07-23-1996
LING AND ZONING MINUTES e
.
The Schertz Planning and Zoning Commission conducted a Public
Hearing on Tuesday, July 23, 1996 at 7:00 p.m. in the Municipal
Complex Council Chambers, 1400 Schertz Parkway, Schertz, Texas.
Those present were as follows:
PLANNING & ZONING COMMISSION
CITY STAFF
PIA JARMAN, CHAIRWOMAN
DAVID RICHMOND, VICE-CHAIRMAN
MERWIN WILLMAN, SECRETARY
TONY MORENO
KEN GREENWALD, COUNCILMAN
STEVE SIMONSON,
ASST. CITY MANAGER
DENISE GRANGER,
PLANNING SECRETARY
MEMBERS ABSENT
OTHERS PRESENT
GARY WALLACE (VACATION)
ERNIE EVANS (WORK RELATED)
KEITH VAN DINE (WORK RELATED)
T.J. Cantwell, Woodland
Oaks Units 5B & 6B
Barry Sanditen, 3009
Partners (Forest Ridge)
James Harden,
16940 IH 35 North
Dan & Ruth Ann Knight,
913 Fawn Drive
Arthur & Jean Weidman
1117 Fawn Drive
Doyle Woodman, 2107
Persimmon Drive
Edward Muro & Elizabeth
Askew,2520 Hidden Grove
Harvey Land, 1213 Fawn
Mae & Maurice Mylius,
1101 Fawn Drive
E.E. Workmon,
2728 Poplar Grove
Robert King, 2700 Kline
Harry Richburg,1005 Fawn
Jack & Ann Ladds,
921 Fawn
John Durbin,
Veytia Partners
Sam Bledsoe, MBC Eng.
Charles DeLong,
2600 Hidden Grove
Charles McDonald,
2629 Cotton King
Bill Armstrong,
1025 Fawn
Ann Mazian, 917 Fawn
Mike Cude, Cude Eng.
Mike Lancaster,
Lancaster Development
John Cuntay, American
Standard
Tim Pruski, Carolina
Crossing
.
.
e
e
.
T.J. Cantwell, Cude Eng.
John Krauss, American
Standard
Patrick Brewer, American
Standard
#1 CALL TO ORDER
Chairwoman Pia Jarman called the Public Hearing to order at 7:02
p.m., a quorum being present at that time. Pia Jarman explained
the procedures to be followed at the public hearing and thanked
everyone for their concerned interest. The City Council public
hearings will be held August 6, 1996.
12
PUBLIC HEARING:
To Receive Citizen Input on a Request from
Mike Lancaster to rezone approximately
10.2 acres on Dimrock and Woodland Oaks
Drive from NS (Neighborhood Services) to
R-6 (Single Family Dwelling District
Gated). (ZC #133-96)
.
Steve Simonson stated that in accordance with the ordinance for a
public hearing on a request for a zoning change, all property
owners within the 200 foot radius were notified. There were
thirty-two (32) letters sent; six (6) were returned with two (2)
in favor and four (4) opposed. The letters that were opposed are
concerned with the amount of residential homes versus NS
(Neighborhood Services) and Commercial property. There also was
mention of the increase in traffic on FM 3009.
.
Mike Lancaster stated the reason for the zoning change is to have a
single family subdivision to be built on the land. In talking with
the Homeowners Association Officers about working together to
enhance the two entries on Dimrock and Woodland Oaks Drive, there
has been talk about doing some matching signage and improving the
landscape area along the entrances. In working with the City of
Schertz to prepare budgets and deed restrictions for the property
to ensure quality development so that there would be sufficient
funds to cover any street maintenance costs of the gated community
in the future. Most of the neighbors have been contacted either in
person or by phone to see if there were any questions or comments
on this proposal. The people that are in opposition to this
rezoning are not really opposed to the gated community, but just
opposed to the ratio of residential versus commercial property as
they feel the City of Schertz is getting too much residential
development. Their concern was from a tax point. In running some
calculations you can put about 10,000 square feet of a retail
building per acre. In having a little over 10 acres this would
allow for up to 100,000 square feet of retail on the property. In
talking with the taxing authority the average valuation would be
$40 to $45 per square foot which would bring the total taxing value
up to about 4 to 4 1/2 million dollars. If we build 40 $100,000.00
to $110,000.00 homes in this area, it would be in the same range.
From a tax valuation stand point there is not a great difference
-2-
e
e
.
having commercial versus residential.
Charles McDonald, 2229 Cotton King, stated he is opposed to the
proposal. He feels this is not the best land use for this land.
The land has been zoned commercial and it needs to remain
commercial. As far as the tax being equal on the improvements
being true. But the ad valorem tax on personal property going into
commercial status is taxable. There could be a million dollars in
personal property that is taxable. As a retail outlet there also
would be sales tax generated. Home Depot in Windcrest does 90
million dollars a year in sales. This is 9 hundred thousand
dollars in sales tax. In a retail environment there also is sales
tax revenue. The one thing that does concern Charles McDonald is
that the City is rezoning all of its prime commercial property to
residential. On FM 3009 with easy access this is an ideal area for
a Medical Clinic. The other concern is the one entrance onto
Dimrock with Dimrock not being a thoroughfare but a residential
street. There does not have to be increase of traffic on Dimrock
like there is with Pulte now going through with trucks. Another
question is the emergency ingress/egress width which seems to be
pretty narrow. As far as the comment by Mr. Lancaster mentioning
the entrance sign becoming more attractive, any commercial
development would also be willing to make these improvements. Also
in talking with people worrying about maybe looking at a house or
dumpster over their back fence, even if it is commercial, in the
ordinance, they have to have their dumpters screened in. What is
the best use of the land economically?
