67
0.67
#DIV /0!
Totall
72.33
76.00
78.00
64.33'''
0.00
Evaluation committee for this RFP: Invitations sent to 676 prospective bidders
Stephen Kendrick Contracts are in accordance with TEC 44.031
Jay Atkins It is recommended that the following awards of annual contracts:
Michael Robles
Group)
1
1 coefficient for unit price book - RSMeans online
Supplier QTY
Supplier QTY
WO0W
Price
Extended Supplier Notes Manufacturer K8anufNurn
Jamoi|& Smith Construction, LP1
EA
$0.73
$0.73
Sterling Structures, Inc. 1
EA
$0.80
$0.80
FRA6MA Construction Services, 1
EA
$0.82
$O.O2 Coefficient for unit price book -RSMeonoo
The Thomas Group, Inc, 1
EA
$0.84
$0.84
Sullivan Contracting Services (P( 1
EA
$0.85
$0.85
Near Future LLC 1
EA
$0.85
$0.85
floors 2adore 1
EA
$0.86
$0.86
SDB Contracting Services (SDB, 11
EA
$0.87
$0.87
Mooring Recovery Services 1
EA
$0.88
$0.88
Reliable Commercial Roofing Se 1
EA
$0.89
$0.89
Blackmon Mooring 1
EA
$0.90
$0.90
LMC Corp (Lee Construction anc 1
EA
$0,90
$090 Regions: 2-Corpus Christi, 3-Victorla, 4-Hou
AAA Time Saver Services 1
EA
$0.91
$0.91
Radius Design Works, LLC 1
EA
$0.93
$0.93
Hallmark Mitigation &Construc1
EA
$0.94
$O.9494%
Bass Constuction Co., Inc. 1
EA
$0.95
$0.95
Mid-Continental Restoration [n1
EA
$0.95
$0.95
THE FENCE LADY INC. 1
EA
$0.96
$0.96
Centennial Moisture Control, |n1
EA
$0.98
$0.98
Falkenberg Construction Compa 1
EA
$0.99
$0.99
L,Sync,LLC 1
EA
$0.99
$0.99
J Reynolds & Co., Inc. 1 EA Nm8�d
2
1 Coefficient for RSMeans online - after hours and overtime hours
Supplier QTY
UOKA
Price
Extended Supplier Notes Manufacturer K4anuf0urn
Jamai|& Smith Construction, LP1
EA
$0.75
$0.75
The Thomas Group, Inc. 1
EA
$0.87
$0.87
Sullivan Contracting Services (P(1
EA
$0.89
$0.89
floors 2 adore 1
EA
$0.89
$0.89
Sterling Structures, Inc. 1
EA
$0.90
$0.80
FRAGMA Construction Services, 1
EA
$0.91
$0.91 Coefficient for RSMeans online - after hour
Mooring Recovery Services 1
EA
$0.92
$0.92
AAA Time Saver Services I
EA
$0.93
$0.93
Blackmon Mooring 1
EA
$0.93
$0.93
N Addendum 1- Page 1
Radius Design Works, LLC 1
EA
$0.95
$0.95
L C Corp (Lee Construction air 1
EA
$0.95
$0.95
SDB Contracting Services (SDB, I 1
EA
$0.95
$0.95
THE FENCE LADY INC. 1
EA
$0.96
$0.96 There will be no extra charge for afterhour!
Hallmark Mitigation & Construc 1
EA
$0.99
$0.99 99%
Reliable Commercial Roofing Se 1
EA
$1.10
$1.10
Bass Constuction Co., Inc. 1
EA
$1.10
$1.10
Mid - Continental Restoration Co 1
EA
$1,10
$1.10
L -Sync, LLC 1
EA
$1.13
$1.13
Falkenberg Construction Compa 1
EA
$1.15
$1.15
The Trevino Group, Inca 1
EA
$1.33
$1.33
Centennial Moisture Control, In 1
EA
$1.35
$1.35
J Reynolds & Co., Inca 1
EA
No Bid
3
Coefficient for National Construction Estimator book by Craftsman
Supplier QTY
UOM
Price
Extended Supplier Notes Manufacturer Manuf Num
Mooring Recovery Services 1
EA
$1.13
$1.13
Tfi ftr radp, lio� 1EA
1:16:
$ .
THE FENCE LADY INC. 1
EA
$1.15
$1.15
1x17,
Jamail & Smith Construction, LP 1
EA
$1.17
$1.17
EA
$1.20
Near Future LLC 1
EA
$1.20
$1.20
IJm:arklitakiantritLt�+w' 1
EA:
,1:20;.....
, $1.20,115%
Sullivan Contracting Services (Pc 1
EA
$1.20
$1.20
Radiu:flignWork,[rL,, 1�
EA,
$1.20' �:
;.:,$120
Mid - Continental Restoration Co 1
EA
$1.20
$1.20
flcrs. 2 adore 1
EA
1FM
$1.20.
