Loading...
26-R-049 Authorizing a Task Order Amendment with Kimley-Horn and Associates, Inc. for the Schertz Forest Roadway and Waterline Improvements ProjectRESOLUTION 26-R-049 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS AUTHORIZING AN AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING SERVICES ON THE SCHERTZ FOREST ROADWAY AND WATERLINE IMPROVEMENT PROJECT WHEREAS, on February 18, 2025, the City Council of the City of Schertz approved Resolution 25-R-035 approving a Task Order with Kimley-Horn Associates, Inc. with a not to exceed amount of $720,000 for the design of the Schertz Forest Roadway and Waterline Improvement Project, and WHEREAS, during the project design it was noted that a segment of existing water main would remain along Ware Seguin Road between the new proposed water main in the subdivision and the new, relocated water main along FM 1518 and that some additional street and drainage channel grading is needed to address existing drainage issues in the Schertz Forest subdivision; and WHEREAS, the City Council wishes to amend the Task Order Agreement to add additional design and surveying services to replace the additional water main section and address the drainage issues; and WHEREAS, City Staff has determined that Kimley-Horn and Associates, Inc. is uniquely qualified to provide such services for the City; and WHEREAS, Kimley-Horn and Associates is an approved On -Call Engineering Fim for the City of Schertz; and WHEREAS, pursuant to Section 252.022(a)(4), the City is not required to seek bids or proposals with respect to a procurement for professional or planning purposes. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCHERTZ, TEXAS THAT: Section 1. The City Council hereby authorizes the City Manager to execute and deliver the Amendment to the Agreement with Kimley-Horn and Associates, Inc., in substantially the same form set forth in Exhibit A for $44,829.29 and to execute further amendments as necessary not to exceed a total amount of $764,000. Section 2. The recitals contained in the preamble hereof are hereby found to be true, and such recitals are hereby made a part of this Resolution for all purposes and are adopted as a part of the judgment and findings of the City Council. Section 3. All resolutions, or parts thereof, which are in conflict or inconsistent with any provision of this Resolution are hereby repealed to the extent of such conflict, and the provisions of this Resolution shall be and remain controlling as to the matters resolved herein. Section 4. This Resolution shall be construed and enforced in accordance with the laws of the State of Texas and the United States of America. Section 5. If any provision of this Resolution or the application thereof to any person or circumstance shall be held to be invalid, the remainder of this Resolution and the application of such provision to other persons and circumstances shall nevertheless be valid, and the City Council hereby declares that this Resolution would have been enacted without such invalid provision. Section 6. It is officially found, determined, and declared that the meeting at which this Resolution is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Resolution, was given, all as required by Chapter 551, Texas Government Code, as amended. Section 7. This Resolution shall be in force and effect from and after its final passage, and it is so resolved. PASSED AND APPROVED on the day of 3,� , 2026. CITY OF SCHERTZ, TEXAS Ra Rodriguez, M r ATTEST: Sheree Courney, Deputy City Secre EXHIBIT A AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT 500773971 A_1 AMENDMENT TO TASK ORDER 01 Amendment No. 1 Task Order Number: 01 Project Name: Schertz Forest Roadway and Waterline Improvements Owner: City of Schertz Engineer: Kimley-Horn and Associates, Inc. General Purpose of the Amendment: Additional Survey and Design services to include the following: • Additional survey on Ware Seguin Road and Robin