.
Ty Briscall, 2608 Hidden Grove, stated he is opposed to the change.
This is one of the last flat areas on FM 3009 until Elbel Road,
where there is an agricultural area with trees and a flat area. FM
3009 does have a lot of trees and valleys for development so this
is a prime piece of property. On looking at FM 3009 to FM 78 and
IH 35 in terms of business, with the exception of Autumn Winds and
the two Churches there is only a couple of ice houses. There is
the new quick lube and the existing real estate business. There
needs to be some more businesses developed. In the original master
plan that was done a few years ago, this was taken into
consideration and this needs to be a part of what the Commission
should be considering. Living in Schertz 14 years, the tax
increases have been quite reasonable. With all the new housing,
there is going to be a need for more services, school district etc.
which will affect our property taxes. As for the concept of a
gated community, Schertz has always been a very safe place to live
this being the reason Ty lives out here. A gated community gives
the sense of a safer place and this will be right next to him.
This may be a marketing tool to use but Schertz should be putting
on a positive note rather than that of "we are going to protect you
from the elements".
.
Robert King, 2700 Kline Circle, stated he is for the request by Mr.
Lancaster simply because of the fact that it is a known factor.
Right now it is zoned commercial, unknown future. In hearing from
some people, they would love to have a medical clinic go in there.
-3-
.
.
.
e
e
This is true but no one has gone out to solicit anyone from the
medical field to build in this area. With all these dreams, this
is not going to happen. With having a good known factor that good
solid citizens would be in this area rather than an unknown factor
and a strip commercial of who knows what.
E.E Workman, 2728 Poplar Grove, said when Mr. Lancaster made his
presentation to their board he showed a tremendous courtesy in
stating what he was going for. The board could not really fault
the concept that he was going for. He was commended for this. The
board could contemplate what was coming and fault it if the board
saw some specific problem items. The consensus of the board at the
time was that it had no objection to the plan Mr. Lancaster
presented. Since those days, in talking with more people
throughout Woodland Oaks, the more they are saying they wouldn't
mind one or two story single family units in contrast to an unknown
commercial development. The people in the area enjoy the rise of
the ground and the trees blocking the houses. Mr. Lancaster has
assured them of his proposal that this will be honored if he was
granted the right to build. Also that the developers that plan
construction of this type will comply with all of the desires and
the will of the Planning and Zoning and the City Council and the
rules in order to take care of such things as wide enough roads,
spacing, traffic, safety and the whole works in conjunction with
the rest of the residents. Mr. Workman stated he supports this
request as do many homeowners who are not present. At the same
time it is recognized that there is a community of difference in
view points. Thank goodness for this.
Mike Lancaster stated that in hearing some of the concerns, if a
commercial business was to go in this area, those beautiful oak
trees will not be there, because no one is going to pay for the
land to put a commercial business to see trees and not their sign.
This is an unfortunate reality of a commercial development aspect.
Even though houses can not compete with property taxes on sales tax
and personal property, these taxes would be starting in the next
year or two, instead of the next three to five years and slowly
being phased in. Not knowing what kind of time value there is over
a period of time, commercial use will probably fare better from a
taxing stand point. But from the stand point of the neighborhood
and the residents backing up to those commercial properties, they
will not fare as well, nor will the value of their homes or the
entry into the existing subdivision. From a traffic stand point
there will be forty houses exiting out onto Dimrock. To be able to
get back through the subdivision you would really have to wind
through to get to Ashley Park and to Schertz Parkway. Most of the
traffic will exit north on Dimrock and either go east or west on FM
3009.
Mike Lancaster stated there is going to be 1.2 acres out of the
tract of land being left for a small neighborhood services type of
business. This will provide services to complement the
subdivision. Mike Lancaster will be building a building in this
area that may provide services like a medical clinic. This will
-4-
e
e
. provide the personal property and sales taxes mentioned previously.
.
.
Pia Jarman
questions.
asked if the Commissioners
There were none at this time.
had
comments
any
or
Chairwoman Pia Jarman adjourned the public hearing on this item at
7:23 p.m.
13
PUBLIC HEARING:
To Receive Citizen Input on a Request from
Sam Bledsoe, MBC Engineers, to rezone
approximately 121 acres on FM 3009 from
PUD (Planned Unit Development), GB
(General Business), M-1 (Manufacture
District Light) to R-6 (Single Family
Dwelling District Gated). (ZC #135-96)
Steve Simonson stated that in accordance with the ordinance for a
public hearing on a request for a zoning change, all property
owners within the 200 foot radius were notified. There were
forty-two (42) letters sent; five (5) were returned with two (2)
in favor and three (3) opposed. One of the letters returned was
opposed as it was assumed, there would be low income housing.