LMC Corp (Lee Construction am 1
EA
$1,20
$1020
AAA Tire Sauer Sr4rices ° . 1
=EA
Falkenberg Construction Compa 1
EA
$1.22
$1.22
The Tr �rino rc f?, lnc. 1
E
`,
$:1.24
$1:24
SDB Contracting Services (SDB, 11
EA
$1.24
$1.24
F,RAGMA Coristru+ction S rui es, 1
$1:25
Centennial Moisture Control, In, 1
EA
$1.25
$1.25
Sterling Structures, Inc, 1
EA
No Biel
Bass Constuction Co., Inc. 1
EA
No Bid
Rel'aWe Commercial Roofing Se 1
EA
No Bid
J Reynolds & Co., Inc. 1
EA
No Bid
18/029JN Addendum 1 - Page 2
4
Coefficient for overtime hours for the National Construction Estimator book by Craftsman
Supplier QTY
UOM
Price
Extended Supplier Notes Manufacturer Manuf Num
Mooring Recovery Services 1
FA
$1.22
$1.22
THE FENCE LADY INC. 1
EA
$1.25
$1.25 Due to the Pricing schedules in Craftsman v
The Thomas Group, Inc... 1
EA
$1.25
$1.25
Jamail & Smith Construction, LP 1
EA
$1.27
$1.27
Mid - Continental Restoration Co 1
EA
$1.27
.$1.27
AAA Time Saver Services 1
EA
$1.27
$1.27
Blackmon Mooring 1
EA
$1.29
$1.29
Near Future LLC 1
EA
$1.30
$1.30
Hallmark Mitigation & Construe 1
EA
$1.30
$1.30
Radius Design Works, LLC 1
EA
$1.30
$1.30
floors 2 adore 1
EA
$1.30
$1.30
L -Sync, LLC 1
EA
$1.30
$1.30
Sullivan Contracting Services (P(1
EA
$1.30
$1.30
FRAGMA Construction Services, 1
EA
$1.32
$1.32
SDB Contracting; Services (SD8 11
EA !
$1.32
$1.32
Falkenberg Construction Compa 1
EA
$1.32
$1.32
The Trevino Group, Inc. 1
EA
$1.34
$1.34
Centennial Moisture Control, In 1
EA
$1.35
$1.35
5
1 Usual and customary mark up for any non - pre - priced items that may come up. This is not a coefficient. It is a percent mark up of actual cost.
Supplier QTY
UOM
Price
Extended Supplier Notes Manufacturer Manuf Num
Sterling Structures, Inc. 1
EA
$10.00
$10.00 10%
AAA Time Saver Services 1
EA
$10.00
$10.0010%
THE FENCE LADY INC. 1
EA
$10.00
$10.00 10%
Falkenberg Construction Compa 1
EA
$12.00
$12.00 12%
The Thomas Group, Inc. 1
EA
$12.00
$12.00 12%
FRAGMA Construction Services, 1
EA
$1.15
$1.15 15%
floors 2 adore 1
EA
$15.00
$15.00 15%
Reliable Commercial Roofing Se 1
EA
$15.00
$15.0015%
The Trevino Group, Inc. 1
EA
$15.00
$15.00 15%
18/029JN Addendum 1 - Page 3
SDB Contracting Services (SDB, 11
EA
$15.00
$15.00 15%
Bass Constuction Co., Inc. 1
EA
$15.00
$15.00 15%
Near Future LLC 1
EA
$15.00
$15.00 15%
L -Sync, LLC 1
EA
$17.00
$17.00 17%
Jamail & Smith Construction, LP 1
EA
$1.18
$1.18 18%
Hallmark Mitigation & Construc 1
EA
$19.00
$19.00 19%
Centennial Moisture Control, In, 1
EA
$0.20
$0.20 20%
Radius Design Works, LLC 1
EA
$0.20
$0.20 20 °%
LMC Corp (Lee Construction an( 1
EA
$1.20
$ .20 70%
Blackmon Mooring 1
EA
$20.00
$20.0020%
Mooring Recovery Services 1
EA
$20.00
$20.00 20%
Mid - Continental Restoration Co 1
EA
$20.00
$20.0020%
J Reynolds & Co., Enc. 1
EA
No Bid
18/029JN Addendum 1- Page 4
Agenda No. 5.
CITY COUNCIL MEMORANDUM
City Council January 25, 2022
Meeting:
Department: Planning & Community Development
Subject: Ordinance No. 22 -S -01 - Consideration and /or action approving an Ordinance by
the City Council of the City of Schertz, Texas on a request to amend the
Comprehensive Land Use Plan by changing approximately 363 acres of the Future
Land Use Map from Agricultural Conservation and Estate Neighborhood land use
designation to Single - Family Residential land use, generally located 6,050 feet east
of the intersection of Trainer Hale Road and FM 1518, also known as Bexar
County Property Identification Numbers, 310053, 310060, 310061, and 310121,
City of Schertz, Bexar County, Texas. (Final Reading) ( *B. James /L. Wood /M.
Harrison)
BACKGROUND: Twenty -eight (28) public hearing notices were mailed to the surrounding property
owners within two hundred (200) feet of the subject property on November 24, 2021, with a public
hearing notice published in the "San Antonio Express ", on December 22, 2021, prior to the City Council
public hearing. At the time of this report, staff has received nine (9) responses in favor, two (2)
responses opposed and One (1) response that did not indicate if they were either in favor, opposed or
neutral to the request.
Owner of approximately 1.66 acres, Property ID 310053: Wiederstein Trust Fund
Owner of approximately 78 acres, Property ID 310060: Valerie Hartmann & Brian Beutnagel
Owner of approximately 69 acres, Property ID 310061: Brycap Comml Properties LLC
Owner of , approximately 53 acres, Property ID 31.01.21: Kneupper Bryson Properties LTD
Applicant: Marcus Moreno, Scott Felder Homes, LLC
Engineer: Todd Blackmon, Pape - Dawson Engineers, Inc.
GOAL
The goal is to amend the Comprehensive Land Use Plan by changing approximately 363 acres of land
of the Future Land Use Map from the Agricultural Conservation and Estate Neighborhood land use
designation to the new land use designation, Single - Family Residential.
COMMUNITY BENEFIT
The community benefit is to promote safe, orderly, efficient development and bring about the City's
vision of future growth.
SUMMARY OF RECOMMENDED ACTION
The applicant is requesting to amend the Comprehensive Land Use Plan by changing approximately
363 acres on the Future Land Use Map from the Agricultural Conversation and Estate Neighborhood
land use designations to the Single- Family Residential land use designation.
The Future Land Use Map for the subject area was evaluated as part of the Sector Plan. Amendment to
the Comprehensive Land Use Plan, adopted by City Council on July 16, 2013. The subject properties
are currently designated under the Agricultural Conservation and Estate Neighborhood land use
designations as shown in "Exhibit 2 ".