Hood Way, as shown in attachment included in Amendment No. 1 scope and fee proposal • Additional water line design on Ware Seguin Road • Additional driveway, grading, fence replacement, tcp and sw3P design Description of Modifications: Reference Kimley-Horn's Amendment No. 1 scope and fee proposal dated December 30, 2025. Owner and Engineer hereby agree to modify the above -referenced Main Agreement as set forth in this Amendment. The Effective Date of the Amendment is , 2026. Owner Engineer City of Schertz Kimley-Horn and Associates, Inc. (typed or printed name of organization) (typed or printed name of organization) By: Date: Name: Title: (individual's signature) (date signed) (typed or printed) (typed or printed) �(i6ividuafs signature) Date: 12/30/2025 (date signed) Name: Jeff Farnsworth (typed or printed) Title: Senior Vice President (typed or printed) Kimley»>Horn December 30, 2025 John Nowak, PE Assistant City Engineer City of Schertz - Engineering 11 Commercial Place Schertz, Texas 78154 RE: Schertz Forest Roadway and Water Line Improvements Project — TO-01 Amendment No. 1— Additional Design Services Dear Mr. Nowak: As requested by the City of Schertz ("City"), Kimley-Horn and Associates, Inc. ("Kimley-Horn) is submitting this amendment letter for additional design services to extend the proposed water main relocation to a 45- degree bend installed as part of the FM 1518 widening project. As part of the original scope of work, the proposed water main for the Schertz Forest project would tie-in to the existing water main at the Nottingshire and Ware Seguin Road intersection. During the 50% review meeting, the City determined it would be in the best interest of the project to replace the main fully to a connection point on the new water main installed near FM 1518 and Ware Seguin Road. This extension will allow for a brand-new water main from Nottingshire to FM 1518. In addition to the water line extension on Ware Seguin Road, additional survey is required within an existing drainage easement at 7018 and 7024 Robin Hood Way. The true low point in the Robin Hood Way profile is at the property line of these two parcels, and Robin Hood Way discharges into this drainage easement. Through discussions with City staff it was determined to obtain additional survey of the existing easement and regrade as needed to ensure sufficient gravity slope is maintained from the low point at Robin Hood Way. This will require additional design including grading of the existing easement and replacement of existing wrought iron fences at both parcels. To accommodate these additional design services, additional traffic control (TCP) and SW3P will also be required. Lastly, after review of the original design scope of services, the street reconstruction limits has increased as originally proposed. This resulted in an additional 13 driveway profiles needed to accommodate the change in grading. Kimley-Horn is requesting additional fee to cover these additional driveway designs. SCOPE OF SERVICES The below tasks outline the additional scope of work to be completed by Kimley-Horn for the above referenced additional design services: Task 1: Proiect Management 1 Project Management - Process amendment Including invoicing with description of services performed and processing contract amendment 10101 Reunion Place, Suite 400, San Antonio, TX 78216 Kimley>>) Horn Page 2 2. Subcontract Management - Prepare subconsultant contract for additional survey - Subconsultant invoicing - Coordination of scope of work with subconsultant 3. Additional Project Coordination Task 2: Data Collection Topographic Survey Services (McGray & McGray) 1. Obtain detailed topographic survey to produce a digital terrain model (DTM) for survey limits identified in survey exhibits (Attachment 2). Data to be collected and deliverables will be consistent with the parameters included in the original scope and fee proposal. The additional areas and limits of survey