Sam Bledsoe stated the 121 acre tract will consist of 333 lots of a
mix of 55' X 65' in width, to 65' X 75'. Most of the smaller lots
being in the northern section of the tract with the larger lots
being in the southern section. There will be an Estate section in
the most southerly section by the CPS easement: these lots being
100' X 150' in depth. This section, the Estates area will not be
gated. One of the concerns was with the continuation of
Weiderstein Road through this development as this is part of the
City's major thoroughfare plan. The owner has made provisions to
carry Wiederstein Road up through the end of his property, which
stops about 300' from FM 3009. This continuation could be another
development.
Barry Sanditen, the owner of the property, stated the smaller lots
will range in price from $120,000, to $150,000 with the larger lots
being $200,000. In participating with the planning of this
development there has been a lot of thought given to the terrain of
the property, location, and what will abut it in the future which
will be the back of retail centers. There is a mobile home park
that abuts the property in the southwest corner. It seemed
appropriate to put smaller lots up near the commercial property,
and back toward the treed area and existing residential areas to
increase the size of the lots and increase the value. One of the
big problems with this site was having to accommodate the major
thoroughfare plan of the City of Sch~rtz for Wiederstein Road. In
having a couple of national builders, that insisted on this site
being gated, to which not everyone is in favor or opposed but then
"you can't satisfy everyone in any given situation". This
development will accommodate both in going to the extra cost in
dedicating the ROWand the expense to build Wiederstein Road in
hopes to be able to do this in phases. The negative factor
-5-
.
.
.
e
e
involved in this tract of property is the power lines that run
through it. This keeps the builders from being able to put houses
right up to it. This is also abutting up to a lot of retail on the
corner and also backing up to the HEB's service entry. The Barshop
owners have deed restricted the developers only to build single
family residential on the whole 121 acres, which is currently zoned
industrial.
Ann Ladds, 921 Fawn Drive, asked if there are deed restrictions?
Barry Sanditen stated that "yes" there are deed restrictions. Ann
Ladds questioned what the building setback restrictions are for the
back, front and sides of the property? Barry Sanditen stated
25'front and back. Ann Ladds stated there is a 75' greenbelt
promised to the residents on Fawn Drive and is this still in the
plan? Barry Sanditen stated if this is not, it can be
accommodated.
Sam Bledsoe stated that there was an understanding that a 75'
greenbelt would be established between the Deer Haven residences
and any commercial/industrial development that could abut their
property.
Ann Ladds stated being this is now being zoned residental "are you
going to be doing away with the greenbelt".
Barry Sandi ten stated there will be a berm but it may not be the
75' greenbelt as that was for commercial development.
Ann Ladds stated most of the homeowners that live there, would like
to know exactly what is going to be put behind them as far as any
sort of buffer zone. With a 20' setback in the back, "most of us
who spend most of our time in our back yards around our pools,
could have a house within 20' of our fences". Most of the
residents that Ann Ladds has talked with have no objection to
residential development. "We welcome it and would love to see it".
Personally, Ann would rather look in her back yard over her fence
and see a residece than a loading dock or a dumpster. But before
it is rezoned Ann Ladds would like the Commission to take into
consideration that the reason they moved out in this area in the
first place was for peace and quiet. The residents would like for
a greenbelt to be put in behind their property. This may be a
place where the jogging path could go. The residents are not in
favor of having houses put right up to their fences. The 75' that
was promised by Barshop was going to be landscaped and bermed so
the commercial would be blocked from view of their property.
James Harden, 16940 IH 35 North, stated he owns the property to the
west of the proposed zoning change. The proposal is showing small
lots abutting his property. Mr. Harden owns a nursery which is
agricultural and also a business. All the small lots that will be
abutting are going to want to have a patio. The nursery is going
to be expanding into this area. There will be tractors, spraying
of insecticide which is state regulated. The residents are not
going to want this type of business behind them. Mr. Harden
-6-
.
.
.
e
e
stated he is not opposed to the subdivision, his main concern is
all of the smaller lots backing up to his property with a 20' rear
building setback. Mr. Harden stated he would like to see a 50'
rear building setback so in 18 years someone is not going to come
to him and advise him he needs to put a greenbelt on his property.
James Harden stated for the record he is opposed to the entire
subdivision.
Bill Armstrong, 1025 Fawn Drive, stated 3 1/2 years ago he bought
his house from Mr. Harry Richburg even though the house was too
small, the neighborhood was beautiful. The one thing that sold him
on the house was the 75' to 100' easement at the rear of the
property as a greenbelt. Having two little children the
neighborhood was a nice place to be able to raise a family. There
are times anyone could walk up Fawn Drive and you may not see a lot
of people in their front yards because everyone is in their back
yards. You will see every morning and evening deer roaming in this
area. Mr. Armstrong stated he is not opposed to the rezoning as
such, it is the 75' greenbelt that is a concern. This was promised
to their community as such. Most of the residents bought property
in this area because of this. If the Commission could please take
this into consideration on making their recommendation to the City
Council.
Charles McDonald, 2629 Cotton King, stated he is opposed
rezoning because of the utilization of the land. This
commercial property on IH 35. If the property was cut
the mobile home park this would keep more of the
property that we need in this area.
to the
is prime
back with
commercial
Pia Jarman asked Steve Simonson for specific classification on the
zoning of this property at the present time. Steve Simonson stated
all of the property that Barshop retains, if this portion is
rezoned, all the remaining property will be commercial property.
