24-R-53 Amendment 6 Project Agreement Cobb, Fendley and Assoc.Inc.-Construction Phase Engineering Services Woman Hollering Creek Wastewater LineRESOLUTION NO. 24-R-53
A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ,
TEXAS, AUTHORIZING AMENDMENT 6 TO THE PROJECT
AGREEMENT WITH COBB, FENDLEY & ASSOCIATES, INC.,
RELATING TO CONSTRUCTION PHASE ENGINEERING SERVICES
FOR THE WOMAN HOLLERING CREEK WASTEWATER LINE
PROJECT, AND OTHER MATTERS IN CONNECTION THEREWITH
WHEREAS, the City staff of the City of Schertz (the "City") has determined that the City
requires professional services relating to the construction phase engineering responsibilities for the
Woman Hollering Creek Wastewater Line Project that exceed the original project agreement
scope; and
WHEREAS, City staff has determined that Cobb, Fendley & Associates, Inc., is uniquely
qualified to provide such services for the City; and
WHEREAS, pursuant to Section 252.022(a)(4), the City is not required to seek bids or
proposals with respect to a procurement for personal, professional, or planning purposes; and
WHEREAS, the City Council has determined that it is in the best interest of the City to
amend the contract with Cobb, Fendley & Associates, Inc., pursuant to its proposed amended scope
and fee for construction phase services presented as Exhibit A ("Amendment 6") for an amount of
$69,529.40.
WHEREAS, the City Council authorizes City Staff to expend up to a not to exceed amount
of $100,000 on further amendments to the Project Agreement, if needed.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SCHERTZ, TEXAS, THAT:
Section 1. The City Council hereby authorizes approval of the Amendment to the
Agreement with Cobb, Fendley & Associates, Inc., in substantially the form set forth on
Exhibit A and to execute further Amendments as necessary not to exceed an additional
expenditure amount of $100,000.
Section 2. The recitals contained in the preamble hereof are hereby found to be true, and
such recitals are hereby made a part of this Resolution for all purposes and are adopted as a
part of the judgment and findings of the City Council.
Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any
provision of this Resolution are hereby repealed to the extent of such conflict, and the
provisions of this Resolution shall be and remain controlling as to the matters resolved
herein.
Section 4. This Resolution shall be construed and enforced in accordance with the laws
of the State of Texas and the United States of America.
Section 5. If any provision of this Resolution or the application thereof to any person or
circumstance shall be held to be invalid, the remainder of this Resolution and the application
of such provision to other persons and circumstances shall nevertheless be valid, and the
City Council hereby declares that this Resolution would have been enacted without such
invalid provision.
Section 6. It is officially found, determined, and declared that the meeting at which this
Resolution is adopted was open to the public and public notice of the time, place, and subject
matter of the public business to be considered at such meeting, including this Resolution,
was given, all as required by Chapter 551, Texas Government Code, as amended.
Section 7. This Resolution shall be in force and effect from and after its final passage, and
it is so resolved.
PASSED AND ADOPTED, this day of 1 , 2024.
CITY OF S ERTZ, TEXAS
Ra .uti z, Mayor
EXHIBIT A
A-1
.. CobbFendley
April 24, 2024
Ms. Kathryn J. Woodlee, P.E., CFM
City of Schertz
City Engineer
10 Commercial Place Building 2
Schertz, TX 78154
VIA E-MAIL
Re: Supplemental Amendment 6 for Woman Hollering Creek Wastewater Project
Extended Construction Time
Ms. Woodlee:
Cobb, Fendley & Associates, Inc. (CobbFendley) appreciates the opportunity to provide this proposal for
additional services for the construction phase. The table below summarizes the additional submittals and
RFIs that have been addressed as well as the extended duration of the contract.
Item
Assumed
Actual as of 4/24/2024
Notes
Submittals
80
111
Some of these required more than 2 reviews
RFIs
80
85
Duration
12 months
26 with a total of 28-29 anticipated
NTP on 1/11/2022 for 12 month duration. Now
anticipate substantial completion in late -June
2024.
CobbFendley has worked diligently and efficiently to perform the scope within the contracted budget. At this
time, the existing budget has been expended and we are requesting additional funds to complete the
remaining anticipated services as summarized below:
1. Addressing final closeout issues and RFIs including drawing revisions. This line item is included for
unknown issues that may arise as the construction is closing out such as the canopy slab for the
MCC not being open, grout placement in the wet well, the Manhole 131-6 correction plan, and other
unforeseen issues that are discovered as the team is performing final observations.
2. Additional Progress Meetings and Project Management. The current schedule shows final
completion in late -June 2024. This proposal assumes project closeout in late -July 2024 with weekly
on -site progress meetings through July.
3. Pre -punch list walk throughs. CobbFendley will participate in pre -punch list walk throughs for the
gravity main, lift station, and forcemain and provide notes of findings and coordination of reviewing
corrected work.