for each are as follows: - Area 1 - Drainage Easement at 7018 and 7024 Robin Hood Way - Area 2 - ROW along 7030 Robin Hood Way o This area was previously unavailable due to bulky brush being within the existing ROW - Area 3 - Ware Seguin Road (Water Main Extension) 2. Design team survey review - Complete necessary site visits to review additional topographic improvements included in survey and provide comments. - Review DTM and provide comments - Coordinate final resolution of comments - General survey cleanup to meet Kimley-Horn CAD standards - Incorporate additional survey and DTM into current base files The survey subconsultant scope and fee proposal can be referenced in Attachment 3. Task 4: Final Design Phase The following additional scope will be completed with the Final Design Phase: Utility Coordination - Coordinate with Overhead Electric company for pole relocation on Nottingshire - Finalize utility conflict matrix (Ware Seguin Road water line extension) General - Finalize general sheets - Update project layout sheets for additional grading and overall project boundary - Update quantity summary Roadway Plan Sheets - Additional driveway design (13 each) within reconstruction limits - Additional grading design within existing drainage easement - Fence replacement/reconstruction plan sheets (7018/7024 Robin Hood Way) Water Plan Sheets - FM 1518 water plans as -built review - Coordinate tie-in connection to appropriate bend/location - Develop water alignment extension from Nottingshire to Ware Seguin Road connection - Update water plan project layout -- iorn.com I 10101 Reunion Place, Suite 400, San Antonio, TX 78216 Kimley>»Horn - Prepare additional plan and profile sheet (40 scale, 1 sheet) Traffic and SW3P Plan Sheets - Additional TCP for water extension on Ware Seguin Road - Update traffic control narrative and sequence of work - Additional SW3P for water extension on Ware Seguin Road and grading easement Miscellaneous 2. Finalize additional quantities and OPCC 3. QC/QA additional design items 4. Address internal QC/QA comments for additional design services SCHEDULE Page 3 Upon approval of this additional service request by the City staff and any necessary council action, Kimley-Horn proposes to complete these additional design services and remaining final design services outlined in the original scope of work at the following schedule: • Data Collection - 30 calendar days • Final Design Phase - 45 calendar days • City Final Review and Sign/Seal Plans and Project Manual - 15 days • Bid Phase - per original schedule • Construction phase - as determined during final design FEE AND BILLING In accordance with the below fee summary table and attached project work plan, Kimley-Horn proposes to complete the above referenced additional design services for a lump sum fee of $44,829.29. The total contract amount proposed for this project, including base, supplemental, and Amendment No. 1 design services, increases to $735,845.85. The following fee summary table outlines the proposed fee by task for additional design services associated with Amendment No. 1 Task Description of Service BASIC SERVICES Amount Basis of Compensation 1 Project Management $ 4,790.00 [Lump Sum ] 2 Data Collection $ 8,359.29 [ Lump Sum ] 4 Final Design Phase $ 31,680.00 [ Lump Sum J TOTAL COMPENSATION (AMENDMENT NO. 1) $ 44,829.29 BASE SERVICES (ORIGINAL SCOPE OF WORK) C $ 668,426.56 [ Lump Sum j SUPPLEMENTAL SERVICES NO. 1 (ORIGINAL SCOPE OF WORK)! $ 22,590.00 TOTAL AMENDMENT CONTRACT AMOUNTS $ 735,845.85 kimley-horn.com 10101 Reunion Place, Suite 400, San Antonio, TX 78216 Kimley»>Horn Page 4 Kimley-Horn will submit invoices to the City on a monthly basis for services performed in accordance with contract requirements. Each invoice will include a summary of work completed for the corresponding month. We appreciate the opportunity to be of service to the City and appreciate the City's consideration for approval of these additional design services. We look forward to successfully completing the design of this project and moving into construction. Please don't hesitate to contact me at ) kimle - or (210) 321-3404 should you have any questions on this Amendment No. 1 request. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. TBPE# 928 t*V4 By: Stephen J. Aniol, P.E. Senior Project Manager Attachments 1 — Project Work Plan 2 — Additional Survey Limits 3 — Subconsultant Scope and Fee Proposal 10101 Reunion Place, Suite 400, San Antonio, TX 78216 CITY OF SCHERTZ Fe,NRirs Proposal Bmekdmm ror Profoasioml services ATTACHMENTI Pro' Name: Schertz Forest Rehabilitation and Water Line Improvements On -Call Engineering Services, Task Order -01 Amendment No. 1 -Additional Design Services IOmley-Hom and Aseadates, Inc. 12/302025 John Nowak, PE Stephen Aniol, PE ` Irm: Date P-1 Submitted: COS Proied Ma winks Y om 0M" pe r es0ionTencrnel Tale Manager Civil Engineer StaREinglrleerl,StaR Engieea Accourdard Con,adard Fee Tahl Su -Corgi m Fee Total npoasd Stag Rates a 306.00 a 29000 a 190.00 a 160.00a 110.00'a 150.00 eak to be tease DevA n Judi Si bt zManl woA3lC SERVICES Y 1 0 3 { .3 33 1 a,M.00 1 3 4,790.00 r 'ed Mrwdtl 2 2 018coidna eme11 CeororlY n 3 1 5 3 I D•01MdRionaI Ped Cmrdl— 4 4 12 1 2,53 00ata 14.13AA.Buift COIIection 0 1 1 4 1 0 f1 T .00 { 8,169.T9 au vepo Ic Surve Servkes iMCG2 8 MCGre land Surve 0 1 a 6159.29 urver review indudin site visit and a a0n and mer ' base files 1 1 4 8 14 1 2200.00 nal n Phaw 1 10 3a 131 0 0 1{I $ 31,580.00 { 1 MAMA* ill CootlinaNanaortlimtew overhsadelectdccom for lemlocalion 2 2 4 68000 nalze mn0id matrb Ylare-S in aMemion 1 1 2 4 a 78D.f10eralnalize neral sheets 'ed laroN, ant.su 1 45 a 790.00 oadwa Plan Shedss' Limits-Nnalush—ntal omebics AtltllkonalDdvewa -13 EA 1 2 12 15 a 2470.W a! nLimtta-Finalize roafiva s4 ment redin sheet and fence detils 4 8 32 44 a 74&R00der Plan SheetsBuin Review caordinete fie4n connection 1 3 14 E &40.00 4.13B Dmeloal" nmenl extension 1 3 4 4000 4.13C U le Wa_terol ctt�utshed 1 3 3 4 4 4000 640.00 4.13D Pre re flle nand osheets 40 soale 1 met 2 4 a 3 Traffic and SW3P Plan Sheets 4.15 Finalize Trek nsheek atltlitional TCP Ware se uin nartatNeantl se uence 2 4 12 iB 1 3140.00 4.16 Finale SW3P san sheets 1148,S water extension and onding e—r-lent, 2 4 24 30 S 499000 Miscellaneous 423 Finiplin, wartifties and OPCC 1 0 11 2,250.00 4.24A OCIOA Final SUt)millal 4 4 s 1 W 4.24B ddress mtemalOG/OA wmmenta 1 2 ID 13 a 2.170.00 Nod Hours (Basic Services): a IS 44 139 4 3 221 Total Amendment 1 Fee I Ia 3{A70A0 I { 1 t"M { {0,{»,L CITY OF SCHERTZ FeelP Proposal 6reakdwm fir Praressiorel Services Name L oaal .2".etl: Pro' Mare r: v-Hom Ro' Mai e Schertz Forest Rehadlitatlon and Water Line Improvements Dn-Call Engineering Services, Task Order -01 nmentlment No. 1 -Additional Desian Services Gurley -Hour and Associates, Inc. I2130l2025 John Nowak, PE Stephen Aniul, PE ATTACHMENTI M!t]C Sr. Projad Civil Engineer Stag Englrwer 8GR Engineer AaWmam Coruullard Fae Total SubCons - OsMorllPerson-11 Tithe Manager Manager If I Fee Total Fr Total Proposed StrR Rates S 305.00 S 290.00 $ 190.00 $ 150M S 14000 S 15a.0D askb be miedll` a DesmPtion 0ndt4nA Submnsuitant ork ATTACHMENT2 LEGEND ® aoomawu suavEruwrrs — — _ H081N -DOD WAYS tl s ATTACHMENT 2 LEGEND .e 46 ® Aonmowu. suAVEruMrts e f•. - - -II >.. nnssrrneN was PvavramyevavEVEo• BADE Mnwas RAEvauAymv -4 eausMavocRPA Axuxaeau rc near POINT PoAOUfl RAORIES. - - - R091N HOOD_WAY- ..... - — -01 I Lo Kimley»)Horn No. RavMlon xy Dah SCHERTZ FOREST Ir 5lAEFlflEHa6/f MN sN..l RTZ ANO VINfylMPROVEMENn; muwimv �mrc[. orma�unn xa �R NG s NOTIINGSHIA-E. I i i II • I I } —I -�___--______-\ -y I I 11: I I t NOT71NGSHIRE i � I I I II ! ADDITIONAL SURVEYAREA-""'I I i- EST ® 8.103.76 SF i I II II II II I I I I II II au I I II E I I II ( 4—'- — FfT- �__- II 'III =3 WARE I I SEGUIN RD FM1518 C I I ' CVT IS' CROSS SECTIONS AND OBTAIN ALL } FJ A PROVEMATCHED WITHIN