The property is a PUD (Planned Unit Development) but it is
commercial PUD. All the land about 800' deep along IH 35 from the
Mobile Villa Subdivision to the HEB complex will be retained as
commercial. About 300' to 350' of FM 3009 from the Seguin Bank
down to the Froboese property will remain commercial.
Barry Sandi ten stated Barshop still owns all of the commercial
property in front of this proposed subdivision. They will not sell
this property.
Harry Richburg, 1005 Fawn Drive, stated his property backs up to
the proposed Estate part of the subdivision. Mr. Richburg is in
favor of the development of the Estate lots but like the other
residents Mr. Richburg still feels there needs to be a greenbelt.
Joanne Harden, 16940 IH 35 North, stated this proposal is very
negative when the homes are going to be so close. The Hardens
don't mind homes per se, but with everyone today, they like their
piece of the woods and to be able to use their property. No matter
-7-
e
e
.
what you do there are some people that you cannot please.
property has at times become a dump site with people putting
trash etc. In spite of these experiences they have been
neighbors. When you have people too close to the fence line
tend to have their noses in other peoples' business".
Their
oil,
good
"they
Merwin Willman stated this is going to be a gated community with a
fence all the way around it, with an electric gate at the entrance.
The business of jumping a fence or going through a fence is not
going to be done unless they go over a 6' fence.
Willadean Land, 1213 Fawn Drive, stated she doesn't want to be
treated like the people in Deer Haven with the water drainage.
Being on the corner water comes into her property now. With more
pavement there is going to be even more water.
Art Weidman, 1117 Fawn Drive asked with this being
community if Wiederstein Road is going to go all the way
then the Estate property cannot be gated.
a gated
through,
Pia Jarman advised that the Estates will not be gated, the gated
part will be for the other portion.
Chairwoman Pia Jarman asked the Commissioners if they had any other
comments or questions.
4It Chairwoman Pia Jarman closed the hearing on agenda item #2 at 8:04
p.m.
14
PUBLIC HEARING:
To Receive Citizen Input on a Request from
the City of Schertz to rezone
approximately 8~61 acres on Schertz
Parkway and Elbel Road from R-4
(Apartment/Multi-Family Dwelling District)
to NS (Neighborhood Services) (ZC #136-96)
Steve Simonson stated that in accordance with the ordinance for a
public hearing on a request for a zoning change, all property
owners within the 200 foot radius were notified. There were nine
(9) letters sent; two (2) were returned with the two (2) letters
in favor. Sycamore Creek was one of the letters returned in favor.
John Durbin stated he is representing Mr. Veytia and they
opposed to the rezoning change. At this time Veytia Partners
requesting the R-4 zoning to remain on a permanent basis. It
been two years in which they asked for the zoning to continue
the present classification. Although they have been unable to
the project off the ground, Mr. Durbin still feels this is
highest and best use for the property and the best thing
Schertz. It is their goal to continue to pursue financing for
project as well as for Joint Venture Partners.
are
is
has
at
get
the
for
the
.
Pia Jarman
construction
stated on the original zoning it was contingent
starting within 6 months, which was back in the
-8-
upon
fall
.
.
.
e
e
of 1994. Since this time there has been several six month
extension requests that have been granted. When the last extension
expired several letters were sent to.Mr. Veytia with no response.
Therefore the Commission assumed there was no more interest in this
property. The Commission would like to stay informed, otherwise
there seems to be no seriousness of intentions in developing the
land.
John Durbin stated the goal is to pursue some kind of means to put
multi-family on this property.
Pia Jarman asked if Mr. Durbin could give any new information
other than information that has been given before.
John Durbin stated there is not any new information of significant
form. The most recent step is a preliminary discussion with an out
of town developer making the land into a joint venture with HUD
financing.
Merwin Willman stated he is reluctant to grant another extension
with all the letters that have been sent and no new information to
keep us informed being returned. This seems to be an indication
that they no longer have an interest in the property.
Chairwoman Pia Jarman asked the Commissioners if they had any other
comments or questions.
Chairwoman Pia Jarman closed the hearing on the Veytia property at
8:11 p.m.
15 ADJOURNMENT OF PUBLIC HEARING:
Chairwoman Pia Jarman adjourned the Public Hearings at 8:11 p.m.
The Schertz Planning and Zoning Commission convened in a regular
session, after the Public Hearing, in the Bob Andrews Municipal
Complex Conference Room, 1400 Schertz Parkway, Schertz, Texas. The
agenda was as follows:
f6 CALL TO ORDER:
Chairwoman Pia Jarman called the July 23, 1996 regular meeting to
order at 8:19 p.m.
f7 APPROVAL OF MINUTES: Public Hearing and Regular Session
July 9, 1996.
Merwin Willman moved to approve the July 9, 1996 Public Hearing and
Regular Session minutes. Tony Moreno seconded the motion which
carried with a unanimous vote.
f8
STATUS OF FINAL PLATS:
Pia Jarman stated there were none at this time.
-9-
e
e
.
19
CITIZENS: INPUT OTHER THAN AGENDA ITEMS
There were none.
#10
CONSIDER AND MAKE RECOMMENDATION: Request from
Lancaster on the above ZC #133-96.