The Agricultural Conservation land use designation is intended to preserve much of South Schertz in a
rural /agricultural state. This area is less attractive for more intense uses due to its distance from the
Interstate and limited street connectivity. Some character - defining elements recommended are mainly
large -lot (5 acre minimum lot size) residential, 70% open space, and agricultural uses with some
agricultural related commercial uses being permitted (landscaping business, metal workshop, farmers
market, convenience store, etc., with appropriate design and transition standards). The Estate
Neighborhood land use designation is designed similar to the Agricultural Conservation designation,
which is intended to preserve the rural character of South Schertz. This area was intended to have large
residential lots, (1/2 acre min.) maintain 50% of open space, and to encourage cluster neighborhood
development.
The applicant is proposing to change the Future Land Use designation of the subject properties to
Single - Family Residential. This proposed future land use designation is intended to be comprised of
primarily conventional detached dwellings. The proposed development will provide a mix of lot sizes,
amenities, open space, and create walk ability throughout the neighborhood.
FISCAL IMPACT
None
RECOMMENDATION
The 2013 Sector :Plan Amendment of the Comprehensive Land Use Plan sought to establish future
development objectives that balance the traditionally rural and agricultural identity that has shaped the
character of South Schertz with the opportunity for smart growth as the City continues to develop south
of FM 78. The proposed development that led to the filing of this Comprehensive Land Use Plan
involves the potential for varying lot sizes, amenities, walkability throughout the subdivision, and open
space. The proposed subdivision does not fit within the Agricultural Conservation and Estate
Neighborhood future land use designations given the required open space and density minimums
required in the land use categories. Therefore, the applicant has moved forward with this proposed
Comprehensive Land Use Amendment to reclassify the properties under the Single - Family Residential
future land use designation.
The South Schertz area, based on recently approved Future Land Use Plan amendments (Carmel Ranch
and Saddlebrook both approved in 2020) has begun to see a shift from the rural, large lot, agricultural
areas to more of the traditional subdivision type development with a mixture in lot sizes, as well as open
space /park, amenity centers, and creating walkable pathways for residents. Additionally, In the
FY2020 -2021 budget City Council approved to allocate funding for a full Comprehensive Land Use
Plan Amendment. This would allow staff the opportunity to tailor the future plans for Schertz to the
evolving needs and desires of our residents. The full amendment would enable City Staff to make
modifications to the Future Land Use .Map that are the more appropriate for each area within Schertz.
As the city has seen in recent years there has been deviation from the current plan to allow for more
single- family residential neighborhoods. With the previous and incoming developments they are
working to keep the esthetics of southern Schertz, with creating larger lots, and incorporating a mixture
of smaller lot sizes, along with vast amounts of open space and developing walkable pathways
meandering through the neighborhood. The subject property, like many others in the area, having the
land use designations of Agricultural Conservation and Estate Neighborhood were found to be more
appropriate at the time the Schertz Sector Plan Amendment of the Comprehensive Land Use Plan was
done in 2013. Staff understands that the intention of the Amendment in 2013 was to maintain the
character of Southern Schertz as the rural /agricultural feel and to have larger lots with 50 -70 percent
open space. However, due to the evolving needs that we are seeing and the recent Comprehensive
Land Use Plan Amendments, allowing this amendment to the Single - Family Residential land use
designation would allow for the mixture of lot sizes, open space /park amenities, and walkable
neighborhoods that are now desired.
The upcoming Comprehensive Plan rework would allow Staff to reconcile the gaps between our future
plan, the residents' desires, and current market conditions. However, this proposed Comprehensive Land
Use Plan amendment for the subject tracts would allow the property owners the ability to have their
property develop as desired, now, without requiring them to wait the full Comprehensive Land Use
Plan amendment.
Planning and Zoning Commission Recommendation: The Planning and Zoning Commission held a
public hearing on December 8, 2021, where they made a recommendation of denial to the City Council
with a vote of 4 -0. The Commission spoke in length regarding the traffic in South Schertz with the
addition of this property being considered single- family residential land use designation, the impact it
would have too surrounding properties, allowing the development to slow down in order for
infrastructure to catch up, and then also debating whether or not to make a recommendation of approval
to change individual parcels on the Comprehensive Land Use Plan given the upcoming full
Comprehensive Land Use Plan Update.
City Council: The City Council held a public hearing on January 11, 2022, for the Sterling Grove
Comprehensive Land Use Plan, where a motion was made with a 5 -2 vote to approve the
Comprehensive Land Use Plan Amendment.
Staff recommends approval of the proposed Comprehensive Land Use Plan. Amendment to change
approximately 363 acres of land from Agricultural Conservation and Estate Neighborhood land use
designations to Single - Family Residential land use designation.
Attachments
Ord. No. 22 -S -01
Comprehensive Plan Amendment Request Letter
Exhibit A: Property Exhibit
Exhibit B: Comprehensive Land Use Plan
Aerial Map
Public Hearing Notice Map
Public Hearing Responses
e__ _ _ _
ORDINANCE NO. 22-S-01
AN ORDINANCE BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS
AMENDING THE COMPREHENSIVE LAND USE PLAN BY CHANGING
APPROXIMATELY 363 ACRES OF THE FUTURE LAND USE MAP FROM THE
AGRICULTRUAL CONSERVATION AND ESTATE NEHIGHBORHOOD TO THE
SINGLE - FAMILY RESIDENTIAL LAND USE DEISGNATION, GENERALLY
LOCATED APPROXIMATELY 6,050 FEET EAST OF THE INTERSECTION OF
TRAINER HALE ROAD AND FM 1518, ALSO KNOWN AS BEXAR COUNTY
PROPERTY IDENTIFCATION NUMBERS 310053, 310060, 310061, AND 310121, CITY
OF SCHERTZ, BEXAR COUNTY, TEXAS.