4. Final Walkthrough. CobbFendley will participate in the final walkthrough for the gravity main, lift
station and forcemain and coordinate with the City and inspection team on preparing and closing out
the final punch list.
5. Startup. CobbFendley will attend the startup of the lift station and coordinate with the City and the
inspection team on the startup protocol and observations.
401 Isom Road, Bldg. 100, Suite 1011 San Antonio, Texas 78216 1 210.826.4611 1 fax 210.826,4906 1 www.cobbfendley.com
TBPE Firm Registration No. F-274 I TBPLS Registration No. 10193891
CobbFendley
6. Record Drawings. CobbFendley will provide a set of Record Drawings based on as -built markups
provided by the Contractor and integrating drawing revisions that were issued as RFI responses.
7. MH131-6 Work Plan Survey. CobbFendley will provide additional survey for MH131-6 as described in
the attached scope of services. Contingency survey fee has also been included to cover potential
additional as -built survey that might be required to confirm the wastewater system was built in
conformance with the engineering plans.
Basis of Compensation
We propose to perform these services according to the fee table below and attached based on the terms and conditions
of the Project Agreement for Engineering Services executed on October 8, 2015 and the Rate Table included within
Supplemental Number 4 executed on April 5, 2022.
Description _ Cost
Additional Engineering $54,202.00
Survey for MH131-6 $5,327.40
Contingency for Additional Survey _ $10,000.00
Total Extended Construction Time $69,529.40
Please do not hesitate to contact me at (512) 834-9798 if you have any questions about the above referenced
proposal.
Sincerely,
0
Julie Hastings, PE, MBA
Principal I Project Manager
cc: Luis Santos, PE
401 Isom Road, Bldg. 100, Suite 101 1 San Antonio, Texas 78216 1 210.826.4611 1 fax 210.826.4906 1 www.cobbfendley.com
TBPE Firm Registration No. F-274 i TBPLS Registration No. 10193891
Page 1 of 2
April 11, 2024
Topographic Survey in the City of Selma, Texas
Proposal for Professional Services
SURVEY — CONTROL
1. CFA will utilize the Trimble VRS — GPS network for this project.
on
Mom on
CobbFendley
TBPE Firm Registration No. 274
2. The GPS control will be referenced to the Texas State Plane Coordinate System — South Central Zone, North
American Datum 1983 (2012), North American Vertical Datum 1988 (Geiod 12b).
3. CobbFendley will recover or establish a minimum of two (2) control monuments within Hallie's Cove Subdivision.
SCOPE OF SERVICES
1. CobbFendley will perform a topographic survey of nine (9) existing manholes. If the manhole at the intersection
of Hallie Stone and Hallie Creek is unbolted, flowline elevations will be collected. One (1) wastewater line within
the project limits (as exposed by designated contractor) will also be surveyed. Top and bottom elevation of the
exposed pipe will be collected.
2. CobbFendley will not access private property for the purposes of this survey. If access is necessary, additional
right -of -entry, permitting and traffic control may be required.
3. A survey drawing will be prepared depicting the manholes and wastewater line. No property lines or ownership
information will be included.
4. The surrey drawing will be prepared using AutoCAD and delivered in electronic format.
5. Client shall furnish the following information or tasks, as available, for services at no cost to CobbFendley-
a) Permission to enter and survey the land, preferably written.
b) Other available information or assistance as appropriate.
505 East Huntland Drive, Suite 100 i Austin, Texas 78752 i 512.834.9798 1 fax 512.834.7727 1 www.cobbfendley.com
TBPE Firm Registration No. 274 TBPLS Registration No. 10046701
Page 2 of 2
LUSIONS FROM THE SCOPE OF SERVICES
no
SO CobbFendley
TBPE Firm Registration No. 274
Specific items excluded from this proposal are as follows, and CobbFendley shall have no responsibility to perform any of
these services.
1. Right of Entry will be PROVIDED BY THE CLIENT.
2. The survey will not address compliance or assessment of additional existing utilities, wetland determinations, fault
lines and/or environmental assessments that are beyond the surveyor's expertise.
3. Location of underground utilities (SUE), 811 calls or markings.
4. Any other service not specifically included within this description of Scope of Services described above.
1.
505 East Huntland Drive, Suite 100 1 Austin, Texas 78752 512.834.9798 1 fax 512.834.7727 1 www.cobbfendley.com
TBPE Firm Registration No. 274 TBPLS Registration No. 10046701
"'
0:400
on
CobbFendley
2021 Standard Rate Schedule
Senior Engineer V or Principal...................................................................................$299.00/HR
Senior Engineer IV or Project Manager V..................................................................
$278.00/HR
Senior Engineer III or Project Manager IV..................................................................