Mike
Steve Simonson stated Mr. Lancaster has submitted the by laws,
covenant, and a suggested budget for the Homeowners Association.
The budget on the maintenance for the subdivision has been
submitted to Ford Engineering. Mr. Ed Ford returned the proposed
budget stating it is fully funded from day one for this
subdivision. Our lawyers are working on the final stages now on
the maintenance which is required in our UDC.
Tony Moreno asked if the rezoning to the City Council would include
the 55' lots as part of the motion? Pia Jarman stated if this is
the Commission's request than it would have to be part of the
motion.
.
David Richmond asked Mr. Lancaster what his estimate would be for
the starting prices on the homes? Mike Lancaster stated the price
of the lots dictate the price of the end product. By cutting the
density down increases the lot price. The builder rethought the
entire project and came up with new floor plans and felt there
would be a successful project with the houses starting at the
$100,000 to about $115,00.00 range. With the masonry it will be
about 75% instead of the 25%.
David Richmond stated in one of the comments made at the Public
Hearing it doesn't seem as if Mr. Lancaster's thoughts for the
piece of neighborhood services district that is being left has ever
been discussed. Mr. Lancaster's comment of intention to build a
building on this property for NS, so it is his intent to develop
that portion.
Mike Lancaster stated he can only do so much at a time.
two tenants that have been in contact with him that
interested. There are some site plans being prepared
There are
are quite
David Richmond stated he is pleased to hear this as that was some
of the concerns with the citizens. Most of the people were under
the assumption that everything on FM 3009 was being rezoned
residential.
.
Merwin Willman stated it bothers him when people feel "we are
giving away all of the commercial property". Many years ago this
whole area on both sides of FM 3009 was zoned GB (General
Business). The plans were for this to be all up and down FM 3009,
until Schertz Parkway came in. When Schertz Parkway came in it was
decided that it would be our main business area and FM 3009 would
go back to residential and small businesses this was the reason it
was changed to NS. There are still areas further down on FM 3009
for business development. When the changes were made the residents
-10-
e
e
4It had no objections.
Tony Moreno moved to forward to City Council with approval from
Planning and Zoning the request submitted by Mike Lancaster to
rezone approximately 10.2 acres on Dimrock and Woodland Oaks Drive
from NS (Neighborhood Services) to R-6 (Single Family Dwelling
District Gated), with the proviso that a variance for 55' width
lots with total lot dimension of 6,000 square feet minimum be
granted. David Richmond seconded the motion which carried with a
unanimous vote
.
.
fl1 CONSIDER AND MAKE RECOMMENDATION: Request from Sam Bledsoe
on the above ZC #135-96.
Steve Simonson stated he had no other information than that
presented at the public hearing.
David Richmond stated his concern echoes what was said in the
public hearing. The residents on Fawn Drive felt a buffer was
appropriate and promised, at least when the property was intended
to be commercially developed. There is a similar reasonable
concern on the other side voiced by the Hardens for some type of a
buffer between their property which obviously is different from the
proposed residential subdivision. The concern about the smaller
lots was not quite understandable. Regardless of a small lot or
large lot, there is still a person in the back yard who may ingest
the insecticide or whatever they are spraying. Whether they are
small lots or large lots is inmaterial. The fact that it is
residential lots and the people will be bordering on a piece of
property that is an agricultural piece of property that is likely
to be further developed as a nursery. This issue raises concern on
that side of the property as much as the concerns voiced by the
residents along Fawn for the possible buffer between them and the
proposed Estate section. While David will commend the developer on
the proposal as he has done a lot of hard work since the last
meeting in acquiescing to the City plan of continuing Wiederstein
Road through the property, doing so to his detriment by not being
able to fence off or gate off the Estate side of the property.
There is still adequate concern by the people around the potential
property for some type of land buffer be it a berm or a particular
width of greenbelt to separate whatever is existing out there.
This is something the Commission should take into account.
Barry Sandi ten stated he would be willing to go 8' on the fence on
the smaller lots that abut Mr. Harden's property.
David Richmond stated the Estate back property line being the back
lot line of the existing Fawn residents, this is the same type of
situation we had with Carolina Crossing addressing the top part of
the property that is adjacent to the west side of Deer Haven. Even
though Antler and Fawn stub out in that area there was concern from
the residents that they would have back lot lines immediately
adjacent to their side yard or back yard. What the developers from
Carolina Crossing did was to allow for a 60' buffer between the
-11-
.
e
e
side lot line for residents on Fawn and Antler and on the back line
of their row of houses that came around the top of the hill. This
was satisfactory with the residents and the developer. There is
similar concern now with regard to those coming down from Fawn and
having the potential of their back lot lines, most having
chain-link fencing being the same back lot lines as the Estates.
Not withstanding that there maybe a 50' back yard setback, it is
going to be one back yard adjacent to another back yard. The
consensus of arguments in the public hearing was that while it was
zoned commercial, they had every understanding from Barshop that
whatever went in this area, the residents would be granted a 75'
buffer as some type of protection. This would give the residents
the feeling of not having someone directly on their property. This
seems to be the major concern of the residents. The other concern
is the new conceptual drawing, despite the fact that it is a very
good job of accommodating the Commission's wishes to put
Wiederstein through, there is going to be seven roads stubbing
right on to Wiederstein. This has the potential of congestion and
traffic problems with all the exit and entrances onto Wiederstein
Road, once it is cut through to FM 3009.