WHEREAS, an application to amend the Comprehensive Land Use Plan by changing
approximately 363 acres of the Future Land Use Map from Agricultural Conservation and Estate
Neighborhood to Single - Family Residential land use designation, also known as Bexar County
Property Identification Numbers 310053, 310060, 310061 and 310121, and more specifically
described in the Exhibit A attached herein (herein, the "Property ") has been filed with the City;
and
WHEREAS, a total of 28 public hearing notices were mailed out to the property owners within
the two hundred (200) feet of the subject property on November 24, 2021 and a public hearing
notice was published in the San Antonio Express on December 22, 2021; and
WHEREAS, the City's Unified Development Code Section 21.4.6.D. provides for certain criteria
to be considered by the Planning and Zoning Commission in making recommendations to City
Council and by City Council in considering final action on an amendment to the Comprehensive
Land Use Plan (the "Criteria "); and
WHEREAS, on December 8, 2021, the Planning and Zoning Commission conducted a public
hearing and, after considering the Criteria, made a recommendation to City Council to approve the
requested Comprehensive Land Use Plan Amendment; and
WHEREAS, on January 11, 2022, the City Council conducted a public hearing and after
considering the Criteria and recommendation by the Planning and Zoning Commission,
determined that the requested Comprehensive Land Use Plan Amendment be approved as provided
for herein.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS:
THAT:
Section 1. The current Comprehensive Land Use Plan is hereby amended to change the
Future Land Use Map of the property, as shown and more particularly described in the attached
Exhibit B, from Estate Neighborhood and Agricultural Conservation land use designation to
Single - Family Residential land use designation.
Section 2. The recitals contained in the preamble hereof are hereby found to be true, and
such recitals are hereby made a part of this Ordinance for all purposes and are adopted as a part of
the judgment and findings of the Council.
Section 3. All ordinances and codes, or parts thereof, which are in conflict or inconsistent
with any provision of this Ordinance are hereby repealed to the extent of such conflict, and the
provisions of this Ordinance shall be and remain controlling as to the matters resolved herein.
Section 4. This Ordinance shall be construed and enforced in accordance with the laws of
the State of Texas and the United States of America.
Section 5. If any provision of this Ordinance or the application thereof to any person or
circumstance shall be held to be invalid, the remainder of this Ordinance and the application of
such provision to other persons and circumstances shall nevertheless be valid, and the City hereby
declares that this Ordinance would have been enacted without such invalid provision.
Section 6. It is officially found, determined, and declared that the meeting at which this
Ordinance is adopted was open to the public and public notice of the time, place, and subject matter
of the public business to be considered at such meeting, including this Ordinance, was given, all
as required by Chapter 551, as amended, Texas Government Code.
Section 7. This Ordinance shall be effective upon the date of final adoption hereof and any
publication required by law.
Section 8. This Ordinance shall be cumulative of all other ordinances of the City of
Schertz, and this Ordinance shall not operate to repeal or affect any other ordinances of the City
of Schertz except insofar as the provisions thereof might be inconsistent or in conflict with the
provisions of this Ordinance, in which event such conflicting provisions, if any, are hereby
repealed.
Approved on first reading the IIth day of January 2022.
PASSED, APPROVED AND ADOPTED on final reading the 25th day of January 2022.
Ralph Gutierrez, Mayor
ATTEST:
Brenda Dennis, City Secretary
(SEAL OF THE CITY)
}t
. /�y/''��/
H V M E S
November 9, 2021
DELIVERED VIA EMAIL
Planning & Community Development Department
Attn: Lesa Wood
City of Schertz
1400 Schertz Parkway
Schertz, Texas 78154
RE: Sterling Grove Comprehensive Plan Amendment, Trainer Hale Road
Dear Ms. Wood,
Scott Felder Homes is excited to share with you all the proposed development of approximately
362 acres on Trainer Hale Road (the "Subject Property ") (see "Exhibit 1 "). The Subject Property
is located both within the City of Schertz ( "City ") boundaries, as well as the City's
Extraterritorial Jurisdiction ( "ETJ "). Please accept this letter as a formal request to amend the
City's future land use designation for the Subject Property to `Single - Family Residential'. The
Subject Property is proposed to be developed as a Master Planned Community, currently branded
Sterling Grove ( "Project ").
The City of Schertz Comprehensive Plan currently designates the future land use of the Subject
Property as Estate Neighborhood and Agricultural Conservation designation (see "Exhibit 2 ").
These land use designations may have been appropriate in the past, but as the City continues to
grow, causing an increased demand for more housing, including more affordable and diverse
housing choices. We request that the Subject Property's current land uses designations be
amended to Single - Family Residential (see "Exhibit 3 "). As you are aware, the City of Schertz is
currently in the process of updating the Comprehensive Land Use Plan and we believe the
Subject Property is better suited for Single Family. The Single - Family Residential designation
allows for the development of a community that includes amenities, walkability, access to the
City's future trail system, and a variety of housing types.
Please note that following the requested change to the Subject Property's future land use
designation, a petition for annexation and request to change the zoning to the Planned
Development District ( "PDD ") will be submitted. The PDD shows in greater detail the diverse
and creative housing choices for future and current Schertz residents. Additionally, the master -
planned community will include access to parks and amenities for all residents. Design
guidelines will also be implemented to promote a cohesive style of architecture blending all
phases of the Project together.
1
We believe the requested change in Land Use is appropriate, compatible, and beneficial for the
City, and therefore ask for your support. We look forward to working with the City on the
Project and are happy to discuss further any questions.