NATCHED AREA (FARM ROW TO CENTERDNF OF WARE EGUN CON EDGE EXISTGTOP 08(AINED. MERGE NEW SURFACETo EASIING. �I70MSPE OF WORK0STENTWON SERVICES ' INCLUDED IN ORIGINAL IFO. ' I is III A �L LEGEND ® ADDmoNAL suAveruNlrs ATTACHMENT2 � � FM ISZB i McGRAY & McGRAY LAND SURVEYORS, INC. 3301 HANCOCK DRIVE, SUITE 6 AUSTIN, TEXAS 7B731 [5121 451-8591 FAX [5121 451-8791 TRANSMITTAL ATTACHMENT 3 TO: Kimley-Horn DATE: November 18, 2025 Attn: Stephen Aniol, PE FROM: Sofia Ratinoff for Chris Conrad 10101 Reunion Place RE: Revised Proposal for Additional Suite 4000 Topographic Surveying Services for the San Antonio, Texas 78216 Schertz Forest Roadway and Waterline PHONE: (210) 321-3404 Improvements Project, Schertz, Texas EMAIL: Stephen.anoil@kimley-horn.com WE ARE SENDING YOU X Attached Under separate cover the following items: COPIES DESCRIPTION 1 Revised Proposal ❑ For Your Approval ❑ As Requested REMARKS: Thank you, Chris TBPELS Survey Firm #10095500 ® For Your Information ❑ For Review and Comment SENT VIA: ❑Delivery Service ❑FedEx ❑Mail ❑Fax ®Email ❑Other-. Ifyou received this message incomplete or illegible, or if enclosures are not as noted, please notify us at once November 18, 2025 Stephen Aniol, P.E. Kimley-Horn 10101 Reunion Place Suite 400 San Antonio, Texas 78216 (210) 321-3404 McGRAY & McGRAY LAND SURVEYORS, INC. VIA EMAIL. Stephen.Anoil@kimley-horn.com RE: Revised Proposal for Additional Topographic Surveying Services for the Schertz Forest Roadway and Waterline improvements Project, Schertz, Texas Dear Mr. Aniol: We appreciate the opportunity to present you with this revised proposal for additional services for the above referenced project. The following represents our understanding of the area to survey and scope of services. Our fee proposal follows. Areas for Survey: • Areas highlighted in "GREEN" on attached Exhibits "A, B and C". Survey Control: We will use the same control as established for the initial work we performed. Scope of Services: Design Surveying Services: 1. Elevations shall be obtained at of a maximum of 25-foot intervals, along with break lines as required, to provide a digital topographic design file at 1-foot contour intervals. The cross section will be between the apparent right-of-way lines. 2. Locate and identify all above ground features within the survey limits including buildings, fences, mailboxes, sidewalks, driveways, guardrails, signs, telecom boxes, visible utilities, utility poles, manholes, water valves with top of nut elevations and water meters. 3. Identify types of existing pavement surfaces for streets, sidewalks and driveways. Locate and identify existing traffic signals including base, street signs and control boxes. 3301 HANCOCK DRIVE, SUITE B AUSTIN, TEXAS 78731 [S12) 451-e591 FAX15123 4S1-8791 Mr. Aniol November 18, 2025 Page 2 of 2 4. Locate sufficient monumentation to define the right-of-way lines. 5. Trees that are 3-inches, and larger in diameter shall be measured, identified and tagged with a point number. Deliverables: A. AutoCAD Civil3D (ver. 2024) drawing file using Kimley-Horn CAD Standards. B. The units of the drawing file shall be U.S. survey feet. Fees: Design Surveying Services (Non-taxable): 2 Man Crew: Field Coordinator: Sr. Survey Technician: AutoCAD Survey Technician: RPLS: Project Manager: 16 hrs @ 1 hrs @ 8 hrs @ 16 hrs @ 2 hrs @ 1 hrs @ $190.00 /hr.= $ $91.35 /hr.= $ $115.53 /hr.= $ $95.38 /hr.= $ $188.06 /hr.= $ $201.50 /hr.= $ TOTAL = $ 3,040.00 91.35 924.24 1,526.08 376.12 201.50 6,159.29 Once we receive notice to proceed, we will visit with you to establish a schedule for this project. Thank you for including us on this project. We look forward to the opportunity to work with you. If you think we have omitted any service you require or misinterpreted your request, please let me or Joe Webber know. Sincerely, Chris J. Conrad, RPLS Vice President TBPELS Survey Firm #10095500 CIC:JDW:spr Encl. Authorized to Proceed by Signature Print Date Name