Merwin Willman stated those concerns are in platting. At this time
we need to be concerned with the rezoning and the granting of a
variance. Looking at the proposal the number of lots 55' wide is
going to be greater than the 30% of the total.
. Steve Simonson stated this variance was not asked for in the
request. However, it is shown on the Master Plan and this needs to
be addressed as it is part of their Master Plan.
.
Sam Bledsoe stated when the first presentation was made, it was
stated that this concept would be a little different than some of
the other developments in the area. There would be a mix of 55',
65' etc. because of the large commercial area the smaller lots
would be in this area; in the wooded area would be the larger lots.
Each particular unit itself would not have the 30%.
Merwin Willman stated lots having 55' frontage should be 30% of the
entire subdivision. An R-6 lot requires 60' X 100' if you have a
55' X 120' there still will need to be a variance of the 55' lots.
The ordinance states it has to be a 60' width lot.
Steve Simonson asked Sam Bledsoe if it would be possible with the
lots 55' and 60' mix in the over-all layout (minus the Estate lots)
to come up with an overall of no more than 33% of 55' wide lots.
This would allow for the permissible percentage of the 55, and
60's.
Tony Moreno moved to forward to City Council with approval from
Planning and Zoning the request submitted by Sam Bledsoe, MBC
Engineers, to rezone approximately 121 acres on FM 3009 from PUD
(Planned Unit Development), GB (General Business), M-l (Manufacture
District Light) to R-6 (Single Family Dwelling District Gated),
with the proviso for a variance granting 55' lots not to exceed
-12-
e
e
.
30% of the total lots and a 50' rear yard setback adjacent to Deer
Haven. Merwin Willman seconded the motion which carried as
follows:
AYES:
NAYS:
Pia Jarman, Merwin Willman, Tony Moreno.
David Richmond.
David Richmond stated the reason he is opposed is the fact of there
not being some type of provision in the motion for the Deer Haven
and the Harden property. The motion as it reads has a 50' setback
but there is still the solid lot line. This leaves a common back
yard line.
Merwin Willman stated this is more than there should be granted as
the original 75' buffer was for commercial property that was to be
in the area. With the residential subdivision going to be in the
area this is a different situation.
Pia Jarman asked David Richmond if the variance was for a 75' back
yard setback would this serve as the 75' greenbelt?
Tony Moreno mentioned there would still be a fence right at the end
of the lots in Deer Haven.
.
David Richmond
shortest line
cul-de-sac to
deep this will
does need to be
stated his concern on the conceptual drawing is
between the two points, is the center of
the back line of the lot. This is not showing
be. In the platting this will be addressed but
a concern for the Commission at this time.
the
the
how
it
Steve Simonson stated the greenbelts are going to start coming back
to haunt us. This is from the staff and City side. There are
concerns coming from HOA's, from the management, that is taking
them over. They are coming back with clear understandings from the
developers that somethings were clearly labeled commons areas and
then there are some that weren't. The first thing coming back, "is
this is City ROW, you take care of it, you developed it, you build
it". From a City stand point if this was to be left there must be
a clear way the HOA with this being outside of the gated community,
who will take care of the greenbelt and what will become of it. If
there is going to be a greenbelt, in the platting stages, there is
going to have to be a clear understanding that if it is going to be
labeled a common area someone will be responsible for it. If there
is a building setback and the developer specifies some type of
fencing there will be the same kind of look and the house would be
put far enough away.
After
"Aye".
some more discussion David Richmond changed his vote to
The motion carried unanimously.
an
.
tl2
CONSIDER AND MAKE RECOMMENDATION: Request from the City of
Schertz, on the above ZC #136-96.
Steve Simonson stated he had no other comments.
-13-
e
e
.
Merwin Willman stated he is not in favor of granting another
extension as there have already been two. In hearing tonight from
the individual there was no real indication that anything is going
to happen. In September 1994 that was when the zoning was changed
from NS to R-4.
Pia Jarman stated there has been no Indication since September 24,
1994 that anything is going to happen. The request from the
petitioner is for the property to stay permanently R-4. The only
thing we received was back in May 23, 1995 when the developer
applied for HUD financing and so briefed the Commission. Since
that time there has been no firm or real indication that any
development is going to take place.
David Richmond stated he is in agreement with Merwin Willman
the developer can submit a reasonable proposal the Commission
review the proposal. In the meantime he needs to look at
means of developing the property
when
can
some
Merwin Willman moved to forward to City Council the request
submitted by the City (Planning and Zoning) to rezone approximately
8.61 acres on Schertz Parkway and Elbel Road from R-4
(Apartment/Multi-Family Dwelling District) to NS (Neighborhood
Services). Tony Moreno seconded the motion which carried with a
unanimous vote.
.
113
CONSIDER AND MAKE RECOMMENDATION: Request from Sam Bledsoe
MBC Engineers for a Specific Use Permit for an
Intermediate School In Greenshire Subdivision.
(SUP #7-96)
Steve Simonson stated he received a call from the School to inform
the Commission that the School Board has not had a seconded meeting
as they had proposed. The School Board has proposed a scheduled
meeting this Thursday. The business manager Hal Baldwin has asked
that this request be tabled until the ,next meeting.