Sincerely,
Marcus C. Moreno
Vice President
Scott Felder Homes, LLC
2
M
F
T
�s
Z
Sterling Grove
363.73 Acres
8676 Trainer Hale Rd
m
N
0
FEET
1,000
JOB NO. - --
DATE Oct 2021
EXHIBIT 1: LOCATION MAP
DESIGNER HF
CITY OF SCHERTZ
CHECKED HF DRAWN SD
(ETJ), TEXAS
NEW BRAUNFELS I SAN ANTONIO I AUSTIN I HOUSTON I FORT WORTH I DALLAS
1672 INDEPENDENCE DR, STE 102 1 NEW BRAUNFELS, TX 78132 1 830.632.5633
SHEET 1.0
TEXAS ENGINEERING FIRM #470 1 TEXAS SURVEYING FIRM #10028800
[Z
K rK 1 t\Mbdd
v K K Mt" K rfC( K y UQ s KAY IBlIbWl kokf
2�
t" x Kt xK twK t
v vx K t K thd"Mv
1400 Schertz Parkway Schertz, Texas 78154 'l 210.619.10 �,
I s
�c. 00t Sc
1400 Schertz ParkwaY Schertz, Texas 78154 lkll�l 210.619.1000 ,, cr Z.cl
1400 Schertz Parkway
Schertz, Texas 78154 210,619.1000 Sch Ou c
1 1
210.619.1000 cfi r..r 4
21=11
14DO Schartz Parkway fterm, To= 78154 210,619,1000 sch"NU coin
,
Reply Form
I am: in favOT Of El %Rgsed to El neutral to 13 the request for ZC2021-016
Way
ME
STREET ADDRESS:
I �� M M. i OR wavlolxsl *
0 1 UFUTFA I. R.. � a.
Iti!1#11114HIM
UWWMM��
I UJIFT,
FIRWWRATIM.'777M
DEVELOPMENT
Sincerely,
I
F I�-- --
Megan Harrison
Planner
ETUMM
I am: in favor of UMsed to 11 neutral to 0
COMME P,rt owner of the Wiederstein Trust property
NTS:
NAME: Vickie McDaniel
93ZWTM��F
uaiz
SIGNATURE
(PLEASE PRINT) B440
STREET ADDRESS: -- 627 Gebhardt Rd, sealy, Tx 77474
T 12/6/2021
DAE:
14 00 Schertz Parkway 4 ertz® Texas 78154 214: IM 000
November 24, 2021
To whom it may concern,
DEVELOPMENT
STREET ADDRESS: 3616 PukowitZ Adkins, TX 78101 ... ......... . ..
12/6/2021
DATE: ----
14005 ParKway Schedz, Texas 75754 210.619.1000 T''hzmzzozel
♦
November 24, 2021
To whom it may concern,
DEVELOPMENT
Sincerely,
Megan Harrison
Planner
Reply Form
I am: in favor of i I qppgsed to 0 neutral to 11 the request for ZC2021-0i 6
o",
i am part owner of the wiederstein Trust Property at 9275 Weir R., .
NAME: Mane Hunter
(PLEASE PRINT)
T 1414 Santa Anna Seguin, TX 78155
STREE ADDRESS:
DATE' 12/6/2021
1440 Schertz PNIMY Schertz, Texas 78164
I
Agenda No. 6.
CITY COUNCIL MEMORANDUM
City Council January 25, 2022
Meeting:
Department: City Secretary
Subject: Appointment of the Mayor Pro Tem - Discussion and consideration and /or
action regarding the confirmation, appointment or election of the Mayor
Pro -Tem. (Mayor /Council)
,rfD LI
On August 28, 2018 City Council amending their Rules of Conduct and Procedure (Ordinance
18 -M -30) regarding the appointment of the Mayor Pro Tem. Below is the amended article: Article 5
Section 5.1 Appointment Procedure for the Mayor Pro Tem.
a. The Council will discuss, and with a majority vote, appoint the Councilmember to serve as the
Mayor Pro Tem for
the City.
b. The appointed Mayor Pro Tem must be a Councilmember and must meet the qualifications of
Section 4.02 of the
City Charter. In addition, to be appointed to the position of Mayor Pro Tem, a Councilmember
must be an elected
member of Council and a member in good standing.
c. Term dates for the Mayor Pro Tem position will begin in February and August of each year
(the election dates
offset by three (3) months). Terms will sequentially rotate according to Councilmember place.
d. If the Councilmember place that is up for appointment as Mayor Pro Tem is vacant or is held
by a Councilmember
who is not qualified to serve as Mayor Pro Tem, the Mayor Pro Tem appointment will go to the
next qualified
Councilmember.
e. The position will have a term of office of six (6) months.
f. The appointed Mayor Pro Tem may be removed by Council by a two - thirds (2/3) majority vote
of the members of
Council at any time during his or her term.
g. Council reserves the right to alter this procedure at any time by resolution or rule.
City Charter Section.
Section 4.02 Qualifications.
The Mayor and each Councilmember must have attained the age of eighteen or older on the first day of
the term of office applied for, be a registered voter of the City of Schertz, and have been a resident of
the City for at least twelve consecutive months immediately preceding the deadline for filing for an
application for a place on the ballot.
Section 4.05 Mayor and Mayor Pro -Tem.
The Mayor shall be the official head of the City government. He or she shall be the chairman and shall
preside at all meetings of the City Council. The Mayor may vote only in the event of a tie. He or she
shall, unless another signatory is otherwise designated by the City Council, sign all official documents
such as ordinances, resolutions, conveyances, grant agreements, official plats, contracts, and bonds. He
or she shall appoint special committees as instructed by City Council, with committee membership to be
composed of nominees by the City Council. He or she shall perform such other duties consistent with
this Charter or as may be imposed upon him or her by City Council. The Mayor shall not have veto
powers.
The Mayor Pro -Tem shall be a Councilmember appointed by the City Council for a term and pursuant
to procedures established by the City Council from time to time. The Mayor Pro- Tem shall act as
Mayor during the absence or disability of the Mayor and in this capacity shall have the rights conferred
upon the Mayor. While acting as Mayor, the Mayor Pro -Tem may vote on any matter before the City
Council.
Council will discuss and consider the appointment of the next Mayor Pro -Tem regarding the above
qualification. Next in line to serve is Councilmember David Scagliola. Mr. Scagliola will be sworn in at
the February 1, 2022 meeting and will serve until August 2, 2022.