$242.00/HR
Senior Engineer II or Project Manager III...................................................................$227.00/HR
Senior Engineer I or Project Manager II.....................................................................$201.00/HR
Engineer III or Project Manager I...............................................................................$175.00/HR
EngineerII.................................................................................................................$155.00/HR
EngineerI..................................................................................................................$129.00/HR
Graduate Engineer II..................................................................................................$118.00/HR
Graduate Engineer.....................................................................................................$108.00/HR
Project Coordinator......................................................................................................$98.00/HR
Senior Technician III (GIS, Telecom, Utility, CAD, Field) ............................................
$170.00/HR
Senior Technician II (GIS, Telecom, Utility, CAD, Field).............................................$149.00/HR
Senior Technician I (GIS, Telecom, Utility, CAD, Field)..............................................$129.00/HR
Technician III (GIS, Telecom, Utility, CAD, Field).......................................................$103.00/HR
Technician II (GIS, Telecom, Utility, CAD, Field)..........................................................$84.00/HR
Technician I (GIS, Telecom, Utility, CAD, Field)...........................................................
$62.00/HR
Licensed State Land Surveyor...................................................................................$242.00/HR
Senior Registered Professional Land Surveyor..........................................................$216.00/HR
Registered Professional Land Surveyor.....................................................................$175.00/HR
ProjectSurveyor........................................................................................................
$155.00/HR
Certified Photogrammetrist. .......................................................................................
$205.00/HR
4 Person Survey Crew...............................................................................................$196.00/HR
3 Person Survey Crew...............................................................................................$175.00/HR
2 Person Survey Crew...............................................................................................$149.00/HR
1 Person Survey Crew...............................................................................................$108.00/HR
2 Person Hy -Drone Crew...........................................................................................
$350.00/HR
2 Person UAV Drone Crew........................................................................................
$242.00/HR
Construction Manager III............................................................................................$288.00/HR
Construction Manager Il.............................................................................................$237.00/HR
ConstructionManager I..............................................................................................
$191.00/HR
Construction Observer III...........................................................................................
$160.00/HR
Construction Observer II............................................................................................$134.00/HR
Construction Observer I.............................................................................................$113.00/HR
Sr. Right -of -Way Agent III or ROW Project Manager III ...............................................
$250.00/HR
Sr. Right -of -Way Agent II or ROW Project Manager II ................................................
$200.00/HR
Sr. Right -of -Way Agent I or ROW Project Manager I..................................................$180.00/HR
Right -of -Way Agent III or ROW Attorney....................................................................
$160.00/HR
Right -of -Way Agent II.................................................................................................
$140.00/HR
Right -of -Way Agent I..................................................................................................$110.00/HR
(Continued)
Right -of -Way Technician............................................................................................$100.00/HR
Administrative............................................................................................................$108.00/HR
Clerical......................................................................................................................... $82.00/HR
Field Data Device................................................................................................ $40.00/HR/unit
SUBSURFACE UTILITY ENGINEERING
Two -Man Designating Crew (4-Hour Minimum)..............................................................$175/HR
One -Man Designating Crew (4-Hour Minimum)..............................................................$113/HR
Vacuum Excavation Truck with 2 Technicians (Vac 6000) (4-Hour Minimum).................$325/HR
Vacuum Excavation Truck with 2 Technicians (Vac 3000 & 4000) (4-Hour Minimum) ..... $304/HR
Ground Penetrating Radar with 1 Technician (4-Hour Minimum)....................................$268/HR
Traffic Control Officer.............................................................................................@ Cost + 10%
Traffic Control (Lane Closures, etc.)................................................................. To Be Negotiated
Permits (Local, State, etc.).....................................................................................@ Cost + 10%
Designation, Location & Traffic Control Vehicles.......................................................... $6.50/Mile
REIMBURSABLE EXPENSE
TechnologyFee (*)........................................................................................................$3.75/HR
Consultant or Specialty Contractor (Outside Firm) ................................................. @ Cost + 10%
Courier, Special Equipment Rental........................................................................@ Cost + 10%
Reasonable Out of Town Travel Expenses (Air, Hotel, Rental, etc.)
................................. @ Cost
Mileage (Standard Car or Truck)....................................................................
IRS Approved Rate
Per Diem for Out of Town Travel (Per Day/Person) ...............................
GSA Standard Rate/Day
TitlePlant Charges................................................................................................@
Cost + 10%
Other Misc. Expenses Related to the Project.........................................................@
Cost + 10%
In -House Reproduction:
➢ Copies (Up to 11" x 17")..................................................................................
$0.15/Each
➢ Color Prints (Up to 11" x 17")..........................................................................$1.50/Each
➢ Color Prints (Larger than 11" x 17")..............................................................$3.00/Sq.
Ft.
➢ Bluelines (All Sizes)........................................................................................$1.00/Each
➢ Bond Prints (All Sizes)....................................................................................
$2.00/Each
➢ Mylar Prints ..................................................................................................$12.00/Each
➢ Vellum Prints..................................................................................................$9.00/Each
(') Technology charges added to each billable man-hour.