David Richmond stated he is concerned about the continuing tabling
of requests. The school board representative, upon observation of
the calender proposed a special meeting was to be held on a
specific date thus the request was tabled until this meeting. If
the school board was concerned to the point of getting this off and
running, it would have seen fit to hold their special meeting as
the Commission suggested to allow for the concerned citizens to
express their views and have an opportunity to engage the school
board in a discussion. Since this was not done, David's
recommendation would be in lieu of continuing to table, that we
disapprove the request and let the school board have a special
meeting, then bring forth another request for a SUP if they still
have the same intended actions.
.
Pia Jarman stated with tabling in Robert's Rules you can table but
we can not put a specific time limit. This was done the last time.
We can table and say until the school board has their meeting with
-14-
e
e
. the homeowners instead of stating a specific time.
Merwin Willman stated he would go along with David and disapprove
until the school board has a good concept on what they want to do.
David Richmond stated that at our meeting clearly there were so
many questions that could not be answered by the school board
representative or were answered by the school board representative
contrary to previous information that had been provided to the
City.
Doyle Woodman stated that Dr. Steele had advised he would let the
citizens know two weeks in advance when they would be holding a
meeting for this request. As of today Dr. Steele has not
contacted anyone.
David Richmond moved to disapprove the request submitted by Sam
Bledsoe, MBC Engineers for a Specific Use Permit for an
Intermediate School in Greenshire Subdivision and convey the
Commission's rationale to the School Board that the reason for
disapproving is to allow them to meet the request of the residents
who wish to better understand the proposal and to allow the School
Board time to get a good proposal ready to come back to the
Commission. Merwin Willman seconded the motion which carried with
a unanimous vote.
.
114
CONSIDER AND TAKE APPROPRIATE ACTION: Request from
Continental Homes, for Final Plat on Carolina
Crossing Subdivision Unit 1. (PC #268-96).
Steve Simonson stated the items requested: building setback line
along Schertz Parkway, the notes required for the gated community
are shown. Also the park land fees have been paid. There is also
a note on the plat about saving the trees that can be saved on the
50' building setback.
Tim Pruski stated the only common area will be off Savannah Drive
when you enter the subdivision where the gates will be located
along with the streets. Two islands, one with the gate pedestal
and one with the actual gate with landscape around it. This is on
Sarasota Place.
Tony Moreno moved to approve the final plat submitted by
Continental Homes, for Carolina Crossing Subdivision Unit 1. David
Richmond seconded the motion which carried with a unanimous vote.
115 CONSIDER AND TAKE APPROPRIATE ACTION: Request from Pape
Dawson Engineers, for Site Plan for American
Standard Office/Warehouse. (PC #276-96)
.
Steve
have
that
page
Simonson stated this is one of the better lay-outs that we
seen for some time. This is obviously a very large lay-out
they are proposing. This is a three part lay-out; the second
shows the handicap parking, the proposed sign, and the docking
-15-
.
.
.
e
e
for the warehouse. On the third page it shows the landscaping plan
that has been proposed for the subdivision. They have not given
the outside dimensions but it is not hard to figure it out.
John Krauss
360' X 680'.
building.
stated on the site plan it shows the building being
There will also be some lease space available in the
Merwin Willman stated there will have to be a variance to the sign
ordinance as they are requesting two monument signs one at each
entrance. Also there is only one plan for a dumpster in the front.
John Krauss stated the offices will be in front of the building
with warehouse leasing in the rear. The tenants will have to
comply with the regulations for dumpsters.
stated this is a double width lot. Also with the
has been several requests from previously approved
delay their landscaping until the drought is broken.
was in agreement with this request.
Steve Simonson
drought there
site plans to
The Commission
John Krauss at this time thanked the Planning and zoning
Commission, the City of Schertz, and Mr. Simonson for help with
the submittal of this site plan. The firm is looking for a good
partnership with the City of Schertz.
Merwin Willman moved to approve the request submitted from Pape
Dawson Engineers, for site plan for American Standard
Office/Warehouse and the variance for two monument signs. Tony
Moreno seconded the motion which carried with a unanimous vote.
116 CONSIDER AND TAKE APPROPRIATE ACTION: Request from Mike Cude
M.W. Cude Engineers Final Plat Woodland Oaks
Unit 5-B. (PC #270-96)
Steve Simonson stated all the signatures that are required are on
the plat for submittal, the various notes, flood plain statement,
and this is not within the ACUIZ zone.
Merwin Willman stated on the location map it doesn't show Woodland
Oaks Drive.
Pia Jarman questioned the note showing area to be replatted.
Steve Simonson stated in the platting of Unit
strange area at the end of the existing street
said they would replat when they redesigned it.
that they are showing.
5-A there was a
in 5-A that they
This is the area
Pia Jarman stated at the bottom it reads the City of San Antonio
Planning Commission. This will need to be corrected.
Tony
M.W.
Moreno moved to approve the request submitted by Mike Cude,
Cude and Engineers for final plat Woodland Oaks Unit 5-B with
-16-
.
.