Agenda No. 9.
CITY COUNCIL MEMORANDUM
City Council January 25, 2022
Meeting:
Department: Engineering
Subject: Monthly Update - on Major Projects in progress /CIP. (B. James /K.
Woodlee)
Attachments
January 2022 Major Project Update
Informational Only
C-1 II SWOL111101M I Ed I Old [/17110`1111101)
City Council Meeting: January 25, 2022
Department: City Manager
Subject: Update on Major Projects in Progress
Background
This is the monthly update on large projects that are in progress or in the planning process. This
update is being provided so Council will be up -to -date on the progress of these large projects. If
Council desires more information on any project or on projects not on this list, please reach out to
staff and that information will be provided.
Facilities Projects:
1. 27 Commercial Place Renovation
• Project Status: Closeout Phase
• Construction Start: June 2021
• Estimated Completion: September 2021
• Cost of Construction: $1,372,794
• Project Update: The contractor has completed all of the punch list items and the new
equipment has been installed. Fleet operations have been taking place in 27
Commercial Place since the middle of November. An open house was held on
December 7th to formally open the facility. Staff is working on closing out the project
now.
2. Animal Adoption Center HVAC Replacement Project
o Project Status: Construction Phase
o Construction Start: October 2021
o Estimated Completion: Winter 2022
o Cost of Construction: $700,000
o Project Update: Team Mechanical has installed all the new duct work and HVAC
equipment. The drop ceiling is being reinstalled. Equipment startup is expected to
take place in late January with project completion to follow in February.
3. Civic Center HVAC Replacement Project
o Project Status: Design Phase and Procurement Phase
o Consultant: M &S Engineering
o Projected Completion: Spring 2022
o Design Cost: $93,500 (NTE)
o Project Update: M &S Engineering continues to work on the design and expect to
have it complete in February. Due to the tight project timeframe, staff is bringing a
resolution to Council on January 25th to award the equipment purchase for the
project to Sullivan Contracting so equipment procurement can begin while design is
being completed. A second resolution will be presented to Council in February for
the full construction cost. The goal is to complete the project prior to the cooling
season beginning in 2022.
4. Borgfeld Facility Renovation Project
o Project Status: Scope Development Phase
o Projected Completion: Spring 2022
o Project Update: Project will consist of renovating approximately 1600 SF of office
space. This will be primarily done in house by the Facilities Team.
5. Civic Center Flooring Project
o Project Status: Complete
o Project Completion: January 2022
o Estimated Cost: $50,000
o Project Update: Flooring has been installed and trim replaced. New floor electrical
boxes have been installed.
o Contractor is returning to take care of minor punch list items
6. Animal Adoption Center Fence Project
o Project Status: In progress
o Project Completion: January, 2022
o Estimated Cost: $40,000
o Project Update: Fence installation is complete. Gate has been installed and power
has been run to the gate motor location.
o Waiting on the installation of the gate motor.
Drainage Projects:
1. Savannah Square Detention Basin, Sycamore Creek at Westchester Drive, and Dietz
Creek at Arroyo Verde (2020 Silt Removal Projects)
o Project Status: Construction Phase
o Consultant: Ford Engineering
o Construction Start: July 26, 2021
o Cost of Construction: $291,627.47 (NTE $320,000)
o Project Update: Myers Concrete Construction has completed 95% of the work to
complete these three projects. The City is waiting on vegetation to be fully stabilized
prior to scheduling a final walk- through during the month of February. Pictured
below is Sycamore Creek.
Water and Wastewater Proiects:
1. FM 1.1.03 Sewer Extension Project
o Project Status: Project Closeout
o Construction Start: May 2021
o Construction Completion: Summer 2021
o Cost of Construction: $74,235.00 (NTE: $81,659.00)
o Project Update: M &C Fonseca Construction has completed the re- vegetation
requirement per the contract, so the project will be closed out.
2. Woman Hollering Creek Wastewater Interceptor Main and Lift Station
o Project Status: Construction
o Construction Contractor: Thalle Construction Co., Inc.
o Construction Management: AGICM
o Design Engineer: Cobb, Fendley & Associates, Inc.
o Estimated Construction Start: Winter 2021/2022
o Estimated Cost of Construction (including construction and ancilliary contracts):
$12 million
o Project Update: Notice to proceed on the 365 -day contract was issued on January
11, 2022. Contractor material submittals are being submitted and reviewed. City
staff met with CPS in mid- January to establish route for electric power to be
extended to the lift station site on IH 10.
3. 24 Dedicated Transmission Main Phase II
Overall project intent is the construction of a 24" dedicated water transmission main to
connect the Live Oak water storage facility to the LH 35 storage tank. Phase 1 (route study,
land acquisition coordination) was completed in March 2021.
o Project Status: Design Phase
o Consultant: Kimley -Horn & Associates
o Design Project Start :Date: June 1, 2021
o Project Completion Date: Winter 2022
o Project Cost (Phase 2 Design): $1,508,875.50
o Project Update: The preliminary plans, project specifications, and cost estimate
were received in November 2021 and are finalized to incorporate comments
provided by City staff. The City of Schertz met with the City of Cibolo January 1.2,
2022 to discuss impacts of the water main route on tree removal. Hydraulic modeling
of the City's water system indicates that dedicated transmission main size performs
better as an 18" or 24" main. Based on discussion with City staff and City
management, the 100% design phase will include a 24 -inch dedicated transmission
main. The Public Works Department have been assisting the project team by
uncovering existing water mains to confirm the depth and location of route
crossings. The route of the Dedicated Transmission Main is provided on the CIP
Map.
4. Riata Lift Station Relocation (Design Phase)
Overall project intent is to relocate the Riata Lift Station ahead of TxDOT's IH -35 NEX
Project to remove it from conflict with the proposed improvements. The design phase will
identify a new site for the lift station, design the new lift station, and design the abandonment
of the existing lift station.
o Project Status: Design Phase
o Consultant: Utility Engineering Group, PLLC (UEG)
o Design Project Start :Date: August 2020
o Expected Design Project Completion Date: Summer 2021
o Total Project Cost: $129,795 (NTE $143,000)
o Project Update: No change from last update. UEG is working on the
property /easement acquisition for the site and sewer mains. Property owner is
asking for minor site revisions to limit easement and buffer zones
5. Aviation Heights Water Main Construction Phases 5, 6, and 7 (Construction Phase)
Overall project intent is the construction of an 8" water main within the Aviation Heights
area along Aero Avenue, Brooks Avenue, Winburn Avenue, Mitchell Avenue, and Aviation
Avenue.
o Project Status: Construction Phase
o Consultant: Ford Engineering
o Project Start Date: October 18, 2021.
o Expected Project Completion Date: January 24, 2023
o Total Project Cost: $1,785,484.25
o Project Update: Work continues by MC Fonseca to place the 8" water main along
Brooks Avenue including temporary backfill and cold -mix asphalt. The water line
on Aero Avenue and Winburn Avenue has been installed, tested, and is in service.
The Contractor is working on obtaining rights -of -entry and temporary construction .
easements on private property where the new water meter will connect to water
services near each home, as required. Aero Avenue pavement is anticipated to be
complete by the end of January, with work continuing on Brookes Avenue and
Winburn Avenue until this phase is complete. Residents continue to reach out to
City staff to answer questions about the status of the project, disturbance on private
property, and water main shut - downs. City staff is preparing an informational flyer
to send out to all affected property owners.
6. Crest Oak Wastewater Upsize
Overall project intent is to upsize the existing 10" sewer main which extends approximately
2,600 linear feet north of Crest Oak.
o Project Status: Scoping phase
o Consultant: None
o Project Start Date: To Be Determined
o Project Completion Date: To Be Determined
o Total Project Cost: Approximately $700,000
o Project Update: No change from last update. Based on the information provided in
the technical memo provided by Kimley -Horn, pipe bursting can likely be utilized
to upgrade the existing 10" sanitary sewer main to a 1.5" sanitary sewer main. Public
Works is obtaining cost information to budget pipe bursting of this sanitary sewer
line.
7. FM 1518 Utility Relocations
Overall project intent is to relocate the water and sewer utilities to avoid conflicts as part of
the TXDOT FM 1518 Project. The current contract is for the design services of the project.
o Project Status: Design Phase
o Consultant: Halff Associates
o Design Project Start Date: June 2021
o Expected Design Project Completion Date: September 2022
o Total Project Cost: $548,370 (NTE $600,000)
o Project Update: No change from last update. Halff has addressed TXDOT's
comments to the 90% plan set. Alignment options are being discussed along Aztec
Lane to limit necessary easement acquisition.
8. Corbett Ground Storage Tank
Overall project intent is the construction of a 3.0 Million Gallon ground storage tank for
filling the Corbett Elevated Storage Tank, the East Live Oak Elevated Storage Tank, plus
additional storage.
o Project Status: Design Phase
o Consultant: Ford Engineering
o Design Project Start Date: June 7, 2021.
o Expected Project Completion Date: May 2022
o Total Project Cost: $466,265.00
o Project Update: No change from last report. Design work is ongoing for the ground
storage tank and pump station. Preliminary Design was received on December 9,
2021, including plans and supporting documents to identify potential design,
construction, or operational problems and provide appropriate resolutions. City staff
has been working to review these plans, but with staff shortages throughout several
departments, comments have not been provided to the design team.
Street Projects:
1. 2018 Street Preservation and Maintenance Reconstruction Project
• Project Status: Substantially Complete
• Construction Start: January 2020
• Construction Completion: Summer 2020
• Cost of Construction: $1,501,1.99
• Project Update: The Schertz Parkway work is fully complete. A vehicle caused
some surface damage to the pavement at the Mesa Verde intersection. Staff is
working to get the damage repaired.
2. 2018 Street Preservation and Maintenance Resurfacing Project
• Project Status: Under Construction
• Construction Start: March 2020
• Construction Completion: Summer 2020
• Cost of Construction: $791,174.34
• Project Update: Council approved the construction contract on December 7th. The
fog seal is expected to be applied in the spring when we have favorable weather.
3. Elbel Road Storm Drain and Paving
• Project Status: Design
• Consultant: Ford Engineering
• Project Start Date: October 4, 2021
• Project Completion. Date: Spring 2022
• Total Project Cost: $1,964,000
• Project Update: The project has been mostly completed. The traffic signal
installation at Westchester will start in the near future. The traffic signal work and
some other, minor work items will not have large impacts to traffic on Elbel. There
will be some short duration, short distance single lane closures in the future as these
work items are completed.
4. 2020 Street Preservation and Maintenance (Resurfacing) Project
• Project Status: Under Construction
• Consultant: Kimley -Horn & Associates
• Project Start Date: November 15, 2021
• Project Completion Date: Spring 2022
• Estimated Cost of Construction: $2,153,000
• Project Update: The concrete prep work has been completed. The contractor is
working on base repairs and other asphalt prep work in the Northcliffe area now.
Once the Northcliffe work is complete, they will move into the Oak Trail Estates
area. Once Oak Trail Estates is complete, they will work through the remaining
areas in the following order: Ashley Place and Savannah Square; Dove Meadows
and Silvertree; and north of Aviation Heights. The contractor's intent is to finish
one are before moving into the next. The slurry seal application is not expected until
we have more favorable weather in the Spring.
5. Tri- County Parkway Reconstruction Project
o Project Status: Construction
o Consultant: Halff Associates
o Construction Start: Spring 2022
o Estimated Cost of Construction: $4,900,000
o Project Update: Council awarded the construction contract on December 7t". The
contract documents have been fully executed and Staff is working with the
contractor to get a construction schedule and a pre - construction meeting scheduled.