.
e
e
the proviso to the note on the plat to reflect the correction: City
of Schertz Planning and Zoning Commission. David Richmond seconded
the motion which carried with a unanimous vote.
f17
CONSIDER AND TAKE APPROPRIATE ACTION: Request from Mike Cude
M.W. Cude Engineers Final Plat, Woodland Oaks
Unit 6-B. (PC #271-96)
Steve
need
name.
Simonson stated they didn't spell Schertz correctly and they
to have the correct Planning and Zoning Commission and City's
Tony Moreno moved to approve the request submitted by Mike Cude,
M.W. Cude and Engineers for final plat Woodland Oaks Unit 6-B with
the proviso to the note on the plat to reflect the correction to
the spelling of Schertz, and the City of Schertz Planning and
Zoning Commission. Merwin Willman seconded the motion which
carried with a unanimous vote.
118 GENERAL DISCUSSION:
Tony Moreno:
Tony Moreno stated he had no comments.
Merwin Willman:
Merwin
going
Garden
with a
Willman stated there seems to be a lot of commercial signs
up that are not authorized. The bar-b-que place up near
Ridge has a home made sign, the Pecan Candy has a trailer
little sign and also Arby's has a sign now.
Steve Simonson stated the Arby's sig~ will be taken down in about
two days.
Merwin Willman stated there is one other problem: the waste of
paper. We are creating a big waste of paper when we have an item
that comes before us and we have to hold it over for another
meeting and Denise has to reproduce it again for the second
meeting. This does not seem to be necessary. We should be able to
hold the paper work over in our files until the next meeting
without her having to reproduce them.
Steve Simonson stated this would be a good idea in saving money and
time. Part of the budget to support the Commission is going up all
the time.
Merwin Willman stated with three gated communities now they are all
talking about some kind of security system on the gate. There
needs to be something in writing on what they use and how they are
going to use it. Seems to be everyone has a question about them.
David Richmond:
-17-
e
e
. David Richmond stated he had no comments.
Pia Jarman:
Pia Jarman stated this evening there were two Commissioners that
were called out of town unexpectedly. Keith could not make it
either, making us down to the bare bones. With some very important
discussions to make this evening we did have a quorum. But it
would have cost the City quite a bit of money if we had to cancel
the meeting this evening. In case of an emergency, David had a
very good idea that perhaps Councilman Ken Greenwald, who is with
the Commission all the time and in having been a Commissioner
himself, perhaps could be part of a quorum.
Councilman Ken Greenwald stated he did not know if this could be
done, since he would also have a vote on the City Council for the
same issue.
David Richmond stated he had suggested it to Pia that we request
approval from the Council in an emergency situation, given that
Councilman Ken Greenwald is ex-officio, and with the Commission all
the time so there is consistency on what is going on. This is the
first time that a cancelation of significant consequences might
have happened, given the size of the citizens with the three public
hearings. This would have made the Commission look bad and the
City also. If there could be a provision that in an emergency, we
could ask Councilman Ken Greenwald to become a voting member.
.
Councilman Ken Greenwald stated he would check with Kerry Sweatt on
this situation. If the lawyers advise that this would not be a
problem, then Ken stated he would not have a problem with this.
Councilman Ken Greenwald:
Councilman Ken Greenwald stated the two Macedonian Mayor's
will be August 3, - August 10, 1996.
visit
Councilman Ken Greenwald stated the City had a little league
team that made the playoffs and came in fourth place. The
step is the State Championship.
ball
next
Councilman Ken Greenwald stated he would be going to New Braunfels
for the Edwards Underground Aquifer meeting. Mr. Sweatt and Ken
will be going to San Marcos on Thursday to see if they may have an
idea on what they are going to do about the water situation. The
idea of holding up on any type of planting is a very good idea.
Steve Simonson:
.
Steve Simonson stated the APA conference information has been
passed out. If everyone could please get back by August 13th with
individual plans. If everyone would still like that special
gettogether on Thursday night Steve will need to know, so a room
can be reserved.
-18-
.
.
.
e
e
Steve Simonson at this time presented the Commission with a new
drawing of the HEB site plan. They have increased in size by about
200' by squaring the building. They have 15,000 square feet of
expansion. There will be covered walkways from the parking lot
with several handicap parking spaces and also they will have their
own gas station. There are two pad sites on the access road: one
39,628' and one 47,753'. The preliminary construction plans are
now in and the site plan should be available by August or early
September.
David Richmond questioned why Seguin State Bank looks as if they
are slowing down on construction. 'Steve Simonson stated it is
taking them some time with the marble on the sides.
Steve Simonson at this time handed out UDC updates with changes
made by the lawyers and Mr. Sweatt. The major change with gated
communities is they will have to go through a public hearing as it
is a zoning issue.
f19 ADJOURNMENT:
David Richmond moved to adjourn the meeting. Tony Moreno seconded
the motion, which carried with a unanimous vote.
Chairwoman Pia Jarman adjourned the meeting at 10:20 p.m.
The next regularly scheduled meeting is August 13, 1996 at 7:00
p.m.
\) , --1
'),<:- 9- YA-1( A A a~\. / ,
Chairwo~n, Planning and~Zoning Commission
City of)Schertz, Texas
ATTEST:
JJ
\~
I,
" ~: .. ,........... ,,--. / " ,'"
-.. e/h.c~' /.Ld! b/'ri">,,,(/t
Planning Secretary v
City of Schertz, Texas
-19-