The contractor is working on a firm pipe delivery time form their pipe supplier so
we can identify a planned project start date. Staff is working with EDC to get
another notification effort underway and to develop a new project video to put on
the EDC's project webpage to inform everyone about the anticipated project start.
6. Pedestrian Routes and Bike Lanes Project
o Project Status: Under Construction
o Construction Start: Spring 2021
o Construction Management: AGICM
o Estimated Cost of Construction: $1.3 million
o Project Update: The work has been completed on Live Oak and the pathway repairs
have also been completed. Most of the bike lane striping is expected to be completed
by January 21st, weather permitting. Staff is in the process of developing the punch
list for the project.
7. Main Street Improvements Project
o Project Status: Design
o Consultant: Kimley -Horn Associates
o Project Update: The field survey work and geotechnical investigation have been
completed. An initial project meeting was held with the Main Street Committee to
get direction on the planned architectural features and improvements. The
consultant is using this information to help refine their options and design. An initial
utility coordination meeting was held on January 10th with GVEC to discuss the
project and options for relocating the existing power lines. GVEC is working on
cost estimates and options for relocating the power lines. A separate utility
coordination meeting will be scheduled with GVEC and other utilities to further
discuss utility relocations for the planned project.
8. Eckhardt Road Maintenance Project
The City is partnering with Guadalupe County to have some heavy maintenance performed
on the section of Eckhardt Road from the entrance to the Parklands Subdivision past the
intersection with Green Valley Road. The City is purchasing materials and Guadalupe
County is providing labor and equipment to perform a more complete maintenance effort
than continuing to address individual potholes as they appear. The road will be resurfaced
with a chip seal treatment (appropriate for long, straight sections of roadway such as
Eckhardt). The project is currently on the County's schedule for March -April 2022.
TxDOT Roadway Proiects:
1. FM 1103 Improvement Project: The FM 1103 project has been delayed due to some
ongoing utility work and a proposed change in a retaining wall design. TxDOT is currently
expecting a start date in February 2022, but that continues to be subject to change.
2. FM 1518 Improvement Project: TxDOT is in the Plans, Specs, and Estimates (.PS &E)
stage of the project. At this time, the design consultant for TxDOT has prepared 90%
construction plans and is working toward 95% completion. The project was scheduled to
be let for construction in September 2022 but that date has shifted and is now planned for
January 2023. Some utilities are delayed in efforts to relocate due to manpower and material
issues. There is also an environmental issue on the JBSA Randolph property needed for
right of way that has only recently come to light that must be investigated by TxDOT. Any
updated letting schedule will be shared as it is received by Staff.
3. I -35 Operational Improvements Project (FM 2252 to Schwab Road): The contractor
continues slow progress on the project. Work continues on project elements outside the
travel lanes and on the VIA Park & Ride facilities. Mainlane paving with porous friction
course (PFC) asphalt has stopped due to cold night weather. It is expected to resume in late
March or April 2022 once low nighttime temperatures are above 70 degrees. Completion
of the project is now expected in late spring 2022.
4. I -35 NEX (I -410 South to FM 1.1.03): A design -build contract for the central segment of
the I -35 Northeast Expansion project has been awarded to Alamo NEX Construction. The
central section runs from 410 N to FM 3009 is fully funded. Significant construction is
expected to begin in spring 2022.
5. IH -10 Graytown Road to Guadalupe County Line: Construction of this $157 million
project to expand IH 1.0 underway. Traffic controls have been placed and work has begun
on the transition of the access roads from two -way to one -way. Grading for the widening
of the main lanes has also begun and utility relocations are underway. (No City of Schertz
utilities need to be relocated for this project.) Ramp and lane closures take place as
necessary and occasionally include full closure of the main lanes for work such as bridge
demolitions. The westbound frontage road bridge over Cibolo Creek has been reopened.
The Trainer Hale Road overpass was demolished and columns for the replacement bridge
have been poured.
Studies and Plans:
1. Water and Wastewater Master Plan Update and Impact Fee Study
o Project Status: Study
o Consultant: Lockwood, Andrews, and Newnam, Inc.
o Project Start Date: December 2019
o Project Completion Date: TBD 2022
o Total Project Cost: $467,280 (NTE $500,000)
o Project Update: No change from last update. Comments on the Land Use Technical
Memo have been provided to consultant. LAN continues to work on completion of
utility models. Once land use assumptions are approved, future conditions will be
input to the models for development of the Capital Improvement Plan for the Impact
Fee update.
2. Stormwater Control Inventory and City Operations Assessment
The work of this project is an action included in the City's Stormwater Management Plan
(Plan). The Plan is the blueprint of activities needed to comply with the City's Texas
Commission on Environmental Quality (TCEQ) Texas Pollutant Discharge Elimination
System (TPDES) General Permit required by virtue of the City's classification as Municipal
Separate Storm Sewer System (MS4).
This project specifically consists of development of an inventory of City facility stormwater
controls and an assessment of city operations as related to stormwater control and quality.
o Project Status: Study
o Consultant: Utility Engineering Group, PLLC
o Project Start Date: July 2020
o Project Completion Date: Winter 2021
o Total Project Cost: $35,000
o Project Update: No change from last project update. Consultant and City staff have
visited City sites for information collection. Consultant has submitted a final draft
from the compiled information and Inventory Assessment is under review by staff.
Planning and Community Development Proiects:
1. CityView Permitting and Development Software
The CityView software is currently configured by the CityView implementation team for
testing. City Staff continues the process of validating and testing the software which project
for completion on January 24, 2022. Validation involves testing the software from both
sides — what customers will see and what City Staff will see once the system is complete
and operational. Staff training and Go -live is scheduled for April 2022.
o Total Project Cost: $523,766.00
o Project Start Date: June 2018 .
o Project Completion. Date: February 2022